Location: northbound exit slip to the A26 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 5 December 2025.
Nearest town: 18.09 miles from Sandway.

Location: westbound exit slip to the A28 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 5 December 2025.
Nearest town: 16.34 miles from Sandway.

Location: westbound exit slip at junction J7 (Maidstone) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 5 December 2025.
Nearest town: 7.2 miles from Sandway.

Location: eastbound between junctions J5 (Aylesford) and J6 (Maidstone) .
Due to: Roadworks.
Period : from 20:06 on 4 December 2025 to 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.89 miles from Sandway.

Location: eastbound entry slip at junction J5 (Aylesford) .
Due to: Roadworks.
Period : from 20:07 on 4 December 2025 to 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 10.01 miles from Sandway.

Location: eastbound exit slip at junction J6 (Maidstone) .
Due to: Roadworks.
Period : from 20:08 on 4 December 2025 to 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.99 miles from Sandway.

Location: eastbound between junctions J3 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane three is closed.
Due to: Emergency barrier repairs.
Period : from 17:44 on 4 December 2025 to 06:00 on 5 December 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 9.83 miles from Sandway.

Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 10 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 10.14 miles from Sandway.

Location: eastbound between the A227 and the junction with the M2 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Nearest town: 17.28 miles from Sandway.

Location: southbound exit slip to the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.61 miles from Sandway.

Location: westbound between junctions J10A and J9 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 05:00 on 6 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.29 miles from Sandway.

Location: westbound exit slip at junction J9 (Ashford) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 05:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.2 miles from Sandway.

Location: westbound entry slip at junction J9 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 05:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.89 miles from Sandway.

Location: westbound between junctions J3 (Maidstone) and J2 (Strood) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.46 miles from Sandway.

Location: westbound at junction J2 (Strood) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.2 miles from Sandway.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.47 miles from Sandway.

Location: northbound between the A228 and the junction with the A26 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Nearest town: 17.63 miles from Sandway.

Location: northbound between the A228 and the junction with the A26 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.63 miles from Sandway.

Location: southbound between the A26 and the junction with the A228 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Nearest town: 17.3 miles from Sandway.

Location: southbound between the A26 and the junction with the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.3 miles from Sandway.

Location: northbound at the junction with the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.58 miles from Sandway.

Location: eastbound entry slip at junction J5 (Aylesford) .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 10.12 miles from Sandway.

Location: westbound exit slip at junction J11 (Canterbury) .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.32 miles from Sandway.

Location: eastbound exit slip to the A227 .
Due to: Litter Clearance.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.76 miles from Sandway.

Location: eastbound exit slip at junction J6 (Maidstone) .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.29 miles from Sandway.

Location: southbound between the junctions with the M20 and the A2042 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.5 miles from Sandway.

Location: southbound between the junctions with the M20 and the A2042 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.5 miles from Sandway.

Location: southbound.
Due to: Roadworks scheme.
Period : from 20:10 on 4 December 2025 to 06:00 on 6 December 2025.
Nearest town: 11.64 miles from Sandway.

Location: southbound.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.64 miles from Sandway.

Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 11.51 miles from Sandway.

Location: southbound.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.64 miles from Sandway.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.93 miles from Sandway.

Location: eastbound exit slip at junction J2A .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.6 miles from Sandway.

Location: westbound between junction J2A and the M25 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.82 miles from Sandway.

Location: eastbound between junctions J2 (Strood) and J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.23 miles from Sandway.

Location: eastbound entry slip at junction J2 (Strood) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2025 to 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.48 miles from Sandway.

Location: eastbound at junction J2 (Strood) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.62 miles from Sandway.

Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Due to: Roadworks scheme.
Period : from 20:08 on 24 November 2025 to 06:00 on 6 December 2025.
Nearest town: 8.92 miles from Sandway.

Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.92 miles from Sandway.

Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 December 2025 to 06:00 on 6 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.84 miles from Sandway.

Location: southbound exit slip to the A26 .
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 3 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.12 miles from Sandway.

