Traffic Higher Berry End

SLIGHT
SEVERE
Traffic Warning Sign

WARNING OF ICEIce on roads continues to cause disruption throughout the country, especially on minor roads and rural areas. Drivers are advised to slow down and drive safely.

DARTFORD CROSSINGOvernight QEII Bridge closures in January – Saturday 11, Saturday 18, and Saturday 25 January 2025 from 10pm - 5am.

DARTFORD CROSSINGThree overnight closures of the QEII Bridge are planned this month for essential maintenance work on bridge bearings and expansion joints.

DARTFORD CROSSINGA contraflow diversion route will be installed through the east tunnel from approximately 9:30pm on these three Saturday nights to maintain travel in the southbound direction.

FULL SCREEN UPDATED: 02:27
×
×

Current traffic around Higher Berry End

The following traffic incidents and congestion for Higher Berry End have been reported by Highways England, Traffic Scotland, Traffic Wales or Transport for London (TfL) in the last two hours:

AUTHORITYOPERATION
Location: The M1 southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .
Reason: Police incident.
Status: Currently Active.
Time to clear: The event is expected to clear between 22:30 and 22:45 on 18 Jan 2025.
Return to normal: Normal traffic conditions are expected between 22:30 and 22:45 on 18 Jan 2025.
Lanes closed: All lanes are closed.
Nearest town: 14.04 miles from Higher Berry End. CLEARED @ 21:19
BROKEN DOWN VEHICLE
Location: The M1 southbound exit slip at junction J15 (Northampton) .
Lane closures: Lane one is closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 02:15 and 02:30 on 19 Jan 2025.
Return to normal: Normal traffic conditions are expected between 02:15 and 02:30 on 19 Jan 2025.
Lanes closed: There is one of two lanes closed.
Nearest town: 19.01 miles from Higher Berry End. CLEARED @ 01:40
BROKEN DOWN VEHICLE
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: The hard shoulder and lane 1 are closed.
Reason: Broken down vehicle.
Status: Currently Active.
Time to clear: The event is expected to clear between 23:45 and 00:00 on 19 Jan 2025.
Return to normal: Normal traffic conditions are expected between 23:45 and 00:00 on 19 Jan 2025.
Lanes closed: There is one of four lanes closed.
Nearest town: 9.09 miles from Higher Berry End. CLEARED @ 23:25
AUTHORITYOPERATION
Location: The M1 northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Reason: Police incident.
Status: Currently Active.
Time to clear: The event is expected to clear between 22:30 and 22:45 on 18 Jan 2025.
Return to normal: Normal traffic conditions are expected between 22:30 and 22:45 on 18 Jan 2025.
Lanes closed: There are lane closures.
Nearest town: 15.44 miles from Higher Berry End. CLEARED @ 21:19


There are no current incidents in this location.

