Location: westbound at junction J9 (Ashford) .
Due to: Congestion.
Normal traffic conditions are expected between 21:45 and 22:00 on 14 March 2026.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.66 miles from Curtisden Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Due to: Roadworks.
Period : from 19:54 on 14 March 2026 to 06:00 on 15 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 16.45 miles from Curtisden Green.

Location: eastbound between junctions J4 (West Malling) and J5 (Aylesford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.18 miles from Curtisden Green.

Location: eastbound entry slip at junction J4 (West Malling) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.46 miles from Curtisden Green.

Location: eastbound at junction J4 (West Malling) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.61 miles from Curtisden Green.

Location: eastbound exit slip at junction J5 (Aylesford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 15 March 2026 to 06:00 on 16 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.44 miles from Curtisden Green.

Location: eastbound exit slip at junction J4 (West Malling) .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 15 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 12.61 miles from Curtisden Green.

Location: southbound between the junctions with the A265 and the A2100 north of Battle.
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 16 March 2026.
Nearest town: 9.25 miles from Curtisden Green.

Location: northbound between the junctions with the A2100 north of Battle and the A265 .
Due to: Emergency roadworks.
Period : expect disruption until 17:00 on 16 March 2026.
Nearest town: 9.46 miles from Curtisden Green.

Location: eastbound between junctions J1 and J3 (Sevenoaks) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 05:30 on 15 March 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.27 miles from Curtisden Green.

Location: eastbound exit slip at junction J2 (Paddock Wood) .
Due to: Emergency barrier repairs.
Period : expect disruption until 05:30 on 15 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 15.44 miles from Curtisden Green.

Location: westbound entry slip at junction J9 (Ashford) .
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 15 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 16.62 miles from Curtisden Green.

Location: westbound between junctions J10 (Ashford) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 15 March 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 17.49 miles from Curtisden Green.

Location: westbound between junctions J9 (Ashford) and J7 (Maidstone) .
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 15 March 2026.
Lanes Closed : All lanes are closed.
Nearest town: 16.89 miles from Curtisden Green.

Location: southbound exit slip to the A26 .
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 31 May 2026.
Lanes Closed : All lanes are closed.
Nearest town: 9.54 miles from Curtisden Green.

Location: southbound.
Due to: Roadworks.
Period : expect disruption until 20:00 on 19 April 2026.
Lanes Closed : All lanes are closed.
Nearest town: 19.73 miles from Curtisden Green.

Location: northbound between the A2100 north of Battle and the junction with the A229 .
Due to: Roadworks.
Period : expect disruption until 20:00 on 29 May 2026.
Nearest town: 8.03 miles from Curtisden Green.

Location: southbound between the A229 and the junction with the A2100 north of Battle.
Due to: Roadworks.
Period : expect disruption until 20:00 on 29 May 2026.
Nearest town: 7.88 miles from Curtisden Green.

Location: northbound between the junctions with the A225 and the A25 West.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 21 March 2026 to 05:00 on 22 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.18 miles from Curtisden Green.

Location: eastbound between junctions J3 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 March 2026 to 23 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.6 miles from Curtisden Green.

Location: westbound between junctions J4 (Gillingham) and J3 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 22 March 2026 to 06:00 on 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.65 miles from Curtisden Green.

Location: eastbound at junction J3 (Maidstone) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 March 2026 to 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.11 miles from Curtisden Green.

Location: eastbound entry slip at junction J3 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 March 2026 to 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.02 miles from Curtisden Green.

Location: westbound at junction J4 (Gillingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 22 March 2026 to 06:00 on 23 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.79 miles from Curtisden Green.

Location: southbound.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 05:00 on 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.85 miles from Curtisden Green.

Location: westbound exit slip at junction J1 (Rochester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.52 miles from Curtisden Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.66 miles from Curtisden Green.

Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.47 miles from Curtisden Green.

Location: northbound between the A228 and the junction with the A26 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.94 miles from Curtisden Green.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 26 March 2026 to 06:00 on 30 March 2026.
Nearest town: 17.81 miles from Curtisden Green.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 March 2026 to 28 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.81 miles from Curtisden Green.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 March 2026 to 06:00 on 29 March 2026.
Schedule : From 20:00 on 29 March 2026 to 06:00 on 30 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.81 miles from Curtisden Green.

Location: southbound between the A2042 and the junction with the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 20 March 2026.
Nearest town: 17.1 miles from Curtisden Green.

Location: northbound between the A259 and the junction with the A2042 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 20 March 2026.
Nearest town: 16.38 miles from Curtisden Green.

Location: anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 16 March 2026 to 05:30 on 17 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.5 miles from Curtisden Green.

Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.6 miles from Curtisden Green.

Location: westbound between junctions J3 (Maidstone) and J2 (Strood) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.59 miles from Curtisden Green.

Location: westbound at junction J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.24 miles from Curtisden Green.

Location: westbound at junction J2 (Strood) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.09 miles from Curtisden Green.

Location: southbound between the junctions with the A26 Tonbridge West and the A26 Tonbridge East.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.24 miles from Curtisden Green.

