Description: M48 : Both directions : Severn Bridge : 7.5t weight restriction for heavy goods vehicles from 27/05/25-until further notice, Start time: 27/05/2025 0:00 , Expected end time: 23/05/2026 23:55, Severity: Moderate, Source: Welsh Government, Last updated: 03/06/2025 12:42
Nearest town: 11.44 miles from Etloe.

Location: northbound between junctions J12 (Gloucester) and J11A (Gloucester) .
Due to: Broken down vehicle.
Status : Cleared.
Nearest town: 10.58 miles from Etloe.

Location: northbound between junctions J3 and J2 (Stapleton) .
Lane Closures : Lane two will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.42 miles from Etloe.

Location: northbound at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.62 miles from Etloe.

Location: southbound at junction J3 .
Lane Closures : Lane two will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.34 miles from Etloe.

Location: westbound at the junction with the A417 north od Gloucester.
Due to: Congestion.
Normal traffic conditions are expected between 17:30 and 17:45 on 14 June 2025.
Nearest town: 15.24 miles from Etloe.

Location: northbound between junctions J12 (Gloucester) and J11A (Gloucester) .
Due to: Congestion.
Normal traffic conditions are expected between 18:00 and 18:15 on 14 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Earlier
Due to: Caused by the earlier broken down vehicle.
Nearest town: 10.52 miles from Etloe.

Location: westbound between the A49 and the junction with the A466 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 28 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.83 miles from Etloe.

Location: northbound between the A436 and the junction with the A46 .
Due to: Roadworks scheme.
Period : from 09:14 on 3 February 2025 to 06:00 on 31 October 2025.
Nearest town: 17.8 miles from Etloe.

Location: northbound between the junctions with the A436 and the A46 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.84 miles from Etloe.

Location: northbound between the junctions with the A436 and the A46 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2025.
Nearest town: 17.8 miles from Etloe.

Location: southbound between the junctions with the A46 and the A436 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2025.
Nearest town: 16.94 miles from Etloe.

Location: southbound between the junctions with the A4137 and the A40 .
Due to: Roadworks.
Period : expect disruption until 07:00 on 17 December 2025.
Nearest town: 13.46 miles from Etloe.

Location: northbound between the junctions with the A40 and the A4137 .
Due to: Roadworks.
Period : expect disruption until 07:00 on 17 December 2025.
Nearest town: 13.39 miles from Etloe.

Location: westbound.
Due to: Roadworks scheme.
Period : from 06:00 on 9 December 2024 to 06:00 on 28 July 2025.
Nearest town: 10.83 miles from Etloe.

Location: northbound between the A419 and the junction with the A436 .
Due to: Roadworks scheme.
Period : from 17:01 on 2 July 2024 to 06:00 on 17 April 2026.
Nearest town: 18.03 miles from Etloe.

Location: northbound between the junctions with the A419 and the A436 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Nearest town: 18.02 miles from Etloe.

Location: northbound between the junctions with the A419 and the A436 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 18.03 miles from Etloe.

Location: southbound between the A436 and the junction with the A419 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 17 April 2026.
Nearest town: 17.96 miles from Etloe.

Location: southbound between the A436 and the junction with the A419 .
Due to: Roadworks scheme.
Period : from 17:01 on 2 July 2024 to 06:00 on 17 April 2026.
Nearest town: 17.96 miles from Etloe.

Location: southbound entry slip at junction J15 (Almondsbury) from M4 eastbound.
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.45 miles from Etloe.

Location: eastbound exit slip at junction J20 (Bristol) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.37 miles from Etloe.

Location: northbound entry slip at junction J15 (Almondsbury) from M4 eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.45 miles from Etloe.

Location: eastbound between junctions J22 (Avonmouth) and J20 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.93 miles from Etloe.

Location: northbound between the A436 and the junction with the A46 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.79 miles from Etloe.

Location: southbound between the A46 and the junction with the A436 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.18 miles from Etloe.

Location: southbound between the A46 and the junction with the A436 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.84 miles from Etloe.

Location: northbound between the A436 and the junction with the M5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.8 miles from Etloe.

Location: northbound between the A436 and the junction with the M5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.4 miles from Etloe.