Roadworks

ROAD WORKS
Location: The A1 southbound between the junctions with the A428 and the A421 .
Reason: Roadworks.
Status: Currently Active.
Period: from 20:54 on 17 Jan 2025 to 05:00 on 20 Jan 2025.
Delay: There are currently delays of 15 minutes against expected traffic.
Lanes Closed: All lanes are closed.
Nearest town: 18.35 miles from Higher Berry End.
ROAD WORKS
Location: The A1 southbound between the junctions with the A14 and the A428 .
Lane closures: Lane two is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:00 on 20 Jan 2025.
Lanes Closed: There is one of two lanes closed.
Nearest town: 19.82 miles from Higher Berry End.
ROAD WORKS
Location: The A1 southbound between the A14 and the junction with the A428 .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:00 on 20 Jan 2025.
Lanes Closed: All lanes are closed.
Nearest town: 18.93 miles from Higher Berry End.
ROAD WORKS
Location: The A1 northbound between the A421 and the junction with the A428 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 21:00 on 19 Jan 2025 to 05:00 on 20 Jan 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 17.35 miles from Higher Berry End.
ROAD WORKS
Location: The A1 southbound between the A428 and the junction with the A421 .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:00 on 20 Jan 2025.
Lanes Closed: All lanes are closed.
Nearest town: 18.78 miles from Higher Berry End.
ROAD WORKS
Location: The A1 northbound between the junctions with the A421 and the A428 .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 00:01 on 10 Apr 2025.
Nearest town: 17.36 miles from Higher Berry End.
ROAD WORKS
Location: The A1 northbound between the junctions with the A603 and the A421 .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 00:01 on 10 Apr 2025.
Nearest town: 16.9 miles from Higher Berry End.
ROAD WORKS
Location: The A1 southbound.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 05:00 on 19 Jan 2025.
Lanes Closed: All lanes are closed.
Nearest town: 17.03 miles from Higher Berry End.
ROAD WORKS
Location: The A5 northbound between the junctions with the A508 and the A43 .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 20 Jan 2025.
Nearest town: 15.04 miles from Higher Berry End.
ROAD WORKS
Location: The A5 southbound between the junctions with the A43 and the A508 .
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 06:00 on 20 Jan 2025.
Nearest town: 15.08 miles from Higher Berry End.
ROAD WORKS
Location: The A1 northbound between the A507 and the junction with the A6001 Biggleswade South .
Lane closures: Lane one is closed.
Reason: Barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:00 on 19 Jan 2025.
Lanes Closed: There is one of two lanes closed.
Nearest town: 15.3 miles from Higher Berry End.
ROAD WORKS
Location: The A1 southbound between the A6001 Biggleswade South and the junction with the A507 .
Lane closures: Lane one is closed.
Reason: Barrier repairs.
Status: Currently Active.
Period: expect disruption until 05:00 on 19 Jan 2025.
Lanes Closed: There is one of two lanes closed.
Nearest town: 15.03 miles from Higher Berry End.
ROAD WORKS
Location: The A421 southbound between the junctions with the A1 and the A4280 .
Lane closures: Lane two will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 Jan 2025 to 25 Jan 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 16.8 miles from Higher Berry End.
ROAD WORKS
Location: The A5 southbound between the A422 and the junction with the A509 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 19:40 on 17 Jan 2025 to 06:00 on 29 Jan 2025.
Nearest town: 13.53 miles from Higher Berry End.
ROAD WORKS
Location: The A5 northbound between the A422 and the junction with the A508 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 20:02 on 17 Jan 2025 to 06:00 on 20 Feb 2025.
Nearest town: 10.47 miles from Higher Berry End.
ROAD WORKS
Location: The A1 southbound between the A428 and the junction with the A421 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 21:00 on 17 Jan 2025 to 05:00 on 21 Jan 2025.
Nearest town: 18.78 miles from Higher Berry End.
ROAD WORKS
Location: The A1M northbound between junctions J8 and J9 .
Lane closures: The hard shoulder is closed.
Reason: Roadworks.
Status: Currently Active.
Period: expect disruption until 12:00 on 8 Dec 2025.
Nearest town: 15.73 miles from Higher Berry End.
ROAD WORKS
Location: The A421 northbound between the junctions with the A4280 and the A1 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 11:42 on 20 Aug 2024 to 00:01 on 10 Apr 2025.
Nearest town: 12.67 miles from Higher Berry End.
ROAD WORKS
Location: The A1 southbound.
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 21:00 on 17 Jan 2025 to 05:00 on 19 Jan 2025.
Nearest town: 19.04 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound exit slip at junction J11A .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 22:00 on 17 Jan 2025 to 05:00 on 22 Mar 2025.
Nearest town: 5.9 miles from Higher Berry End.
ROAD WORKS
Location: The A1 northbound between the junctions with the A603 and the A421 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 05:00 on 28 Apr 2024 to 00:01 on 10 Apr 2025.
Nearest town: 14.74 miles from Higher Berry End.
ROAD WORKS
Location: The A421 southbound between the junctions with the A1 and the A4280 .
Reason: Roadworks scheme.
Status: Currently Active.
Period: from 10:23 on 30 Nov 2023 to 00:01 on 10 Apr 2025.
Nearest town: 17.29 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: From 22:00 on 24 Jan 2025 to 05:00 on 25 Jan 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 12.84 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J11A and J12 (Flitwick) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 4.67 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 3.08 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J11A and J12 (Flitwick) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 29 Sep 2025 to 05:00 on 30 Sep 2025.
Nearest town: 4.67 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 05:00 on 1 Feb 2025 to 22:00 on 29 Sep 2025.
Nearest town: 3.08 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J11A and J12 (Flitwick) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 05:00 on 1 Feb 2025 to 22:00 on 29 Sep 2025.
Nearest town: 4.67 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound at junction J11 (Luton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 29 Sep 2025 to 05:00 on 30 Sep 2025.
Nearest town: 8.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 29 Sep 2025 to 05:00 on 30 Sep 2025.
Nearest town: 11.08 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound at junction J11 (Luton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 05:00 on 1 Feb 2025 to 22:00 on 29 Sep 2025.
Nearest town: 8.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 05:00 on 1 Feb 2025 to 22:00 on 29 Sep 2025.
Nearest town: 11.08 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 14.83 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane closures: Lanes 1, 2, 3 and 4 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 14.17 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound entry slip at junction J11 (Luton) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 8.32 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J13 (Milton Keynes) and J14 (Milton Keynes) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 29 Sep 2025 to 05:00 on 30 Sep 2025.
Nearest town: 2.79 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 29 Sep 2025 to 05:00 on 30 Sep 2025.
Nearest town: 3.08 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound at junction J10 (Luton Airport) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 29 Sep 2025 to 05:00 on 30 Sep 2025.
Nearest town: 11.9 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound at junction J10 (Luton Airport) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 05:00 on 1 Feb 2025 to 22:00 on 29 Sep 2025.
Nearest town: 11.84 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.81 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound exit slip at junction J10 (Luton Airport) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 11.91 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound exit slip at junction J11 (Luton) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 8.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J11A and J12 (Flitwick) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 29 Sep 2025 to 05:00 on 30 Sep 2025.
Nearest town: 5.57 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound at junction J11A .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 29 Sep 2025 to 05:00 on 30 Sep 2025.
Nearest town: 6.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J11 (Luton) and J11A .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 29 Sep 2025 to 05:00 on 30 Sep 2025.
Nearest town: 8.04 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J11A and J12 (Flitwick) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 05:00 on 1 Feb 2025 to 22:00 on 29 Sep 2025.
Nearest town: 5.57 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound at junction J11A .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 05:00 on 1 Feb 2025 to 22:00 on 29 Sep 2025.
Nearest town: 6.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J11 (Luton) and J11A .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 05:00 on 1 Feb 2025 to 22:00 on 29 Sep 2025.
Nearest town: 8.04 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound exit slip at junction J11A .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 6.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J10 (Luton Airport) and J12 (Flitwick) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 11.69 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound exit slip at junction J10 (Luton Airport) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 10 Feb 2025 to 16 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 11.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound exit slip at junction J12 (Flitwick) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 4 Feb 2025 to 05:00 on 5 Feb 2025.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 18 Mar 2025 to 22 Mar 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 3.17 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 4 Feb 2025 to 05:00 on 5 Feb 2025.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 18 Mar 2025 to 22 Mar 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 2.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 10 Feb 2025 to 16 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 11.75 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J11A and J10 (Luton Airport) .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 10 Feb 2025 to 16 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 5.9 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound at junction J10 (Luton Airport) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 20 Jan 2025 to 25 Jan 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 11.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J11 (Luton) and J10 (Luton Airport) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 20 Jan 2025 to 25 Jan 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.14 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J11 (Luton) and J10 (Luton Airport) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 8.67 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound entry slip at junction J11 (Luton) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 10 Feb 2025 to 16 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 8.37 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J14 (Milton Keynes) and J13 (Milton Keynes) .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 4 Feb 2025 to 05:00 on 5 Feb 2025.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 18 Mar 2025 to 22 Mar 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 3.95 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound at junction J11 (Luton) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 8.2 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound exit slip at junction J11 (Luton) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 10 Feb 2025 to 16 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 8.2 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound exit slip at junction J9 (Dunstable A5) .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 10 Feb 2025 to 16 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.64 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 4 Feb 2025 to 05:00 on 5 Feb 2025.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 18 Mar 2025 to 22 Mar 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 4.57 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound exit slip at junction J11A .
