Location: westbound at the junction with the A453 .
Due to: Roadworks.
Period : from 21:40 on 26 July 2024 to 05:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.9 miles from Moravian Settlement.
Location: northbound between the A607 Syston North and the junction with the A606 .
Due to: Roadworks.
Period : from 20:27 on 26 July 2024 to 05:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.39 miles from Moravian Settlement.
Location: eastbound entry slip from the M1 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.36 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6007 and the A6464 .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 27 July 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 5.99 miles from Moravian Settlement.
Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2024 to 06:00 on 28 July 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.33 miles from Moravian Settlement.
Location: southbound between junctions J26 (Nottingham) and J25 (Nottingham) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 July 2024 to 06:00 on 28 July 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.55 miles from Moravian Settlement.
Location: southbound between the junctions with the A6006 and the A607 Syston North.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:30 on 27 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.14 miles from Moravian Settlement.
Location: southbound exit slip to the A6 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.42 miles from Moravian Settlement.
Location: southbound between junctions J29 (Chesterfield) and J28 (Matlock) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 16.84 miles from Moravian Settlement.
Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Due to: Roadworks scheme.
Period : from 21:00 on 23 July 2024 to 06:00 on 9 August 2024.
Nearest town: 4.16 miles from Moravian Settlement.
Location: southbound between junctions J25 (Nottingham) and J24 (E.
Mids Airport) .
Due to: Roadworks scheme.
Period : from 21:04 on 22 July 2024 to 06:00 on 9 August 2024.
Nearest town: 3.38 miles from Moravian Settlement.
Location: eastbound between the M1 and the junction with the A6007 .
Due to: Roadworks scheme.
Period : from 20:11 on 22 July 2024 to 06:00 on 27 July 2024.
Nearest town: 3.36 miles from Moravian Settlement.
Location: eastbound between the M1 and the junction with the A6007 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.28 miles from Moravian Settlement.
Location: eastbound between the A453 and the junction with the A60 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.77 miles from Moravian Settlement.
Location: westbound exit slip to the A453 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.8 miles from Moravian Settlement.
Location: westbound exit slip to the A453 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.78 miles from Moravian Settlement.
Location: eastbound at the junction with the A453 .
Due to: Planned Roadworks.
Period : expect disruption until 05:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.72 miles from Moravian Settlement.
Location: eastbound entry slip from the A453 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.92 miles from Moravian Settlement.
Location: westbound entry slip from the A453 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.9 miles from Moravian Settlement.
Location: northbound.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.77 miles from Moravian Settlement.
Location: northbound at the junction with the A52 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.61 miles from Moravian Settlement.
Location: southbound exit slip to the A52 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.9 miles from Moravian Settlement.
Location: southbound between the A52 eastbound and the junction with the M1 .
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.91 miles from Moravian Settlement.
Location: eastbound between the A6 and the junction with the M1 J24A .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 27 July 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 2.73 miles from Moravian Settlement.
Location: westbound between the A6 and the junction with the A521 Blythe Bridge East.
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 27 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 2.75 miles from Moravian Settlement.
Location: westbound between the M1 and the junction with the A6 .
Lane Closures : Lane two is closed.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 27 July 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 3.88 miles from Moravian Settlement.
Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks scheme.
Period : from 14:32 on 11 July 2024 to 06:00 on 17 August 2024.
Nearest town: 8.04 miles from Moravian Settlement.
Location: southbound exit slip at junction J28 (Matlock) .
Due to: Roadworks scheme.
Period : from 20:14 on 23 July 2024 to 06:00 on 17 August 2024.
Nearest town: 13.72 miles from Moravian Settlement.
Location: southbound entry slip at junction J28 (Matlock) .
Lane Closures : Lane two is closed.
Due to: Planned Roadworks.
Period : expect disruption until 06:00 on 27 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.38 miles from Moravian Settlement.
Location: southbound exit slip to the A5121 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.86 miles from Moravian Settlement.
Location: northbound exit slip to the A5121 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 30 July 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.19 miles from Moravian Settlement.
Location: northbound exit slip to the A607 .
Due to: Roadworks scheme.
Period : from 20:04 on 13 July 2024 to 06:00 on 4 August 2024.
