Location: northbound between junctions J6 (Worcester) and J4A (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.79 miles from Penn.

Location: southbound between junctions J6 (Birmingham) and J4A .
Due to: Congestion.
Normal traffic conditions are expected between 22:15 and 22:30 on 2 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13.17 miles from Penn.

Location: northbound exit slip at junction J8 (Birmingham) .
Due to: Congestion.
Normal traffic conditions are expected between 21:30 and 21:45 on 2 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.6 miles from Penn.

Location: northbound between junctions J4 (Lichfield) and J4A .
Due to: Congestion.
Normal traffic conditions are expected between 22:00 and 22:15 on 2 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.58 miles from Penn.

Location: southbound exit slip at junction J4A .
Due to: Roadworks.
Period : from 21:08 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.31 miles from Penn.

Location: northbound.
Due to: Roadworks.
Period : from 20:49 on 2 June 2025 to 05:00 on 3 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.28 miles from Penn.

Location: westbound exit slip at junction J7 (Wellington) .
Due to: Roadworks.
Period : from 20:48 on 2 June 2025 to 05:00 on 3 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.13 miles from Penn.

Location: southbound entry slip at junction J1 (West Bromwich) .
Due to: Roadworks.
Period : from 20:45 on 2 June 2025 to 05:00 on 3 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.65 miles from Penn.

Location: northbound between the junctions with the M54 and the A5 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.47 miles from Penn.

Location: southbound between the junctions with the A5 and the M54 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.17 miles from Penn.

Location: southbound exit slip to the A5127 .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 22 December 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.31 miles from Penn.

Location: southbound entry slip at junction J8 (Birmingham E) .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 7 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.55 miles from Penn.

Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : Lane one is closed.
Due to: Bridge repairs.
Period : expect disruption until 05:00 on 7 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.66 miles from Penn.

Location: southbound entry slip at Hilton Park Services.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.24 miles from Penn.

Location: southbound between junctions J11A (Lichfield) and J10A (Wolverhampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.38 miles from Penn.

Location: southbound between junctions J4 (Bromsgrove) and J4A (Birmingham) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.99 miles from Penn.

Location: northbound entry slip at junction from M5 South.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.64 miles from Penn.

Location: southbound exit slip at Hilton Park Services.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.34 miles from Penn.

Location: southbound at junction J11A (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.44 miles from Penn.

Location: southbound entry slip at junction J11 (Cannock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.88 miles from Penn.

Location: southbound between junctions J12 (Telford) and J11A (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.35 miles from Penn.

Location: northbound between junctions J7 (Birmingham) and J8 (Birmingham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.46 miles from Penn.

Location: westbound between junctions J6 (Telford W) and J7 (Wellington) .
Due to: Roadworks scheme.
Period : from 21:02 on 2 June 2025 to 06:00 on 3 June 2025.
Nearest town: 17.81 miles from Penn.

Location: northbound between junctions J13 (Stafford) and J14 (Stafford) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 3 June 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 15.53 miles from Penn.

Location: northbound at junction J8 (Birmingham) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 3 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 8.75 miles from Penn.

Location: westbound between junctions J6 (Telford W) and J7 (Wellington) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 June 2025.
Nearest town: 17.81 miles from Penn.

Location: northbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 18.24 miles from Penn.

Location: eastbound entry slip at junction J7 (Wellington) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.23 miles from Penn.

Location: westbound exit slip at junction J7 (Wellington) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 17.96 miles from Penn.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.4 miles from Penn.

Location: southbound exit slip at junction J4 (Lichfield) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.26 miles from Penn.

Location: southbound at junction J1 (West Bromwich) .
Due to: Roadworks.
Period : expect disruption until 05:00 on 3 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.82 miles from Penn.

Location: southbound between junctions J1 (West Bromwich) and J3 (Kidderminster) .
Due to: Roadworks scheme.
Period : from 22:00 on 27 May 2025 to 05:00 on 14 June 2025.
Nearest town: 8.68 miles from Penn.

Location: northbound between the junctions with the M54 and the A5 .
Due to: Roadworks scheme.
Period : from 20:10 on 13 January 2025 to 06:00 on 1 August 2025.
Nearest town: 8.47 miles from Penn.

Location: southbound between the junctions with the A5 and the M54 .
Due to: Roadworks scheme.
Period : from 20:10 on 13 January 2025 to 06:00 on 24 July 2025.
Nearest town: 9.17 miles from Penn.

Location: southbound entry slip from the A51 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.75 miles from Penn.

Location: southbound exit slip to the A51 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.51 miles from Penn.

Location: northbound exit slip to the A51 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.92 miles from Penn.

