Location: westbound entry slip from the A1303 .
Due to: Congestion.
Normal traffic conditions are expected between 18:45 and 19:00 on 25 April 2024.
Nearest town: 16.27 miles from Carlton Green.
Location: eastbound between the junctions with the A131 South and the A131 North.
Due to: Congestion.
Normal traffic conditions are expected between 18:30 and 18:45 on 25 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.89 miles from Carlton Green.
Location: northbound between junctions J8A (Stansted) and J10 (Saffron Walden) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.44 miles from Carlton Green.
Location: northbound between the A14 and the junction with the A1065 .
Lane Closures : Lane one is closed.
Due to: Emergency Roadside Drains works.
Period : expect disruption until 06:00 on 26 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.88 miles from Carlton Green.
Location: southbound between the A1101 and the junction with the A14 .
Lane Closures : Lane one is closed.
Due to: Emergency Roadside Drains works.
Period : expect disruption until 06:00 on 26 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.09 miles from Carlton Green.
Location: southbound between the A1101 and the junction with the A1304 .
Lane Closures : Lane two is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.38 miles from Carlton Green.
Location: eastbound between junctions J43 Bury St Edmunds Central and J47 Elmswell.
Due to: Roadworks.
Period : from 14:52 on 9 April 2024 to 06:00 on 8 June 2024.
Nearest town: 15.37 miles from Carlton Green.
Location: eastbound entry slip at junction J37 Newmarket West.
Lane Closures : Lane one is closed.
Due to: Emergency Roadside Drains works.
Period : expect disruption until 06:00 on 30 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.35 miles from Carlton Green.
Location: eastbound exit slip at junction J35 Stow Cum Quy.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 9.58 miles from Carlton Green.
Location: eastbound between junctions J32 Histon and J33 Cambridge.
Due to: Roadworks.
Period : from 22:50 on 11 March 2024 to 05:00 on 27 April 2024.
Nearest town: 13.18 miles from Carlton Green.
Location: eastbound exit slip at junction J34 Fen Ditton.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 11.55 miles from Carlton Green.
Location: eastbound between junctions J32 Histon and J35 Stow Cum Quy.
Due to: Roadworks scheme.
Period : from 19:41 on 7 March 2024 to 05:00 on 27 April 2024.
Nearest town: 10.22 miles from Carlton Green.
Location: westbound between junctions J47 Elmswell and J45 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 30 April 2024 to 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.63 miles from Carlton Green.
Location: northbound between the junctions with the A1304 and the A14 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2024 to 3 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.33 miles from Carlton Green.
Location: northbound between the junctions with the A1304 and the A14 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.33 miles from Carlton Green.
Location: southbound between the junctions with the A14 and the A1304 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 May 2024 to 3 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.84 miles from Carlton Green.
Location: northbound between junctions J8A (Stansted) and J10 (Saffron Walden) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 05:00 on 30 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.44 miles from Carlton Green.
Location: northbound exit slip at junction J9 (Newmarket) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.07 miles from Carlton Green.
Location: northbound between the junctions with the A1301 and the A505 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.23 miles from Carlton Green.
Location: northbound at junction J9A (Saffron Walden) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 05:00 on 4 May 2024.
Nearest town: 10.07 miles from Carlton Green.
Location: northbound at junction J9A (Saffron Walden) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.77 miles from Carlton Green.
Location: westbound between the junctions with the M11 and the A1198 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.76 miles from Carlton Green.
Location: westbound between junctions J37 Newmarket West and J36 A11 Junction.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.74 miles from Carlton Green.
Location: southbound between the A134 Thetford West and the junction with the A14 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.41 miles from Carlton Green.
Location: northbound between the A14 and the junction with the A134 Thetford West.
Lane Closures : Lane one will be closed.
Due to: Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.24 miles from Carlton Green.
Location: southbound at junction J12 (Cambridge) .
Due to: Road repairs.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 14.25 miles from Carlton Green.
Location: southbound between junctions J13 (Cambridge) and J12 (Cambridge) .
Lane Closures : Lane two is closed.
Due to: Road repairs.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.39 miles from Carlton Green.
Location: southbound between junctions J12 (Cambridge) and J11 (Royston) .
Due to: Road repairs.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 14.05 miles from Carlton Green.
Location: southbound exit slip at junction J11 (Royston) .
Due to: Road repairs.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.72 miles from Carlton Green.
Location: eastbound between junctions J35 Stow Cum Quy and J36 A11 Junction.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.88 miles from Carlton Green.
