Location: northbound at the junction with the A194 .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 8 July 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.48 miles from Bank Top.

Location: The A1M southbound between junctions J62 and J61 .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 8 July 2025 to 06:00 on 9 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.37 miles from Bank Top.

Location: northbound entry slip from the A694 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 8 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 4.23 miles from Bank Top.

Location: southbound exit slip to the A694 .
Lane Closures : Lane two is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 8 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.98 miles from Bank Top.

Location: northbound.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 July 2025 to 06:00 on 9 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.77 miles from Bank Top.

Location: southbound.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 July 2025 to 06:00 on 9 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.87 miles from Bank Top.

Location: southbound between the A197 and the junction with the A19 .
Lane Closures : Lane one is closed.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.27 miles from Bank Top.

Location: southbound.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.85 miles from Bank Top.

Location: southbound.
Due to: Horticultural works.
Period : expect disruption until 06:00 on 8 July 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.98 miles from Bank Top.

Location: The A1M northbound between junctions J63 and J65 .
Due to: Roadworks scheme.
Period : from 20:03 on 4 July 2025 to 06:00 on 27 July 2025.
Nearest town: 12.07 miles from Bank Top.

Location: southbound between the A197 and the junction with the A19 .
Due to: Roadworks scheme.
Period : from 20:02 on 23 June 2025 to 20:00 on 11 July 2025.
Nearest town: 13.19 miles from Bank Top.

Location: southbound.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 20 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8 miles from Bank Top.

Location: northbound.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 20 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.4 miles from Bank Top.

Location: northbound at the junction with the A1290 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.22 miles from Bank Top.

Location: southbound at the junction with the A1290 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.67 miles from Bank Top.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 14 July 2025 to 06:00 on 15 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.53 miles from Bank Top.

Location: southbound between the A183 and the junction with the A1018 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.61 miles from Bank Top.

Location: southbound exit slip to the A690 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.66 miles from Bank Top.

Location: southbound between the A1231 and the junction with the A183 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.45 miles from Bank Top.

Location: northbound between the A690 and the junction with the A183 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.85 miles from Bank Top.

Location: The A194M northbound between the A1M and junction J3 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.66 miles from Bank Top.

Location: The A194M northbound exit slip at junction J2 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.67 miles from Bank Top.

Location: The A194M southbound exit slip at junction J2 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.82 miles from Bank Top.

Location: The A194M southbound between junctions J3 and J1 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 July 2025 to 06:00 on 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.9 miles from Bank Top.

Location: The A194M northbound between junctions J1 and J3 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 July 2025 to 19 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.66 miles from Bank Top.

Location: westbound exit slip to the A194 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 25 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.18 miles from Bank Top.

Location: The A194M southbound between junctions J3 and J2 Washington(North) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 July 2025 to 26 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 July 2025 to 2 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.01 miles from Bank Top.

Location: The A194M northbound entry slip at junction J2 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.71 miles from Bank Top.

Location: The A194M northbound entry slip at junction J1 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.69 miles from Bank Top.

Location: The A194M southbound exit slip at junction J1 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.71 miles from Bank Top.

Location: The A194M northbound exit slip at junction J2 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.67 miles from Bank Top.

Location: The A194M southbound exit slip at junction J2 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.82 miles from Bank Top.

Location: The A194M southbound entry slip at junction J2 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.78 miles from Bank Top.

Location: The A194M northbound exit slip at junction J1 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.68 miles from Bank Top.

Location: The A194M southbound entry slip at junction .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.77 miles from Bank Top.

Location: westbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 19:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.11 miles from Bank Top.

Location: eastbound between the junctions with the A6085 and the A1 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 19:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.62 miles from Bank Top.

Location: eastbound between the A6085 and the junction with the A1 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 19:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.42 miles from Bank Top.

Location: eastbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 19:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.83 miles from Bank Top.

Location: westbound between the A1 and the junction with the A6085 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 19:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 3.51 miles from Bank Top.

Location: westbound.
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 19:00 on 12 July 2025 to 06:00 on 13 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.77 miles from Bank Top.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8 miles from Bank Top.

Location: southbound at the junction with the A184 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.29 miles from Bank Top.

Location: southbound at the junction with the A184 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.28 miles from Bank Top.

Location: The A1M northbound between junctions J64 and J65 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 July 2025 to 06:00 on 12 July 2025.
Schedule : From 20:00 on 20 July 2025 to 06:00 on 21 July 2025.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.01 miles from Bank Top.

Location: southbound between the A694 and the junction with the A184 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.72 miles from Bank Top.

Location: southbound between the A694 and the junction with the A184 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.75 miles from Bank Top.

Location: southbound entry slip from the A692 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.92 miles from Bank Top.

