Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 16:30 and 16:45 on 8 December 2025.
Normal traffic conditions are expected between 16:30 and 16:45 on 8 December 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 14.87 miles from Pednormead End.

Location: anticlockwise exit slip at junction J23 (Hatfield) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 11:45 and 12:00 on 8 December 2025.
Normal traffic conditions are expected between 11:45 and 12:00 on 8 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.19 miles from Pednormead End.

Swakeleys Roundabout - There is a broken down car on the eastbound on slip road to the A40.
All lanes are open.
Nearest town: 11.84 miles from Pednormead End.

Edgware Road West Hendon Broadway junction with Cool Oak Lane (All Directions).
There is a reported collision at this location.
All lanes are open.
Nearest town: 18.72 miles from Pednormead End.

The Parkway (Northbound) at the junction of North Hyde Road - Road is now fully open.
Traffic is moving well.
Nearest town: 16.74 miles from Pednormead End.

Western Avenue (Eastbound) near the junction of Victoria Road lane one blocked by a broken down van.
Vehicle has been recovered.
Traffis is flowing well.
Nearest town: 19.9 miles from Pednormead End.

Western Avenue (Eastbound) near the junction with Alperton Lane - Collision - Lane one reopened.
Traffic is flowing well for the time of day.
Nearest town: 17.88 miles from Pednormead End.

All lanes reopened.
Traffic is moving well.
Nearest town: 18.52 miles from Pednormead End.

Watling Avenue (All Directions) at the junction of Orange Hill Road .
Traffic signals have been restored.
Traffic signals have been restored.
Nearest town: 16.99 miles from Pednormead End.

Forty Avenue (All Directions) at the junction of Preston Road.
Lane restrictions in place due to a collision.
The road has reopened.
Nearest town: 17.2 miles from Pednormead End.

High Street Harlesden (All Directions) at the junction of Wendover Road - Faulty traffic signals The traffic signals have been repaired.
Nearest town: 19.83 miles from Pednormead End.

Lampton Road (Both Directions) at the junction of Alexandra Road - Temporary signals in operation to facilitate resurfacing works.
Nearest town: 19.22 miles from Pednormead End.

Heston Road (All Directions) at the junction of Wheatlands - Temporary signals in operation to facilitate resurfacing works.
Expect some delays while the restrictions are in place.
Nearest town: 18.3 miles from Pednormead End.

Kymberley Road (One Way System) between Headstone Road and College Road - Road closure to facilitate resurfacing works
Nearest town: 14.88 miles from Pednormead End.

Location: northbound exit slip at junction J5 (Harrow A41) .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.32 miles from Pednormead End.

Location: anticlockwise exit slip at junction J24 (Potters Bar) .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.69 miles from Pednormead End.

Location: clockwise between junctions J22 (St Albans) and J23 (Hatfield) .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.14 miles from Pednormead End.

Location: northbound exit slip at junction J4 (High Wycombe) .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 8 December 2025.
Nearest town: 8.52 miles from Pednormead End.

Location: anticlockwise exit slip at junction J21 (M1) .
Due to: Congestion.
Normal traffic conditions are expected between 16:45 and 17:00 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.56 miles from Pednormead End.

Location: clockwise exit slip at junction J21 (M1) .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.25 miles from Pednormead End.

Location: anticlockwise exit slip at junction J21A (Watword) .
Due to: Congestion.
Normal traffic conditions are expected between 16:45 and 17:00 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.1 miles from Pednormead End.

Location: anticlockwise entry slip at junction J21 (M1) .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.4 miles from Pednormead End.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 8 December 2025.
Nearest town: 18.93 miles from Pednormead End.

Location: clockwise exit slip at junction J22 (St Albans) .
Due to: Congestion.
Normal traffic conditions are expected between 17:15 and 17:30 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.86 miles from Pednormead End.

