Location: eastbound between the junctions with the A350 and the A36 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.52 miles from Bleet.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.13 miles from Bleet.

Location: eastbound between the junctions with the A36 and the A360 .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.15 miles from Bleet.

Location: eastbound between junctions J18 (Bath) and J15 (Swindon) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.19 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 15.52 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.9 miles from Bleet.

Location: northbound between the junctions with the A30 West and the A303 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 13:00 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 14.85 miles from Bleet.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 17:00 on 12 September 2025.
Nearest town: 14.48 miles from Bleet.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 06:00 on 13 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.03 miles from Bleet.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Due to: Roadworks.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18.03 miles from Bleet.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 18:00 on 31 July 2026.
Nearest town: 18.45 miles from Bleet.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 17 September 2025 to 19 September 2025.
Nearest town: 18.23 miles from Bleet.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 19 September 2025 to 17:00 on 19 September 2025.
Nearest town: 13.17 miles from Bleet.

Location: westbound between the junctions with the A360 and the A36 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 08:00 on 16 September 2025 to 16:00 on 16 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.64 miles from Bleet.

Location: eastbound between the junctions with the A36 and the A360 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 08:00 on 16 September 2025 to 16:00 on 16 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.14 miles from Bleet.

Location: southbound between the A350 South and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 16 September 2025 to 15:30 on 16 September 2025.
Nearest town: 10.33 miles from Bleet.

Location: southbound between the junctions with the A303 and the A30 West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 16 September 2025 to 15:30 on 16 September 2025.
Nearest town: 16.71 miles from Bleet.

Location: northbound between the A303 and the junction with the A350 South.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 16 September 2025 to 15:30 on 16 September 2025.
Nearest town: 13.98 miles from Bleet.

Location: northbound between the junctions with the A30 West and the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 16 September 2025 to 15:30 on 16 September 2025.
Nearest town: 16.82 miles from Bleet.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 September 2025 to 19 September 2025.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 22 September 2025 to 25 September 2025.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 29 September 2025 to 30 September 2025.
Nearest town: 16.5 miles from Bleet.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:00 on 22 September 2025 to 16:00 on 22 September 2025.
Nearest town: 16.77 miles from Bleet.

Location: westbound between junctions J16 (Swindon) and J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 23 September 2025 to 25 September 2025.
Nearest town: 15.23 miles from Bleet.

Location: westbound entry slip at junction J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 29 September 2025 to 30 September 2025.
Nearest town: 13.44 miles from Bleet.

Location: westbound at junction J17 (Chippenham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 29 September 2025 to 30 September 2025.
Nearest town: 13.54 miles from Bleet.

Location: eastbound between the junctions with the A360 and the A345 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 18 September 2025 to 16:00 on 18 September 2025.
Schedule : From 20:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 22 September 2025 to 25 September 2025.
Schedule : From 20:00 on 26 September 2025 to 06:00 on 27 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.02 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 17 September 2025 to 05:00 on 19 September 2025.
Nearest town: 17.7 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.7 miles from Bleet.

Location: eastbound between junctions J17 (Chippenham) and J16 (Swindon) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 September 2025 to 06:00 on 18 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.76 miles from Bleet.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 15:00 from 17 September 2025 to 18 September 2025.
Schedule : From 08:00 on 22 September 2025 to 15:00 on 22 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.17 miles from Bleet.

Location: eastbound entry slip at junction J17 (Chippenham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 September 2025 to 06:00 on 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.56 miles from Bleet.

Location: northbound between the A30 West and the junction with the A303 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 07:00 and 17:00 from 15 September 2025 to 26 September 2025.
Nearest town: 18.95 miles from Bleet.

Location: southbound between the A303 and the junction with the A30 West.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 07:00 and 17:00 from 15 September 2025 to 26 September 2025.
Nearest town: 18.64 miles from Bleet.

Location: eastbound between the junctions with the A360 and the A345 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 15 September 2025 to 12:00 on 15 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.02 miles from Bleet.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 15:00 from 15 September 2025 to 16 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.48 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 15 September 2025 to 06:00 on 18 November 2025.
Nearest town: 15.59 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 November 2025 to 8 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 November 2025 to 14 November 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.78 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 18 September 2025.
Nearest town: 15.65 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 November 2025 to 06:00 on 15 November 2025.
Schedule : From 20:00 on 17 November 2025 to 06:00 on 18 November 2025.
Nearest town: 19.04 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 October 2025 to 1 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 5 November 2025.
Nearest town: 18.34 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 October 2025 to 06:00 on 25 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 30 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.22 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 September 2025 to 20 September 2025.
Schedule : From 20:00 on 22 September 2025 to 06:00 on 23 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.13 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 September 2025 to 06:00 on 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.66 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 October 2025 to 11 October 2025.
Schedule : From 20:00 on 13 October 2025 to 06:00 on 14 October 2025.
Nearest town: 16.83 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 October 2025 to 24 October 2025.
Nearest town: 17.54 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 September 2025 to 26 September 2025.
Nearest town: 16.25 miles from Bleet.

Location: westbound between junctions J18 (Bath) and J19 (Bristol) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 October 2025 to 18 October 2025.
Schedule : From 20:00 on 20 October 2025 to 06:00 on 21 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.33 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 15 September 2025 to 06:00 on 14 November 2025.
Nearest town: 19.39 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 October 2025 to 18 October 2025.
Schedule : From 20:00 on 20 October 2025 to 06:00 on 21 October 2025.
Nearest town: 17.81 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 September 2025 to 26 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.53 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 October 2025 to 11 October 2025.
Schedule : From 20:00 on 13 October 2025 to 06:00 on 14 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.28 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 September 2025 to 20 September 2025.
Schedule : From 20:00 on 22 September 2025 to 06:00 on 23 September 2025.
Nearest town: 16.45 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 September 2025 to 06:00 on 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Nearest town: 17.04 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 October 2025 to 24 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.99 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 18 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.05 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 October 2025 to 06:00 on 25 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 October 2025 to 30 October 2025.
Nearest town: 19.39 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 5 November 2025 to 8 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 November 2025 to 14 November 2025.
Nearest town: 19.35 miles from Bleet.

Location: eastbound between junctions J19 (Bristol) and J18 (Bath) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 October 2025 to 1 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 November 2025 to 5 November 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.84 miles from Bleet.

Location: westbound between junctions J17 (Chippenham) and J18 (Bath) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 20 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.35 miles from Bleet.

Location: eastbound between junctions J18 (Bath) and J17 (Chippenham) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 20 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.34 miles from Bleet.