Location: southbound between the junctions with the A634 and the A620 .
Lane Closures : Lane one is closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 22:00 and 22:15 on 29 May 2025.
Normal traffic conditions are expected between 22:00 and 22:15 on 29 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.93 miles from Fishlake.

Location: westbound between junctions J4 and J3 .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Road Management.
Time To Clear : The event is expected to clear between 20:00 and 20:15 on 29 May 2025.
Normal traffic conditions are expected between 20:00 and 20:15 on 29 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.31 miles from Fishlake.

Location: westbound between junctions J4 and J3 .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Vehicle fire.
Time To Clear : The event is expected to clear between 23:30 and 23:45 on 29 May 2025.
Normal traffic conditions are expected between 23:15 and 23:30 on 29 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.04 miles from Fishlake.

Location: westbound exit slip at junction J31 (Normanton) .
Due to: Congestion.
Normal traffic conditions are expected between 19:30 and 19:45 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.77 miles from Fishlake.

Location: southbound between the junctions with the A634 and the A620 .
Due to: Congestion.
Normal traffic conditions are expected between 19:45 and 20:00 on 29 May 2025.
Cause : Road traffic collision.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.43 miles from Fishlake.

Location: southbound between the junctions with the M62 and the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 19:15 and 19:30 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.05 miles from Fishlake.

Location: southbound between the M62 and the junction with the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.11 miles from Fishlake.

Location: northbound at the junction with the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 16:45 and 17:00 on 29 May 2025.
Nearest town: 8.67 miles from Fishlake.

Location: southbound between the junctions with the M62 and the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 17:00 and 17:15 on 29 May 2025.
Nearest town: 11.05 miles from Fishlake.

Location: southbound between the M62 and the junction with the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 16:00 and 16:15 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.11 miles from Fishlake.

Location: northbound at the junction with the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 15:45 and 16:00 on 29 May 2025.
Nearest town: 8.32 miles from Fishlake.

Location: southbound between the junctions with the M62 and the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 15:00 and 15:15 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.05 miles from Fishlake.

Location: northbound between the A638 and the junction with the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 17:15 and 17:30 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.33 miles from Fishlake.

Location: The A1M southbound between junctions J41 and J40 .
Due to: Congestion.
Normal traffic conditions are expected between 18:30 and 18:45 on 29 May 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.47 miles from Fishlake.

Location: The A1M northbound between junctions J42 and J45 .
Due to: Roadworks.
Period : from 20:17 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.43 miles from Fishlake.

Location: northbound between junctions J4 (Doncaster) and J5 (Scunthorpe) .
Due to: Roadworks.
Period : from 20:17 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4.49 miles from Fishlake.

Location: southbound between the junctions with the A18 and the M180 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 30 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.27 miles from Fishlake.

Location: southbound between junctions J5 (Scunthorpe) and J4 (Doncaster) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 22:00 on 6 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 1.61 miles from Fishlake.

Location: southbound between junctions J6 (Selby) and J5 (Scunthorpe) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 22:00 on 6 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 1.22 miles from Fishlake.

Location: eastbound between junctions J35 (M18) and J36 (Goole) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 7.29 miles from Fishlake.

Location: westbound between junctions J37 (Howden) and J36 (Goole) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 8.71 miles from Fishlake.

Location: southbound between junctions J48 and J47 (Wetherby) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.26 miles from Fishlake.

Location: southbound exit slip at junction J47 (Wetherby) .
Due to: Roadworks scheme.
Period : from 20:30 on 29 May 2025 to 06:00 on 30 May 2025.
Nearest town: 19.25 miles from Fishlake.

Location: southbound exit slip at junction J47 (Wetherby) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.25 miles from Fishlake.

Location: The A1M northbound between junctions J41 and J42 .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.33 miles from Fishlake.

Location: northbound entry slip at junction J47 (Wetherby) .
Due to: Road repairs.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.48 miles from Fishlake.

Location: westbound between junctions J5 and J3 .
Due to: Roadworks scheme.
Period : from 20:12 on 27 May 2025 to 06:00 on 14 June 2025.
Nearest town: 19.92 miles from Fishlake.

Location: eastbound between junctions J3 and J4 .
Due to: Roadworks scheme.
Period : from 20:11 on 27 May 2025 to 06:00 on 14 June 2025.
Nearest town: 15.36 miles from Fishlake.