Location: southbound between the junctions with the A4146 South and the A4012 .
Due to: Congestion.
Normal traffic conditions are expected between 16:45 and 17:00 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.17 miles from Pednormead End.

Location: anticlockwise at junction J21 (M1) .
Due to: Congestion.
Normal traffic conditions are expected between 17:15 and 17:30 on 8 December 2025.
Delay : There are currently delays of 15 minutes against expected traffic.
Nearest town: 10.37 miles from Pednormead End.

Location: The A308M eastbound between the junctions with the M4 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 16:45 and 17:00 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.15 miles from Pednormead End.

Location: northbound between the junctions with the A5183 and the A4012 .
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.94 miles from Pednormead End.

Location: anticlockwise between junctions J18 (Rickmansworth) and J16 (M40) .
Due to: Congestion.
Normal traffic conditions are expected between 17:30 and 17:45 on 8 December 2025.
Delay : There are currently delays of 40 minutes against expected traffic.
Nearest town: 6.59 miles from Pednormead End.

Location: northbound at the junction with the M1 .
Due to: Congestion.
Normal traffic conditions are expected between 16:15 and 16:30 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 10.46 miles from Pednormead End.

Location: The A1M southbound exit slip at junction J1 .
Due to: Congestion.
Normal traffic conditions are expected between 16:00 and 16:15 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.14 miles from Pednormead End.

Location: clockwise entry slip at junction J15 (Slough) from the M4 westbound.
Due to: Congestion.
Normal traffic conditions are expected between 15:00 and 15:15 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.24 miles from Pednormead End.

Location: anticlockwise exit slip at junction J20 (Hemel Hstead) .
Due to: Congestion.
Normal traffic conditions are expected between 14:45 and 15:00 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.91 miles from Pednormead End.

Location: eastbound between the M25 and the junction with the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 13:30 and 13:45 on 8 December 2025.
Nearest town: 18.92 miles from Pednormead End.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 13:00 and 13:15 on 8 December 2025.
Nearest town: 18.93 miles from Pednormead End.

Location: eastbound between the junctions with the M25 and the A308 .
Due to: Congestion.
Normal traffic conditions are expected between 12:15 and 12:30 on 8 December 2025.
Nearest town: 18.93 miles from Pednormead End.

Location: northbound at the junction with the M40 .
Due to: Congestion.
Normal traffic conditions are expected between 11:45 and 12:00 on 8 December 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.62 miles from Pednormead End.

Location: eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.88 miles from Pednormead End.

Location: eastbound exit slip at junction J4 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.88 miles from Pednormead End.

Location: eastbound entry slip at junction J4B (Heathrow) from the M25 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.05 miles from Pednormead End.

Location: anticlockwise exit slip at junction J15 (Slough) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.95 miles from Pednormead End.

Location: anticlockwise entry slip at junction J17 (Maple Cross) .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.63 miles from Pednormead End.

Location: clockwise between junctions J13 (A30) and J14 (Heathrow Airport) .
Lane Closures : Lanes 3, 4 and 5 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be three of five lanes closed.
Nearest town: 17.94 miles from Pednormead End.

Location: clockwise at junction J14 (Heathrow Airport) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.05 miles from Pednormead End.

Location: clockwise between junctions J14 (Heathrow Airport) and J15 (Slough) .
Lane Closures : Lanes 3, 4, 5 and 6 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be four of six lanes closed.
Nearest town: 16.29 miles from Pednormead End.

Location: clockwise at junction J14 (Heathrow Airport) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.34 miles from Pednormead End.

Location: clockwise at junction J13 (A30) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.16 miles from Pednormead End.

Location: clockwise entry slip at junction J13 (A30) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.06 miles from Pednormead End.

Location: eastbound entry slip at junction J4B (Heathrow) from the M25 clockwise.
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.41 miles from Pednormead End.

Location: clockwise at junction J15 (Slough) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.58 miles from Pednormead End.