Lane closures: Lane one will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 4 Feb 2025 to 05:00 on 5 Feb 2025.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 18 Mar 2025 to 22 Mar 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 5.9 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound entry slip at junction J11A .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 10 Feb 2025 to 16 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 6.27 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J12 (Flitwick) and J11A .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 10 Feb 2025 to 16 Feb 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 5.13 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J11A and J11 (Luton) .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Lanes Closed: There will be two of four lanes closed.
Nearest town: 7.62 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J12 (Flitwick) and J11A .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 4 Feb 2025 to 05:00 on 5 Feb 2025.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 18 Mar 2025 to 22 Mar 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 3.53 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound exit slip at Toddington Services.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 4 Feb 2025 to 05:00 on 5 Feb 2025.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 18 Mar 2025 to 22 Mar 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 4.38 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 3 Feb 2025 to 05:00 on 4 Feb 2025.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 5 Feb 2025 to 8 Feb 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 1.36 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound at junction J13 (Milton Keynes) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 22:00 on 4 Feb 2025 to 05:00 on 5 Feb 2025.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 18 Mar 2025 to 22 Mar 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 2.79 miles from Higher Berry End.
ROAD WORKS
Location: The A5 northbound between the junctions with the A509 and the A422 .
Lane closures: Lane two will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 29 Jan 2025 to 1 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 3 Feb 2025 to 8 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 10 Feb 2025 to 15 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 17 Feb 2025 to 20 Feb 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 9.69 miles from Higher Berry End.
ROAD WORKS
Location: The A5 southbound at the junction with the A422 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 Jan 2025 to 25 Jan 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 Jan 2025 to 29 Jan 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 13.53 miles from Higher Berry End.
ROAD WORKS
Location: The A5 southbound between the A508 and the junction with the A422 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: From 20:00 on 17 Jan 2025 to 06:00 on 18 Jan 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 Jan 2025 to 25 Jan 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 Jan 2025 to 29 Jan 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 13.46 miles from Higher Berry End.
ROAD WORKS
Location: The A5 southbound between the A422 and the junction with the A509 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 Jan 2025 to 25 Jan 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 Jan 2025 to 29 Jan 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 10.37 miles from Higher Berry End.
ROAD WORKS
Location: The A5 northbound between the A509 and the junction with the A422 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 29 Jan 2025 to 1 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 3 Feb 2025 to 8 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 10 Feb 2025 to 15 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 17 Feb 2025 to 20 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 9.76 miles from Higher Berry End.
ROAD WORKS
Location: The A5 northbound between the A422 and the junction with the A508 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 29 Jan 2025 to 1 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 3 Feb 2025 to 8 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 10 Feb 2025 to 15 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 17 Feb 2025 to 20 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 10.47 miles from Higher Berry End.
ROAD WORKS
Location: The A5 northbound at the junction with the A508 .
Lane closures: Lanes 1 and 2 will be closed.
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 20 Jan 2025 to 25 Jan 2025.
Schedule: Expect disruption everyday between 20:00 and 06:00 from 27 Jan 2025 to 29 Jan 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 13.45 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane closures: Lane one will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 23 Jan 2025 to 05:00 on 24 Jan 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 9 miles from Higher Berry End.
ROAD WORKS
Location: The A5 southbound between the junctions with the A4146 South and the A4012 .
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 01:00 on 21 Jan 2025 to 06:00 on 21 Jan 2025.
Nearest town: 3.84 miles from Higher Berry End.
ROAD WORKS
Location: The A5 southbound between the junctions with the A4146 South and the A4012 .
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 20:00 on 20 Jan 2025 to 01:00 on 21 Jan 2025.
Nearest town: 3.62 miles from Higher Berry End.
ROAD WORKS
Location: The A5 northbound between the junctions with the A4012 and the A4146 Bletchley South.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 01:00 on 21 Jan 2025 to 06:00 on 21 Jan 2025.
Nearest town: 3.87 miles from Higher Berry End.
ROAD WORKS
Location: The A5 northbound between the junctions with the A4012 and the A4146 Bletchley South.
Reason: Roadside drains works are planned.
Status: Pending.
Schedule: From 20:00 on 20 Jan 2025 to 01:00 on 21 Jan 2025.
Nearest town: 3.64 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Lane closures: Lane one will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 23 Jan 2025 to 05:00 on 24 Jan 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 1.95 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Lane closures: Lane one will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 21 Jan 2025 to 05:00 on 22 Jan 2025.
Lanes Closed: There will be one of three lanes closed.
Nearest town: 9.5 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane closures: Lanes 1, 2 and 3 will be closed.
Reason: Road repairs are planned.
Status: Pending.
Schedule: From 22:00 on 23 Jan 2025 to 05:00 on 24 Jan 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 8.57 miles from Higher Berry End.
ROAD WORKS
Location: The A1 southbound exit slip to the A428 .
Reason: Roadworks are planned.
Status: Pending.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 20 Jan 2025 to 25 Jan 2025.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 27 Jan 2025 to 1 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 3 Feb 2025 to 8 Feb 2025.
Schedule: Expect disruption everyday between 20:00 and 05:00 from 10 Feb 2025 to 15 Feb 2025.
Lanes Closed: All lanes will be closed.
Nearest town: 18.89 miles from Higher Berry End.
ROAD WORKS
Location: The A1M southbound between junctions J8 and J7 .
Lane closures: Lane two will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: From 21:00 on 22 Jan 2025 to 05:00 on 23 Jan 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 15.75 miles from Higher Berry End.
ROAD WORKS
Location: The A5 southbound between the junctions with the A5183 and the M1 .
Lane closures: Lane one will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 22 Jan 2025 to 05:00 on 23 Jan 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 5.98 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J11 (Luton) and J11A .
Lane closures: Lanes 2 and 3 will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 22 Jan 2025 to 05:00 on 23 Jan 2025.
Lanes Closed: There will be two of three lanes closed.
Nearest town: 7.75 miles from Higher Berry End.
ROAD WORKS
Location: The A1 northbound between the junctions with the A6001 Biggleswade South and the A6001 Biggleswade North.
Lane closures: Lane one will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: From 20:00 on 22 Jan 2025 to 05:00 on 23 Jan 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 14.69 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane closures: Lanes 2, 3 and 4 will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 20 Jan 2025 to 05:00 on 21 Jan 2025.
Lanes Closed: There will be three of four lanes closed.
Nearest town: 15.58 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound between junctions J11A and J11 (Luton) .
Lane closures: The hard shoulder will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 20 Jan 2025 to 22 Jan 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 7.15 miles from Higher Berry End.
ROAD WORKS
Location: The M1 southbound entry slip at junction J11A .
Lane closures: Lane one will be closed.
Reason: Emergency barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 20 Jan 2025 to 22 Jan 2025.
Lanes Closed: There will be one of two lanes closed.
Nearest town: 6.27 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J13 (Milton Keynes) and J14 (Milton Keynes) .
Reason: Litter clearance is planned.
Status: Pending.
Schedule: From 22:00 on 21 Jan 2025 to 05:00 on 22 Jan 2025.
Nearest town: 3.94 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane closures: Lane one will be closed.
Reason: Roadside equipment maintenance is planned.
Status: Pending.
Schedule: From 22:00 on 21 Jan 2025 to 05:00 on 22 Jan 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 9.86 miles from Higher Berry End.
ROAD WORKS
Location: The M1 northbound between junctions J11A and J12 (Flitwick) .
Lane closures: Lane one will be closed.
Reason: Barrier repairs are planned.
Status: Pending.
Schedule: Expect disruption everyday between 22:00 and 05:00 from 21 Jan 2025 to 23 Jan 2025.
Lanes Closed: There will be one of four lanes closed.
Nearest town: 4.67 miles from Higher Berry End.