Location: northbound between junctions J32 (Doncaster) and J36 (Barnsley) .
Due to: Roadworks scheme.
Period : from 20:13 on 19 May 2025 to 06:00 on 30 May 2025.
Nearest town: 18.51 miles from Fishlake.

Location: southbound between the M62 and the junction with the A639 .
Due to: Roadworks scheme.
Period : from 10:04 on 14 May 2025 to 06:00 on 21 December 2025.
Nearest town: 10.83 miles from Fishlake.

Location: southbound between the junctions with the M62 and the A639 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 21 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.33 miles from Fishlake.

Location: southbound between the M62 and the junction with the A639 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 21 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.83 miles from Fishlake.

Location: northbound between the A639 and the junction with the M62 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 21 December 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.14 miles from Fishlake.

Location: southbound between junctions J7 (Hull) and J4 (Doncaster) .
Due to: Roadworks scheme.
Period : from 20:16 on 19 May 2025 to 06:00 on 24 September 2025.
Nearest town: 2.52 miles from Fishlake.

Location: westbound between junction J2 and the M18 .
Due to: Roadworks scheme.
Period : from 20:04 on 28 May 2025 to 06:00 on 23 September 2025.
Nearest town: 2.12 miles from Fishlake.

Location: northbound between junctions J3 (Doncaster) and J6 (Selby) .
Due to: Roadworks scheme.
Period : from 20:04 on 27 May 2025 to 06:00 on 22 September 2025.
Nearest town: 5.56 miles from Fishlake.

Location: southbound exit slip to the A638 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.13 miles from Fishlake.

Location: The A1M southbound between junctions J41 and J40 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 17 August 2025.
Nearest town: 12.16 miles from Fishlake.

Location: The A1M northbound.
Due to: Roadworks scheme.
Period : from 11:20 on 13 September 2024 to 06:00 on 30 August 2025.
Nearest town: 9.05 miles from Fishlake.

Location: The A1M northbound.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.01 miles from Fishlake.

Location: The A1M northbound.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 August 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.05 miles from Fishlake.

Location: southbound between the A18 and the junction with the M180 .
Due to: Roadworks scheme.
Period : from 06:00 on 20 January 2025 to 06:00 on 2 June 2025.
Nearest town: 13.24 miles from Fishlake.

Location: westbound entry slip at junction J32 (Pontefract) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 05:00 on 6 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.46 miles from Fishlake.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.96 miles from Fishlake.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.36 miles from Fishlake.

Location: southbound at junction J32 (Doncaster) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.48 miles from Fishlake.

Location: northbound at junction J32 (Doncaster) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 5 June 2025 to 06:00 on 6 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.02 miles from Fishlake.

Location: southbound between the junctions with the A18 and the M180 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.28 miles from Fishlake.

Location: southbound between the junctions with the A18 and the M180 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.24 miles from Fishlake.

Location: eastbound between junctions J2 and J3 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.09 miles from Fishlake.

Location: eastbound entry slip at junction J3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.18 miles from Fishlake.

Location: westbound entry slip at junction J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.18 miles from Fishlake.

Location: westbound exit slip at junction J3 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.11 miles from Fishlake.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 4 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.22 miles from Fishlake.

Location: eastbound between junctions J1 and J2 .
Lane Closures : Lane three will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 10:00 on 5 June 2025 to 14:30 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.92 miles from Fishlake.

Location: eastbound between junctions J2 and J3 .
Lane Closures : Lane three will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 10:00 on 5 June 2025 to 14:30 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.86 miles from Fishlake.

Location: westbound between junctions J3 and J2 .
Lane Closures : Lane three will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 10:00 on 5 June 2025 to 14:30 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.69 miles from Fishlake.

Location: westbound at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 10:00 on 5 June 2025 to 14:30 on 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.95 miles from Fishlake.

Location: westbound between junctions J2 and J1 .
Lane Closures : Lane three will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 10:00 on 5 June 2025 to 14:30 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.4 miles from Fishlake.

Location: northbound at junction J33 (Sheffield) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.75 miles from Fishlake.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.96 miles from Fishlake.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.72 miles from Fishlake.

Location: northbound at junction J32 (Doncaster) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.49 miles from Fishlake.

