Location: westbound between the A17 and the junction with the A1101 .
Due to: Roadworks.
Period : from 19:46 on 23 January 2026 to 06:00 on 26 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.22 miles from Badgeney.

Location: westbound between junctions J24B and J23 .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadside Equipment Maintenance.
Period : expect disruption until 15:30 on 24 January 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18.97 miles from Badgeney.

Location: The A1M southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 January 2026 to 06:00 on 25 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.23 miles from Badgeney.

Location: The A1M southbound at junction J17 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 January 2026 to 06:00 on 25 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.39 miles from Badgeney.

Location: The A1M southbound exit slip at junction J16 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 January 2026 to 06:00 on 25 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.44 miles from Badgeney.

Location: southbound between the junctions with the A605 and the A1139 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 January 2026 to 06:00 on 25 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.44 miles from Badgeney.

Location: southbound between the junctions with the A605 and the A1139 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 January 2026 to 06:00 on 25 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.71 miles from Badgeney.

Location: eastbound between the junctions with the A1139 and the A141 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 January 2026 to 06:00 on 25 January 2026.
Nearest town: 4.62 miles from Badgeney.

Location: westbound between the junctions with the A141 and the A1139 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 January 2026 to 06:00 on 25 January 2026.
Nearest town: 4.6 miles from Badgeney.

Location: eastbound between the junctions with the A141 and the A1101 .
Due to: Roadworks.
Period : expect disruption until 23:59 on 27 March 2026.
Nearest town: 6.03 miles from Badgeney.

Location: westbound between the junctions with the A1101 and the A141 .
Due to: Roadworks.
Period : expect disruption until 23:59 on 27 March 2026.
Nearest town: 6.09 miles from Badgeney.

Location: westbound at the junction with the A1101 .
Due to: Roadworks scheme.
Period : from 20:01 on 22 January 2026 to 06:00 on 29 January 2026.
Nearest town: 8.01 miles from Badgeney.

Location: eastbound at the junction with the A1101 .
Due to: Roadworks scheme.
Period : from 20:01 on 22 January 2026 to 06:00 on 29 January 2026.
Nearest town: 7.98 miles from Badgeney.

Location: westbound between the A17 and the junction with the A1139 .
Due to: Roadworks scheme.
Period : from 20:01 on 22 January 2026 to 06:00 on 30 January 2026.
Nearest town: 8.27 miles from Badgeney.

Location: eastbound exit slip to the A10 .
Due to: Roadworks scheme.
Period : from 20:01 on 15 January 2026 to 06:00 on 14 February 2026.
Nearest town: 18.92 miles from Badgeney.

Location: eastbound between the A1139 and the junction with the A17 .
Due to: Roadworks scheme.
Period : from 20:01 on 22 January 2026 to 06:00 on 30 January 2026.
Nearest town: 14.55 miles from Badgeney.

Location: westbound between the A17 and the junction with the A1101 .
Due to: Roadworks scheme.
Period : from 20:00 on 23 January 2026 to 06:00 on 21 March 2026.
Nearest town: 18.23 miles from Badgeney.

Location: The A1M southbound between junctions J14 and A1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.49 miles from Badgeney.

Location: The A1M southbound between junctions J15 and A1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 18.25 miles from Badgeney.

Location: westbound between the A17 and the junction with the A1101 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 26 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 18.23 miles from Badgeney.

Location: eastbound between the junctions with the A1139 and the A141 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 28 January 2026 to 30 January 2026.
Nearest town: 5.31 miles from Badgeney.

Location: westbound between the junctions with the A141 and the A1139 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 28 January 2026 to 30 January 2026.
Nearest town: 5.22 miles from Badgeney.

Location: eastbound between the A1101 and the junction with the A17 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 26 January 2026.
Lanes Closed : All lanes are closed.
Nearest town: 16.2 miles from Badgeney.

Location: The A1M northbound between junctions J16 and J17 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.65 miles from Badgeney.

Location: eastbound between junctions J23 and J24 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.06 miles from Badgeney.

Location: The A1M northbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.02 miles from Badgeney.

Location: The A1M northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.17 miles from Badgeney.

Location: westbound at junction J25 Bar Hill.
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 29 January 2026 to 06:00 on 30 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.81 miles from Badgeney.

Location: northbound between the A605 and the junction with the A6118 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 27 January 2026 to 29 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.11 miles from Badgeney.

Location: northbound between the A1139 and the junction with the A6118 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 26 January 2026 to 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.44 miles from Badgeney.