Location: westbound between junctions J36 A11 Junction and J35 Stow Cum Quy.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 05:00 on 8 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.89 miles from Carlton Green.
Location: eastbound at junction J33 Cambridge.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.85 miles from Carlton Green.
Location: eastbound between junctions J32 Histon and J33 Cambridge.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.18 miles from Carlton Green.
Location: westbound between junctions J35 Stow Cum Quy and J33 Cambridge.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.66 miles from Carlton Green.
Location: eastbound between junctions J43 Bury St Edmunds Central and J47 Elmswell.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 16.13 miles from Carlton Green.
Location: southbound between junctions J14 (St Neots) and J11 (Royston) .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.93 miles from Carlton Green.
Location: southbound between junctions J11 (Royston) and J10 (Saffron Walden) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.11 miles from Carlton Green.
Location: westbound between junctions J32 Histon and J31 M11 Junction.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 7 May 2024 to 05:00 on 8 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.17 miles from Carlton Green.
Location: northbound between junctions J13 (Cambridge) and J14 (St Neots) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 6 May 2024 to 05:00 on 7 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.57 miles from Carlton Green.
Location: northbound exit slip at junction J14 (St Neots) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 6 May 2024 to 05:00 on 7 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.1 miles from Carlton Green.
Location: southbound entry slip at junction J14 (St Neots) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 7 May 2024 to 05:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.9 miles from Carlton Green.
Location: southbound between junctions J10 (Saffron Walden) and J9 (Newmarket) .
Lane Closures : Lane one is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 04:00 on 26 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.03 miles from Carlton Green.
Location: northbound between junctions J10 (Saffron Walden) and J11 (Royston) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 04:00 on 27 April 2024.
Schedule : Expect disruption everyday between 21:00 and 04:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 21:00 and 04:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.28 miles from Carlton Green.
Location: southbound between junctions J12 (Cambridge) and J11 (Royston) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 09:30 on 26 April 2024 to 15:30 on 26 April 2024.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 April 2024 to 3 May 2024.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 6 May 2024 to 8 May 2024.
Nearest town: 13.92 miles from Carlton Green.
Location: northbound between junctions J11 (Royston) and J12 (Cambridge) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 09:30 on 26 April 2024 to 15:30 on 26 April 2024.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 April 2024 to 3 May 2024.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 6 May 2024 to 8 May 2024.
Nearest town: 13.69 miles from Carlton Green.
Location: westbound entry slip at junction J37 Newmarket West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 April 2024 to 5 May 2024.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.27 miles from Carlton Green.
Location: westbound between junctions J39 Kentford and J37 Newmarket West.
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 April 2024 to 5 May 2024.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.42 miles from Carlton Green.
Location: eastbound between junctions J33 Cambridge and J36 A11 Junction.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.6 miles from Carlton Green.
Location: westbound between junctions J37 Newmarket West and J36 A11 Junction.
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2024 to 12 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 19 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 2 June 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.27 miles from Carlton Green.
Location: westbound at junction J36 A11 Junction.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2024 to 12 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 19 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 2 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.9 miles from Carlton Green.
Location: westbound entry slip at junction J36 A11 Junction.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 April 2024 to 5 May 2024.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.78 miles from Carlton Green.
Location: westbound exit slip at junction J35 Stow Cum Quy.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2024 to 12 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 19 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 2 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.26 miles from Carlton Green.
Location: westbound exit slip at junction J35 Stow Cum Quy.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 April 2024 to 5 May 2024.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.26 miles from Carlton Green.
Location: eastbound entry slip at junction J35 Stow Cum Quy.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 9.43 miles from Carlton Green.
Location: westbound between junctions J36 A11 Junction and J35 Stow Cum Quy.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2024 to 12 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 19 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 2 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.78 miles from Carlton Green.
Location: westbound between junctions J37 Newmarket West and J35 Stow Cum Quy.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 April 2024 to 5 May 2024.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.37 miles from Carlton Green.
Location: eastbound between junctions J32 Histon and J33 Cambridge.
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 26 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 13.47 miles from Carlton Green.
Location: southbound between the junctions with the A14 and the A1304 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 April 2024 to 5 May 2024.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 6 May 2024 to 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.9 miles from Carlton Green.
Location: westbound between junctions J39 Kentford and J35 Stow Cum Quy.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 21 July 2024.
Nearest town: 9.27 miles from Carlton Green.