Nearest town: 18.38 miles from Moravian Settlement.
Location: northbound between junctions J21A (Leicester) and J22 (Leicester) .
Due to: Roadworks scheme.
Period : from 20:15 on 10 July 2024 to 06:00 on 30 July 2024.
Nearest town: 19.43 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks scheme.
Period : from 20:03 on 7 July 2024 to 06:00 on 17 August 2024.
Nearest town: 7.97 miles from Moravian Settlement.
Location: southbound between the A516 and the junction with the A50 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 5 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 12 August 2024 to 17 August 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 19 August 2024 to 24 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.86 miles from Moravian Settlement.
Location: southbound between junctions J22 (Leicester) and J21A (Leicester) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency roadworks.
Period : expect disruption until 09:00 on 30 November 2024.
Nearest town: 19.31 miles from Moravian Settlement.
Location: northbound between junctions J23 and J23A (Tamworth) .
Due to: Roadworks scheme.
Period : from 20:06 on 25 July 2024 to 06:00 on 17 August 2024.
Nearest town: 7.95 miles from Moravian Settlement.
Location: northbound between the A511 and the junction with the M1 .
Due to: Roadworks scheme.
Period : from 20:06 on 25 July 2024 to 06:00 on 17 August 2024.
Nearest town: 7.75 miles from Moravian Settlement.
Location: southbound between junctions J29 (Chesterfield) and J28 (Matlock) .
Due to: Roadworks scheme.
Period : from 20:08 on 22 July 2024 to 06:00 on 7 August 2024.
Nearest town: 19.91 miles from Moravian Settlement.
Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Due to: Roadworks scheme.
Period : from 20:05 on 19 July 2024 to 06:00 on 18 November 2024.
Nearest town: 5.76 miles from Moravian Settlement.
Location: southbound exit slip to the A5121 .
Due to: Roadworks scheme.
Period : from 21:06 on 8 February 2024 to 06:00 on 31 July 2024.
Nearest town: 14.86 miles from Moravian Settlement.
Location: northbound entry slip from the A5121 .
Due to: Roadworks scheme.
Period : from 21:06 on 8 February 2024 to 06:00 on 6 August 2024.
Nearest town: 15.19 miles from Moravian Settlement.
Location: northbound between the A607 and the junction with the A52 .
Due to: Roadworks scheme.
Period : from 20:00 on 18 July 2024 to 06:00 on 3 August 2024.
Nearest town: 15.89 miles from Moravian Settlement.
Location: southbound between the A511 and the junction with the M42 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 05:00 on 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.16 miles from Moravian Settlement.
Location: southbound between the junctions with the A5111 and the A50 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 August 2024 to 06:00 on 17 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.26 miles from Moravian Settlement.
Location: southbound between the junctions with the A5111 and the A50 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 August 2024 to 10 August 2024.
Schedule : From 20:00 on 12 August 2024 to 06:00 on 13 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.26 miles from Moravian Settlement.
Location: southbound entry slip from the A516 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 August 2024 to 10 August 2024.
Schedule : From 20:00 on 12 August 2024 to 06:00 on 13 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.87 miles from Moravian Settlement.
Location: southbound between the junctions with the A5111 and the A516 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 August 2024 to 10 August 2024.
Schedule : From 20:00 on 12 August 2024 to 06:00 on 13 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.74 miles from Moravian Settlement.
Location: westbound at the junction with the A606 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2024 to 06:00 on 30 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.75 miles from Moravian Settlement.
Location: westbound between the junctions with the A6011 and the A606 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2024 to 06:00 on 30 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.89 miles from Moravian Settlement.
Location: eastbound at the junction with the A606 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 July 2024 to 06:00 on 30 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.69 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 August 2024.
Nearest town: 7.97 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 5 August 2024 to 20:00 on 5 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 August 2024 to 17 August 2024.
Nearest town: 7.97 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 5 August 2024 to 20:00 on 5 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 August 2024 to 17 August 2024.
Nearest town: 7.97 miles from Moravian Settlement.
Location: westbound between the junctions with the A6005 and the A6514 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 August 2024 to 17 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.23 miles from Moravian Settlement.
Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 5 August 2024 to 20:00 on 5 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 August 2024 to 17 August 2024.
Nearest town: 8.04 miles from Moravian Settlement.
Location: westbound exit slip to the A6514 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 17 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.17 miles from Moravian Settlement.
Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 14 August 2024.
Nearest town: 8.04 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 August 2024.
Nearest town: 7.97 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 14 August 2024.
Nearest town: 6.98 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 14 August 2024.
Nearest town: 6.98 miles from Moravian Settlement.
Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 5 August 2024.
Nearest town: 8.04 miles from Moravian Settlement.
Location: eastbound between the junctions with the A46 and the A1 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Nearest town: 19.53 miles from Moravian Settlement.
Location: northbound between junctions J21A (Leicester) and J22 (Leicester) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 05:00 on 2 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.56 miles from Moravian Settlement.
Location: northbound between the junctions with the A511 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 8 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.01 miles from Moravian Settlement.
Location: northbound between junctions J23A (Tamworth) and J24 (E.
Mids Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 17 August 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.77 miles from Moravian Settlement.
Location: northbound between junctions J23 and J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 17 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.95 miles from Moravian Settlement.
Location: northbound entry slip at junction J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 8 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.27 miles from Moravian Settlement.
Location: The junction of the A42 and the M1 J23A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 8 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.27 miles from Moravian Settlement.
Location: northbound between the junctions with the A453 and the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 8 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.73 miles from Moravian Settlement.
Location: northbound exit slip at junction J23A (Tamworth) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 17 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.42 miles from Moravian Settlement.
Location: The junction of the A42 and the M1 J23A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 17 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.02 miles from Moravian Settlement.
Location: northbound between junctions J23 and J23A (Tamworth) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 1 August 2024 to 15:00 on 1 August 2024.
Nearest town: 8.14 miles from Moravian Settlement.
Location: northbound between the M42 and the junction with the A511 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.38 miles from Moravian Settlement.
Location: northbound between junctions J22 (Leicester) and J23 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 05:00 on 1 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.28 miles from Moravian Settlement.
Location: northbound between junctions J23 and J23A (Tamworth) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 July 2024 to 5 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.31 miles from Moravian Settlement.
Location: southbound between junctions J23A (Tamworth) and J23 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 July 2024 to 5 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.45 miles from Moravian Settlement.
Location: eastbound between the A516 and the junction with the A38 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 31 July 2024 to 2 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.73 miles from Moravian Settlement.
Location: eastbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 31 July 2024 to 2 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.4 miles from Moravian Settlement.
Location: westbound between the A38 and the junction with the A516 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 19:00 on 7 August 2024 to 05:00 on 8 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.14 miles from Moravian Settlement.
Location: eastbound exit slip to the A38 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 31 July 2024 to 2 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.9 miles from Moravian Settlement.
Location: eastbound entry slip from the A516 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 31 July 2024 to 2 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.47 miles from Moravian Settlement.
Location: westbound entry slip from the A38 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 19:00 on 7 August 2024 to 05:00 on 8 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.65 miles from Moravian Settlement.
Location: westbound between the A6007 and the junction with the A5111 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.67 miles from Moravian Settlement.
Location: eastbound between the A5111 and the junction with the A6007 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.53 miles from Moravian Settlement.
Location: westbound between the A6007 and the junction with the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.83 miles from Moravian Settlement.
Location: eastbound between the junctions with the M1 and the A6007 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.68 miles from Moravian Settlement.
Location: eastbound entry slip from the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.36 miles from Moravian Settlement.
Location: northbound between the A6 and the junction with the A61 Derby.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.11 miles from Moravian Settlement.
Location: northbound between the A52 and the junction with the A6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.44 miles from Moravian Settlement.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.29 miles from Moravian Settlement.
Location: northbound exit slip to the A6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.16 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 31 July 2024 to 16:30 on 31 July 2024.
Nearest town: 7.66 miles from Moravian Settlement.
Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 31 July 2024 to 16:30 on 31 July 2024.
Nearest town: 7.69 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6011 and the A46 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 July 2024 to 05:00 on 31 July 2024.
