Location: southbound between junctions M1 and J12 .
Due to: Roadworks scheme.
Period : from 20:04 on 22 May 2025 to 06:00 on 11 June 2025.
Nearest town: 17.59 miles from Heage.

Location: northbound between junctions J23 and J23A (Tamworth) .
Due to: Roadworks scheme.
Period : from 20:05 on 22 May 2025 to 06:00 on 21 June 2025.
Nearest town: 16.94 miles from Heage.

Location: southbound between the A516 and the junction with the A50 .
Due to: Roadworks scheme.
Period : from 20:06 on 20 May 2025 to 06:00 on 31 May 2025.
Nearest town: 10.06 miles from Heage.

Location: northbound between the A50 and the junction with the A516 .
Due to: Roadworks scheme.
Period : from 20:10 on 12 May 2025 to 06:00 on 31 May 2025.
Nearest town: 12.7 miles from Heage.

Location: northbound between junctions J13 and .
Due to: Roadworks scheme.
Period : from 20:05 on 22 May 2025 to 06:00 on 21 June 2025.
Nearest town: 16.48 miles from Heage.

Location: northbound between junction J14 and the M1 .
Due to: Roadworks scheme.
Period : from 20:03 on 22 May 2025 to 06:00 on 21 June 2025.
Nearest town: 19.56 miles from Heage.

Location: northbound between the junctions with the A61 Alfreton and the M1 .
Due to: Roadworks scheme.
Period : from 20:02 on 21 May 2025 to 06:00 on 21 June 2025.
Nearest town: 5.81 miles from Heage.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks scheme.
Period : from 20:02 on 20 May 2025 to 06:00 on 18 April 2026.
Nearest town: 11.7 miles from Heage.

Location: westbound between the A6514 and the junction with the M1 .
Due to: Roadworks scheme.
Period : from 20:02 on 20 May 2025 to 06:00 on 18 April 2026.
Nearest town: 12.36 miles from Heage.

Location: southbound exit slip at junction J28 (Matlock) .
Due to: Roadworks scheme.
Period : from 20:00 on 21 May 2025 to 06:00 on 21 June 2025.
Nearest town: 7.19 miles from Heage.

Location: northbound exit slip at junction J28 (Matlock) .
Due to: Roadworks scheme.
Period : from 20:00 on 21 May 2025 to 06:00 on 21 June 2025.
Nearest town: 6.99 miles from Heage.

Location: westbound exit slip to the M1 .
Due to: Roadworks scheme.
Period : from 20:00 on 21 May 2025 to 06:00 on 21 June 2025.
Nearest town: 10.55 miles from Heage.

Location: northbound exit slip at junction J25 (Nottingham) .
Due to: Roadworks scheme.
Period : from 20:00 on 21 May 2025 to 06:00 on 21 June 2025.
Nearest town: 10.2 miles from Heage.

Location: southbound exit slip at junction J25 (Nottingham) .
Due to: Roadworks scheme.
Period : from 20:00 on 21 May 2025 to 06:00 on 21 June 2025.
Nearest town: 10.29 miles from Heage.

Location: eastbound entry slip from the M1 .
Due to: Roadworks scheme.
Period : from 20:00 on 21 May 2025 to 06:00 on 21 June 2025.
Nearest town: 10.23 miles from Heage.

Location: northbound between junctions J23 and J23A (Tamworth) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 09:00 on 30 November 2025.
Nearest town: 18.86 miles from Heage.

Location: northbound between junctions J28 (Matlock) and J29 (Chesterfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 31 May 2025 to 2 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.47 miles from Heage.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 June 2025 to 06:00 on 2 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.64 miles from Heage.

Location: southbound entry slip at junction J25 (Nottingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 May 2025 to 06:00 on 1 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.29 miles from Heage.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 May 2025 to 06:00 on 1 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.64 miles from Heage.

Location: southbound between junctions J25 (Nottingham) and J24 (E.
Mids Airport) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 June 2025 to 06:00 on 2 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.15 miles from Heage.

Location: southbound between junctions J25 (Nottingham) and J24 (E.
Mids Airport) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 May 2025 to 06:00 on 1 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.15 miles from Heage.

Location: northbound between the A5121 Burton Upon Trent South and the junction with the A5121 Burton Upon Trent North.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 06:00 on 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.86 miles from Heage.

Location: northbound exit slip to the A5121 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 06:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.06 miles from Heage.

Location: southbound between the junctions with the A5121 Burton upon Trent North and the A5121 Burton upon Trent South.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.15 miles from Heage.

