Location: southbound.
Lane Closures : Lane one is closed.
Due to: Vehicle tyre change.
Time To Clear : The event is expected to clear between 13:00 and 13:15 on 14 January 2025.
Normal traffic conditions are expected between 13:00 and 13:15 on 14 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.55 miles from Farnley.
Location: northbound between junctions J40 (Wakefield) and J41 (Wakefield) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 10:15 and 10:30 on 14 January 2025.
Normal traffic conditions are expected between 10:15 and 10:30 on 14 January 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.24 miles from Farnley.
Location: northbound exit slip at junction J42 (Hull) For M62 East.
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 14 January 2025.
Nearest town: 14.35 miles from Farnley.
Location: northbound entry slip at junction J41 (Wakefield) .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 14 January 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.83 miles from Farnley.
Location: northbound at junction J40 (Wakefield) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 14 January 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.71 miles from Farnley.
Location: northbound at junction J41 (Wakefield) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 14 January 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.89 miles from Farnley.
Location: northbound entry slip at junction J42 (Hull) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 14 January 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.23 miles from Farnley.
Location: eastbound exit slip at junction J30 (Rothwell) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 14 January 2025.
Nearest town: 15.46 miles from Farnley.
Location: southbound at junction J46 (Leeds) .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 14 January 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 13 miles from Farnley.
Location: eastbound exit slip at junction J29 (M1) .
Due to: Congestion.
Normal traffic conditions are expected between 07:15 and 07:30 on 14 January 2025.
Nearest town: 14.16 miles from Farnley.
Location: northbound exit slip at junction J42 (Hull) For M62 East.
Due to: Congestion.
Normal traffic conditions are expected between 07:15 and 07:30 on 14 January 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.35 miles from Farnley.
Location: northbound between junctions J46 (Leeds) and J47 (Wetherby) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 19:00 on 15 January 2025.
Nearest town: 13.51 miles from Farnley.
Location: The A1M southbound between junctions J43 and J42 .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 06:00 on 15 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.87 miles from Farnley.
Location: The A1M southbound between junctions J43 and J42 .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 20:00 on 14 January 2025.
Nearest town: 16 miles from Farnley.
Location: northbound between junctions J39 (Denby Dale) and J41 (Wakefield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 06:00 on 15 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.78 miles from Farnley.
Location: northbound entry slip at junction J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 14 January 2025 to 06:00 on 15 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.2 miles from Farnley.
Location: northbound at junction J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 06:00 on 15 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.46 miles from Farnley.
Location: northbound entry slip at junction J40 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:30 on 14 January 2025 to 06:00 on 15 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.69 miles from Farnley.
Location: northbound exit slip at junction J40 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 14 January 2025 to 06:00 on 15 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.99 miles from Farnley.
Location: southbound entry slip at junction J41 (Wakefield) .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 05:00 on 15 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.94 miles from Farnley.
Location: westbound between junctions J30 (Rothwell) and J29 (M1) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 05:00 on 15 January 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.34 miles from Farnley.
Location: southbound entry slip at junction J42 (Hull) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 05:00 on 15 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.45 miles from Farnley.
Location: southbound at junction J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 05:00 on 15 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.31 miles from Farnley.
Location: westbound exit slip at junction J29 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 05:00 on 15 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.56 miles from Farnley.
Location: southbound between junctions J42 (Hull) and J40 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 05:00 on 15 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.64 miles from Farnley.
Location: westbound at junction J30 (Rothwell) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 05:00 on 15 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.54 miles from Farnley.
Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Horticultural works.
Lanes Closed : There are two of four lanes closed.
Nearest town: 17.88 miles from Farnley.
Location: southbound between junctions J39 (Denby Dale) and J38 (Huddersfield) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Horticultural works.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18.99 miles from Farnley.
Location: eastbound exit slip at junction J4 (Hunslet) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 January 2025.
Nearest town: 10.32 miles from Farnley.
Location: eastbound between junctions J32 (Pontefract) and J32A (A1M) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.87 miles from Farnley.
Location: The A1M northbound exit slip at junction J44 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 January 2025.
Nearest town: 13.98 miles from Farnley.
Location: eastbound between junctions J24 (Huddersfield) and J25 (Brighouse) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 18.41 miles from Farnley.
Location: The A1M northbound exit slip at junction J44 .
Due to: Roadworks scheme.
Period : from 20:06 on 13 January 2025 to 06:00 on 1 February 2025.
Nearest town: 13.98 miles from Farnley.
Location: westbound between the A162 Tadcaster West and the junction with the A1M .
Due to: Roadworks scheme.