Location: clockwise exit slip at junction J15 (Slough) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.56 miles from Pednormead End.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 8 December 2025.
Nearest town: 7.3 miles from Pednormead End.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 12 December 2025.
Nearest town: 12.07 miles from Pednormead End.

Location: southbound between junctions J6A (St Albans) and J6 (Watford A405) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.4 miles from Pednormead End.

Location: The A1M southbound exit slip at junction J1 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.17 miles from Pednormead End.

Location: clockwise exit slip at junction J23 (Hatfield) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.84 miles from Pednormead End.

Location: anticlockwise exit slip at junction J23 (Hatfield) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.33 miles from Pednormead End.

Location: southbound entry slip at junction J2 (Beaconsfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:15 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.24 miles from Pednormead End.

Location: southbound between junctions J2 (Beaconsfield) and J1A (Watford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:15 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.22 miles from Pednormead End.

Location: southbound exit slip at junction J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.74 miles from Pednormead End.

Location: northbound exit slip at junction J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.39 miles from Pednormead End.

Location: northbound between junctions J11A and J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.02 miles from Pednormead End.

Location: northbound between junctions J8 (Hemel Hstead) and J10 (Luton Airport) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:00 on 19 December 2025.
Nearest town: 11.68 miles from Pednormead End.

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:00 on 9 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.22 miles from Pednormead End.

Location: The A1M southbound between junctions J6 and J4 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.38 miles from Pednormead End.

Location: northbound between junctions J5 (High Wycombe) and J6 (Thame) .
Lane Closures : The hard shoulder is closed.
Due to: Planned Roadworks.
Period : expect disruption until 15:30 on 8 December 2025.
Nearest town: 13.43 miles from Pednormead End.

Location: northbound between junctions J1A (Watford) and J2 (Beaconsfield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.17 miles from Pednormead End.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 12 December 2025.
Nearest town: 7.67 miles from Pednormead End.

Location: eastbound between junctions J3 (Heathrow) and J2 (N.Circular) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.14 miles from Pednormead End.

Location: eastbound between junctions J3 (Heathrow) and J2 (N.Circular) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 8 December 2025 to 05:30 on 9 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.73 miles from Pednormead End.

Location: northbound between junctions J6 (Thame) and J8A (Thame) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 10 December 2025.
Nearest town: 15.93 miles from Pednormead End.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 23:59 on 10 December 2025.
Nearest town: 9.26 miles from Pednormead End.

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Due to: Roadworks scheme.
Period : from 20:04 on 26 November 2025 to 06:00 on 12 December 2025.
Nearest town: 15.33 miles from Pednormead End.

Location: northbound between the A4012 and the junction with the A422 .
Due to: Roadworks scheme.
Period : from 20:03 on 4 December 2025 to 06:00 on 17 January 2026.
Nearest town: 18.21 miles from Pednormead End.

Location: southbound between junctions J11A and J9 (Dunstable A5) .
Due to: Roadside Equipment Maintenance.
Period : from 14:30 on 4 December 2025 to 05:00 on 21 December 2025.
Nearest town: 12.38 miles from Pednormead End.

Location: anticlockwise exit slip at junction J24 (Potters Bar) .
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.81 miles from Pednormead End.

Location: anticlockwise between junctions J22 (St Albans) and J21A (Watword) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.12 miles from Pednormead End.

Location: clockwise exit slip at junction J18 (Rickmansworth) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 12 December 2025 to 05:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.42 miles from Pednormead End.

Location: southbound between junctions J6 (Watford A405) and J5 (Harrow A41) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 December 2025 to 05:00 on 11 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.67 miles from Pednormead End.

Location: northbound between junctions J5 (Harrow A41) and J6 (Watford A405) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 December 2025 to 05:00 on 11 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.86 miles from Pednormead End.

Location: southbound between junctions J11A and J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:00 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.58 miles from Pednormead End.