Location: northbound exit slip at junction J6 (Selby) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : From 20:00 on 16 September 2025 to 06:00 on 17 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.57 miles from Fishlake.

Location: southbound entry slip at junction J6 (Selby) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : From 20:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.81 miles from Fishlake.

Location: southbound exit slip at junction J5 (Scunthorpe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : From 20:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.61 miles from Fishlake.

Location: southbound between junctions J5 (Scunthorpe) and J4 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 September 2025 to 06:00 on 19 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.61 miles from Fishlake.

Location: southbound entry slip at junction J5 (Scunthorpe) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 September 2025 to 06:00 on 19 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.88 miles from Fishlake.

Location: southbound exit slip at junction J4 (Doncaster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 September 2025 to 06:00 on 19 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.53 miles from Fishlake.

Location: southbound entry slip at junction .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 September 2025 to 06:00 on 19 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.89 miles from Fishlake.

Location: southbound between junctions J7 (Hull) and J6 (Selby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : From 20:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 2.52 miles from Fishlake.

Location: westbound between junction J2 and the M18 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 September 2025 to 06:00 on 19 September 2025.
Schedule : From 20:00 on 22 September 2025 to 06:00 on 23 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.07 miles from Fishlake.

Location: westbound between junction J2 and the M18 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : From 20:00 on 16 September 2025 to 06:00 on 17 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.12 miles from Fishlake.

Location: northbound between junctions J5 (Scunthorpe) and J6 (Selby) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 06:00 on 29 May 2025.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : From 20:00 on 16 September 2025 to 06:00 on 17 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.02 miles from Fishlake.

Location: northbound entry slip at junction J4 (Doncaster) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 4.79 miles from Fishlake.

Location: northbound between junctions J3 (Doncaster) and J4 (Doncaster) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 5.56 miles from Fishlake.

Location: northbound between junctions J5 (Scunthorpe) and J6 (Selby) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 30 May 2025 to 20:00 on 30 May 2025.
Schedule : From 06:00 on 31 May 2025 to 20:00 on 12 September 2025.
Schedule : From 06:00 on 13 September 2025 to 20:00 on 15 September 2025.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 16 September 2025 to 17 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 1.43 miles from Fishlake.

Location: southbound between junctions J6 (Selby) and J5 (Scunthorpe) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : From 20:00 on 23 September 2025 to 06:00 on 24 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.05 miles from Fishlake.

Location: southbound between junctions J6 (Selby) and J5 (Scunthorpe) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 September 2025 to 06:00 on 19 September 2025.
Schedule : From 20:00 on 22 September 2025 to 06:00 on 23 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 1.34 miles from Fishlake.

Location: northbound between junctions J4 (Doncaster) and J5 (Scunthorpe) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : From 20:00 on 16 September 2025 to 06:00 on 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.99 miles from Fishlake.

Location: northbound entry slip at junction J5 (Scunthorpe) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 31 May 2025.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : From 20:00 on 16 September 2025 to 06:00 on 17 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.73 miles from Fishlake.

Location: northbound exit slip at junction J5 (Scunthorpe) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 2.02 miles from Fishlake.

Location: northbound between junctions J4 (Doncaster) and J5 (Scunthorpe) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 5.09 miles from Fishlake.

Location: northbound between junctions J4 (Doncaster) and J5 (Scunthorpe) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 30 May 2025 to 20:00 on 30 May 2025.
Schedule : From 06:00 on 31 May 2025 to 20:00 on 12 September 2025.
Schedule : From 06:00 on 13 September 2025 to 20:00 on 15 September 2025.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 16 September 2025 to 17 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 2.52 miles from Fishlake.

Location: southbound between junctions J48 and J47 (Wetherby) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 06:00 on 4 June 2025 to 19:00 on 5 June 2025.
Nearest town: 19.21 miles from Fishlake.

Location: The A1M northbound between junctions J40 and J41 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.94 miles from Fishlake.

Location: The A1M southbound between junctions J41 and J40 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.29 miles from Fishlake.

Location: The A1M southbound at junction J41 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 June 2025 to 06:00 on 5 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.72 miles from Fishlake.

Location: The A1M northbound between junctions J40 and J41 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.94 miles from Fishlake.

Location: The A1M southbound entry slip at junction J41 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 5 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.05 miles from Fishlake.

Location: The A1M southbound between junctions J41 and J40 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.29 miles from Fishlake.