Traffic in Nearby Villages

Higher Berry End


Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone, tablet or any electronic device without a hands-free kit whilst driving. If you're caught by the police using any device that can send or receive data whilst driving or riding a motorcyle you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web:

National Highways TrafficNational Highways England

Official source of traffic updates.

Transport for LondonTransport for London (TFL)

Transport for London's (TfL) portal for transportation in London.

Traffic WalesTraffic Wales

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location: southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .

Due to: Police incident.



Time To Clear : The event is expected to clear between 22:30 and 22:45 on 18 January 2025.

Normal traffic conditions are expected between 22:30 and 22:45 on 18 January 2025.

Lanes Closed : All lanes are closed.
Nearest town: 14.04 miles from Higher Berry End.

51.82--0.42

Location: southbound exit slip at junction J15 (Northampton) .

Lane Closures : Lane one is closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 02:15 and 02:30 on 19 January 2025.

Normal traffic conditions are expected between 02:15 and 02:30 on 19 January 2025.

Lanes Closed : There is one of two lanes closed.
Nearest town: 19.01 miles from Higher Berry End.

52.19--0.9

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : The hard shoulder and lane 1 are closed.

Due to: Broken down vehicle.



Time To Clear : The event is expected to clear between 23:45 and 00:00 on 19 January 2025.

Normal traffic conditions are expected between 23:45 and 00:00 on 19 January 2025.

Lanes Closed : There is one of four lanes closed.
Nearest town: 9.09 miles from Higher Berry End.

52.08--0.74

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .

Due to: Police incident.



Time To Clear : The event is expected to clear between 22:30 and 22:45 on 18 January 2025.

Normal traffic conditions are expected between 22:30 and 22:45 on 18 January 2025.

Lanes Closed : There are lane closures.
Nearest town: 15.44 miles from Higher Berry End.

51.8--0.41

Location: southbound between the junctions with the A428 and the A421 .

Due to: Roadworks.



Period : from 20:54 on 17 January 2025 to 05:00 on 20 January 2025.

Delay : There are currently delays of 15 minutes against expected traffic.

Lanes Closed : All lanes are closed.
Nearest town: 18.35 miles from Higher Berry End.

52.2--0.3

Location: southbound between the junctions with the A14 and the A428 .

Lane Closures : Lane two is closed.

Due to: Roadworks.



Period : expect disruption until 05:00 on 20 January 2025.

Lanes Closed : There is one of two lanes closed.
Nearest town: 19.82 miles from Higher Berry End.

52.23--0.29

Location: southbound between the A14 and the junction with the A428 .

Due to: Roadworks.



Period : expect disruption until 05:00 on 20 January 2025.

Lanes Closed : All lanes are closed.
Nearest town: 18.93 miles from Higher Berry End.

52.21--0.3

Location: northbound between the A421 and the junction with the A428 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 19 January 2025 to 05:00 on 20 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 17.35 miles from Higher Berry End.

52.18--0.31

Location: southbound between the A428 and the junction with the A421 .

Due to: Roadworks.



Period : expect disruption until 05:00 on 20 January 2025.

Lanes Closed : All lanes are closed.
Nearest town: 18.78 miles from Higher Berry End.

52.21--0.29

Location: northbound between the junctions with the A421 and the A428 .

Due to: Roadworks.



Period : expect disruption until 00:01 on 10 April 2025.
Nearest town: 17.36 miles from Higher Berry End.

52.19--0.31

Location: northbound between the junctions with the A603 and the A421 .

