Location: northbound between junctions J18 (Holmes Chapel) and J19 (Northwich) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 10:00 and 10:15 on 25 November 2025.
Normal traffic conditions are expected between 10:00 and 10:15 on 25 November 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 12.93 miles from Balterley.

Location: northbound exit slip to the A50 .
Due to: Congestion.
Normal traffic conditions are expected between 14:30 and 14:45 on 25 November 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.27 miles from Balterley.

Location: eastbound between the A5005 and the junction with the A521 Blythe Bridge West.
Due to: Congestion.
Normal traffic conditions are expected between 13:30 and 13:45 on 25 November 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.44 miles from Balterley.

Location: northbound exit slip to the A527 South.
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 25 November 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.34 miles from Balterley.

Location: southbound exit slip at junction J15 (Stoke on Trent) .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 25 November 2025.
Nearest town: 7.34 miles from Balterley.

Location: northbound between the junctions with the M6 J15 and the A519 .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 25 November 2025.
Nearest town: 7.43 miles from Balterley.

Location: southbound entry slip from the A34 .
Due to: Congestion.
Normal traffic conditions are expected between 09:00 and 09:15 on 25 November 2025.
Nearest town: 5.07 miles from Balterley.

Location: southbound exit slip at Keele Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.6 miles from Balterley.

Location: southbound between junctions J20A (Chester) and J19 (Northwich) .
Lane Closures : The hard shoulder is closed.
Due to: Litter Clearance.
Period : expect disruption until 18:00 on 25 November 2025.
Nearest town: 19.88 miles from Balterley.

Location: southbound between junctions J20A (Chester) and J19 (Northwich) .
Lane Closures : The hard shoulder is closed.
Due to: Litter Clearance.
Period : expect disruption until 18:00 on 25 November 2025.
Nearest town: 19.88 miles from Balterley.

Location: southbound between junctions J19 (Northwich) and J18 (Holmes Chapel) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 05:00 on 26 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.47 miles from Balterley.

Location: northbound between junctions J19 (Northwich) and J20 (Macclesfield) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 November 2025 to 05:00 on 28 November 2025.
Nearest town: 19.68 miles from Balterley.

Location: northbound between junctions J17 (Congleton) and J18 (Holmes Chapel) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 05:00 on 26 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.96 miles from Balterley.

Location: northbound between junctions J19 (Northwich) and J20 (Macclesfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 25 November 2025 to 27 November 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.68 miles from Balterley.

Location: southbound exit slip at junction J15 (Stoke on Trent) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 November 2025 to 26 November 2025.
Schedule : From 21:00 on 27 November 2025 to 06:00 on 28 November 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 December 2025 to 20 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 19 January 2026 to 23 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.27 miles from Balterley.

Location: southbound exit slip at Keele Services.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.6 miles from Balterley.

Location: southbound entry slip at Keele Services.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.62 miles from Balterley.

Location: northbound entry slip from the M6 J19 northbound exit.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.41 miles from Balterley.

Location: northbound exit slip at junction J19 (Northwich) to A556 south.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.32 miles from Balterley.

Location: northbound between junctions J18 (Holmes Chapel) and J19 (Northwich) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Nearest town: 16.44 miles from Balterley.

Location: northbound at junction J19 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.32 miles from Balterley.

Location: northbound between junctions J18 (Holmes Chapel) and J19 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.44 miles from Balterley.

Location: westbound between the A5005 and the junction with the A500 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Nearest town: 9.19 miles from Balterley.

Location: westbound between the junctions with the A5005 and the A500 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.55 miles from Balterley.

Location: westbound between the A5005 and the junction with the A500 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.19 miles from Balterley.

Location: southbound exit slip to the A5006 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.27 miles from Balterley.

Location: southbound entry slip from the A50 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Nearest town: 8.31 miles from Balterley.

Location: southbound entry slip from the A50 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.31 miles from Balterley.

Location: southbound exit slip to the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.48 miles from Balterley.

Location: southbound exit slip at Keele Services.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 15 December 2025.
Nearest town: 4.6 miles from Balterley.

Location: southbound exit slip at Keele Services.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 November 2025 to 06:00 on 26 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.6 miles from Balterley.

