Location: northbound exit slip at junction J28 (Cullompton) .
Due to: Congestion.
Normal traffic conditions are expected between 12:45 and 13:00 on 10 March 2026.
Nearest town: 14.77 miles from East Budleigh.

Location: westbound at the junction with the M5 .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 10 March 2026.
Nearest town: 8.04 miles from East Budleigh.

Location: westbound between the junctions with the A303 and the A35 .
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 2 April 2026.
Nearest town: 17.63 miles from East Budleigh.

Location: eastbound between the junctions with the A35 and the A303 .
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 2 April 2026.
Nearest town: 16.15 miles from East Budleigh.

Location: southbound between junctions J27 (Barnstaple) and J28 (Cullompton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.61 miles from East Budleigh.

Location: eastbound between the A382 and the junction with the A377 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.61 miles from East Budleigh.

Location: northbound between junctions J28 (Cullompton) and J27 (Barnstaple) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.05 miles from East Budleigh.

Location: westbound between the junctions with the A358 and the A375 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 14:30 on 10 March 2026 to 15:30 on 10 March 2026.
Nearest town: 16.48 miles from East Budleigh.

Location: eastbound between the junctions with the A375 and the A358 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 14:30 on 10 March 2026 to 15:30 on 10 March 2026.
Nearest town: 16.39 miles from East Budleigh.

Location: northbound entry slip at junction J28 (Cullompton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 March 2026 to 11 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.9 miles from East Budleigh.

Location: northbound between junctions J28 (Cullompton) and J27 (Barnstaple) .
Due to: Roadworks scheme.
Period : from 20:12 on 9 March 2026 to 06:00 on 11 March 2026.
Nearest town: 14.85 miles from East Budleigh.

Location: northbound between junctions J28 (Cullompton) and J27 (Barnstaple) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.85 miles from East Budleigh.

Location: westbound between the junctions with the A358 and the A375 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Nearest town: 14.61 miles from East Budleigh.

Location: eastbound between the junctions with the A375 and the A358 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 10 March 2026 to 06:00 on 11 March 2026.
Nearest town: 14.42 miles from East Budleigh.

Location: westbound between the junctions with the A358 and the A30 .
Due to: Roadworks.
Period : expect disruption until 18:00 on 10 March 2026.
Nearest town: 18.65 miles from East Budleigh.

Location: eastbound between the junctions with the A30 and the A358 .
Due to: Roadworks.
Period : expect disruption until 18:00 on 10 March 2026.
Nearest town: 18.54 miles from East Budleigh.

Location: northbound between junctions J27 (Barnstaple) and J26 (Wellington) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 22 March 2026.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.7 miles from East Budleigh.

Location: southbound between junctions J28 (Cullompton) and J29 (Honiton) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 29 August 2027.
Nearest town: 12.04 miles from East Budleigh.

Location: northbound between junctions J29 (Honiton) and J28 (Cullompton) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 29 August 2027.
Nearest town: 11.93 miles from East Budleigh.

Location: westbound between the junctions with the A358 and the A375 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 17 March 2026 to 15:30 on 17 March 2026.
Nearest town: 12.41 miles from East Budleigh.

Location: westbound between the junctions with the A358 and the A375 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 17 March 2026 to 15:30 on 17 March 2026.
Nearest town: 12.42 miles from East Budleigh.

Location: eastbound between the A30 and the junction with the A358 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 17 March 2026 to 15:30 on 17 March 2026.
Nearest town: 12.57 miles from East Budleigh.

Location: westbound between the A375 and the junction with the A30 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 17 March 2026 to 15:30 on 17 March 2026.
Nearest town: 12.52 miles from East Budleigh.

Location: eastbound exit slip to the A377 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 23 March 2026 to 27 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 10.23 miles from East Budleigh.

Location: eastbound.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 23 March 2026 to 27 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.16 miles from East Budleigh.

Location: eastbound.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 23 March 2026 to 27 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.08 miles from East Budleigh.

Location: eastbound.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 23 March 2026 to 27 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.1 miles from East Budleigh.

Location: eastbound.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 23 March 2026 to 27 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.1 miles from East Budleigh.

Location: northbound between junctions J29 (Honiton) and J28 (Cullompton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.17 miles from East Budleigh.

Location: northbound exit slip at junction J28 (Cullompton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Nearest town: 14.65 miles from East Budleigh.

Location: northbound exit slip at junction J28 (Cullompton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.65 miles from East Budleigh.

Location: eastbound between the junctions with the A382 and the M5 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 9.19 miles from East Budleigh.

Location: westbound between the A375 and the junction with the M5 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.34 miles from East Budleigh.

Location: eastbound between the junctions with the M5 and the A375 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.02 miles from East Budleigh.

Location: eastbound.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.4 miles from East Budleigh.

Location: eastbound.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.97 miles from East Budleigh.