Due to: Roadworks.



Period : expect disruption until 00:01 on 10 April 2025.
Nearest town: 16.9 miles from Higher Berry End.

52.17--0.3

Location: southbound.

Due to: Roadworks.



Period : expect disruption until 05:00 on 19 January 2025.

Lanes Closed : All lanes are closed.
Nearest town: 17.03 miles from Higher Berry End.

52.18--0.3

Location: northbound between the junctions with the A508 and the A43 .

Due to: Roadworks.



Period : expect disruption until 06:00 on 20 January 2025.
Nearest town: 15.04 miles from Higher Berry End.

52.08--0.9

Location: southbound between the junctions with the A43 and the A508 .

Due to: Roadworks.



Period : expect disruption until 06:00 on 20 January 2025.
Nearest town: 15.08 miles from Higher Berry End.

52.08--0.9

Location: northbound between the A507 and the junction with the A6001 Biggleswade South .

Lane Closures : Lane one is closed.

Due to: Barrier repairs.



Period : expect disruption until 05:00 on 19 January 2025.

Lanes Closed : There is one of two lanes closed.
Nearest town: 15.3 miles from Higher Berry End.

52.04--0.22

Location: southbound between the A6001 Biggleswade South and the junction with the A507 .

Lane Closures : Lane one is closed.

Due to: Barrier repairs.



Period : expect disruption until 05:00 on 19 January 2025.

Lanes Closed : There is one of two lanes closed.
Nearest town: 15.03 miles from Higher Berry End.

52.07--0.24

Location: southbound between the junctions with the A1 and the A4280 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.8 miles from Higher Berry End.

52.18--0.32

Location: southbound between the A422 and the junction with the A509 .

Due to: Roadworks scheme.



Period : from 19:40 on 17 January 2025 to 06:00 on 29 January 2025.
Nearest town: 13.53 miles from Higher Berry End.

52.07--0.87

Location: northbound between the A422 and the junction with the A508 .

Due to: Roadworks scheme.



Period : from 20:02 on 17 January 2025 to 06:00 on 20 February 2025.
Nearest town: 10.47 miles from Higher Berry End.

52.05--0.81

Location: southbound between the A428 and the junction with the A421 .

Due to: Roadworks scheme.



Period : from 21:00 on 17 January 2025 to 05:00 on 21 January 2025.
Nearest town: 18.78 miles from Higher Berry End.

52.21--0.29

Location: The A1M northbound between junctions J8 and J9 .

Lane Closures : The hard shoulder is closed.

Due to: Roadworks.



Period : expect disruption until 12:00 on 8 December 2025.
Nearest town: 15.73 miles from Higher Berry End.

51.95--0.21

Location: northbound between the junctions with the A4280 and the A1 .

Due to: Roadworks scheme.



Period : from 11:42 on 20 August 2024 to 00:01 on 10 April 2025.
Nearest town: 12.67 miles from Higher Berry End.

52.14--0.4

Location: southbound.

Due to: Roadworks scheme.



Period : from 21:00 on 17 January 2025 to 05:00 on 19 January 2025.
Nearest town: 19.04 miles from Higher Berry End.

52.21--0.3

Location: southbound exit slip at junction J11A .

Due to: Roadworks scheme.



Period : from 22:00 on 17 January 2025 to 05:00 on 22 March 2025.
Nearest town: 5.9 miles from Higher Berry End.

51.93--0.49

Location: northbound between the junctions with the A603 and the A421 .

Due to: Roadworks scheme.



Period : from 05:00 on 28 April 2024 to 00:01 on 10 April 2025.
Nearest town: 14.74 miles from Higher Berry End.

52.11--0.28

Location: southbound between the junctions with the A1 and the A4280 .

Due to: Roadworks scheme.



Period : from 10:23 on 30 November 2023 to 00:01 on 10 April 2025.
Nearest town: 17.29 miles from Higher Berry End.

52.18--0.31

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 24 January 2025 to 05:00 on 25 January 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.84 miles from Higher Berry End.

52.12--0.8

Location: northbound between junctions J11A and J12 (Flitwick) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.67 miles from Higher Berry End.

51.95--0.5

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.08 miles from Higher Berry End.

51.96--0.52

Location: northbound between junctions J11A and J12 (Flitwick) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 4.67 miles from Higher Berry End.

51.95--0.5

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 3.08 miles from Higher Berry End.

51.96--0.52

Location: northbound between junctions J11A and J12 (Flitwick) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 4.67 miles from Higher Berry End.

51.95--0.5

Location: northbound at junction J11 (Luton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 8.5 miles from Higher Berry End.

51.89--0.47

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 11.08 miles from Higher Berry End.

51.86--0.43

Location: northbound at junction J11 (Luton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 8.5 miles from Higher Berry End.

51.89--0.47

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 11.08 miles from Higher Berry End.

51.86--0.43

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.83 miles from Higher Berry End.

51.81--0.41

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .

Lane Closures : Lanes 1, 2, 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.17 miles from Higher Berry End.

51.82--0.42

Location: northbound entry slip at junction J11 (Luton) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 8.32 miles from Higher Berry End.

51.89--0.47

Location: northbound between junctions J13 (Milton Keynes) and J14 (Milton Keynes) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 2.79 miles from Higher Berry End.

52.03--0.61

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 3.08 miles from Higher Berry End.

51.96--0.52

Location: northbound at junction J10 (Luton Airport) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 11.9 miles from Higher Berry End.

51.85--0.42

Location: northbound at junction J10 (Luton Airport) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 11.84 miles from Higher Berry End.

51.85--0.42

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.81 miles from Higher Berry End.

51.82--0.42

Location: northbound exit slip at junction J10 (Luton Airport) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.91 miles from Higher Berry End.

51.85--0.42

Location: northbound exit slip at junction J11 (Luton) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 8.5 miles from Higher Berry End.

51.89--0.47

Location: northbound between junctions J11A and J12 (Flitwick) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 5.57 miles from Higher Berry End.