Location: westbound between the A606 and the junction with the A60 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.49 miles from Heage.

Location: westbound between the junctions with the A6011 and the A606 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.54 miles from Heage.

Location: eastbound at the junction with the A606 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.45 miles from Heage.

Location: northbound at the junction with the A52 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.12 miles from Heage.

Location: eastbound at the junction with the A453 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.86 miles from Heage.

Location: eastbound at the junction with the A453 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.62 miles from Heage.

Location: eastbound entry slip from the A453 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.75 miles from Heage.

Location: eastbound at the junction with the A453 .
Lane Closures : Lane four will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.86 miles from Heage.

Location: northbound exit slip to the A52 eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.06 miles from Heage.

Location: northbound between the junctions with the M1 and the A52 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.98 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.02 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.99 miles from Heage.

Location: northbound between the M1 and the junction with the A52 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.97 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.01 miles from Heage.

Location: northbound between junctions J23 and J23A (Tamworth) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.93 miles from Heage.

Location: southbound between junctions J23A (Tamworth) and J23 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.77 miles from Heage.

Location: southbound at junction J23A (Tamworth) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.74 miles from Heage.

Location: southbound between junctions J24 (E.
Mids Airport) and J23A (Tamworth) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.25 miles from Heage.

Location: southbound between junctions J23A (Tamworth) and J23 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.63 miles from Heage.

Location: northbound entry slip at junction J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.26 miles from Heage.

Location: northbound exit slip at junction J23A (Tamworth) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.41 miles from Heage.

Location: northbound.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.7 miles from Heage.

Location: northbound between junction J14 and the M1 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.34 miles from Heage.

Location: southbound exit slip at junction J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.74 miles from Heage.

Location: The junction of the A42 and the M1 J23A .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16 miles from Heage.

Location: northbound between the M1 and the junction with the A52 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 4 June 2025.
Nearest town: 14.11 miles from Heage.

Location: southbound between junctions M1 and J13 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.59 miles from Heage.

Location: northbound between junction J14 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : From 20:00 on 10 June 2025 to 06:00 on 11 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.66 miles from Heage.

Location: northbound between junctions J13 and M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.59 miles from Heage.

Location: northbound between junctions J23A (Tamworth) and J24 (E.
Mids Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.73 miles from Heage.

Location: northbound between junctions J23 and J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.94 miles from Heage.

Location: northbound entry slip at junction J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.26 miles from Heage.

Location: northbound between junction J14 and the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2025 to 06:00 on 23 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.48 miles from Heage.

Location: northbound exit slip at junction J23A (Tamworth) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2025 to 05:00 on 23 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.41 miles from Heage.

Location: The junction of the A42 and the M1 J23A .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 11 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16 miles from Heage.

Location: The junction of the A42 and the M1 J23A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.88 miles from Heage.

Location: northbound between the junctions with the A610 and the A61 Alfreton.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 05:00 on 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.61 miles from Heage.

Location: eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.89 miles from Heage.

Location: eastbound entry slip from the A514 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 28 May 2025 to 05:00 on 29 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.92 miles from Heage.

Location: eastbound exit slip to the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.14 miles from Heage.

Location: northbound exit slip at junction J25 (Nottingham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.45 miles from Heage.

Location: westbound exit slip to the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.3 miles from Heage.

Location: southbound exit slip at junction J25 (Nottingham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.06 miles from Heage.

Location: northbound between the junctions with the A61 Alfreton and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.81 miles from Heage.

Location: northbound exit slip at junction J28 (Matlock) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.06 miles from Heage.

Location: southbound exit slip at junction J28 (Matlock) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.19 miles from Heage.

Location: southbound between junctions J13 and J12 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 May 2025 to 05:00 on 29 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.67 miles from Heage.

Location: southbound between junctions M1 and J13 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 28 May 2025 to 05:00 on 29 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.33 miles from Heage.

Location: westbound between the A46 and the junction with the A6011 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 28 May 2025 to 17:30 on 31 October 2025.
Nearest town: 19.26 miles from Heage.

Location: eastbound between the A6011 and the junction with the A46 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 07:30 on 28 May 2025 to 17:30 on 31 October 2025.
Nearest town: 19.12 miles from Heage.

Location: northbound between junctions J28 (Matlock) and J30 (Chesterfield) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 29 May 2025.
Nearest town: 9.69 miles from Heage.

Location: northbound between junctions J28 (Matlock) and J29 (Chesterfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.69 miles from Heage.

Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.66 miles from Heage.

Location: northbound between the junctions with the M1 and the A52 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.97 miles from Heage.

Location: northbound between the M1 and the junction with the A52 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.99 miles from Heage.

Location: northbound between the junctions with the M1 and the A52 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.98 miles from Heage.

Location: northbound between the M1 and the junction with the A52 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.11 miles from Heage.

Location: southbound between junctions J29A (Markham Vale) and J28 (Matlock) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.05 miles from Heage.

Location: northbound between the junctions with the M1 and the A52 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.97 miles from Heage.

Location: southbound between the A52 and the junction with the M1 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 4 June 2025.
Nearest town: 13.99 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.11 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.98 miles from Heage.

Location: southbound between the A52 and the junction with the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.99 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.98 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.07 miles from Heage.

Location: southbound between the junctions with the A52 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.01 miles from Heage.

Location: southbound between the junctions with the A6 and the A52 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.39 miles from Heage.

Location: southbound between the junctions with the A52 and the A5111 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.57 miles from Heage.

Location: northbound at the junction with the A52 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.55 miles from Heage.

Location: southbound between the A52 and the junction with the A6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.35 miles from Heage.

Location: southbound entry slip from the A5111 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.12 miles from Heage.

Location: southbound exit slip to the A6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.08 miles from Heage.

Location: northbound exit slip to the A5111 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.28 miles from Heage.

Location: northbound between the A6 and the junction with the A52 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.27 miles from Heage.

Location: eastbound entry slip from the A5111 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.3 miles from Heage.

Location: northbound between the A6 and the junction with the A52 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.35 miles from Heage.

Location: westbound exit slip to the A5111 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.26 miles from Heage.

Location: westbound entry slip from the A5111 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.3 miles from Heage.

Location: southbound between junctions J30 (Chesterfield) and J29A (Markham Vale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.33 miles from Heage.

Location: northbound between the A61 Derby and the junction with the A610 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 05:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.73 miles from Heage.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Nearest town: 11.7 miles from Heage.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Nearest town: 11.7 miles from Heage.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Nearest town: 12.27 miles from Heage.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Nearest town: 12.27 miles from Heage.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 April 2026 to 06:00 on 18 April 2026.
Nearest town: 12.27 miles from Heage.

Location: eastbound between the junctions with the A6464 and the A6514 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 April 2026 to 06:00 on 18 April 2026.
Nearest town: 12.27 miles from Heage.

Location: westbound between the A6464 and the junction with the A6007 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.68 miles from Heage.

Location: westbound between the junctions with the A6005 and the A6514 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 6 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.68 miles from Heage.

Location: westbound at the junction with the A6005 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.98 miles from Heage.

Location: westbound entry slip from the A6005 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.86 miles from Heage.

Location: westbound exit slip to the A6005 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.02 miles from Heage.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.41 miles from Heage.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Nearest town: 12.36 miles from Heage.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Nearest town: 12.36 miles from Heage.

Location: westbound between the junctions with the A6514 and the A6464 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 05:59 on 18 April 2026 to 06:00 on 18 April 2026.
Nearest town: 12.36 miles from Heage.

Location: westbound exit slip to the A6514 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 06:00 on 24 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.57 miles from Heage.

Location: westbound between the junctions with the A6007 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.7 miles from Heage.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.55 miles from Heage.

Location: southbound between the junctions with the A610 and the A61 Derby.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.27 miles from Heage.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.29 miles from Heage.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 5 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.95 miles from Heage.

Location: southbound between junctions J26 (Nottingham) and J25 (Nottingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.26 miles from Heage.

Location: southbound between junctions J25 (Nottingham) and J24 (E.
Mids Airport) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.83 miles from Heage.

Location: eastbound between the A6 and the junction with the M1 J24A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.99 miles from Heage.

Location: eastbound between the A6 and the junction with the M1 J24A .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.99 miles from Heage.

Location: southbound between junctions J26 (Nottingham) and J24 (E.
Mids Airport) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 5 June 2025.
Nearest town: 9.26 miles from Heage.

Location: eastbound between the A6 and the junction with the M1 J24A .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 5 June 2025.
Nearest town: 12.99 miles from Heage.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.97 miles from Heage.

Location: northbound between the A50 and the junction with the A516 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.7 miles from Heage.

Location: southbound exit slip to the A50 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.2 miles from Heage.

Location: southbound between the A516 and the junction with the A50 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.06 miles from Heage.