Location: southbound between junctions J6 (Watford A405) and J5 (Harrow A41) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 14 December 2025 to 05:30 on 15 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.67 miles from Pednormead End.

Location: northbound between junctions J5 (Harrow A41) and J6 (Watford A405) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:30 on 14 December 2025 to 05:30 on 15 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.86 miles from Pednormead End.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 14 December 2025 to 23:59 on 18 December 2025.
Nearest town: 7.83 miles from Pednormead End.

Location: southbound between junctions J8A (Thame) and J6 (Thame) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 13 December 2025 to 06:00 on 14 December 2025.
Nearest town: 18.55 miles from Pednormead End.

Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 December 2025 to 15 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.33 miles from Pednormead End.

Location: southbound entry slip at junction J9 (Dunstable A5) .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 December 2025 to 15 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.29 miles from Pednormead End.

Location: southbound entry slip at junction J7 (Thame) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 13 December 2025 to 06:00 on 14 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.47 miles from Pednormead End.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 December 2025 to 15 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.2 miles from Pednormead End.

Location: northbound between junctions J1 (North Circular) and J5 (Harrow A41) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 12 December 2025 to 05:30 on 13 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.49 miles from Pednormead End.

Location: The A1M northbound between junctions J4 and J6 .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.19 miles from Pednormead End.

Location: The A1M northbound entry slip at junction J5 .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.35 miles from Pednormead End.

Location: southbound entry slip at junction J3 (Loudwater) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:15 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.09 miles from Pednormead End.

Location: southbound between junctions J4 (High Wycombe) and J2 (Beaconsfield) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:15 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.21 miles from Pednormead End.

Location: southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:15 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.24 miles from Pednormead End.

Location: southbound between junctions J2 (Beaconsfield) and J1A (Watford) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.79 miles from Pednormead End.

Location: northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 December 2025 to 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.97 miles from Pednormead End.

Location: northbound at junction J4 (High Wycombe) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 December 2025 to 19 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.52 miles from Pednormead End.

Location: southbound between the A4130 and the junction with the A4 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.52 miles from Pednormead End.

Location: The A404M southbound entry slip at junction J9B .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.82 miles from Pednormead End.

Location: The A404M southbound between junctions J9B and J9A .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.71 miles from Pednormead End.

Location: northbound at the junction with the M1 .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 9 December 2025 to 05:00 on 10 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.42 miles from Pednormead End.

Location: southbound at the junction with the M1 .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 9 December 2025 to 05:00 on 10 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.35 miles from Pednormead End.

Location: southbound between junctions J4 (High Wycombe) and J2 (Beaconsfield) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:30 on 12 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.08 miles from Pednormead End.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 11 December 2025 to 13 December 2025.
Lanes Closed : There will be one of five lanes closed.
Nearest town: 12.21 miles from Pednormead End.

Location: southbound between junctions J8 (Hemel Hstead) and J6 (Watford A405) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:30 on 12 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.29 miles from Pednormead End.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 11 December 2025 to 13 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.85 miles from Pednormead End.

Location: southbound between junctions J6A (St Albans) and J6 (Watford A405) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:30 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.36 miles from Pednormead End.

Location: The A1M northbound between junctions J4 and J6 .
Lane Closures : Lane three will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:30 on 12 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.4 miles from Pednormead End.

Location: The A1M southbound at junction J6 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:00 on 12 December 2025.
Schedule : From 23:00 on 12 December 2025 to 05:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.96 miles from Pednormead End.

Location: The A1M southbound between junctions J6 and J4 .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:00 on 12 December 2025.
Schedule : From 23:00 on 12 December 2025 to 05:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.84 miles from Pednormead End.

Location: The A1M southbound exit slip at junction J4 .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:00 on 12 December 2025.
Schedule : From 23:00 on 12 December 2025 to 05:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.18 miles from Pednormead End.

