Location: westbound entry slip at junction J1 (Farnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.52 miles from Stanbury.

Location: westbound between junctions J21 (Milnrow) and J20 (Rochdale) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 26 May 2025.
Nearest town: 17.56 miles from Stanbury.

Location: westbound exit slip at junction J20 (Rochdale) .
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 26 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.69 miles from Stanbury.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 May 2025.
Nearest town: 12.31 miles from Stanbury.

Location: westbound between junctions J21 (Milnrow) and J20 (Rochdale) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 00:00 on 30 March 2026.
Nearest town: 16.27 miles from Stanbury.

Location: eastbound between junctions J28 (Leeds) and J29 (M1) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.48 miles from Stanbury.

Location: eastbound between junctions J28 (Leeds) and J29 (M1) .
Due to: Roadworks scheme.
Period : from 12:32 on 27 February 2025 to 06:00 on 31 December 2025.
Nearest town: 19.48 miles from Stanbury.

Location: westbound exit slip at junction J26 (M606 Bradford) .
Due to: Roadworks scheme.
Period : from 20:01 on 22 April 2025 to 20:00 on 30 August 2025.
Nearest town: 12.97 miles from Stanbury.

Location: westbound between junctions J10 (Burnley) and J9 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 11.14 miles from Stanbury.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 12.76 miles from Stanbury.

Location: eastbound between junctions J6 (Blackburn) and J10 (Burnley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.81 miles from Stanbury.

Location: westbound between junctions J6 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.99 miles from Stanbury.

Location: westbound between junctions J10 (Burnley) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 12.82 miles from Stanbury.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 19.66 miles from Stanbury.

Location: The A627M northbound between junctions J3 and A664 Rochdale.
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 17.91 miles from Stanbury.

Location: The A627M southbound between junctions J3 and J1 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 17.94 miles from Stanbury.

Location: The A627M northbound between junctions J1 and J2 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 19.81 miles from Stanbury.

Location: The A627M northbound between junctions J2 and J3 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 1 April 2026.
Nearest town: 18.53 miles from Stanbury.

Location: westbound between junctions J22 (Ripponden) and J21 (Milnrow) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.4 miles from Stanbury.

Location: westbound entry slip at junction J21 (Milnrow) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.37 miles from Stanbury.

Location: westbound exit slip at junction J21 (Milnrow) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.08 miles from Stanbury.

Location: westbound entry slip at Hartshead Moor Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 June 2025 to 06:00 on 2 June 2025.
Schedule : From 20:00 on 1 September 2025 to 06:00 on 2 September 2025.
Schedule : From 22:00 on 1 December 2025 to 06:00 on 2 December 2025.
Schedule : From 20:00 on 1 March 2026 to 06:00 on 2 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.3 miles from Stanbury.

Location: southbound exit slip at junction J1 (M62) to M62 West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 June 2025 to 06:00 on 2 June 2025.
Schedule : From 20:00 on 1 September 2025 to 06:00 on 2 September 2025.
Schedule : From 22:00 on 1 December 2025 to 06:00 on 2 December 2025.
Schedule : From 20:00 on 1 March 2026 to 06:00 on 2 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.63 miles from Stanbury.

Location: eastbound between junctions J28 (Leeds) and J29 (M1) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 May 2025 to 2 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 June 2025 to 9 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.48 miles from Stanbury.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 May 2025 to 06:00 on 1 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.25 miles from Stanbury.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 June 2025 to 06:00 on 8 June 2025.
Schedule : From 20:00 on 14 June 2025 to 06:00 on 15 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.25 miles from Stanbury.

Location: southbound between the A680 and the junction with the A681 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.09 miles from Stanbury.

Location: southbound between the A681 and the junction with the A682 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.79 miles from Stanbury.

Location: southbound between the A680 and the junction with the A681 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.17 miles from Stanbury.

Location: westbound exit slip at junction J26 (M606 Bradford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : From 20:00 on 25 July 2025 to 06:00 on 26 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.97 miles from Stanbury.

Location: southbound exit slip at junction J1 (M62) to roundabout.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 00:00 from 9 June 2025 to 13 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.63 miles from Stanbury.