Period : from 20:06 on 13 January 2025 to 06:00 on 1 February 2025.
Nearest town: 14.62 miles from Farnley.
Location: eastbound between junctions J23 (Huddersfield) and J24 (Huddersfield) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 January 2025 to 06:00 on 15 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.2 miles from Farnley.
Location: eastbound between junctions J22 (Ripponden) and J24 (Huddersfield) .
Due to: Roadworks scheme.
Period : from 21:30 on 19 December 2024 to 06:00 on 15 January 2025.
Nearest town: 19.08 miles from Farnley.
Location: westbound between junctions J26 (M606 Bradford) and J23 (Huddersfield) .
Due to: Roadworks scheme.
Period : from 20:00 on 13 January 2025 to 06:00 on 25 January 2025.
Nearest town: 15.42 miles from Farnley.
Location: westbound at junction J26 (M606 Bradford) .
Due to: Roadworks scheme.
Period : from 20:00 on 6 January 2025 to 06:00 on 31 January 2025.
Nearest town: 11.96 miles from Farnley.
Location: southbound between junctions J46 (Leeds) and J43 (Leeds) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.05 miles from Farnley.
Location: northbound between junctions J44 (Leeds) and J46 (Leeds) .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 14 April 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 12.73 miles from Farnley.
Location: southbound exit slip at junction J1 (M62) to M62 West.
Due to: Roadworks scheme.
Period : from 20:00 on 13 January 2025 to 06:00 on 13 February 2025.
Nearest town: 12.39 miles from Farnley.
Location: northbound between junctions J43 (Leeds) and J44 (Leeds) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 17 April 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.92 miles from Farnley.
Location: eastbound exit slip at junction J29 (M1) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 05:00 on 21 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.16 miles from Farnley.
Location: southbound exit slip at junction J42 (Hull) to roundabout.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 05:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.88 miles from Farnley.
Location: eastbound entry slip at junction J29 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 05:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.32 miles from Farnley.
Location: The A1M northbound between junctions J49 and J50 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.82 miles from Farnley.
Location: eastbound entry slip at junction J4 (Hunslet) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 05:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.81 miles from Farnley.
Location: The A1M northbound between junctions J42 and J44 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.56 miles from Farnley.
Location: westbound between junction J1 (Farnley) and the M62 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.54 miles from Farnley.
Location: westbound between junctions J2 (Armley) and J1 (Farnley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 January 2025 to 06:00 on 29 January 2025.
Nearest town: 10.26 miles from Farnley.
Location: westbound entry slip at junction J1 (Farnley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.41 miles from Farnley.
Location: westbound at junction J1 (Farnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.31 miles from Farnley.
Location: westbound between junctions J2 (Armley) and J1 (Farnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.22 miles from Farnley.
Location: eastbound entry slip at junction J1 (Farnley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 22 January 2025.
Schedule : From 23:59 on 22 January 2025 to 06:00 on 23 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.32 miles from Farnley.
Location: eastbound exit slip at junction J1 (Farnley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 22 January 2025.
Schedule : From 23:59 on 22 January 2025 to 06:00 on 23 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 January 2025 to 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.47 miles from Farnley.
Location: westbound at junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.26 miles from Farnley.
Location: westbound entry slip at junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.28 miles from Farnley.
Location: eastbound between the M62 and junction J2 (Armley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 06:00 on 1 February 2025.
Nearest town: 10.73 miles from Farnley.
Location: eastbound between the M62 and junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 22 January 2025.
Schedule : From 23:59 on 22 January 2025 to 06:00 on 23 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 January 2025 to 1 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.73 miles from Farnley.
Location: westbound exit slip at junction J1 (Farnley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.31 miles from Farnley.
Location: westbound exit slip at junction J26 (M606 Bradford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 19 January 2025 to 06:00 on 24 April 2025.
Nearest town: 12.29 miles from Farnley.
Location: westbound exit slip at junction J26 (M606 Bradford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 February 2025 to 1 March 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 March 2025 to 8 March 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2025 to 22 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.29 miles from Farnley.
Location: eastbound between junctions J27 (M621 Leeds) and J28 (Leeds) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 19 January 2025 to 05:00 on 20 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.4 miles from Farnley.
Location: southbound exit slip at junction J1 (M62) to roundabout.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 February 2025 to 1 March 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 March 2025 to 8 March 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2025 to 22 March 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.39 miles from Farnley.
Location: westbound at junction J26 (M606 Bradford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 21 January 2025 to 24 January 2025.
Schedule : From 06:00 on 25 January 2025 to 20:00 on 27 January 2025.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 28 January 2025 to 31 January 2025.