Location: northbound between junctions J2 (Beaconsfield) and J4 (High Wycombe) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:30 on 12 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.35 miles from Pednormead End.

Location: northbound.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 11 December 2025 to 05:00 on 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.76 miles from Pednormead End.

Location: westbound between junctions J7 (Slough) and J8 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.46 miles from Pednormead End.

Location: northbound entry slip at junction J6 (Watford A405) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 13 December 2025.
Nearest town: 10.42 miles from Pednormead End.

Location: northbound entry slip at junction J6 (Watford A405) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 December 2025 to 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.42 miles from Pednormead End.

Location: northbound exit slip at junction J6 (Watford A405) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 December 2025 to 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.48 miles from Pednormead End.

Location: northbound at junction J4 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.34 miles from Pednormead End.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.53 miles from Pednormead End.

Location: southbound between junctions J11A and J9 (Dunstable A5) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.54 miles from Pednormead End.

Location: southbound between junctions J5 (Harrow A41) and J1 (North Circular) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 December 2025 to 05:30 on 11 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.85 miles from Pednormead End.

Location: southbound between junctions J6 (Thame) and J5 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.22 miles from Pednormead End.

Location: southbound entry slip at junction J5 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.52 miles from Pednormead End.

Location: southbound at junction J5 (High Wycombe) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:15 on 11 December 2025 to 06:00 on 12 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.64 miles from Pednormead End.

Location: southbound between junctions J5 (Harrow A41) and J1 (North Circular) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 10 December 2025 to 05:30 on 11 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.41 miles from Pednormead End.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.45 miles from Pednormead End.

Location: northbound between the junctions with the A5183 and the A4012 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Nearest town: 15.35 miles from Pednormead End.

Location: southbound between the junctions with the A4012 and the A5183 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 December 2025 to 06:00 on 11 December 2025.
Nearest town: 15.37 miles from Pednormead End.

Location: northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 December 2025 to 11 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.22 miles from Pednormead End.

Location: northbound between junctions J2 (Beaconsfield) and J4 (High Wycombe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 December 2025 to 11 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.33 miles from Pednormead End.

Location: The A1M southbound between junctions J6 and J4 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 9 December 2025 to 05:30 on 10 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.77 miles from Pednormead End.

Location: clockwise between junctions J22 (St Albans) and J23 (Hatfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 9 December 2025 to 05:30 on 10 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.76 miles from Pednormead End.

Location: southbound between junctions J4 (High Wycombe) and J2 (Beaconsfield) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 December 2025 to 11 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.21 miles from Pednormead End.

Location: southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 December 2025 to 11 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.24 miles from Pednormead End.

Location: clockwise between junctions J23 (Hatfield) and J25 (Enfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 9 December 2025 to 12 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.77 miles from Pednormead End.

Location: southbound at junction J4 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.83 miles from Pednormead End.

Location: southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.45 miles from Pednormead End.

Location: southbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.83 miles from Pednormead End.

Location: southbound exit slip at junction J4 (High Wycombe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 December 2025 to 06:00 on 10 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.59 miles from Pednormead End.

Location: northbound between junctions J7 (Thame) and J8A (Thame) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 07:00 on 9 December 2025 to 23:59 on 19 December 2025.
Nearest town: 18.89 miles from Pednormead End.

Location: northbound entry slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.18 miles from Pednormead End.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.68 miles from Pednormead End.

Location: northbound exit slip at junction J10 (Luton Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.62 miles from Pednormead End.

Location: northbound between junctions J8 (Hemel Hstead) and J10 (Luton Airport) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 19 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.02 miles from Pednormead End.

Location: northbound between junctions J1 (North Circular) and J2 (North Circular) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 10 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.51 miles from Pednormead End.

Location: southbound at the junction with the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 19 December 2025.
Nearest town: 12.19 miles from Pednormead End.

Location: northbound at the junction with the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 December 2025 to 19 December 2025.
Nearest town: 12.25 miles from Pednormead End.