Location: The A1M southbound at junction J41 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.72 miles from Fishlake.

Location: southbound between junctions J32 (Doncaster) and J31 (Worksop) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.98 miles from Fishlake.

Location: southbound between junctions J32 (Doncaster) and J31 (Worksop) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.22 miles from Fishlake.

Location: southbound exit slip at junction J31 (Worksop) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.98 miles from Fishlake.

Location: southbound at junction J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.5 miles from Fishlake.

Location: southbound entry slip at junction J32 (Doncaster) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 05:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.42 miles from Fishlake.

Location: southbound entry slip at junction J33 (Sheffield) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 19.87 miles from Fishlake.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 19.72 miles from Fishlake.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 June 2025 to 05:00 on 3 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.05 miles from Fishlake.

Location: northbound between junctions J6 (Selby) and J7 (Hull) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.33 miles from Fishlake.

Location: northbound between junctions J6 (Selby) and J7 (Hull) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.33 miles from Fishlake.

Location: southbound between junctions J7 (Hull) and J6 (Selby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 06:00 on 4 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.97 miles from Fishlake.

Location: southbound between junctions J7 (Hull) and J6 (Selby) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.97 miles from Fishlake.

Location: northbound entry slip at junction With M1 North.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 05:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.02 miles from Fishlake.

Location: northbound at junction J32 (Doncaster) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 05:00 on 3 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.02 miles from Fishlake.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.18 miles from Fishlake.

Location: northbound between junctions J33 (Sheffield) and J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.98 miles from Fishlake.

Location: northbound at junction J33 (Sheffield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.75 miles from Fishlake.

Location: northbound between junctions J33 (Sheffield) and J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 31 May 2025 to 05:00 on 1 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.98 miles from Fishlake.

Location: northbound at junction J33 (Sheffield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 31 May 2025 to 05:00 on 1 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.75 miles from Fishlake.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 31 May 2025 to 05:00 on 1 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.18 miles from Fishlake.

Location: northbound between junctions J32 (Doncaster) and J34 (Meadowhall) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 31 May 2025 to 05:00 on 2 June 2025.
Nearest town: 19.18 miles from Fishlake.

Location: northbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.75 miles from Fishlake.

Location: northbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 31 May 2025 to 05:00 on 1 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.75 miles from Fishlake.

Location: westbound at junction J30 (Rothwell) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 31 May 2025 to 2 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 June 2025 to 9 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.75 miles from Fishlake.

Location: westbound entry slip at junction J1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.7 miles from Fishlake.

Location: eastbound between junctions J35 (M18) and J36 (Goole) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 May 2025 to 06:00 on 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.29 miles from Fishlake.

Location: westbound between junctions J37 (Howden) and J36 (Goole) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 30 May 2025 to 06:00 on 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.71 miles from Fishlake.

Location: The A1M northbound entry slip at junction J42 .
Due to: Road repairs.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.22 miles from Fishlake.

Location: westbound between junctions J4 and J3 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.71 miles from Fishlake.

Location: westbound between junctions J4 and J3 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.71 miles from Fishlake.

Location: eastbound entry slip at junction J4 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.47 miles from Fishlake.

Location: eastbound between junctions J3 and J4 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.36 miles from Fishlake.

Location: eastbound between junctions J3 and J4 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.36 miles from Fishlake.

Location: eastbound exit slip at junction J4 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.2 miles from Fishlake.

Location: westbound between junctions J5 and J4 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.92 miles from Fishlake.

Location: westbound entry slip at junction J4 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.42 miles from Fishlake.

Location: westbound between junctions J5 and J4 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.92 miles from Fishlake.

Location: westbound exit slip at junction J4 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 May 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.71 miles from Fishlake.

Location: southbound exit slip at junction J1 (Rotherham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 7 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.71 miles from Fishlake.

Location: eastbound between junctions J34 (Selby) and J35 (M18) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.07 miles from Fishlake.

Location: westbound exit slip at junction J34 (Selby) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.93 miles from Fishlake.

Location: westbound between junctions J37 (Howden) and J36 (Goole) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.22 miles from Fishlake.

Location: westbound entry slip at junction J35 (M18) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.23 miles from Fishlake.

Location: eastbound at junction J34 (Selby) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.23 miles from Fishlake.