Schedule : From 06:00 on 1 February 2025 to 20:00 on 3 February 2025.
Nearest town: 12.34 miles from Farnley.
Location: westbound at junction J26 (M606 Bradford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.29 miles from Farnley.
Location: westbound between junctions J27 (M621 Leeds) and J26 (M606 Bradford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12 miles from Farnley.
Location: eastbound exit slip at junction J26 (M606 Bradford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 19 January 2025 to 06:00 on 8 March 2025.
Nearest town: 13.03 miles from Farnley.
Location: eastbound exit slip at junction J26 (M606 Bradford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 February 2025 to 1 March 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 March 2025 to 8 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.03 miles from Farnley.
Location: eastbound at junction J26 (M606 Bradford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.15 miles from Farnley.
Location: eastbound at junction J26 (M606 Bradford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 21 January 2025 to 24 January 2025.
Schedule : From 06:00 on 25 January 2025 to 20:00 on 27 January 2025.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 28 January 2025 to 31 January 2025.
Schedule : From 06:00 on 1 February 2025 to 20:00 on 3 February 2025.
Nearest town: 13.11 miles from Farnley.
Location: northbound entry slip at junction J1 (M62) from M62 East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 February 2025 to 1 March 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 March 2025 to 8 March 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.93 miles from Farnley.
Location: The A1M southbound at junction J44 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 January 2025 to 05:00 on 19 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.95 miles from Farnley.
Location: westbound between the A162 Tadcaster West and the junction with the A1M .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 January 2025 to 05:00 on 19 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.62 miles from Farnley.
Location: northbound between junctions J41 (Wakefield) and J42 (Hull) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 06:00 on 20 January 2025.
Nearest town: 14.92 miles from Farnley.
Location: northbound at junction J42 (Hull) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 January 2025 to 06:00 on 20 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.55 miles from Farnley.
Location: northbound at junction J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 06:00 on 19 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.55 miles from Farnley.
Location: northbound between junctions J41 (Wakefield) and J42 (Hull) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 January 2025 to 06:00 on 20 January 2025.
Lanes Closed : There will be two of five lanes closed.
Nearest town: 14.77 miles from Farnley.
Location: northbound at junction J41 (Wakefield) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 January 2025 to 06:00 on 20 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.92 miles from Farnley.
Location: northbound entry slip at junction J41 (Wakefield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 06:00 on 19 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.85 miles from Farnley.
Location: northbound at junction J41 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 06:00 on 19 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.92 miles from Farnley.
Location: northbound between junctions J41 (Wakefield) and J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 06:00 on 19 January 2025.
Lanes Closed : There will be two of five lanes closed.
Nearest town: 14.77 miles from Farnley.
Location: southbound at junction J42 (Hull) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 06:00 on 20 January 2025.
Nearest town: 13.76 miles from Farnley.
Location: southbound at junction J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 06:00 on 19 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.76 miles from Farnley.
Location: southbound at junction J42 (Hull) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 January 2025 to 06:00 on 20 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.76 miles from Farnley.
Location: westbound between junctions J3 (City Centre) and J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.28 miles from Farnley.
Location: westbound between junctions J3 (City Centre) and J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 22 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.28 miles from Farnley.
Location: eastbound at junction J2 (Armley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 February 2025 to 06:00 on 21 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.21 miles from Farnley.
Location: eastbound entry slip at junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 February 2025 to 06:00 on 22 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.23 miles from Farnley.
Location: eastbound entry slip at junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 February 2025 to 06:00 on 20 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.23 miles from Farnley.
Location: eastbound at junction J2 (Armley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 February 2025 to 06:00 on 19 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.21 miles from Farnley.
Location: westbound entry slip at junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 February 2025 to 06:00 on 21 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.28 miles from Farnley.
Location: westbound at junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.33 miles from Farnley.
Location: westbound at junction J3 (City Centre) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.44 miles from Farnley.
Location: westbound at junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 22 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.33 miles from Farnley.
Location: westbound at junction J3 (City Centre) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 22 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.44 miles from Farnley.
Location: westbound entry slip at junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 February 2025 to 06:00 on 19 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.28 miles from Farnley.
Location: eastbound between junctions J2 (Armley) and J3 (City Centre) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 06:00 on 22 February 2025.
Nearest town: 10.21 miles from Farnley.
Location: eastbound between junctions J2 (Armley) and J3 (City Centre) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 23:59 on 21 January 2025.
Nearest town: 10.26 miles from Farnley.