Location: southbound between the A38 and the junction with the M42 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.18 miles from Penn.

Location: northbound entry slip from the A51 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.75 miles from Penn.

Location: southbound at junction J14 (Stafford) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.52 miles from Penn.

Location: southbound at junction J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.52 miles from Penn.

Location: northbound between junctions J13 (Stafford) and J14 (Stafford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 13 June 2025.
Nearest town: 16.48 miles from Penn.

Location: northbound between junctions J13 (Stafford) and J14 (Stafford) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.48 miles from Penn.

Location: northbound between junctions J13 (Stafford) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.48 miles from Penn.

Location: southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.07 miles from Penn.

Location: southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.07 miles from Penn.

Location: southbound between junctions J15 (Stoke on Trent) and J13 (Stafford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 13 June 2025.
Nearest town: 19.07 miles from Penn.

Location: southbound between junctions J14 (Stafford) and J13 (Stafford) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.09 miles from Penn.

Location: southbound between junctions J14 (Stafford) and J13 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 11 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.09 miles from Penn.

Location: northbound exit slip at junction J6 (Birmingham) for A38(M) south.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.2 miles from Penn.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.96 miles from Penn.

Location: northbound between the junctions with the M54 and the A5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 July 2025 to 14 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.47 miles from Penn.

Location: northbound between the junctions with the M54 and the A5 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 13 July 2025 to 06:00 on 1 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.41 miles from Penn.

Location: southbound between the junctions with the A5 and the M54 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 30 June 2025 to 06:00 on 24 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.17 miles from Penn.

Location: southbound between the junctions with the A5 and the M54 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 June 2025 to 30 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.17 miles from Penn.

Location: northbound between the A51 and the junction with the A453 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 7 July 2025 to 05:00 on 8 July 2025.
Schedule : From 21:00 on 11 August 2025 to 05:00 on 12 August 2025.
Schedule : From 21:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.14 miles from Penn.

Location: northbound between the A453 and the junction with the A38 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 7 July 2025 to 05:00 on 8 July 2025.
Schedule : From 21:00 on 11 August 2025 to 05:00 on 12 August 2025.
Schedule : From 21:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.31 miles from Penn.

Location: northbound.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 8 July 2025 to 05:00 on 9 July 2025.
Schedule : From 21:00 on 12 August 2025 to 05:00 on 13 August 2025.
Schedule : From 21:00 on 16 September 2025 to 05:00 on 17 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19 miles from Penn.

Location: northbound between the A5148 and the junction with the A513 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 8 July 2025 to 05:00 on 9 July 2025.
Schedule : From 21:00 on 12 August 2025 to 05:00 on 13 August 2025.
Schedule : From 21:00 on 16 September 2025 to 05:00 on 17 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.38 miles from Penn.

Location: southbound between the junctions with the A513 and the A5192 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 July 2025 to 05:00 on 10 July 2025.
Schedule : From 21:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 21:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.07 miles from Penn.

Location: northbound entry slip from the A5127 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 8 July 2025 to 05:00 on 9 July 2025.
Schedule : From 21:00 on 12 August 2025 to 05:00 on 13 August 2025.
Schedule : From 21:00 on 16 September 2025 to 05:00 on 17 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.1 miles from Penn.

Location: southbound.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 July 2025 to 05:00 on 10 July 2025.
Schedule : From 21:00 on 13 August 2025 to 05:00 on 14 August 2025.
Schedule : From 21:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.05 miles from Penn.

Location: southbound at junction J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 18:45 on 7 June 2025 to 00:01 on 7 June 2025.
Schedule : From 18:45 on 28 June 2025 to 00:01 on 28 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.52 miles from Penn.

Location: southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 18:45 on 7 June 2025 to 00:01 on 7 June 2025.
Schedule : From 18:45 on 28 June 2025 to 00:01 on 28 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.09 miles from Penn.

Location: northbound between junctions J13 (Stafford) and J14 (Stafford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 18:45 on 7 June 2025 to 00:01 on 7 June 2025.
Schedule : From 18:45 on 28 June 2025 to 00:01 on 28 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.4 miles from Penn.

Location: southbound between junctions J15 (Stoke on Trent) and J13 (Stafford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 18:45 on 7 June 2025 to 00:01 on 28 June 2025.
Nearest town: 19.09 miles from Penn.

Location: southbound between junctions J14 (Stafford) and J13 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 18:45 on 7 June 2025 to 00:01 on 7 June 2025.
Schedule : From 18:45 on 28 June 2025 to 00:01 on 28 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.09 miles from Penn.

