Location: eastbound exit slip at junction J11 (Runcorn) .
Due to: Congestion.
Normal traffic conditions are expected between 04:00 and 04:15 on 26 May 2025.
Nearest town: 14.47 miles from Bunbury.

Location: eastbound exit slip at junction J11 (Runcorn) .
Due to: Congestion.
Normal traffic conditions are expected between 03:00 and 03:15 on 26 May 2025.
Nearest town: 14.47 miles from Bunbury.

Location: eastbound between junctions J12 (Runcorn) and J10 (Northwich) .
Due to: Roadworks scheme.
Period : from 20:04 on 14 May 2025 to 06:00 on 22 June 2025.
Nearest town: 13.83 miles from Bunbury.

Location: westbound at junction J9 (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 1 August 2025.
Nearest town: 17.64 miles from Bunbury.

Location: northbound between junctions J16 (Stoke on Trent) and J17 (Congleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.06 miles from Bunbury.

Location: northbound exit slip at Sandbach Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.08 miles from Bunbury.

Location: northbound entry slip at junction J20 (Macclesfield) from the M56 west.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.37 miles from Bunbury.

Location: westbound exit slip at junction J9 (Preston) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.69 miles from Bunbury.

Location: westbound between junctions J7 and J9 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 1 June 2025 to 05:00 on 2 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.05 miles from Bunbury.

Location: northbound entry slip at junction J20 (Macclesfield) from the M56 east.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.39 miles from Bunbury.

Location: eastbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Nearest town: 16.98 miles from Bunbury.

Location: eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.25 miles from Bunbury.

Location: eastbound exit slip at junction J9 (Preston) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.98 miles from Bunbury.

Location: northbound between the junctions with the A494 and the A540 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.28 miles from Bunbury.

Location: northbound between the junctions with the A494 and the A548 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.27 miles from Bunbury.

Location: southbound at the junction with the A494 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.28 miles from Bunbury.

Location: eastbound between the A550 and the junction with the M56 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.26 miles from Bunbury.

Location: eastbound exit slip to the A540 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.34 miles from Bunbury.

Location: northbound exit slip to the A494 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.28 miles from Bunbury.

Location: northbound between the junctions with the A494 and the A540 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Nearest town: 16.3 miles from Bunbury.

Location: southbound between the junctions with the A540 and the A494 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Nearest town: 16.39 miles from Bunbury.

Location: southbound between the junctions with the A540 and the A494 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 May 2025 to 05:00 on 31 May 2025.
Nearest town: 16.39 miles from Bunbury.

Location: westbound between junctions J10 (Northwich) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : From 20:00 on 2 June 2025 to 06:00 on 3 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : From 22:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.19 miles from Bunbury.

Location: westbound between junctions J10 (Northwich) and J11 (Runcorn) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.4 miles from Bunbury.

Location: westbound entry slip at junction J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 May 2025 to 29 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.36 miles from Bunbury.

Location: westbound exit slip at junction J11 (Runcorn) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.6 miles from Bunbury.

Location: westbound between junctions J9 (Preston) and J10 (Northwich) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2025 to 7 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.12 miles from Bunbury.

Location: westbound between junctions J9 (Preston) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : From 20:00 on 4 July 2025 to 06:00 on 5 July 2025.
Schedule : From 20:00 on 7 July 2025 to 06:00 on 8 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.12 miles from Bunbury.

Location: westbound between junctions J9 (Preston) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 29 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.12 miles from Bunbury.

Location: southbound between junctions J10 (Elton) and J11 (Runcorn) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 28 May 2025 to 05:00 on 29 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.57 miles from Bunbury.

Location: southbound at junction J10 (Elton) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 28 May 2025 to 05:00 on 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.77 miles from Bunbury.

Location: southbound entry slip at junction J10 (Elton) .
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 28 May 2025 to 05:00 on 29 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.71 miles from Bunbury.

Location: westbound at junction J15 (Ellesmere Port) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Nearest town: 12.64 miles from Bunbury.