Location: eastbound between the A227 and the junction with the M2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 23 December 2025.
Nearest town: 18.04 miles from Sandway.

Location: southbound entry slip from the A2 .
Due to: Roadworks.
Period : expect disruption until 18:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.2 miles from Sandway.

Location: southbound entry slip from the A2 .
Due to: Roadworks.
Period : expect disruption until 18:00 on 5 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.2 miles from Sandway.

Location: eastbound entry slip at junction J9 (Ashford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 05:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.97 miles from Sandway.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 05:00 on 12 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8 miles from Sandway.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 0.86 miles from Sandway.

Location: westbound between junctions J11 (Canterbury) and J10A .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 05:00 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.39 miles from Sandway.

Location: eastbound between junctions J8 (Maidstone) and J10A .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 05:00 on 12 December 2025.
Nearest town: 8 miles from Sandway.

Location: eastbound between junctions J9 (Ashford) and J10A .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 05:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.61 miles from Sandway.

Location: northbound between the junctions with the A26 Tonbridge West and the A225 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.33 miles from Sandway.

Location: westbound between junctions J3 (Maidstone) and J2 (Strood) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 December 2025 to 13 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.65 miles from Sandway.

Location: westbound exit slip at junction J2 (Strood) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 13 December 2025.
Nearest town: 14.2 miles from Sandway.

Location: westbound at junction J2 (Strood) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 December 2025 to 13 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.2 miles from Sandway.

Location: westbound exit slip at junction J2 (Strood) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.2 miles from Sandway.

Location: eastbound between junctions J7 (Maidstone) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.26 miles from Sandway.

Location: eastbound entry slip at junction J7 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.34 miles from Sandway.

Location: westbound between junctions J11 (Canterbury) and J10A .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 05:00 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.13 miles from Sandway.

Location: westbound at the junction with the A2070 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.86 miles from Sandway.

Location: eastbound at the junction with the M2 J1 and A289.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 8 December 2025 to 11 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.07 miles from Sandway.

Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 11 December 2025 to 16:00 on 11 December 2025.
Nearest town: 17.34 miles from Sandway.

Location: westbound between the junctions with the A2070 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 11 December 2025 to 16:00 on 11 December 2025.
Nearest town: 17.25 miles from Sandway.

Location: northbound between the junctions with the A259 and the A2042 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 10 December 2025 to 05:30 on 11 December 2025.
Nearest town: 12.31 miles from Sandway.

Location: southbound between the junctions with the A2042 and the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:30 on 10 December 2025 to 05:30 on 11 December 2025.
Nearest town: 12.26 miles from Sandway.

Location: westbound.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.05 miles from Sandway.

Location: westbound.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.81 miles from Sandway.

Location: westbound.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.56 miles from Sandway.

Location: westbound between junctions J6 (Maidstone) and J2 (Paddock Wood) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 05:00 on 11 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.45 miles from Sandway.

Location: westbound entry slip at junction J4 (West Malling) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 05:00 on 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.85 miles from Sandway.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 05:00 on 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.56 miles from Sandway.

Location: eastbound entry slip at junction J2A .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 9 December 2025 to 05:30 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.25 miles from Sandway.

Location: westbound between junctions J3 and J2A .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 9 December 2025 to 05:30 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.35 miles from Sandway.

Location: westbound exit slip at junction J2A .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 9 December 2025 to 05:30 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.94 miles from Sandway.

Location: eastbound between junctions J2A and J3 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 9 December 2025 to 05:30 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.23 miles from Sandway.

Location: eastbound between junctions J2 (Paddock Wood) and J3 (Sevenoaks) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 10 December 2025 to 16:00 on 10 December 2025.
Nearest town: 18.13 miles from Sandway.

Location: eastbound between junctions J2 (Paddock Wood) and J3 (Sevenoaks) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 10 December 2025 to 16:00 on 10 December 2025.
Nearest town: 17.88 miles from Sandway.