Location: eastbound between junctions J1 and J3 (Sevenoaks) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 March 2026 to 05:30 on 17 March 2026.
Schedule : From 22:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.45 miles from Curtisden Green.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 09:30 on 16 March 2026 to 15:00 on 16 March 2026.
Nearest town: 13.94 miles from Curtisden Green.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 09:30 on 16 March 2026 to 15:00 on 16 March 2026.
Nearest town: 13.99 miles from Curtisden Green.

Location: clockwise exit slip at junction J5 (Sevenoaks) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 17 March 2026 to 05:30 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.53 miles from Curtisden Green.

Location: slip road to the A21 southbound at junction J5.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 17 March 2026 to 05:30 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.4 miles from Curtisden Green.

Location: southbound between the M25 and the junction with the A25 after A25 west exit.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 17 March 2026 to 05:30 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.51 miles from Curtisden Green.

Location: eastbound between junctions J1 and J3 (Sevenoaks) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 March 2026 to 20 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.91 miles from Curtisden Green.

Location: eastbound exit slip at junction J2 (Paddock Wood) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 18 March 2026 to 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.44 miles from Curtisden Green.

Location: northbound between the junctions with the A2100 north of Battle and the A265 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Nearest town: 10.73 miles from Curtisden Green.

Location: southbound between the junctions with the A265 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Nearest town: 10.14 miles from Curtisden Green.

Location: southbound between the A2042 and the junction with the A259 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Nearest town: 16.94 miles from Curtisden Green.

Location: northbound between the A259 and the junction with the A2042 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Nearest town: 16.95 miles from Curtisden Green.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.75 miles from Curtisden Green.

Location: eastbound at junction J4 (West Malling) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.61 miles from Curtisden Green.

Location: eastbound between junctions J3 (Sevenoaks) and J4 (West Malling) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 12.83 miles from Curtisden Green.

Location: northbound between the A228 and the junction with the A26 Tonbridge West.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.28 miles from Curtisden Green.

Location: northbound exit slip to the A26 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.38 miles from Curtisden Green.

Location: northbound entry slip from the A26 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 9.4 miles from Curtisden Green.

Location: westbound entry slip at junction J9 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.62 miles from Curtisden Green.

Location: westbound between junctions J9 (Ashford) and J7 (Maidstone) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.89 miles from Curtisden Green.

Location: southbound exit slip to the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2026 to 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.8 miles from Curtisden Green.

Location: westbound between junctions J3 (Maidstone) and J2 (Strood) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.46 miles from Curtisden Green.

Location: eastbound between junctions J6 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lane four will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.27 miles from Curtisden Green.

Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.05 miles from Curtisden Green.

Location: westbound at junction J2 (Strood) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.09 miles from Curtisden Green.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.03 miles from Curtisden Green.

Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 8.11 miles from Curtisden Green.

Location: northbound between the A228 and the junction with the A26 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.96 miles from Curtisden Green.

Location: southbound between the A26 and the junction with the A262 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 March 2026 to 19 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.06 miles from Curtisden Green.

Location: eastbound between the A227 and the junction with the M2 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Nearest town: 19 miles from Curtisden Green.

Location: eastbound between the A227 and the junction with the M2 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19 miles from Curtisden Green.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.75 miles from Curtisden Green.

Location: westbound between the junctions with the A2036 and the A269 Bexhill East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 17 March 2026 to 18:00 on 19 March 2026.
Nearest town: 19.86 miles from Curtisden Green.

Location: eastbound between the junctions with the A269 Bexhill East and the A2036 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 17 March 2026 to 18:00 on 19 March 2026.
Nearest town: 19.86 miles from Curtisden Green.

Location: eastbound between junctions J9 (Ashford) and J10 (Ashford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 18 March 2026 to 15:00 on 18 March 2026.
Nearest town: 17.33 miles from Curtisden Green.

Location: eastbound between junctions J9 (Ashford) and J10 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 March 2026 to 06:00 on 20 March 2026.
Schedule : From 21:00 on 23 March 2026 to 06:00 on 24 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.25 miles from Curtisden Green.

Location: eastbound between junctions J9 (Ashford) and J10A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 March 2026 to 06:00 on 25 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.11 miles from Curtisden Green.

Location: westbound between junctions J3 (Sevenoaks) and J2 (Paddock Wood) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 March 2026 to 05:30 on 17 March 2026.
Schedule : From 23:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 13.23 miles from Curtisden Green.

Location: eastbound between junctions J1 and J3 (Sevenoaks) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 March 2026 to 05:30 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.31 miles from Curtisden Green.

Location: westbound between junctions J2 (Paddock Wood) and J1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 March 2026 to 05:30 on 17 March 2026.
Schedule : From 23:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.14 miles from Curtisden Green.

Location: eastbound between the junctions with the A227 and the M2 .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.93 miles from Curtisden Green.

Location: northbound between the A262 and the junction with the A228 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.98 miles from Curtisden Green.

Location: southbound between the A228 and the junction with the A262 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.89 miles from Curtisden Green.

Location: southbound between the A2100 north of Battle and the junction with the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Nearest town: 11.8 miles from Curtisden Green.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.26 miles from Curtisden Green.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Nearest town: 16.79 miles from Curtisden Green.

