Location: westbound entry slip at junction J11 (Winchester) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 8 June 2025 to 06:00 on 9 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.57 miles from Penton Mewsey.

Location: westbound between junctions J6 (Basingstoke) and J7 (Basingstoke) .
Lane Closures : The hard shoulder is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 8 June 2025.
Nearest town: 16.55 miles from Penton Mewsey.

Location: westbound entry slip at junction J7 (Basingstoke) .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 8 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 16.03 miles from Penton Mewsey.

Location: westbound exit slip at junction J7 (Basingstoke) .
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 8 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 16.28 miles from Penton Mewsey.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Due to: Roadworks scheme.
Period : from 20:08 on 4 June 2025 to 06:00 on 9 August 2025.
Nearest town: 18.82 miles from Penton Mewsey.

Location: southbound between junctions J1 (Lordshill) and A35 .
Due to: Roadworks scheme.
Period : from 21:02 on 4 June 2025 to 06:00 on 9 August 2025.
Nearest town: 19.78 miles from Penton Mewsey.

Location: southbound entry slip from the A33 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 December 2027.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.6 miles from Penton Mewsey.

Location: westbound between junctions J7 (Basingstoke) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 February 2027.
Nearest town: 15.59 miles from Penton Mewsey.

Location: eastbound between junctions J9 (Winchester) and J7 (Basingstoke) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 February 2027.
Nearest town: 15.33 miles from Penton Mewsey.

Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 February 2027.
Nearest town: 15.29 miles from Penton Mewsey.

Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.88 miles from Penton Mewsey.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lane four is closed.
Due to: Roadworks.
Period : expect disruption until 23:00 on 10 January 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 19.88 miles from Penton Mewsey.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.94 miles from Penton Mewsey.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.8 miles from Penton Mewsey.

Location: westbound between the A338 and the junction with the A345 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.29 miles from Penton Mewsey.

Location: southbound between the A303 and the junction with the A30 West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 9 June 2025 to 13 June 2025.
Nearest town: 17 miles from Penton Mewsey.

Location: northbound between the A30 West and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 9 June 2025 to 13 June 2025.
Nearest town: 17.05 miles from Penton Mewsey.

Location: eastbound between the A338 and the junction with the A342 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.27 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.35 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.32 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.31 miles from Penton Mewsey.

Location: northbound between the junctions with the A272 and the A303 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.53 miles from Penton Mewsey.

Location: southbound between the junctions with the A303 and the A272 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.52 miles from Penton Mewsey.

Location: westbound at the junction with the A345 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.33 miles from Penton Mewsey.

Location: eastbound between the junctions with the A360 and the A345 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.96 miles from Penton Mewsey.

Location: eastbound between the A360 and the junction with the A3028 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 11 June 2025.
Nearest town: 11.96 miles from Penton Mewsey.

Location: eastbound between the junctions with the A345 and the A3028 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.31 miles from Penton Mewsey.

Location: eastbound between the A3093 and the junction with the M3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.65 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.19 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.22 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.19 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.22 miles from Penton Mewsey.

Location: eastbound between the A3057 and the junction with the A3093 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.41 miles from Penton Mewsey.

Location: eastbound exit slip to the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.66 miles from Penton Mewsey.

Location: eastbound between the A3057 and the junction with the A3093 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.41 miles from Penton Mewsey.

Location: eastbound exit slip to the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.66 miles from Penton Mewsey.

Location: eastbound entry slip from the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.73 miles from Penton Mewsey.

Location: eastbound between the A3093 and the junction with the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.65 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.81 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.78 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.81 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : From 21:00 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.78 miles from Penton Mewsey.

Location: eastbound between the A345 and the junction with the A3028 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.68 miles from Penton Mewsey.

Location: northbound between the A30 West and the junction with the A303 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 June 2025 to 06:00 on 12 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.83 miles from Penton Mewsey.

Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 June 2025 to 14 June 2025.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.92 miles from Penton Mewsey.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 4 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.63 miles from Penton Mewsey.

Location: eastbound exit slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 4 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.42 miles from Penton Mewsey.

Location: southbound at junction J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.78 miles from Penton Mewsey.

Location: southbound between junctions J3 and J1 (Lordshill) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.21 miles from Penton Mewsey.

Location: westbound exit slip at junction J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.1 miles from Penton Mewsey.

Location: northbound between junctions J1 (Lordshill) and M27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 August 2025 to 30 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 September 2025 to 4 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.98 miles from Penton Mewsey.

Location: westbound at junction J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.1 miles from Penton Mewsey.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.82 miles from Penton Mewsey.

Location: eastbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 5 July 2025.
Nearest town: 7.19 miles from Penton Mewsey.

Location: northbound between the junctions with the A343 and the A4 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.68 miles from Penton Mewsey.

Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 June 2025 to 06:00 on 25 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.99 miles from Penton Mewsey.' data-nearesttown='WEST END'>
Location: westbound entry slip at junction J5 (S'ton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 June 2025 to 06:00 on 25 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.99 miles from Penton Mewsey.

Location: westbound between the A3057 and the junction with the A342 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.36 miles from Penton Mewsey.

Location: eastbound between junctions J3 (Southampton) and J4 (M3) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.86 miles from Penton Mewsey.

Location: westbound between junctions J4 (M3) and J3 (Southampton) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.55 miles from Penton Mewsey.

Location: southbound between the A303 and the junction with the A272 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.95 miles from Penton Mewsey.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.09 miles from Penton Mewsey.

Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.15 miles from Penton Mewsey.

Location: westbound between junctions J11 (Winchester) and J12 (Eastleigh) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 25 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.32 miles from Penton Mewsey.

Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 October 2025.
Nearest town: 18.42 miles from Penton Mewsey.

Location: southbound between the A272 and the junction with the M3 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 8 June 2025 to 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.86 miles from Penton Mewsey.

Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.88 miles from Penton Mewsey.' data-nearesttown='WEST END'>
Location: westbound between junctions J5 (S'ton Airport) and J4 (M3) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 January 2026 to 23:00 on 6 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.88 miles from Penton Mewsey.