Nearest town: 15.43 miles from Moravian Settlement.
Location: westbound between the junctions with the A46 and the A6011 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 July 2024 to 05:00 on 31 July 2024.
Nearest town: 15.46 miles from Moravian Settlement.
Location: southbound between the junctions with the A610 and the A61 Derby.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2024 to 1 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.85 miles from Moravian Settlement.
Location: northbound between the junctions with the A61 Derby and the A610 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2024 to 1 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.84 miles from Moravian Settlement.
Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 05:00 on 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.9 miles from Moravian Settlement.
Location: southbound between the A52 and the junction with the M1 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 05:00 on 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.95 miles from Moravian Settlement.
Location: southbound between the A607 Syston South and the junction with the A6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.67 miles from Moravian Settlement.
Location: northbound between the junctions with the A5630 and the A6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.1 miles from Moravian Settlement.
Location: southbound between junctions J29 (Chesterfield) and J28 (Matlock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 17 August 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.58 miles from Moravian Settlement.
Location: southbound exit slip at junction J28 (Matlock) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 July 2024 to 06:00 on 27 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 August 2024 to 17 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.72 miles from Moravian Settlement.
Location: westbound at the junction with the A606 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.75 miles from Moravian Settlement.
Location: westbound at the junction with the A60 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.71 miles from Moravian Settlement.
Location: eastbound between the A60 and the junction with the A606 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.72 miles from Moravian Settlement.
Location: eastbound at the junction with the A60 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.68 miles from Moravian Settlement.
Location: eastbound between the junctions with the A606 and the A6011 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.74 miles from Moravian Settlement.
Location: westbound between the A60 and the junction with the A453 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 August 2024 to 3 August 2024.
Schedule : From 20:00 on 5 August 2024 to 06:00 on 6 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.99 miles from Moravian Settlement.
Location: westbound entry slip from the A6005 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.36 miles from Moravian Settlement.
Location: westbound exit slip to the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.8 miles from Moravian Settlement.
Location: westbound entry slip from the A453 .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.9 miles from Moravian Settlement.
Location: eastbound exit slip to the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.72 miles from Moravian Settlement.
Location: eastbound at the junction with the A453 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.72 miles from Moravian Settlement.
Location: eastbound between the A6514 and the junction with the A6005 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.24 miles from Moravian Settlement.
Location: eastbound entry slip from the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.77 miles from Moravian Settlement.
Location: westbound at the junction with the A453 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.77 miles from Moravian Settlement.
Location: westbound at the junction with the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 August 2024 to 3 August 2024.
Schedule : From 20:00 on 5 August 2024 to 06:00 on 6 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.91 miles from Moravian Settlement.
Location: westbound at the junction with the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.91 miles from Moravian Settlement.
Location: westbound at the junction with the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.78 miles from Moravian Settlement.
Location: westbound entry slip from the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.8 miles from Moravian Settlement.
Location: eastbound entry slip from the A6005 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.4 miles from Moravian Settlement.
Location: westbound entry slip from the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.71 miles from Moravian Settlement.
Location: westbound exit slip to the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.78 miles from Moravian Settlement.
Location: eastbound entry slip from the A453 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 August 2024 to 06:00 on 7 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.77 miles from Moravian Settlement.
Location: eastbound at the junction with the A453 .
Lane Closures : Lane four will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 8.8 miles from Moravian Settlement.
Location: westbound entry slip from the A453 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.9 miles from Moravian Settlement.
Location: eastbound exit slip to the A6005 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.26 miles from Moravian Settlement.
Location: northbound between the M1 and the junction with the A52 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Nearest town: 8.34 miles from Moravian Settlement.
Location: eastbound at the junction with the A453 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2024 to 06:00 on 6 August 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.8 miles from Moravian Settlement.
Location: westbound between the A453 and the junction with the A6005 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 July 2024 to 06:00 on 31 July 2024.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.7 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6005 and the A453 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.48 miles from Moravian Settlement.
Location: eastbound between the A6005 and the junction with the A453 .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.54 miles from Moravian Settlement.
Location: eastbound between the junctions with the A6005 and the A453 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 31 July 2024 to 06:00 on 1 August 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.48 miles from Moravian Settlement.