Location: westbound between junctions J36 (Goole) and J34 (Selby) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.27 miles from Fishlake.

Location: eastbound between junctions J33 (Knottingley) and J34 (Selby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.62 miles from Fishlake.

Location: eastbound exit slip at junction J35 (M18) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.15 miles from Fishlake.

Location: westbound exit slip at junction J35 (M18) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.81 miles from Fishlake.

Location: westbound entry slip at junction J36 (Goole) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.98 miles from Fishlake.

Location: westbound entry slip at junction J36 (Goole) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8 miles from Fishlake.

Location: northbound between junctions J6 (Selby) and J7 (Hull) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 28 June 2025 to 05:00 on 29 June 2025.
Schedule : From 23:00 on 12 July 2025 to 05:00 on 13 July 2025.
Schedule : From 23:00 on 19 July 2025 to 05:00 on 20 July 2025.
Schedule : From 23:00 on 26 July 2025 to 05:00 on 27 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.05 miles from Fishlake.

Location: The A1M northbound exit slip at junction J38 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.37 miles from Fishlake.

Location: The A1M northbound between junctions J37 and J38 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.02 miles from Fishlake.

Location: The A1M northbound at junction J37 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9 miles from Fishlake.

Location: The A1M northbound exit slip at junction J37 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9 miles from Fishlake.

Location: southbound between the junctions with the A639 and the A638 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.12 miles from Fishlake.

Location: The A1M southbound entry slip at junction J38 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.02 miles from Fishlake.

Location: The junction of the A638 and the A1M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.02 miles from Fishlake.

Location: The junction of the A638 and the A1M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8 miles from Fishlake.

Location: northbound exit slip to the A1M .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.04 miles from Fishlake.

Location: The A1M northbound between junctions J36 and J37 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 June 2025 to 06:00 on 8 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.93 miles from Fishlake.

Location: eastbound entry slip at junction J3 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Nearest town: 13.18 miles from Fishlake.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 August 2025 to 06:00 on 22 August 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.41 miles from Fishlake.

Location: southbound between junction J1 (Rotherham) and the M1 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 August 2025 to 06:00 on 22 August 2025.
Nearest town: 16.87 miles from Fishlake.

Location: southbound between junction J1 (Rotherham) and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 20 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.87 miles from Fishlake.

Location: slip road to the M1 northbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 August 2025 to 06:00 on 22 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.69 miles from Fishlake.

Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 21 August 2025 to 06:00 on 22 August 2025.
Nearest town: 19.41 miles from Fishlake.

Location: southbound at junction J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 August 2025 to 06:00 on 22 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.48 miles from Fishlake.

Location: northbound between the M1 southbound and junction J1 (Rotherham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 20 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.48 miles from Fishlake.

Location: The A1M southbound entry slip at junction J41 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2025 to 06:00 on 28 April 2025.
Schedule : From 20:00 on 17 August 2025 to 06:00 on 18 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.33 miles from Fishlake.

Location: The A1M southbound between junctions J41 and J40 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2025 to 06:00 on 28 April 2025.
Schedule : From 20:00 on 17 August 2025 to 06:00 on 18 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.29 miles from Fishlake.

Location: The A1M southbound at junction J41 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 August 2025 to 06:00 on 18 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.43 miles from Fishlake.

Location: westbound entry slip at junction J3 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 30 May 2025 to 06:00 on 2 June 2025.
Nearest town: 13.18 miles from Fishlake.

Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 July 2025 to 06:00 on 6 July 2025.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Schedule : From 20:00 on 4 October 2025 to 06:00 on 5 October 2025.
Schedule : From 20:00 on 11 October 2025 to 06:00 on 12 October 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.09 miles from Fishlake.

Location: northbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 5 July 2025 to 06:00 on 6 July 2025.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Schedule : From 20:00 on 4 October 2025 to 06:00 on 5 October 2025.
Schedule : From 20:00 on 11 October 2025 to 06:00 on 12 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.75 miles from Fishlake.

Location: northbound between junctions J6 (Selby) and J7 (Hull) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Schedule : From 20:00 on 7 July 2025 to 06:00 on 8 July 2025.
Schedule : From 20:00 on 4 August 2025 to 06:00 on 5 August 2025.
Schedule : From 20:00 on 1 September 2025 to 06:00 on 2 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.57 miles from Fishlake.