Location: eastbound between junctions J3 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.51 miles from Curtisden Green.

Location: eastbound between junctions J3 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.6 miles from Curtisden Green.

Location: eastbound at junction J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14 miles from Curtisden Green.

Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 28 March 2026.
Nearest town: 17.05 miles from Curtisden Green.

Location: northbound between the A28 and the junction with the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Nearest town: 16.26 miles from Curtisden Green.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 March 2026 to 28 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.79 miles from Curtisden Green.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Nearest town: 16.88 miles from Curtisden Green.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 March 2026 to 06:00 on 28 March 2026.
Nearest town: 11.8 miles from Curtisden Green.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 25 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.91 miles from Curtisden Green.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 25 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.05 miles from Curtisden Green.

Location: westbound at junction J6 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.53 miles from Curtisden Green.

Location: westbound exit slip at junction J6 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.55 miles from Curtisden Green.

Location: westbound between junctions J7 (Maidstone) and J6 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.19 miles from Curtisden Green.

Location: westbound entry slip at junction J5 (Aylesford) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.24 miles from Curtisden Green.

Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.29 miles from Curtisden Green.

Location: westbound entry slip at junction J4 (West Malling) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.46 miles from Curtisden Green.

Location: southbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 12.4 miles from Curtisden Green.

Location: westbound exit slip at junction J5 (Aylesford) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 March 2026 to 06:00 on 19 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 11.26 miles from Curtisden Green.

Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.39 miles from Curtisden Green.

Location: westbound at junction J5 (Aylesford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.28 miles from Curtisden Green.

Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.48 miles from Curtisden Green.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.62 miles from Curtisden Green.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.67 miles from Curtisden Green.

Location: eastbound between junctions J7 (Maidstone) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 March 2026 to 06:00 on 17 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.21 miles from Curtisden Green.

Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2026 to 19 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.18 miles from Curtisden Green.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 30 March 2026 to 2 April 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 7 April 2026 to 11 April 2026.
Nearest town: 15.27 miles from Curtisden Green.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 16 March 2026 to 21 March 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 23 March 2026 to 28 March 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 30 March 2026 to 2 April 2026.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 7 April 2026 to 11 April 2026.
Nearest town: 15.39 miles from Curtisden Green.

Location: westbound between junctions J3 (Maidstone) and J2 (Strood) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.59 miles from Curtisden Green.

Location: westbound at junction J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.24 miles from Curtisden Green.

Location: westbound at junction J2 (Strood) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.09 miles from Curtisden Green.

Location: westbound exit slip at junction J2 (Strood) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.09 miles from Curtisden Green.

Location: westbound exit slip at junction J5 (Maidstone) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.61 miles from Curtisden Green.

Location: eastbound exit slip at junction J5 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Schedule : From 20:00 on 20 March 2026 to 06:00 on 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.63 miles from Curtisden Green.

Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 17 March 2026 to 06:00 on 18 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.62 miles from Curtisden Green.

Location: westbound between junctions J6 (Faversham) and J5 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 20 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.02 miles from Curtisden Green.

Location: eastbound exit slip at junction J10 (Ashford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 18.31 miles from Curtisden Green.

Location: eastbound between junctions J9 (Ashford) and J10A .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 19 March 2026 to 06:00 on 21 March 2026.
Nearest town: 18.01 miles from Curtisden Green.

Location: eastbound between junctions J9 (Ashford) and J10A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 March 2026 to 21 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.01 miles from Curtisden Green.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2026 to 21 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.37 miles from Curtisden Green.

Location: eastbound between junctions J4 (Gillingham) and J5 (Maidstone) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2026 to 20 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.02 miles from Curtisden Green.

Location: westbound between junctions J5 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 March 2026 to 20 March 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 March 2026 to 28 March 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.64 miles from Curtisden Green.

Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 16 March 2026 to 20 March 2026.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 23 March 2026 to 27 March 2026.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 30 March 2026 to 1 April 2026.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 7 April 2026 to 10 April 2026.
Nearest town: 14.14 miles from Curtisden Green.

Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 16 March 2026 to 20 March 2026.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 23 March 2026 to 27 March 2026.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 30 March 2026 to 1 April 2026.
Schedule : Expect disruption everyday between 09:30 and 16:30 from 7 April 2026 to 10 April 2026.
Nearest town: 14.2 miles from Curtisden Green.

Location: westbound between the junctions with the A2036 and the A269 Bexhill East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Nearest town: 19.86 miles from Curtisden Green.

Location: eastbound between the junctions with the A269 Bexhill East and the A2036 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Nearest town: 19.86 miles from Curtisden Green.

Location: eastbound between junctions J8 (Maidstone) and J10 (Ashford) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 16 March 2026 to 06:00 on 21 March 2026.
Nearest town: 16.17 miles from Curtisden Green.

Location: eastbound between junctions J8 (Maidstone) and J10 (Ashford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.17 miles from Curtisden Green.

Location: eastbound entry slip at junction J9 (Ashford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 March 2026 to 21 March 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.76 miles from Curtisden Green.