Location: eastbound between junctions J2 (Armley) and J2A (Holbeck) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 January 2025 to 23:59 on 21 January 2025.
Nearest town: 10.28 miles from Farnley.
Location: westbound between junctions J3 (City Centre) and J2 (Armley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 06:00 on 21 February 2025.
Nearest town: 10.44 miles from Farnley.
Location: westbound exit slip at junction J2 (Armley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 22 January 2025.
Schedule : From 20:00 on 19 February 2025 to 06:00 on 20 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.33 miles from Farnley.
Location: westbound exit slip at junction J2 (Armley) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 February 2025 to 06:00 on 19 February 2025.
Schedule : From 20:00 on 20 February 2025 to 06:00 on 21 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.33 miles from Farnley.
Location: westbound entry slip at junction J3 (City Centre) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 22 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.24 miles from Farnley.
Location: westbound entry slip at junction J3 (City Centre) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.24 miles from Farnley.
Location: eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 04:30 on 18 January 2025 to 07:30 on 18 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.24 miles from Farnley.
Location: eastbound exit slip at junction J3 (City Centre) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 04:30 on 18 January 2025 to 07:30 on 18 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.27 miles from Farnley.
Location: westbound entry slip at junction J23 (Huddersfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 January 2025 to 05:00 on 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.47 miles from Farnley.
Location: westbound at junction J7 (Stourton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 January 2025 to 05:00 on 18 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.22 miles from Farnley.
Location: southbound entry slip at junction J41 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 17 January 2025 to 06:00 on 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.94 miles from Farnley.
Location: southbound at junction J42 (Hull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 January 2025 to 06:00 on 18 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.95 miles from Farnley.
Location: westbound exit slip at junction J29 (M1) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 17 January 2025 to 06:00 on 18 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.56 miles from Farnley.
Location: westbound between junctions J30 (Rothwell) and J29 (M1) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 17 January 2025 to 06:00 on 18 January 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.34 miles from Farnley.
Location: southbound between junctions J42 (Hull) and J40 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 January 2025 to 06:00 on 18 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.64 miles from Farnley.
Location: southbound exit slip at junction J41 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:30 on 17 January 2025 to 06:00 on 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.81 miles from Farnley.
Location: westbound entry slip at junction J30 (Rothwell) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 17 January 2025 to 06:00 on 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.55 miles from Farnley.
Location: eastbound between junctions J31 (Normanton) and J33 (Knottingley) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 January 2025 to 06:00 on 1 March 2025.
Nearest town: 18.92 miles from Farnley.
Location: eastbound between junctions J31 (Normanton) and J32A (A1M) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 January 2025 to 06:00 on 18 January 2025.
Schedule : From 20:00 on 28 February 2025 to 06:00 on 1 March 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.92 miles from Farnley.
Location: eastbound between junctions J22 (Ripponden) and J24 (Huddersfield) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 January 2025 to 05:00 on 16 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.98 miles from Farnley.
Location: westbound between junctions J24 (Huddersfield) and J23 (Huddersfield) .
Lane Closures : Lane three will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 January 2025 to 05:00 on 16 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.98 miles from Farnley.
Location: northbound exit slip at junction J41 (Wakefield) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 January 2025 to 05:00 on 16 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.95 miles from Farnley.
Location: southbound exit slip at junction J41 (Wakefield) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 January 2025 to 05:00 on 16 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.81 miles from Farnley.
Location: eastbound between the junctions with the A659 Tadcaster East and the A1237 York South .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 January 2025 to 05:00 on 17 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.85 miles from Farnley.
Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 January 2025 to 05:00 on 18 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.88 miles from Farnley.
Location: southbound between junctions J41 (Wakefield) and J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 January 2025 to 06:00 on 16 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.34 miles from Farnley.
Location: southbound entry slip at junction J40 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 15 January 2025 to 06:00 on 16 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.78 miles from Farnley.
Location: southbound exit slip at junction J40 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 15 January 2025 to 06:00 on 16 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.45 miles from Farnley.
Location: eastbound entry slip at junction J3 (City Centre) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 January 2025 to 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.24 miles from Farnley.
Location: southbound between junctions J48 and J47 (Wetherby) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 January 2025 to 16 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.12 miles from Farnley.
Location: The A1M southbound between junctions J44 and J42 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 January 2025 to 16 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 14.63 miles from Farnley.
Location: eastbound exit slip at junction J27 (M621 Leeds) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 15:30 from 20 January 2025 to 21 January 2025.
Nearest town: 11.79 miles from Farnley.
Location: The A1M southbound exit slip at junction J44 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.63 miles from Farnley.