Location: eastbound entry slip from the A382 .
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.28 miles from East Budleigh.

Location: eastbound between the A383 and the junction with the A380 .
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.73 miles from East Budleigh.

Location: eastbound exit slip to the A382 .
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.49 miles from East Budleigh.

Location: eastbound between the A384 and the junction with the A382 .
Lane Closures : Lane two will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.83 miles from East Budleigh.

Location: northbound at junction J29 (Honiton) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.94 miles from East Budleigh.

Location: southbound between junctions J28 (Cullompton) and J29 (Honiton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.44 miles from East Budleigh.

Location: northbound between junctions J30 (Exeter) and J29 (Honiton) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.43 miles from East Budleigh.

Location: southbound between junctions J29 (Honiton) and J30 (Exeter) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.86 miles from East Budleigh.

Location: northbound between junctions J31 (Bodmin) and J30 (Exeter) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.8 miles from East Budleigh.

Location: southbound between junctions J30 (Exeter) and J31 (Bodmin) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.42 miles from East Budleigh.

Location: westbound between the junctions with the A382 and the A384 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 19:00 on 12 March 2026 to 06:00 on 13 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.99 miles from East Budleigh.

Location: westbound between the A380 and the junction with the A382 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 March 2026 to 06:00 on 16 March 2026.
Schedule : From 20:00 on 22 March 2026 to 06:00 on 23 March 2026.
Schedule : From 20:00 on 29 March 2026 to 06:00 on 30 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.01 miles from East Budleigh.

Location: westbound between the A380 and the junction with the A382 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 15 March 2026 to 06:00 on 16 March 2026.
Schedule : From 19:00 on 22 March 2026 to 06:00 on 23 March 2026.
Schedule : From 19:00 on 29 March 2026 to 06:00 on 30 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.84 miles from East Budleigh.

Location: westbound between the A382 and the junction with the A384 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 19:00 on 15 March 2026 to 06:00 on 30 March 2026.
Nearest town: 15.3 miles from East Budleigh.

Location: westbound between the A382 and the junction with the A384 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 March 2026 to 06:00 on 16 March 2026.
Schedule : From 20:00 on 22 March 2026 to 06:00 on 23 March 2026.
Schedule : From 20:00 on 29 March 2026 to 06:00 on 30 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.3 miles from East Budleigh.

Location: westbound entry slip from the A383 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 March 2026 to 06:00 on 16 March 2026.
Schedule : From 20:00 on 22 March 2026 to 06:00 on 23 March 2026.
Schedule : From 20:00 on 29 March 2026 to 06:00 on 30 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.49 miles from East Budleigh.

Location: southbound entry slip at junction J30 (Exeter) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.27 miles from East Budleigh.

Location: southbound at junction J29 (Honiton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.09 miles from East Budleigh.

Location: southbound between junctions J30 (Exeter) and J31 (Bodmin) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.42 miles from East Budleigh.

Location: southbound between junctions J29 (Honiton) and J30 (Exeter) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.86 miles from East Budleigh.

Location: southbound between junctions J29 (Honiton) and J30 (Exeter) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 14 March 2026 to 06:00 on 15 March 2026.
Nearest town: 8.09 miles from East Budleigh.

Location: southbound exit slip at junction J30 (Exeter) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.42 miles from East Budleigh.

Location: northbound between junctions J29 (Honiton) and J28 (Cullompton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 March 2026 to 06:00 on 14 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.56 miles from East Budleigh.

Location: southbound exit slip at junction J30 (Exeter) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 13 March 2026 to 05:00 on 14 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.42 miles from East Budleigh.

Location: eastbound between the junctions with the M5 and the A375 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 14:00 on 13 March 2026 to 15:00 on 13 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.81 miles from East Budleigh.

Location: westbound between the junctions with the A375 and the M5 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 14:00 on 13 March 2026 to 15:00 on 13 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.92 miles from East Budleigh.

Location: eastbound between the junctions with the M5 and the A375 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 13 March 2026 to 12:00 on 13 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.36 miles from East Budleigh.

Location: northbound between junctions J29 (Honiton) and J28 (Cullompton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 March 2026 to 06:00 on 13 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.28 miles from East Budleigh.

Location: southbound between junctions J27 (Barnstaple) and J28 (Cullompton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 12 March 2026 to 06:00 on 13 March 2026.
Nearest town: 18.61 miles from East Budleigh.

Location: southbound entry slip at junction J27 (Barnstaple) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 March 2026 to 06:00 on 13 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.61 miles from East Budleigh.

Location: southbound between junctions J27 (Barnstaple) and J28 (Cullompton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 March 2026 to 06:00 on 13 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.61 miles from East Budleigh.

Location: westbound between the A382 and the junction with the A384 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 19:00 on 12 March 2026 to 06:00 on 18 March 2026.
Nearest town: 19.59 miles from East Budleigh.