Location: southbound between the A184 and the junction with the A167 Washington Birtley.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.51 miles from Bank Top.

Location: southbound exit slip to the A692 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.77 miles from Bank Top.

Location: southbound exit slip to the A167 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.15 miles from Bank Top.

Location: northbound between the junctions with the A194M and the A167 Washington Birtley .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 July 2025 to 06:00 on 12 July 2025.
Schedule : From 20:00 on 20 July 2025 to 06:00 on 21 July 2025.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.57 miles from Bank Top.

Location: The A1M northbound at junction J63 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 July 2025 to 06:00 on 12 July 2025.
Schedule : From 20:00 on 20 July 2025 to 06:00 on 21 July 2025.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.07 miles from Bank Top.

Location: The A1M northbound between junctions J63 and J65 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 July 2025 to 06:00 on 12 July 2025.
Schedule : From 20:00 on 20 July 2025 to 06:00 on 21 July 2025.
Schedule : From 20:00 on 26 July 2025 to 06:00 on 27 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.79 miles from Bank Top.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.23 miles from Bank Top.

Location: southbound entry slip from the A167 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.53 miles from Bank Top.

Location: The A1M southbound at junction J65 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Schedule : From 20:00 on 19 July 2025 to 06:00 on 20 July 2025.
Schedule : From 20:00 on 27 July 2025 to 06:00 on 28 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.33 miles from Bank Top.

Location: southbound between the A68 and the junction with the A1 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 July 2025 to 06:00 on 10 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.02 miles from Bank Top.

Location: northbound between the A1 and the junction with the A68 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 July 2025 to 06:00 on 10 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.62 miles from Bank Top.

Location: southbound between the A68 and the junction with the A1 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.26 miles from Bank Top.

Location: northbound between the A1 and the junction with the A68 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.12 miles from Bank Top.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.36 miles from Bank Top.

Location: northbound.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.27 miles from Bank Top.

Location: southbound between the junctions with the A68 and the A1 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.37 miles from Bank Top.

Location: southbound between the junctions with the A68 and the A1 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.29 miles from Bank Top.

Location: northbound between the junctions with the A1 and the A68 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 4.26 miles from Bank Top.

Location: northbound between the junctions with the A1 and the A68 .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 11 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.36 miles from Bank Top.

Location: eastbound between the junctions with the A194M and the A19 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:00 from 8 July 2025 to 9 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.21 miles from Bank Top.

Location: westbound between the A19 and the junction with the A194 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:00 from 8 July 2025 to 9 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.63 miles from Bank Top.

Location: The A1M southbound between junctions J64 and J61 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 4 August 2025 to 06:00 on 6 September 2025.
Nearest town: 11.08 miles from Bank Top.

Location: The A1M southbound between junctions J63 and J61 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.81 miles from Bank Top.

Location: The A1M southbound between junctions J62 and J61 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 5 August 2025 to 8 August 2025.
Schedule : From 06:00 on 9 August 2025 to 20:00 on 11 August 2025.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 12 August 2025 to 15 August 2025.
Schedule : From 06:00 on 16 August 2025 to 20:00 on 18 August 2025.
Nearest town: 16.69 miles from Bank Top.

Location: The A1M southbound between junctions J63 and J61 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.81 miles from Bank Top.

Location: The A1M southbound between junctions J64 and J63 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 September 2025 to 6 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.08 miles from Bank Top.

Location: The A1M southbound between junctions J64 and J63 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 August 2025 to 9 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 August 2025 to 16 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 August 2025 to 30 August 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.08 miles from Bank Top.

Location: northbound at the junction with the A1231 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.99 miles from Bank Top.

Location: northbound between the junctions with the A183 and the A1231 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.44 miles from Bank Top.

Location: southbound exit slip to the A183 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.47 miles from Bank Top.

Location: southbound at the junction with the A1231 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.83 miles from Bank Top.

Location: southbound between the A1231 and the junction with the A690 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 August 2025 to 22 August 2025.
Schedule : From 20:00 on 26 August 2025 to 06:00 on 27 August 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.94 miles from Bank Top.

Location: northbound entry slip from the A1231 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.84 miles from Bank Top.

Location: northbound between the A183 and the junction with the A1290 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.04 miles from Bank Top.

Location: northbound exit slip to the A1290 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.17 miles from Bank Top.

Location: southbound between the A184 and the junction with the A1231 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 12 July 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.67 miles from Bank Top.

Location: southbound between the A197 and the junction with the A19 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 8 July 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 13.19 miles from Bank Top.

Location: southbound between the A694 and the junction with the A167 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 10 July 2025 to 06:00 on 28 July 2025.
Nearest town: 4.75 miles from Bank Top.