Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 01:45 and 02:00 on 24 April 2024.
Normal traffic conditions are expected between 01:45 and 02:00 on 24 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 16.33 miles from Hope End Green.
Location: northbound between junctions J6 (Hatfield) and J7 (Chelmsford) .
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 23:00 and 23:15 on 23 April 2024.
Normal traffic conditions are expected between 23:00 and 23:15 on 23 April 2024.
Lanes Closed : There are lane closures.
Nearest town: 12.89 miles from Hope End Green.
Green Street (All Directions) at the junction of Jute Lane - The level crossing barriers are now working.
Fault now repaired.
Nearest town: 19.29 miles from Hope End Green.
Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Due to: Congestion.
Normal traffic conditions are expected between 00:45 and 01:00 on 24 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 15.83 miles from Hope End Green.
Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Due to: Congestion.
Normal traffic conditions are expected between 23:45 and 00:00 on 24 April 2024.
Cause : Road traffic collision.
Nearest town: 15.83 miles from Hope End Green.
Location: southbound entry slip at junction J8 (Bishops Stortford) .
Due to: Roadworks.
Period : from 21:07 on 23 April 2024 to 05:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 3.5 miles from Hope End Green.
Location: southbound between the A130 Chelmsford South and the junction with the A1023 .
Due to: Roadworks.
Period : from 19:45 on 23 April 2024 to 05:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 13.99 miles from Hope End Green.
Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 April 2024 to 05:30 on 25 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.54 miles from Hope End Green.
Location: northbound between the junctions with the A1023 and the A414 Chelmsford West.
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 05:00 and 21:00 from 24 April 2024 to 27 April 2024.
Schedule : From 05:00 on 28 April 2024 to 21:00 on 29 April 2024.
Schedule : Expect disruption everyday between 05:00 and 21:00 from 30 April 2024 to 4 May 2024.
Schedule : From 05:00 on 5 May 2024 to 21:00 on 6 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.42 miles from Hope End Green.
Location: eastbound.
Lane Closures : Lane two is closed.
Due to: Planned Roadworks.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.94 miles from Hope End Green.
Location: eastbound between the M11 and the junction with the A131 South.
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.56 miles from Hope End Green.
Location: westbound between the A12 Colchester West and the junction with the A131 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 05:00 on 25 April 2024.
Nearest town: 16.65 miles from Hope End Green.
Location: eastbound between the A131 North and the junction with the A12 Colchester West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 05:00 on 25 April 2024.
Nearest town: 16.47 miles from Hope End Green.
Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 14.48 miles from Hope End Green.
Location: northbound between junctions J7A and J8 (Bishops Stortford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 05:00 on 25 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.91 miles from Hope End Green.
Location: northbound exit slip at junction J8 (Bishops Stortford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 05:00 on 25 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 3.63 miles from Hope End Green.
Location: clockwise between junctions J25 (Enfield) and J27 (Stansted) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 16.94 miles from Hope End Green.
Location: northbound between the junctions with the A130 Chelmsford North and the A120 Colchester West.
Lane Closures : Lane one is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.44 miles from Hope End Green.
Location: southbound between junctions J8 (Bishops Stortford) and J6 (Hatfield) .
Due to: Roadworks.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 3.74 miles from Hope End Green.
Location: northbound between junctions J7A and J8 (Bishops Stortford) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:30 on 24 April 2024 to 15:30 on 24 April 2024.
Nearest town: 4.01 miles from Hope End Green.
Location: northbound between junctions J7 (Chelmsford) and J8 (Bishops Stortford) .
Due to: Roadworks scheme.
Period : from 21:01 on 15 April 2024 to 05:00 on 26 June 2024.
Nearest town: 11.06 miles from Hope End Green.
Location: northbound between junctions J7A and J8 (Bishops Stortford) .
Due to: Roadworks scheme.
Period : from 21:00 on 19 April 2024 to 05:00 on 27 April 2024.
Nearest town: 3.91 miles from Hope End Green.
Location: northbound entry slip from the A130 .
Due to: Roadworks.
Period : from 23:05 on 18 December 2023 to 23:59 on 23 August 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.45 miles from Hope End Green.
Location: northbound entry slip from the A130 .
Due to: Roadworks.
Period : expect disruption until 23:59 on 23 August 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.35 miles from Hope End Green.
Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 29 June 2024.
Nearest town: 16.7 miles from Hope End Green.
Location: anticlockwise between junctions J28 (Chelmsford) and J28 (Chelmsford) .
Due to: Roadworks scheme.
Period : from 05:05 on 29 September 2023 to 05:00 on 29 June 2024.
Nearest town: 17.14 miles from Hope End Green.
Location: anticlockwise at junction J28 (Chelmsford) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 29 June 2024.
Nearest town: 17.24 miles from Hope End Green.
Location: anticlockwise entry slip at junction J28 (Chelmsford) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 29 June 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.14 miles from Hope End Green.
Location: anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 30 April 2024 to 05:30 on 1 May 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.54 miles from Hope End Green.
Location: anticlockwise at junction J25 (Enfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 25 April 2024 to 05:30 on 26 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.25 miles from Hope End Green.
Location: anticlockwise between junctions J26 (Waltham Abbey) and J25 (Enfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 25 April 2024 to 05:30 on 26 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.1 miles from Hope End Green.
Location: anticlockwise between junctions J25 (Enfield) and J24 (Potters Bar) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 25 April 2024 to 05:30 on 26 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.68 miles from Hope End Green.
Location: clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Planned Roadworks.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 17.58 miles from Hope End Green.