51.93--0.5

Location: northbound at junction J11A .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 6.5 miles from Higher Berry End.

51.92--0.49

Location: northbound between junctions J11 (Luton) and J11A .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2025 to 05:00 on 30 September 2025.
Nearest town: 8.04 miles from Higher Berry End.

51.9--0.47

Location: northbound between junctions J11A and J12 (Flitwick) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 5.57 miles from Higher Berry End.

51.93--0.5

Location: northbound at junction J11A .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 6.5 miles from Higher Berry End.

51.92--0.49

Location: northbound between junctions J11 (Luton) and J11A .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 05:00 on 1 February 2025 to 22:00 on 29 September 2025.
Nearest town: 8.04 miles from Higher Berry End.

51.9--0.47

Location: northbound exit slip at junction J11A .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 6.5 miles from Higher Berry End.

51.92--0.49

Location: northbound between junctions J10 (Luton Airport) and J12 (Flitwick) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.69 miles from Higher Berry End.

51.85--0.42

Location: southbound exit slip at junction J10 (Luton Airport) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.5 miles from Higher Berry End.

51.86--0.43

Location: southbound exit slip at junction J12 (Flitwick) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 4 February 2025 to 05:00 on 5 February 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 March 2025 to 22 March 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 3.17 miles from Higher Berry End.

51.96--0.52

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 4 February 2025 to 05:00 on 5 February 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 March 2025 to 22 March 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 2.5 miles from Higher Berry End.

52.03--0.6

Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.75 miles from Higher Berry End.

51.85--0.42

Location: southbound between junctions J11A and J10 (Luton Airport) .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 5.9 miles from Higher Berry End.

51.93--0.49

Location: southbound at junction J10 (Luton Airport) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 25 January 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.5 miles from Higher Berry End.

51.86--0.43

Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 25 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.14 miles from Higher Berry End.

51.88--0.46

Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.67 miles from Higher Berry End.

51.89--0.47

Location: southbound entry slip at junction J11 (Luton) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 8.37 miles from Higher Berry End.

51.89--0.47

Location: southbound between junctions J14 (Milton Keynes) and J13 (Milton Keynes) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 4 February 2025 to 05:00 on 5 February 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 March 2025 to 22 March 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 3.95 miles from Higher Berry End.

52.04--0.64

Location: southbound at junction J11 (Luton) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.2 miles from Higher Berry End.

51.9--0.47

Location: southbound exit slip at junction J11 (Luton) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 8.2 miles from Higher Berry End.

51.9--0.47

Location: southbound exit slip at junction J9 (Dunstable A5) .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.64 miles from Higher Berry End.

51.82--0.42

Location: southbound.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 4 February 2025 to 05:00 on 5 February 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 March 2025 to 22 March 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 4.57 miles from Higher Berry End.

51.95--0.5

Location: southbound exit slip at junction J11A .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 4 February 2025 to 05:00 on 5 February 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 March 2025 to 22 March 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 5.9 miles from Higher Berry End.

51.93--0.49

Location: southbound entry slip at junction J11A .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 6.27 miles from Higher Berry End.

51.92--0.49

Location: southbound between junctions J12 (Flitwick) and J11A .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 10 February 2025 to 16 February 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.13 miles from Higher Berry End.

51.94--0.5

Location: southbound between junctions J11A and J11 (Luton) .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.62 miles from Higher Berry End.

51.9--0.48

Location: southbound between junctions J12 (Flitwick) and J11A .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 4 February 2025 to 05:00 on 5 February 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 March 2025 to 22 March 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 3.53 miles from Higher Berry End.

51.96--0.52

Location: southbound exit slip at Toddington Services.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 4 February 2025 to 05:00 on 5 February 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 March 2025 to 22 March 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 4.38 miles from Higher Berry End.

51.95--0.5

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 3 February 2025 to 05:00 on 4 February 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 5 February 2025 to 8 February 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 1.36 miles from Higher Berry End.

52--0.54

Location: southbound at junction J13 (Milton Keynes) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 4 February 2025 to 05:00 on 5 February 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 March 2025 to 22 March 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 2.79 miles from Higher Berry End.

52.03--0.61

Location: northbound between the junctions with the A509 and the A422 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 February 2025 to 20 February 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.69 miles from Higher Berry End.

52.04--0.79

Location: southbound at the junction with the A422 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.53 miles from Higher Berry End.

52.07--0.87

Location: southbound between the A508 and the junction with the A422 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 17 January 2025 to 06:00 on 18 January 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.46 miles from Higher Berry End.

52.07--0.87

Location: southbound between the A422 and the junction with the A509 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.37 miles from Higher Berry End.

52.05--0.8

Location: northbound between the A509 and the junction with the A422 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 February 2025 to 20 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 9.76 miles from Higher Berry End.

52.04--0.79

Location: northbound between the A422 and the junction with the A508 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 February 2025 to 20 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 10.47 miles from Higher Berry End.

52.05--0.81

Location: northbound at the junction with the A508 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.45 miles from Higher Berry End.

52.07--0.87

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 23 January 2025 to 05:00 on 24 January 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 9 miles from Higher Berry End.

52.08--0.74

Location: southbound between the junctions with the A4146 South and the A4012 .

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 01:00 on 21 January 2025 to 06:00 on 21 January 2025.
Nearest town: 3.84 miles from Higher Berry End.

51.94--0.61

Location: southbound between the junctions with the A4146 South and the A4012 .

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 20 January 2025 to 01:00 on 21 January 2025.
Nearest town: 3.62 miles from Higher Berry End.

51.95--0.62

Location: northbound between the junctions with the A4012 and the A4146 Bletchley South.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 01:00 on 21 January 2025 to 06:00 on 21 January 2025.
Nearest town: 3.87 miles from Higher Berry End.

51.94--0.61

Location: northbound between the junctions with the A4012 and the A4146 Bletchley South.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 20 January 2025 to 01:00 on 21 January 2025.
Nearest town: 3.64 miles from Higher Berry End.