Location: westbound between the A382 and the junction with the A384 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 12 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 16 March 2026 to 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.59 miles from East Budleigh.

Location: westbound between the junctions with the A3052 and the A358 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 14:00 on 12 March 2026 to 15:30 on 12 March 2026.
Nearest town: 19.15 miles from East Budleigh.

Location: westbound between the junctions with the A3052 and the A358 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 14:00 on 12 March 2026 to 15:30 on 12 March 2026.
Nearest town: 18.92 miles from East Budleigh.

Location: eastbound between the A358 and the junction with the A3052 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 14:00 on 12 March 2026 to 15:30 on 12 March 2026.
Nearest town: 18.85 miles from East Budleigh.

Location: westbound between the junctions with the A3052 and the A358 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 12 March 2026 to 12:30 on 12 March 2026.
Nearest town: 19.15 miles from East Budleigh.

Location: eastbound between the A358 and the junction with the A3052 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 12 March 2026 to 12:30 on 12 March 2026.
Nearest town: 18.83 miles from East Budleigh.

Location: westbound between the junctions with the A3052 and the A358 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 12 March 2026 to 12:30 on 12 March 2026.
Nearest town: 18.83 miles from East Budleigh.

Location: westbound between the A3052 and the junction with the A358 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 12 March 2026 to 12:30 on 12 March 2026.
Nearest town: 18.92 miles from East Budleigh.

Location: northbound between junctions J29 (Honiton) and J28 (Cullompton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 11 March 2026 to 06:00 on 12 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.57 miles from East Budleigh.

Location: northbound between junctions J28 (Cullompton) and J27 (Barnstaple) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 March 2026 to 06:00 on 12 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.85 miles from East Budleigh.

Location: eastbound between the junctions with the A3052 and the A3066 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 14:00 on 11 March 2026 to 15:00 on 11 March 2026.
Nearest town: 19.33 miles from East Budleigh.

Location: westbound between the junctions with the A3066 and the A3052 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 14:00 on 11 March 2026 to 15:00 on 11 March 2026.
Nearest town: 19.89 miles from East Budleigh.

Location: westbound between the junctions with the A3066 and the A3052 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 14:00 on 11 March 2026 to 15:00 on 11 March 2026.
Nearest town: 19.91 miles from East Budleigh.

Location: eastbound between the A382 and the junction with the A380 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.23 miles from East Budleigh.

Location: westbound between the junctions with the A380 and the A382 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.06 miles from East Budleigh.

Location: eastbound between the junctions with the A382 and the A380 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.02 miles from East Budleigh.

Location: westbound between the junctions with the A380 and the A382 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 14 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.09 miles from East Budleigh.

Location: eastbound between the A375 and the junction with the A3066 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.25 miles from East Budleigh.

Location: westbound between the A3052 and the junction with the A375 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 March 2026 to 14 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.31 miles from East Budleigh.

Location: eastbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2026 to 2 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.99 miles from East Budleigh.

Location: westbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 March 2026 to 2 April 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.1 miles from East Budleigh.

Location: southbound at junction J30 (Exeter) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.42 miles from East Budleigh.

Location: southbound between junctions J28 (Cullompton) and J29 (Honiton) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.48 miles from East Budleigh.

Location: northbound at junction J29 (Honiton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.94 miles from East Budleigh.

Location: southbound between junctions J29 (Honiton) and J30 (Exeter) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.86 miles from East Budleigh.

Location: northbound between junctions J30 (Exeter) and J29 (Honiton) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.43 miles from East Budleigh.

Location: northbound between junctions J31 (Bodmin) and J30 (Exeter) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 10 March 2026 to 13 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.11 miles from East Budleigh.

Location: westbound between the junctions with the A358 and the A30 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Nearest town: 17.7 miles from East Budleigh.

Location: eastbound between the junctions with the M5 and the A375 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.7 miles from East Budleigh.

Location: eastbound between the junctions with the A30 and the A358 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Nearest town: 17.62 miles from East Budleigh.

Location: westbound between the junctions with the A358 and the A375 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 10 March 2026 to 12 March 2026.
Nearest town: 16.48 miles from East Budleigh.

Location: eastbound between the junctions with the A375 and the A358 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 10 March 2026 to 12 March 2026.
Nearest town: 16.39 miles from East Budleigh.

Location: westbound between the junctions with the A358 and the A375 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.06 miles from East Budleigh.

Location: eastbound between the junctions with the A375 and the A358 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 June 2026 to 27 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.66 miles from East Budleigh.

Location: southbound at junction J31 (Bodmin) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 04:00 from 10 March 2026 to 28 March 2026.
Schedule : From 20:00 on 28 March 2026 to 04:00 on 29 March 2026.
Schedule : Expect disruption everyday between 20:00 and 04:00 from 29 March 2026 to 1 April 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.3 miles from East Budleigh.