Location: northbound between the junctions with the M1 and the A52 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Nearest town: 8.29 miles from Moravian Settlement.
Location: southbound between the junctions with the A52 and the M1 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Nearest town: 8.36 miles from Moravian Settlement.
Location: southbound between the junctions with the A52 and the M1 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 August 2024 to 06:00 on 2 August 2024.
Nearest town: 8.34 miles from Moravian Settlement.
Location: southbound between the A52 and the junction with the M1 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 August 2024 to 06:00 on 3 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.9 miles from Moravian Settlement.
Location: westbound between the junctions with the A6464 and the A6007 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 05:00 on 30 July 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.75 miles from Moravian Settlement.
Location: westbound between the A6007 and the junction with the M1 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 05:00 on 30 July 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.57 miles from Moravian Settlement.
Location: southbound between the A516 and the junction with the A50 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 17 August 2024.
Nearest town: 5.87 miles from Moravian Settlement.
Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 August 2024 to 8 August 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.16 miles from Moravian Settlement.
Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 July 2024 to 06:00 on 30 July 2024.
Schedule : From 21:00 on 2 August 2024 to 06:00 on 3 August 2024.
Schedule : From 21:00 on 5 August 2024 to 06:00 on 6 August 2024.
Schedule : From 21:00 on 8 August 2024 to 06:00 on 9 August 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 4.15 miles from Moravian Settlement.
Location: southbound between junctions J25 (Nottingham) and J24 (E.
Mids Airport) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 July 2024 to 2 August 2024.
Schedule : From 21:00 on 8 August 2024 to 06:00 on 9 August 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 3.38 miles from Moravian Settlement.
Location: southbound between junctions J25 (Nottingham) and J24 (E.
Mids Airport) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 July 2024 to 06:00 on 31 July 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 6 August 2024 to 8 August 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.38 miles from Moravian Settlement.
Location: northbound between junctions J21A (Leicester) and J22 (Leicester) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 15:00 from 29 July 2024 to 2 August 2024.
Schedule : Expect disruption everyday between 08:00 and 15:00 from 5 August 2024 to 9 August 2024.
Schedule : Expect disruption everyday between 08:00 and 15:00 from 12 August 2024 to 16 August 2024.
Nearest town: 18.51 miles from Moravian Settlement.
Location: southbound entry slip at junction J29 (Chesterfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.91 miles from Moravian Settlement.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.49 miles from Moravian Settlement.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.46 miles from Moravian Settlement.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.44 miles from Moravian Settlement.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.47 miles from Moravian Settlement.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.46 miles from Moravian Settlement.
Location: northbound between the A607 and the junction with the A6006 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.49 miles from Moravian Settlement.
Location: northbound between the A6006 and the junction with the A52 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.9 miles from Moravian Settlement.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.04 miles from Moravian Settlement.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.5 miles from Moravian Settlement.
Location: southbound entry slip from the A606 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.97 miles from Moravian Settlement.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.13 miles from Moravian Settlement.
Location: northbound exit slip to the A606 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.95 miles from Moravian Settlement.
Location: southbound exit slip to the A6006 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.02 miles from Moravian Settlement.
Location: southbound between the A52 and the junction with the A6006 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.9 miles from Moravian Settlement.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.36 miles from Moravian Settlement.
Location: northbound exit slip to the A6006 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.93 miles from Moravian Settlement.
Location: southbound between the A6006 and the junction with the A607 Syston North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.04 miles from Moravian Settlement.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.16 miles from Moravian Settlement.
Location: northbound between the A607 Syston South and the junction with the A607 Syston North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.37 miles from Moravian Settlement.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.18 miles from Moravian Settlement.
Location: southbound between the A606 and the junction with the A607 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 5 August 2024 to 06:00 on 7 August 2024.
Nearest town: 14.97 miles from Moravian Settlement.
Location: southbound exit slip to the A607 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 August 2024 to 7 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.33 miles from Moravian Settlement.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 3 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.39 miles from Moravian Settlement.
Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 July 2024 to 31 July 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 3.27 miles from Moravian Settlement.