Location: eastbound.
Due to: Roadworks scheme.
Period : from 20:06 on 19 November 2025 to 06:00 on 9 December 2025.
Nearest town: 9.24 miles from Balterley.

Location: southbound.
Due to: Roadworks scheme.
Period : from 21:01 on 17 November 2025 to 06:00 on 27 November 2025.
Nearest town: 2.77 miles from Balterley.

Location: westbound between the A521 Blythe Bridge West and the junction with the A500 .
Due to: Roadworks scheme.
Period : from 20:04 on 24 November 2025 to 06:00 on 9 December 2025.
Nearest town: 10.87 miles from Balterley.

Location: southbound between junctions J17 (Congleton) and J16 (Stoke on Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 2 December 2025 to 06:00 on 3 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.88 miles from Balterley.

Location: southbound between junctions J17 (Congleton) and J16 (Stoke on Trent) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 18 December 2025 to 06:00 on 19 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 4.12 miles from Balterley.

Location: southbound entry slip at junction J15 (Stoke on Trent) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 December 2025 to 06:00 on 15 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.42 miles from Balterley.

Location: southbound between the junctions with the A519 and the M6 J15.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 December 2025 to 06:00 on 15 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.46 miles from Balterley.

Location: southbound between junctions J17 (Congleton) and J16 (Stoke on Trent) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 2 December 2025 to 06:00 on 19 December 2025.
Nearest town: 5.88 miles from Balterley.

Location: southbound between junctions J17 (Congleton) and J16 (Stoke on Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 2 December 2025 to 06:00 on 3 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.88 miles from Balterley.

Location: northbound exit slip at junction J17 (Congleton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 19:00 on 10 December 2025 to 06:00 on 20 December 2025.
Nearest town: 7.21 miles from Balterley.

Location: northbound exit slip at junction J17 (Congleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 December 2025 to 12 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 December 2025 to 20 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.21 miles from Balterley.

Location: northbound between junctions J16 (Stoke on Trent) and J17 (Congleton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 10 December 2025 to 12 December 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 December 2025 to 20 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 6.73 miles from Balterley.

Location: southbound between junctions J19 (Northwich) and J18 (Holmes Chapel) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 2 December 2025 to 06:00 on 3 December 2025.
Nearest town: 18.5 miles from Balterley.

Location: southbound between junctions J19 (Northwich) and J18 (Holmes Chapel) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 December 2025 to 06:00 on 3 December 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.32 miles from Balterley.

Location: southbound at junction J19 (Northwich) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 December 2025 to 06:00 on 3 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.5 miles from Balterley.

Location: northbound between junctions J18 (Holmes Chapel) and J19 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 December 2025 to 06:00 on 2 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.61 miles from Balterley.

Location: northbound between junctions J19 (Northwich) and J20 (Macclesfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 27 November 2025 to 05:00 on 28 November 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.87 miles from Balterley.

Location: southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 30 November 2025 to 06:00 on 1 December 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.28 miles from Balterley.

Location: southbound between junctions J17 (Congleton) and J16 (Stoke on Trent) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2025 to 05:00 on 29 November 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 3.3 miles from Balterley.

Location: northbound between junctions J13 (Stafford) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 27 November 2025 to 06:00 on 28 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.87 miles from Balterley.

Location: northbound entry slip at junction J15 (Stoke on Trent) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : From 21:00 on 15 December 2025 to 06:00 on 16 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 January 2026 to 10 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.42 miles from Balterley.

Location: southbound between the junctions with the A519 and the M6 J15.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : From 21:00 on 15 December 2025 to 06:00 on 16 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 January 2026 to 10 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.42 miles from Balterley.

Location: northbound exit slip at junction J15 (Stoke on Trent) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2025 to 28 November 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 December 2025 to 6 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : From 21:00 on 15 December 2025 to 06:00 on 16 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.47 miles from Balterley.

Location: southbound between the junctions with the A519 and the M6 J15.
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Schedule : From 21:00 on 5 December 2025 to 06:00 on 6 December 2025.
Schedule : From 21:00 on 15 December 2025 to 06:00 on 16 December 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 January 2026 to 10 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.46 miles from Balterley.