Location: southbound exit slip at junction J4 (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 05:00 on 7 June 2025 to 22:00 on 8 June 2025.
Schedule : From 20:00 on 15 August 2025 to 06:00 on 18 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.26 miles from Penn.

Location: southbound between junctions J3 (Kidderminster) and J4 (Bromsgrove) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.9 miles from Penn.

Location: northbound between junctions J12 (Telford) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.16 miles from Penn.

Location: southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 June 2025 to 14 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.1 miles from Penn.

Location: eastbound at junction J5 (Telford) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.71 miles from Penn.

Location: eastbound between junctions J6 (Telford W) and J5 (Telford) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.93 miles from Penn.

Location: eastbound at junction J6 (Telford W) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.27 miles from Penn.

Location: eastbound exit slip at junction J5 (Telford) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.78 miles from Penn.

Location: southbound entry slip at junction J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.27 miles from Penn.

Location: southbound at junction J14 (Stafford) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.52 miles from Penn.

Location: southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.09 miles from Penn.

Location: southbound between junctions J14 (Stafford) and J13 (Stafford) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.09 miles from Penn.

Location: northbound between junctions J6 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.53 miles from Penn.

Location: southbound between junctions J4A (Birmingham) and J5 (Droitwich) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 3 June 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 16.67 miles from Penn.

Location: northbound at junction J8 (Birmingham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.23 miles from Penn.

Location: southbound between junctions J8 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.47 miles from Penn.

Location: southbound exit slip to the A5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.06 miles from Penn.

Location: northbound entry slip from the A5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 06:00 on 11 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 July 2025 to 9 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.99 miles from Penn.

Location: northbound between the A51 and the junction with the A453 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.14 miles from Penn.

Location: northbound between the A453 and the junction with the A38 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 19 September 2025.
Nearest town: 18.31 miles from Penn.

Location: northbound between the A453 and the junction with the A38 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.31 miles from Penn.

Location: northbound between the junctions with the A453 and the A38 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 June 2025 to 06:00 on 12 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 July 2025 to 12 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 July 2025 to 18 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.54 miles from Penn.

Location: southbound entry slip at junction J3 (Birmingham S) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.5 miles from Penn.

Location: northbound exit slip at junction J3 (Birmingham S) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.33 miles from Penn.

Location: southbound exit slip at junction J3 (Birmingham S) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.54 miles from Penn.

Location: southbound exit slip at junction J3 (Birmingham S) To A435 south.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.62 miles from Penn.

Location: southbound exit slip at junction J3 (Birmingham S) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 July 2025 to 06:00 on 12 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.54 miles from Penn.

Location: southbound exit slip at junction J3 (Birmingham S) To A435 south.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 July 2025 to 06:00 on 12 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.62 miles from Penn.

Location: northbound entry slip at junction J3 (Birmingham S) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 July 2025 to 1 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.44 miles from Penn.

Location: southbound entry slip at junction J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 27 June 2025 to 05:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.55 miles from Penn.

Location: southbound at junction J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 June 2025 to 05:00 on 25 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.69 miles from Penn.

Location: southbound at junction J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 June 2025 to 05:00 on 25 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.66 miles from Penn.

Location: southbound between junctions T2 and M42 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 June 2025 to 05:00 on 25 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.43 miles from Penn.

Location: southbound exit slip at junction J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 June 2025 to 05:00 on 27 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.66 miles from Penn.

Location: southbound between junctions J1 (West Bromwich) and J3 (Kidderminster) .
Due to: Roadworks.
Period : expect disruption until 05:00 on 3 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.64 miles from Penn.

Location: northbound between junctions J2 (Dudley) and J1 (West Bromwich) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.7 miles from Penn.

Location: northbound at junction J3 (Kidderminster) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.07 miles from Penn.

Location: southbound entry slip at junction J2 (Dudley) .
Due to: Roadworks.
Period : expect disruption until 05:00 on 3 June 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.68 miles from Penn.

Location: northbound exit slip at junction J2 (Dudley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.78 miles from Penn.

Location: northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.92 miles from Penn.

Location: northbound exit slip at junction J1 (West Bromwich) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.63 miles from Penn.

Location: northbound entry slip at junction J2 (Dudley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 23 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.7 miles from Penn.

Location: northbound exit slip at junction J2 (Dudley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 August 2025 to 06:00 on 2 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 August 2025 to 23 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.78 miles from Penn.

Location: eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.91 miles from Penn.

Location: northbound exit slip at junction J3 (Birmingham S) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 July 2025 to 06:00 on 1 August 2025.
Nearest town: 18.33 miles from Penn.

Location: northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 27 August 2025.
Nearest town: 9.92 miles from Penn.