Location: southbound exit slip at junction J24A (Stoke, Derby) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 November 2024 to 06:00 on 18 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.78 miles from Moravian Settlement.
Location: southbound exit slip at junction J24 (E.
Mids Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 November 2024 to 06:00 on 18 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.13 miles from Moravian Settlement.
Location: northbound entry slip at junction J24 (E.
Mids Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 November 2024 to 06:00 on 18 November 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.65 miles from Moravian Settlement.
Location: westbound between the A515 Sudbury West and the junction with the A518 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 19:00 on 31 July 2024 to 05:00 on 1 August 2024.
Schedule : From 19:00 on 8 August 2024 to 05:00 on 9 August 2024.
Schedule : From 19:00 on 27 August 2024 to 05:00 on 28 August 2024.
Schedule : From 19:00 on 2 September 2024 to 05:00 on 3 September 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19 miles from Moravian Settlement.
Location: eastbound between the junctions with the A518 Uttoxeter East and the A515 Sudbury West.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 19:00 on 31 July 2024 to 05:00 on 1 August 2024.
Schedule : From 19:00 on 8 August 2024 to 05:00 on 9 August 2024.
Schedule : From 19:00 on 27 August 2024 to 05:00 on 28 August 2024.
Schedule : From 19:00 on 2 September 2024 to 05:00 on 3 September 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.82 miles from Moravian Settlement.
Location: northbound exit slip to the A5121 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2024 to 3 August 2024.
Schedule : From 20:00 on 5 August 2024 to 06:00 on 6 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.18 miles from Moravian Settlement.
Location: northbound entry slip from the A5121 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 July 2024 to 3 August 2024.
Schedule : From 20:00 on 5 August 2024 to 06:00 on 6 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.02 miles from Moravian Settlement.
Location: northbound exit slip to the A607 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 August 2024 to 06:00 on 4 August 2024.
Nearest town: 18.38 miles from Moravian Settlement.
Location: northbound between the A607 Syston South and the junction with the A607 Syston North.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 August 2024 to 06:00 on 4 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.55 miles from Moravian Settlement.
Location: northbound between junctions J21A (Leicester) and J22 (Leicester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 July 2024 to 06:00 on 30 July 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.43 miles from Moravian Settlement.
Location: northbound between the A513 and the junction with the A5121 Burton Upon Trent South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 5 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 12 August 2024 to 17 August 2024.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 19 August 2024 to 23 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.01 miles from Moravian Settlement.
Location: southbound between the A5121 Burton Upon Trent South and the junction with the A513 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 5 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 12 August 2024 to 17 August 2024.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 19 August 2024 to 23 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.61 miles from Moravian Settlement.
Location: southbound between the A516 and the junction with the A5132 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 16 September 2024 to 20 September 2024.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 23 September 2024 to 27 September 2024.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 30 September 2024 to 4 October 2024.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 7 October 2024 to 11 October 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.96 miles from Moravian Settlement.
Location: southbound between the A516 and the junction with the A5132 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 13 September 2024 to 05:00 on 16 September 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 16 September 2024 to 21 September 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 23 September 2024 to 28 September 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 30 September 2024 to 5 October 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.17 miles from Moravian Settlement.
Location: northbound between the A5132 and the junction with the A516 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 29 July 2024 to 3 August 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 5 August 2024 to 10 August 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 12 August 2024 to 17 August 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 19 August 2024 to 24 August 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9 miles from Moravian Settlement.
Location: northbound between the A5132 and the junction with the A50 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 29 July 2024 to 2 August 2024.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 5 August 2024 to 9 August 2024.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 12 August 2024 to 16 August 2024.
Schedule : Expect disruption everyday between 05:00 and 19:00 from 19 August 2024 to 23 August 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.29 miles from Moravian Settlement.
Location: northbound between the A5132 and the junction with the A50 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 16 September 2024 to 21 September 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 23 September 2024 to 28 September 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 30 September 2024 to 5 October 2024.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 7 October 2024 to 12 October 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.1 miles from Moravian Settlement.
Location: southbound exit slip at junction J24 (E.
Mids Airport) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 05:59 on 18 November 2024 to 06:00 on 18 November 2024.
Nearest town: 3.27 miles from Moravian Settlement.