Location: southbound between the junctions with the M25 and the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 December 2025 to 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.98 miles from Pednormead End.

Location: westbound exit slip to the A412 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 December 2025 to 12 December 2025.
Schedule : From 23:00 on 12 December 2025 to 05:30 on 13 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.22 miles from Pednormead End.

Location: The A1M northbound between junctions J4 and J6 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18 miles from Pednormead End.

Location: The A1M northbound between junctions J3 and J4 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 11 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.92 miles from Pednormead End.

Location: The A1M northbound between junctions J2 and J3 .
Lane Closures : Lane two will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 11 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.79 miles from Pednormead End.

Location: The A1M northbound entry slip at junction J4 .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.09 miles from Pednormead End.

Location: The A1M northbound entry slip at junction J5 .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.35 miles from Pednormead End.

Location: The A1M northbound exit slip at junction J6 .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 8 December 2025 to 11 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.6 miles from Pednormead End.

Location: eastbound exit slip at junction J8 (High Wycombe) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 12 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.63 miles from Pednormead End.

Location: eastbound between junctions J10 (Reading) and J8 (High Wycombe) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 December 2025 to 12 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.33 miles from Pednormead End.

Location: anticlockwise between junctions J14 (Heathrow Airport) and J13 (A30) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 December 2025 to 12 December 2025.
Schedule : From 23:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : There will be four of five lanes closed.
Nearest town: 17.13 miles from Pednormead End.

Location: anticlockwise entry slip at junction J14 (Heathrow Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 December 2025 to 12 December 2025.
Schedule : From 23:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.51 miles from Pednormead End.

Location: anticlockwise entry slip at junction J14 (Heathrow Airport) from A3113.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 December 2025 to 12 December 2025.
Schedule : From 23:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.86 miles from Pednormead End.

Location: anticlockwise at junction J13 (A30) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 December 2025 to 12 December 2025.
Schedule : From 23:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.97 miles from Pednormead End.

Location: anticlockwise exit slip at junction J13 (A30) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 8 December 2025 to 12 December 2025.
Schedule : From 23:00 on 12 December 2025 to 06:00 on 13 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.97 miles from Pednormead End.

Location: southbound entry slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.42 miles from Pednormead End.

Location: southbound exit slip at junction J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.42 miles from Pednormead End.

Location: southbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.84 miles from Pednormead End.

Location: southbound exit slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.74 miles from Pednormead End.

Location: southbound entry slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.57 miles from Pednormead End.

Location: northbound entry slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.18 miles from Pednormead End.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.44 miles from Pednormead End.

Location: northbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.98 miles from Pednormead End.

Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.97 miles from Pednormead End.

Location: northbound exit slip at junction J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.62 miles from Pednormead End.

Location: northbound between junctions J8 (Hemel Hstead) and J10 (Luton Airport) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.06 miles from Pednormead End.

Location: southbound exit slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.12 miles from Pednormead End.

Location: northbound exit slip at junction J11 (Luton) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.83 miles from Pednormead End.

Location: The A308M eastbound between the junctions with the M4 and the A308 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 8 December 2025 to 13 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.41 miles from Pednormead End.

Location: southbound exit slip at junction J11A .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.62 miles from Pednormead End.

Location: southbound exit slip at junction J11 (Luton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.42 miles from Pednormead End.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 December 2025 to 05:00 on 21 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.26 miles from Pednormead End.

Location: northbound between junctions J10 (Luton Airport) and J11A .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.72 miles from Pednormead End.

Location: northbound exit slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 December 2025 to 05:00 on 18 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.18 miles from Pednormead End.

Location: northbound between junctions J11 (Luton) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 December 2025 to 05:00 on 19 December 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.57 miles from Pednormead End.

Location: southbound exit slip at Toddington Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 December 2025 to 05:00 on 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.02 miles from Pednormead End.