Location: southbound entry slip at Knutsford Services.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 05:00 on 27 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.63 miles from Balterley.

Location: southbound between junctions J19 (Northwich) and J18 (Holmes Chapel) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 05:00 on 27 November 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.32 miles from Balterley.

Location: southbound at junction J19 (Northwich) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 05:00 on 27 November 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.47 miles from Balterley.

Location: southbound exit slip at junction J18 (Holmes Chapel) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 November 2025 to 29 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.96 miles from Balterley.

Location: southbound entry slip at junction J17 (Congleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.4 miles from Balterley.

Location: southbound between junctions J18 (Holmes Chapel) and J16 (Stoke on Trent) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 8.08 miles from Balterley.

Location: southbound entry slip at junction J18 (Holmes Chapel) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 November 2025 to 29 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.66 miles from Balterley.

Location: southbound between junctions J19 (Northwich) and J17 (Congleton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 November 2025 to 29 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.58 miles from Balterley.

Location: southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 November 2025 to 28 November 2025.
Schedule : From 21:00 on 4 December 2025 to 06:00 on 5 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.3 miles from Balterley.

Location: southbound exit slip at junction J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 November 2025 to 28 November 2025.
Schedule : From 21:00 on 4 December 2025 to 06:00 on 5 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.47 miles from Balterley.

Location: westbound entry slip from the A5007 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2025 to 28 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.87 miles from Balterley.

Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2025 to 06:00 on 29 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2025 to 6 December 2025.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.24 miles from Balterley.

Location: westbound exit slip to the A5007 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 November 2025 to 28 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11 miles from Balterley.

Location: westbound between the A521 Blythe Bridge West and the junction with the A5035 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 November 2025 to 28 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.9 miles from Balterley.

Location: westbound between the junctions with the A5005 and the A500 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2025 to 06:00 on 29 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2025 to 6 December 2025.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.38 miles from Balterley.

Location: westbound between the junctions with the A5005 and the A500 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2025 to 06:00 on 29 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2025 to 6 December 2025.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.58 miles from Balterley.

Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 November 2025 to 06:00 on 29 November 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 December 2025 to 6 December 2025.
Schedule : From 20:00 on 8 December 2025 to 06:00 on 9 December 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.38 miles from Balterley.

Location: westbound entry slip from the A520 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 November 2025 to 28 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.62 miles from Balterley.

Location: southbound exit slip at junction J16 (Stoke on Trent) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.01 miles from Balterley.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.77 miles from Balterley.

Location: northbound exit slip at junction J16 (Stoke on Trent) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.62 miles from Balterley.

Location: southbound between the M6 J16 and the junction with the A34 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 1.91 miles from Balterley.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 November 2025 to 06:00 on 27 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 2.6 miles from Balterley.

Location: northbound between the M6 J15 and the junction with the A34 Newcastle Under Lyme South .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2025 to 06:00 on 29 November 2025.
Nearest town: 7.41 miles from Balterley.

Location: northbound between the A519 and the junction with the A34 Newcastle Under Lyme South .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2025 to 06:00 on 29 November 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.81 miles from Balterley.

Location: northbound between the junctions with the M6 J15 and the A519 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 November 2025 to 06:00 on 29 November 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.41 miles from Balterley.

Location: eastbound between the A521 Blythe Bridge East and the junction with the A6 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 25 November 2025 to 29 November 2025.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 1 December 2025 to 6 December 2025.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.94 miles from Balterley.

Location: northbound between junctions J16 (Stoke on Trent) and J17 (Congleton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 06:00 from 4 December 2025 to 6 December 2025.
Schedule : Expect disruption everyday between 23:00 and 06:00 from 8 December 2025 to 13 December 2025.
Schedule : Expect disruption everyday between 23:00 and 06:00 from 15 December 2025 to 20 December 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 3.15 miles from Balterley.

Location: northbound between junctions J18 (Holmes Chapel) and J19 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 November 2025 to 29 November 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 13.5 miles from Balterley.

Location: eastbound between the A521 Blythe Bridge West and the junction with the A522 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 05:00 from 12 January 2026 to 14 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.45 miles from Balterley.