Location: southbound entry slip at junction J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.64 miles from Bunbury.

Location: westbound between junctions J14 (Helsby) and J15 (Ellesmere Port) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Nearest town: 12.24 miles from Bunbury.

Location: southbound.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.81 miles from Bunbury.

Location: southbound between the M6 J16 and the junction with the A34 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 06:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.18 miles from Bunbury.

Location: eastbound between the A550 and the junction with the M56 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.26 miles from Bunbury.

Location: eastbound between the A494 Chester and junction J15 (Ellesmere Port) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.56 miles from Bunbury.

Location: southbound entry slip at junction J5 (Bebington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.27 miles from Bunbury.

Location: westbound between junctions J14 (Helsby) and J15 (Ellesmere Port) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.24 miles from Bunbury.

Location: northbound between junctions J20 (Macclesfield) and J21 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 23:00 on 29 May 2025 to 05:00 on 30 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.92 miles from Bunbury.

Location: northbound between junctions J18 (Holmes Chapel) and J19 (Northwich) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 28 May 2025 to 04:30 on 29 May 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.86 miles from Bunbury.

Location: northbound between junctions J15 (Stoke on Trent) and J16 (Stoke on Trent) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 May 2025 to 30 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.89 miles from Bunbury.

Location: northbound exit slip at junction J16 (Stoke on Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.68 miles from Bunbury.

Location: eastbound between the A5104 and the junction with the A41 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.33 miles from Bunbury.

Location: eastbound exit slip to the A483 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 28 May 2025 to 30 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.54 miles from Bunbury.

Location: northbound exit slip at junction J10 (Elton) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 02:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.59 miles from Bunbury.

Location: southbound exit slip at junction J10 (Elton) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 June 2025 to 02:00 on 4 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.95 miles from Bunbury.

Location: southbound exit slip at junction J12 (Chester) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2025 to 02:00 on 29 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.89 miles from Bunbury.

Location: northbound exit slip at junction J10 (Elton) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.59 miles from Bunbury.

Location: southbound exit slip at junction J10 (Elton) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.95 miles from Bunbury.

Location: southbound exit slip at junction J16 (Stoke on Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.41 miles from Bunbury.

Location: northbound between junctions J18 (Holmes Chapel) and J19 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 27 May 2025 to 09:57 on 28 May 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.41 miles from Bunbury.

Location: southbound entry slip at junction J16 (Stoke on Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.58 miles from Bunbury.

Location: southbound at junction J16 (Stoke on Trent) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.41 miles from Bunbury.

Location: southbound between junctions J17 (Congleton) and J16 (Stoke on Trent) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.84 miles from Bunbury.

Location: northbound between the junctions with the A34 and the M6 J16.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 May 2025 to 06:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.29 miles from Bunbury.

Location: westbound exit slip at junction J14 (Helsby) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 02:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.13 miles from Bunbury.

Location: eastbound exit slip at junction J14 (Helsby) .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 May 2025 to 02:00 on 28 May 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.17 miles from Bunbury.

Location: eastbound between junctions J12 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 June 2025 to 6 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2025 to 13 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.04 miles from Bunbury.

Location: eastbound entry slip at junction J11 (Runcorn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 June 2025 to 6 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2025 to 13 June 2025.
Schedule : From 20:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.58 miles from Bunbury.

Location: eastbound between junctions J11 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 May 2025 to 31 May 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.49 miles from Bunbury.

Location: eastbound between junctions J11 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : From 20:00 on 6 June 2025 to 06:00 on 7 June 2025.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.87 miles from Bunbury.

Location: eastbound between junctions J11 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.49 miles from Bunbury.

Location: eastbound entry slip at junction J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 June 2025 to 19 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.58 miles from Bunbury.

Location: eastbound between junctions J12 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 17 June 2025 to 19 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.05 miles from Bunbury.

Location: eastbound exit slip at junction J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 June 2025 to 4 June 2025.
Schedule : From 21:00 on 6 June 2025 to 06:00 on 7 June 2025.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Schedule : From 21:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.3 miles from Bunbury.