Location: clockwise entry slip at junction J28 (Chelmsford) .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.18 miles from Hope End Green.
Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:00 on 30 April 2024 to 05:00 on 29 June 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.28 miles from Hope End Green.
Location: clockwise between junctions J26 (Waltham Abbey) and J27 (Stansted) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.25 miles from Hope End Green.
Location: southbound exit slip at junction J6 (Hatfield) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.53 miles from Hope End Green.
Location: clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.24 miles from Hope End Green.
Location: clockwise at junction J27 (Stansted) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.99 miles from Hope End Green.
Location: clockwise entry slip at junction J27 (Stansted) From M11 South.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.75 miles from Hope End Green.
Location: northbound exit slip at junction J6 (Hatfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.32 miles from Hope End Green.
Location: clockwise entry slip at junction J27 (Stansted) From M11 North.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.05 miles from Hope End Green.
Location: clockwise at junction J25 (Enfield) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.68 miles from Hope End Green.
Location: clockwise between junctions J24 (Potters Bar) and J25 (Enfield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.45 miles from Hope End Green.
Location: anticlockwise between junctions J26 (Waltham Abbey) and J25 (Enfield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.23 miles from Hope End Green.
Location: clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 29 April 2024 to 3 May 2024.
Schedule : From 23:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.88 miles from Hope End Green.
Location: northbound exit slip at junction J9 (Newmarket) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.94 miles from Hope End Green.
Location: northbound between the junctions with the A1301 and the A505 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.78 miles from Hope End Green.
Location: northbound at junction J9A (Saffron Walden) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 05:00 on 4 May 2024.
Nearest town: 14.94 miles from Hope End Green.
Location: northbound at junction J9A (Saffron Walden) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.28 miles from Hope End Green.
Location: southbound between the junctions with the A130 Chelmsford South and the A414 Chelmsford West.
Lane Closures : Lane two is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.45 miles from Hope End Green.
Location: northbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.94 miles from Hope End Green.
Location: northbound between the A414 Chelmsford West and the junction with the A130 Chelmsford South.
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 05:00 and 21:00 from 24 April 2024 to 27 April 2024.
Schedule : From 05:00 on 28 April 2024 to 21:00 on 29 April 2024.
Schedule : Expect disruption everyday between 05:00 and 21:00 from 30 April 2024 to 4 May 2024.
Schedule : From 05:00 on 5 May 2024 to 21:00 on 6 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.8 miles from Hope End Green.
Location: northbound between the A1023 and the junction with the A414 Chelmsford West.
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 05:00 and 21:00 from 24 April 2024 to 27 April 2024.
Schedule : From 05:00 on 28 April 2024 to 21:00 on 29 April 2024.
Schedule : Expect disruption everyday between 05:00 and 21:00 from 30 April 2024 to 4 May 2024.
Schedule : From 05:00 on 5 May 2024 to 21:00 on 6 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.34 miles from Hope End Green.
Location: northbound exit slip to the A414 .
Due to: Road repairs.
Period : expect disruption until 05:00 on 3 May 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.8 miles from Hope End Green.
Location: northbound between the A1023 and the junction with the A414 Chelmsford West.
Lane Closures : Lane two is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.01 miles from Hope End Green.
Location: northbound exit slip to the A414 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.8 miles from Hope End Green.
Location: southbound between the A414 Chelmsford West and the junction with the A1023 .
Lane Closures : Lane three will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 05:00 and 20:00 from 24 April 2024 to 26 April 2024.
Schedule : From 05:00 on 27 April 2024 to 20:00 on 2 May 2024.
Schedule : From 05:00 on 3 May 2024 to 23:00 on 7 August 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.73 miles from Hope End Green.
Location: northbound entry slip from the A1023 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.79 miles from Hope End Green.
Location: northbound between the A1023 and the junction with the A414 Chelmsford West.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.84 miles from Hope End Green.
Location: northbound between the junctions with the M25 and the A1023 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.23 miles from Hope End Green.
Location: northbound.
Due to: Road repairs.
Period : expect disruption until 05:00 on 3 May 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.74 miles from Hope End Green.
Location: northbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.74 miles from Hope End Green.
Location: northbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.9 miles from Hope End Green.
Location: northbound at junction J6 (Hatfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 03:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.32 miles from Hope End Green.
Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 03:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.6 miles from Hope End Green.
Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.62 miles from Hope End Green.
Location: northbound exit slip at junction J8 (Bishops Stortford) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.63 miles from Hope End Green.
Location: eastbound between the A131 North and the junction with the A12 Colchester West.
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 April 2024.
Nearest town: 19.58 miles from Hope End Green.
Location: northbound between junctions J5 (Loughton) and J6 (Hatfield) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Road repairs.
Period : expect disruption until 05:30 on 24 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 15.93 miles from Hope End Green.
Location: northbound between junctions J7 (Chelmsford) and J7A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 3 June 2024 to 8 June 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 June 2024 to 15 June 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 June 2024 to 22 June 2024.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 24 June 2024 to 26 June 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.32 miles from Hope End Green.
Location: southbound between junctions J10 (Saffron Walden) and J9 (Newmarket) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 04:00 from 25 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 21:00 and 04:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 21:00 and 04:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.33 miles from Hope End Green.
Location: northbound between junctions J10 (Saffron Walden) and J11 (Royston) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 04:00 on 27 April 2024.
Schedule : Expect disruption everyday between 21:00 and 04:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 21:00 and 04:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.2 miles from Hope End Green.