51.95--0.62

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 23 January 2025 to 05:00 on 24 January 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 1.95 miles from Higher Berry End.

52.02--0.59

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 21 January 2025 to 05:00 on 22 January 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.5 miles from Higher Berry End.

51.88--0.45

Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 23 January 2025 to 05:00 on 24 January 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.57 miles from Higher Berry End.

52.07--0.73

Location: southbound exit slip to the A428 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 27 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 10 February 2025 to 15 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.89 miles from Higher Berry End.

52.21--0.3

Location: The A1M southbound between junctions J8 and J7 .

Lane Closures : Lane two will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 22 January 2025 to 05:00 on 23 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.75 miles from Higher Berry End.

51.92--0.23

Location: southbound between the junctions with the A5183 and the M1 .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 22 January 2025 to 05:00 on 23 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.98 miles from Higher Berry End.

51.92--0.5

Location: northbound between junctions J11 (Luton) and J11A .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 22 January 2025 to 05:00 on 23 January 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.75 miles from Higher Berry End.

51.9--0.48

Location: northbound between the junctions with the A6001 Biggleswade South and the A6001 Biggleswade North.

Lane Closures : Lane one will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 22 January 2025 to 05:00 on 23 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.69 miles from Higher Berry End.

52.08--0.25

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.58 miles from Higher Berry End.

51.79--0.41

Location: southbound between junctions J11A and J11 (Luton) .

Lane Closures : The hard shoulder will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 22 January 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.15 miles from Higher Berry End.

51.91--0.48

Location: southbound entry slip at junction J11A .

Lane Closures : Lane one will be closed.

Due to: Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 22 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.27 miles from Higher Berry End.

51.92--0.49

Location: northbound between junctions J13 (Milton Keynes) and J14 (Milton Keynes) .

Due to: Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 21 January 2025 to 05:00 on 22 January 2025.
Nearest town: 3.94 miles from Higher Berry End.

52.04--0.64

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 21 January 2025 to 05:00 on 22 January 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.86 miles from Higher Berry End.

52.09--0.75

Location: northbound between junctions J11A and J12 (Flitwick) .

Lane Closures : Lane one will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 21 January 2025 to 23 January 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 4.67 miles from Higher Berry End.

51.95--0.5

Location: northbound entry slip at junction J9 (Dunstable A5) .

Lane Closures : Lane one will be closed.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 22:00 on 21 January 2025 to 05:00 on 22 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 13.81 miles from Higher Berry End.

51.82--0.42

Location: northbound exit slip at junction J10 (Luton Airport) .

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 22:00 on 21 January 2025 to 05:00 on 22 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.91 miles from Higher Berry End.

51.85--0.42

Location: northbound between junctions J8 (Hemel Hstead) and J10 (Luton Airport) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 22:00 on 21 January 2025 to 05:00 on 22 January 2025.

Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.54 miles from Higher Berry End.

51.81--0.42

Location: northbound exit slip at junction J9 (Dunstable A5) .

Due to: Roadside drains works are planned.

Status : Pending.

Schedule : From 22:00 on 21 January 2025 to 05:00 on 22 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 14.03 miles from Higher Berry End.

51.82--0.42

Location: northbound between junctions J11A and J12 (Flitwick) .

Lane Closures : Lane one will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 21 January 2025 to 23 January 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.09 miles from Higher Berry End.

51.94--0.5

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .

Lane Closures : Lane one will be closed.

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.79 miles from Higher Berry End.

52.03--0.61

Location: southbound entry slip at junction J13 (Milton Keynes) .

Due to: Roadside equipment maintenance is planned.

Status : Pending.

Schedule : From 22:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 2.5 miles from Higher Berry End.

52.03--0.6

Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .

Lane Closures : Lane three will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.13 miles from Higher Berry End.

51.87--0.44

Location: southbound between junctions J10 (Luton Airport) and J9 (Dunstable A5) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 22:00 on 20 January 2025 to 05:00 on 22 January 2025.
Nearest town: 12.82 miles from Higher Berry End.

51.84--0.42

Location: southbound between junctions J10 (Luton Airport) and J9 (Dunstable A5) .

Lane Closures : Lanes 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 21 January 2025 to 05:00 on 22 January 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.82 miles from Higher Berry End.

51.84--0.42

Location: southbound between junctions J10 (Luton Airport) and J9 (Dunstable A5) .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.82 miles from Higher Berry End.

51.84--0.42

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .

Lane Closures : Lane three will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.08 miles from Higher Berry End.

51.86--0.43

Location: northbound between junctions J6 (Watford A405) and J10 (Luton Airport) .

Lane Closures : Lanes 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.74 miles from Higher Berry End.

51.75--0.4

Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .

Lane Closures : Lanes 3 and 4 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 January 2025 to 1 February 2025.

Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.5 miles from Higher Berry End.

51.86--0.43

Location: northbound at junction J11 (Luton) .

Lane Closures : Lane one will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 8.5 miles from Higher Berry End.

51.89--0.47

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .

Lane Closures : Lane one will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.2 miles from Higher Berry End.

51.88--0.46

Location: northbound exit slip at junction J11 (Luton) .

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 8.5 miles from Higher Berry End.

51.89--0.47

Location: northbound between junctions J11 (Luton) and J11A .

Lane Closures : Lane one will be closed.

Due to: Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.04 miles from Higher Berry End.

51.9--0.47

Location: The A1M southbound between junctions J7 and J6 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 27 January 2025 to 05:00 on 28 January 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.8 miles from Higher Berry End.

51.86--0.2

Location: The A1M southbound between junctions J7 and J6 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 27 January 2025 to 05:00 on 28 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 19.05 miles from Higher Berry End.

51.84--0.2

Location: The A1M southbound between junctions J7 and J6 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 January 2025 to 05:00 on 23 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.59 miles from Higher Berry End.