Location: The A1M northbound at junction J17 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 26 January 2026 to 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.34 miles from Badgeney.

Location: The A1M southbound between junctions J17 and J16 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 January 2026 to 06:00 on 29 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.81 miles from Badgeney.

Location: The A1M southbound exit slip at junction J16 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 January 2026 to 06:00 on 29 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.44 miles from Badgeney.

Location: westbound between the junctions with the A1260 and the A1 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 January 2026 to 06:00 on 7 February 2026.
Nearest town: 17.47 miles from Badgeney.

Location: westbound between the junctions with the A1260 and the A1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 January 2026 to 31 January 2026.
Schedule : From 20:00 on 2 February 2026 to 06:00 on 3 February 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.47 miles from Badgeney.

Location: westbound between the junctions with the A1260 and the A1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2026 to 7 February 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.47 miles from Badgeney.

Location: eastbound between the junctions with the A1 and the A1260 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 3 February 2026 to 06:00 on 13 February 2026.
Nearest town: 19.84 miles from Badgeney.

Location: eastbound between the junctions with the A1 and the A1260 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 February 2026 to 13 February 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.84 miles from Badgeney.

Location: eastbound between the junctions with the A1 and the A1260 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 February 2026 to 7 February 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.84 miles from Badgeney.

Location: westbound at the junction with the A1101 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2026 to 29 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.99 miles from Badgeney.

Location: eastbound at the junction with the A1101 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2026 to 29 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.99 miles from Badgeney.

Location: westbound between junctions J24B and J23 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 January 2026 to 30 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.26 miles from Badgeney.

Location: The A1M northbound between junctions J16 and J17 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 06:00 on 28 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.52 miles from Badgeney.

Location: The A1M southbound at junction J17 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 06:00 on 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.39 miles from Badgeney.

Location: The A1M southbound between junctions J17 and J16 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2026 to 06:00 on 28 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.3 miles from Badgeney.

Location: westbound between the junctions with the A17 and the A1101 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2026 to 30 January 2026.
Nearest town: 10.96 miles from Badgeney.

Location: eastbound between the junctions with the A1101 and the A17 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2026 to 30 January 2026.
Nearest town: 10.92 miles from Badgeney.

Location: westbound between the junctions with the A141 and the A1139 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.27 miles from Badgeney.

Location: eastbound between the junctions with the A1139 and the A141 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.31 miles from Badgeney.

Location: eastbound between the junctions with the A1139 and the A141 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 28 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.24 miles from Badgeney.

Location: westbound between the junctions with the A17 and the A1101 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2026 to 30 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.69 miles from Badgeney.

Location: The A1M northbound between junctions A1 and J14 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 January 2026 to 05:00 on 30 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.34 miles from Badgeney.

Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 30 January 2026 to 05:00 on 4 February 2026.
Nearest town: 19.25 miles from Badgeney.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 February 2026 to 05:00 on 3 February 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 19.25 miles from Badgeney.

Location: southbound between the junctions with the A1M and the A141 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 February 2026 to 05:00 on 3 February 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.43 miles from Badgeney.

Location: The A1M southbound between junctions J16 and J15 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 06:00 on 27 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.4 miles from Badgeney.

Location: The A1M southbound between junctions J17 and J16 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 06:00 on 27 January 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.65 miles from Badgeney.

Location: The A1M northbound between junctions J16 and J17 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 06:00 on 27 January 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.41 miles from Badgeney.

Location: The A1M northbound between junctions J15 and J16 .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 January 2026 to 06:00 on 27 January 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.51 miles from Badgeney.

Location: The A1M southbound at junction J17 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 30 January 2026.
Schedule : From 21:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.39 miles from Badgeney.

Location: The A1M southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 30 January 2026.
Schedule : From 21:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.23 miles from Badgeney.

Location: The A1M southbound exit slip at junction J16 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 30 January 2026.
Schedule : From 21:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 16.44 miles from Badgeney.

Location: southbound between the junctions with the A605 and the A1139 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 30 January 2026.
Schedule : From 21:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.71 miles from Badgeney.

Location: southbound between the junctions with the A605 and the A1139 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 30 January 2026.
Schedule : From 21:00 on 30 January 2026 to 06:00 on 31 January 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 17.44 miles from Badgeney.

Location: eastbound exit slip to the A10 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 January 2026 to 31 January 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 February 2026 to 7 February 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 February 2026 to 14 February 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.99 miles from Badgeney.