Location: The A1M southbound exit slip at junction J44 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 January 2025 to 06:00 on 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.63 miles from Farnley.
Location: The A1M northbound exit slip at junction J44 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 January 2025 to 06:00 on 18 January 2025.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.93 miles from Farnley.
Location: The A1M southbound entry slip at junction J44 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2025 to 06:00 on 30 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.75 miles from Farnley.
Location: westbound at the junction with the A1M .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.88 miles from Farnley.
Location: westbound between the A162 Tadcaster West and the junction with the A1M .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.62 miles from Farnley.
Location: The A1M southbound between junctions J45 and J44 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 January 2025 to 06:00 on 18 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.42 miles from Farnley.
Location: The A1M northbound entry slip at junction J44 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 January 2025 to 06:00 on 17 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.65 miles from Farnley.
Location: westbound between junctions J24 (Huddersfield) and J22 (Ripponden) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.3 miles from Farnley.
Location: eastbound between junctions J26 (M606 Bradford) and J27 (M621 Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 13 February 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.14 miles from Farnley.
Location: southbound exit slip at junction J1 (M62) to roundabout.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 13 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.39 miles from Farnley.
Location: southbound exit slip at junction J1 (M62) to M62 West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 31 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.39 miles from Farnley.
Location: westbound at junction J26 (M606 Bradford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 January 2025 to 18 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 31 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.82 miles from Farnley.
Location: eastbound at junction J26 (M606 Bradford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 13 February 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.51 miles from Farnley.
Location: eastbound entry slip at junction J26 (M606 Bradford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 13 February 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.55 miles from Farnley.
Location: eastbound entry slip at junction J26 (M606 Bradford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 13 February 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.58 miles from Farnley.
Location: northbound between junctions J42 (Hull) and J44 (Leeds) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : There are three of five lanes closed.
Nearest town: 13.79 miles from Farnley.
Location: northbound entry slip at junction J44 (Leeds) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 January 2025 to 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.76 miles from Farnley.
Location: northbound between junctions J43 (Leeds) and J45 (Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 January 2025 to 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.09 miles from Farnley.
Location: northbound exit slip at junction J45 (Leeds) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 January 2025 to 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.58 miles from Farnley.
Location: northbound exit slip at junction J44 (Leeds) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 January 2025 to 18 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.73 miles from Farnley.
Location: The A1M southbound between junctions J45 and J44 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 January 2025 to 06:00 on 1 February 2025.
Nearest town: 13.42 miles from Farnley.
Location: westbound exit slip at junction J24 (Huddersfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 January 2025 to 20 January 2025.
Schedule : From 20:00 on 24 January 2025 to 06:00 on 25 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.12 miles from Farnley.
Location: southbound exit slip at junction J1 (M62) to M62 West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 January 2025 to 20 January 2025.
Schedule : From 20:00 on 24 January 2025 to 06:00 on 25 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.39 miles from Farnley.
Location: westbound between junctions J25 (Brighouse) and J24 (Huddersfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 January 2025 to 20 January 2025.
Schedule : From 20:00 on 24 January 2025 to 06:00 on 25 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.4 miles from Farnley.
Location: westbound entry slip at junction J25 (Brighouse) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 January 2025 to 20 January 2025.
Schedule : From 20:00 on 24 January 2025 to 06:00 on 25 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.76 miles from Farnley.
Location: westbound between junctions J26 (M606 Bradford) and J25 (Brighouse) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 January 2025 to 20 January 2025.
Schedule : From 20:00 on 24 January 2025 to 06:00 on 25 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.46 miles from Farnley.
Location: eastbound between the A659 Tadcaster West and the junction with the A659 Tadcaster East.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2025 to 06:00 on 8 February 2025.
Nearest town: 14.86 miles from Farnley.
Location: eastbound between the A659 Tadcaster West and the junction with the A659 Tadcaster East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.86 miles from Farnley.
Location: westbound between the A659 Tadcaster East and the junction with the A659 Tadcaster West.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 10 February 2025 to 06:00 on 22 February 2025.
Nearest town: 17.68 miles from Farnley.
Location: westbound between the A659 Tadcaster East and the junction with the A659 Tadcaster West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 February 2025 to 22 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.68 miles from Farnley.
Location: westbound exit slip to the A162 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 15 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 February 2025 to 22 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.69 miles from Farnley.
Location: eastbound entry slip from the A162 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 1 February 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2025 to 8 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.54 miles from Farnley.
Location: eastbound between junctions J26 (M606 Bradford) and J27 (M621 Leeds) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 13 February 2025.
Nearest town: 12.51 miles from Farnley.