Location: eastbound between junctions J6 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.53 miles from Sandway.

Location: eastbound between junctions J5 (Aylesford) and J6 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.7 miles from Sandway.

Location: eastbound at junction J6 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.29 miles from Sandway.

Location: eastbound entry slip at junction J6 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.18 miles from Sandway.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.14 miles from Sandway.

Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.33 miles from Sandway.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.02 miles from Sandway.

Location: northbound.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.4 miles from Sandway.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2025 to 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.93 miles from Sandway.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2025 to 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.19 miles from Sandway.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.05 miles from Sandway.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.81 miles from Sandway.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.56 miles from Sandway.

Location: eastbound between junctions J9 (Ashford) and J11 (Canterbury) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.88 miles from Sandway.

Location: westbound between junctions J11 (Canterbury) and J10 (Ashford) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.22 miles from Sandway.

Location: eastbound at junction J5 (Aylesford) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 9 December 2025 to 16:00 on 9 December 2025.
Nearest town: 10.36 miles from Sandway.

Location: westbound between the A268 and the junction with the A2101 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2025 to 06:00 on 8 December 2025.
Nearest town: 19.32 miles from Sandway.

Location: eastbound between junctions J2 (Strood) and J3 (Maidstone) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 12 December 2025.
Nearest town: 14.62 miles from Sandway.

Location: eastbound between junctions J2 (Strood) and J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.09 miles from Sandway.

Location: eastbound between junctions J2 (Strood) and J3 (Maidstone) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.23 miles from Sandway.

Location: eastbound at junction J2 (Strood) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.62 miles from Sandway.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.93 miles from Sandway.

Location: eastbound.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.69 miles from Sandway.

Location: eastbound entry slip from the A2050 Canterbury South.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.31 miles from Sandway.

Location: westbound between junctions J5 (Maidstone) and J4 (Gillingham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 14 February 2026.
Nearest town: 7.51 miles from Sandway.

Location: westbound entry slip at Medway Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.63 miles from Sandway.

Location: westbound exit slip at Medway Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.63 miles from Sandway.

Location: westbound between junctions J5 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 20 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 January 2026 to 10 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 January 2026 to 17 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.51 miles from Sandway.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.42 miles from Sandway.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.45 miles from Sandway.

Location: westbound entry slip at junction J7 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.4 miles from Sandway.

Location: westbound between junctions J7 (Maidstone) and J6 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.78 miles from Sandway.

Location: westbound entry slip at junction J7 (Maidstone) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.35 miles from Sandway.

Location: southbound exit slip to the A228 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.61 miles from Sandway.

Location: southbound entry slip from the A228 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.54 miles from Sandway.

Location: southbound between the A26 and the junction with the A262 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 7 December 2025 to 06:00 on 8 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.42 miles from Sandway.

Location: southbound at the junction with the M2 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2025 to 06:00 on 7 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.34 miles from Sandway.

Location: westbound between the A268 and the junction with the A2101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 December 2025 to 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.23 miles from Sandway.

Location: westbound between the junctions with the A2070 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 December 2025 to 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19 miles from Sandway.

Location: westbound between the junctions with the A268 and the A2101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 December 2025 to 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.32 miles from Sandway.

Location: westbound between the junctions with the A268 and the A2101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 December 2025 to 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.23 miles from Sandway.

Location: eastbound between the A2101 and the junction with the A268 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 6 December 2025 to 06:00 on 8 December 2025.
Nearest town: 19.47 miles from Sandway.

Location: eastbound between the A2101 and the junction with the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 December 2025 to 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.47 miles from Sandway.

Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 December 2025 to 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.05 miles from Sandway.

Location: eastbound between the junctions with the A2101 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 December 2025 to 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.23 miles from Sandway.

Location: eastbound between the junctions with the A2101 and the A268 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 December 2025 to 8 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.22 miles from Sandway.

Location: northbound between the A262 and the junction with the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.93 miles from Sandway.

Location: southbound between the A228 and the junction with the A262 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.08 miles from Sandway.