Location: eastbound between junction J2 (Chepstow) and the M4 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.69 miles from Etloe.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 18 June 2025 to 20 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.46 miles from Etloe.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 18 June 2025 to 20 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.87 miles from Etloe.

Location: northbound between junctions J2 (Stapleton) and J1 (Filton) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 18 June 2025 to 20 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.44 miles from Etloe.

Location: northbound between junction J1 (Filton) and the M4 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 18 June 2025 to 20 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.08 miles from Etloe.

Location: northbound between junctions J14 (Dursley) and J13 (Stroud) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 June 2025 to 21 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.45 miles from Etloe.

Location: southbound between junctions J14 (Dursley) and J15 (Almondsbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.4 miles from Etloe.

Location: southbound between junctions J14 (Dursley) and J15 (Almondsbury) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 18 June 2025 to 20 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.4 miles from Etloe.

Location: eastbound exit slip at junction J1 (Avonmouth) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.41 miles from Etloe.

Location: eastbound between junctions J2 (Chepstow) and J1 (Avonmouth) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.69 miles from Etloe.

Location: westbound at junction J1 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.43 miles from Etloe.

Location: southbound exit slip at junction J11A (Gloucester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.66 miles from Etloe.

Location: northbound between the A436 and the junction with the M5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.4 miles from Etloe.

Location: southbound between the M5 and the junction with the A46 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.55 miles from Etloe.

Location: southbound between the junctions with the M50 and the A40 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.41 miles from Etloe.

Location: westbound between the junctions with the A449 and the A49 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.32 miles from Etloe.

Location: southbound exit slip at junction J15 (Almondsbury) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.41 miles from Etloe.

Location: eastbound entry slip at junction J20 (Bristol) from M5 north.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.65 miles from Etloe.

Location: eastbound entry slip at junction J20 (Bristol) from M5 south.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.53 miles from Etloe.

Location: eastbound between junctions J22 (Avonmouth) and J20 (Bristol) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.02 miles from Etloe.

Location: southbound between junctions J14 (Dursley) and J15 (Almondsbury) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.23 miles from Etloe.

Location: eastbound at junction J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.44 miles from Etloe.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.45 miles from Etloe.

Location: eastbound at junction J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.44 miles from Etloe.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.45 miles from Etloe.

Location: westbound at junction J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.7 miles from Etloe.

Location: eastbound exit slip at junction J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.44 miles from Etloe.

Location: westbound exit slip at junction J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.7 miles from Etloe.

Location: eastbound between junctions J3 (Newent) and J1 (Malvern) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.04 miles from Etloe.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.85 miles from Etloe.

Location: westbound between junctions J1 (Malvern) and J3 (Newent) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.47 miles from Etloe.

Location: southbound between the A436 and the junction with the A419 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.82 miles from Etloe.

Location: northbound between the A419 and the junction with the A436 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18 miles from Etloe.

Location: eastbound between junctions J2 (Chepstow) and J1 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.69 miles from Etloe.

Location: westbound between the M4 and junction J1 (Avonmouth) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.56 miles from Etloe.

Location: westbound between the A417 west of Gloucester and the junction with the A48 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 18 June 2025.
Nearest town: 12.23 miles from Etloe.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.12 miles from Etloe.

Location: westbound between the A417 west of Gloucester and the junction with the A48 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.23 miles from Etloe.

Location: southbound between the A436 and the junction with the A419 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.82 miles from Etloe.

Location: westbound between the A4136 and the junction with the A449 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 16 June 2025 to 17 June 2025.
Nearest town: 9.39 miles from Etloe.

Location: eastbound between the A449 and the junction with the A4136 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 16 June 2025 to 17 June 2025.
Nearest town: 9.35 miles from Etloe.

Location: northbound at junction J2 (Stapleton) .
Lane Closures : Lane two will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.05 miles from Etloe.

Location: southbound between junctions J2 (Stapleton) and J3 .
Lane Closures : Lane two will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.04 miles from Etloe.

Location: southbound between junctions J1 (Filton) and J2 (Stapleton) .
Lane Closures : Lane two will be closed.
Due to: Gantry construction is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 27 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.95 miles from Etloe.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.89 miles from Etloe.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 June 2025 to 5 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 July 2025 to 12 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.88 miles from Etloe.