Location: westbound at junction J26 (M606 Bradford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.97 miles from Stanbury.

Location: westbound between junctions J27 (M621 Leeds) and J26 (M606 Bradford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.76 miles from Stanbury.

Location: westbound at junction J26 (M606 Bradford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.
Schedule : Expect disruption everyday between 20:00 and 00:00 from 12 August 2025 to 15 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.97 miles from Stanbury.

Location: westbound between junctions J27 (M621 Leeds) and J26 (M606 Bradford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2025 to 06:00 on 6 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2025 to 16 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.68 miles from Stanbury.

Location: westbound at junction J26 (M606 Bradford) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 27 May 2025.
Nearest town: 12.97 miles from Stanbury.

Location: southbound between the junctions with the A680 and the A681 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.19 miles from Stanbury.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.76 miles from Stanbury.

Location: eastbound between junctions J8 (Bury) and J10 (Burnley) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.73 miles from Stanbury.

Location: eastbound exit slip at junction J9 (Burnley) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.76 miles from Stanbury.

Location: eastbound exit slip at junction J8 (Bury) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.02 miles from Stanbury.

Location: eastbound entry slip at junction J3 (City Centre) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.84 miles from Stanbury.

Location: westbound between junctions J28 (Leeds) and J27 (M621 Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.15 miles from Stanbury.

Location: westbound at junction J28 (Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 May 2025 to 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.48 miles from Stanbury.

Location: eastbound between junctions J9 (Burnley) and J10 (Burnley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 27 May 2025 to 17:00 on 27 May 2025.
Nearest town: 12.04 miles from Stanbury.

Location: The A627M southbound between junctions A664 Rochdale and J3 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 29 May 2025 to 17:00 on 29 May 2025.
Nearest town: 17.27 miles from Stanbury.

Location: southbound between junctions J2 (Euroway Trading Est.) and J1 (M62) to M62 East.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Nearest town: 12.27 miles from Stanbury.

Location: southbound exit slip at junction J1 (M62) to M62 East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.82 miles from Stanbury.

Location: southbound between junctions J2 (Euroway Trading Est.) and J1 (M62) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.27 miles from Stanbury.

Location: eastbound between junctions J26 (M606 Bradford) and J27 (M621 Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.6 miles from Stanbury.

Location: westbound between junction J1 (Farnley) and the M62 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.7 miles from Stanbury.

Location: westbound between junction J1 (Farnley) and the M62 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.7 miles from Stanbury.

Location: westbound between junction J1 (Farnley) and the M62 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.31 miles from Stanbury.

Location: eastbound between the M62 and junction J1 (Farnley) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.73 miles from Stanbury.

Location: eastbound between the M62 and junction J1 (Farnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.54 miles from Stanbury.

Location: eastbound exit slip at junction J27 (M621 Leeds) For A62/A650.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 June 2025 to 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.45 miles from Stanbury.

Location: westbound between junction J1 (Farnley) and the M62 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.56 miles from Stanbury.

Location: westbound between junction J1 (Farnley) and the M62 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.56 miles from Stanbury.

Location: eastbound exit slip at junction J27 (M621 Leeds) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 6 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.47 miles from Stanbury.

Location: southbound.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 May 2025 to 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.08 miles from Stanbury.

Location: northbound between junctions J1 (M62) and J3 (Odsal) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 May 2025 to 29 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.02 miles from Stanbury.

Location: eastbound between junctions J6 (Belle Isle) and J7 (Stourton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 9 August 2025 to 11 August 2025.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 16 August 2025 to 18 August 2025.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 30 August 2025 to 1 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.48 miles from Stanbury.

Location: eastbound between junctions J6 (Belle Isle) and J7 (Stourton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 16 July 2025 to 06:00 on 17 July 2025.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 18 August 2025 to 22 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.48 miles from Stanbury.

Location: westbound between junctions J21 (Milnrow) and J20 (Rochdale) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 00:00 on 29 March 2026 to 00:00 on 30 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.87 miles from Stanbury.

Location: eastbound between junctions J20 (Rochdale) and J21 (Milnrow) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 00:00 on 29 June 2025 to 00:00 on 30 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.32 miles from Stanbury.