51.86--0.2

Location: The A1M southbound between junctions J7 and J6 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 January 2025 to 25 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.59 miles from Higher Berry End.

51.86--0.2

Location: The A1M southbound between junctions J7 and J6 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 27 January 2025 to 05:00 on 28 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.59 miles from Higher Berry End.

51.86--0.2

Location: The A1M northbound between junctions J6 and J7 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 20 January 2025 to 05:00 on 28 January 2025.
Nearest town: 19.08 miles from Higher Berry End.

51.84--0.2

Location: The A1M northbound between junctions J6 and J7 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 January 2025 to 05:00 on 23 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 19.08 miles from Higher Berry End.

51.84--0.2

Location: The A1M northbound between junctions J6 and J7 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 27 January 2025 to 05:00 on 28 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.08 miles from Higher Berry End.

51.84--0.2

Location: The A1M northbound between junctions J6 and J7 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 January 2025 to 05:00 on 23 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 18.79 miles from Higher Berry End.

51.86--0.2

Location: The A1M northbound between junctions J6 and J7 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 January 2025 to 05:00 on 23 January 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.04 miles from Higher Berry End.

51.84--0.2

Location: The A1M northbound between junctions J6 and J7 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 January 2025 to 22 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.08 miles from Higher Berry End.

51.84--0.2

Location: The A1M southbound between junctions J7 and J6 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 22 January 2025 to 05:00 on 28 January 2025.
Nearest town: 18.59 miles from Higher Berry End.

51.86--0.2

Location: The A1M southbound between junctions J7 and J6 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 27 January 2025 to 05:00 on 28 January 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.14 miles from Higher Berry End.

51.84--0.21

Location: The A1M southbound between junctions J7 and J6 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 January 2025 to 05:00 on 23 January 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.14 miles from Higher Berry End.

51.84--0.21

Location: The A1M southbound between junctions J7 and J6 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 23 January 2025 to 25 January 2025.

Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.14 miles from Higher Berry End.

51.84--0.21

Location: southbound between the junctions with the A6 Bedford south and the M1 .

Lane Closures : Lane one will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.61 miles from Higher Berry End.

52.09--0.52

Location: The A1M southbound between junctions J10 and J9 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 20 January 2025 to 05:00 on 15 March 2025.
Nearest town: 16.14 miles from Higher Berry End.

51.98--0.2

Location: The A1M southbound between junctions J10 and J9 .

Lane Closures : Lane two will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 February 2025 to 15 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 February 2025 to 22 February 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.14 miles from Higher Berry End.

51.98--0.2

Location: The A1M southbound at junction J9 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 February 2025 to 15 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 17 February 2025 to 22 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 16.07 miles from Higher Berry End.

51.97--0.2

Location: The A1M northbound between junctions J8 and J9 .

Lane Closures : Lanes 2 and 3 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 27 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 February 2025 to 15 February 2025.

Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.76 miles from Higher Berry End.

51.95--0.21

Location: The A1M northbound at junction J9 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 27 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 February 2025 to 15 February 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 15.78 miles from Higher Berry End.

51.96--0.21

Location: The A1M southbound exit slip at junction J9 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 27 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 February 2025 to 15 February 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.07 miles from Higher Berry End.

51.97--0.2

Location: The A1M northbound exit slip at junction J9 .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 20 January 2025 to 05:00 on 15 March 2025.
Nearest town: 15.78 miles from Higher Berry End.

51.96--0.21

Location: The A1M northbound exit slip at junction J9 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 20 January 2025 to 25 January 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 27 January 2025 to 1 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 3 February 2025 to 8 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 February 2025 to 15 February 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.78 miles from Higher Berry End.

51.96--0.21

Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .

Lane Closures : Lane one will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.31 miles from Higher Berry End.

52.17--0.87

Location: southbound between the junctions with the A428 and the A421 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 January 2025 to 05:00 on 21 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.38 miles from Higher Berry End.

52.2--0.3

Location: northbound between the junctions with the A4280 and the A1 .

Due to: Roadworks.



Period : expect disruption until 07:00 on 10 February 2025.
Nearest town: 17.04 miles from Higher Berry End.

52.18--0.31

Location: southbound between the junctions with the A1 and the A4280 .

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 17:00 on 14 February 2025 to 00:01 on 10 April 2025.
Nearest town: 17.03 miles from Higher Berry End.

52.18--0.31

Location: southbound between the junctions with the A1 and the A4280 .

Due to: Roadworks.



Period : expect disruption until 07:00 on 10 February 2025.
Nearest town: 17.29 miles from Higher Berry End.

52.18--0.31

Location: northbound between the junctions with the A421 and the A428 .

Lane Closures : Lane one will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 07:00 and 17:00 from 10 February 2025 to 14 February 2025.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 February 2025 to 22 February 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.02 miles from Higher Berry End.

52.19--0.3

Location: northbound between the A603 and the junction with the A1 .

Lane Closures : Lanes 1 and 2 will be closed.

Due to: Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 17 January 2025 to 06:00 on 18 January 2025.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.

Lanes Closed : All lanes will be closed.
Nearest town: 11.31 miles from Higher Berry End.

52.13--0.42

Location: northbound between the A6 Bedford central and the junction with the A603 .

Lane Closures : Lane two will be closed.

Due to: Barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.

Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.8 miles from Higher Berry End.

52.11--0.45

Location: westbound between the A509 North and the junction with the A5076 Northampton East.

Lane Closures : Lane one is closed.

Due to: Roadworks.



Period : expect disruption until 06:00 on 23 January 2025.

Lanes Closed : There is one of two lanes closed.
Nearest town: 19.36 miles from Higher Berry End.

52.26--0.75

Location: northbound between junctions J10 (Luton Airport) and J14 (Milton Keynes) .

Due to: Roadworks scheme is planned.

Status : Pending.

Schedule : From 22:00 on 27 January 2025 to 05:00 on 30 September 2025.
Nearest town: 11.9 miles from Higher Berry End.

51.85--0.42