Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 January 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 15.81 miles from Ashe.
Location: eastbound exit slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2025 to 23 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.4 miles from Ashe.
Location: northbound at the junction with the A325 .
Due to: Roadworks scheme.
Period : from 21:00 on 16 January 2025 to 06:00 on 25 January 2025.
Nearest town: 19.86 miles from Ashe.
Location: northbound.
Due to: Roadworks scheme.
Period : from 21:00 on 16 January 2025 to 06:00 on 21 January 2025.
Nearest town: 4.85 miles from Ashe.
Location: westbound between junctions J10 (Reading) and J12 (Reading) .
Due to: Roadworks scheme.
Period : from 21:00 on 17 January 2025 to 06:00 on 11 February 2025.
Nearest town: 18.39 miles from Ashe.
Location: eastbound entry slip at junction J12 (Reading) .
Due to: Roadworks scheme.
Period : from 21:00 on 16 January 2025 to 06:00 on 15 March 2025.
Nearest town: 15.35 miles from Ashe.
Location: eastbound between junctions J12 (Reading) and J10 (Reading) .
Due to: Roadworks scheme.
Period : from 14:12 on 10 September 2024 to 06:00 on 31 March 2025.
Nearest town: 15.31 miles from Ashe.
Location: eastbound at junction J12 (Reading) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 15.31 miles from Ashe.
Location: westbound at junction J12 (Reading) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 15.29 miles from Ashe.
Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 16.21 miles from Ashe.
Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 16.69 miles from Ashe.
Location: eastbound at junction J11 (Basingstoke) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 16.27 miles from Ashe.
Location: westbound at junction J11 (Basingstoke) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 16.49 miles from Ashe.
Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 March 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 15.3 miles from Ashe.
Location: eastbound between junctions J13 (Newbury) and J10 (Reading) .
Due to: Roadworks scheme.
Period : from 20:00 on 17 January 2025 to 06:00 on 18 February 2025.
Nearest town: 15.77 miles from Ashe.
Location: westbound at junction J12 (Reading) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 6 March 2025.
Nearest town: 15.29 miles from Ashe.
Location: westbound between junctions J7 (Basingstoke) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 February 2025.
Nearest town: 3.88 miles from Ashe.
Location: eastbound between junctions J9 (Winchester) and J7 (Basingstoke) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 February 2025.
Nearest town: 3.81 miles from Ashe.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 8 February 2025.
Nearest town: 3.82 miles from Ashe.
Location: northbound exit slip to the A303 westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 January 2025 to 28 January 2025.
Schedule : From 21:00 on 23 February 2025 to 06:00 on 24 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.64 miles from Ashe.
Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 25 January 2025 to 06:00 on 24 February 2025.
Nearest town: 7.56 miles from Ashe.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 January 2025 to 28 January 2025.
Schedule : From 21:00 on 23 February 2025 to 06:00 on 24 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.56 miles from Ashe.
Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 25 January 2025 to 06:00 on 26 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.49 miles from Ashe.
Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 25 January 2025 to 06:00 on 26 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.75 miles from Ashe.
Location: southbound between the A303 and the junction with the A272 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 25 January 2025 to 06:00 on 26 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.91 miles from Ashe.
Location: northbound between the A33 and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 January 2025 to 2 February 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2025 to 9 February 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 February 2025 to 16 February 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 February 2025 to 23 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.57 miles from Ashe.
Location: northbound between the A272 and the junction with the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 January 2025 to 28 January 2025.
Schedule : From 21:00 on 23 February 2025 to 06:00 on 24 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.96 miles from Ashe.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 January 2025 to 28 January 2025.
Schedule : From 21:00 on 23 February 2025 to 06:00 on 24 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.82 miles from Ashe.
Location: northbound exit slip to the A303 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 January 2025 to 28 January 2025.
Schedule : From 21:00 on 23 February 2025 to 06:00 on 24 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.47 miles from Ashe.
Location: northbound exit slip to the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 January 2025 to 2 February 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2025 to 9 February 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 February 2025 to 16 February 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 February 2025 to 23 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.96 miles from Ashe.
Location: northbound exit slip to the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 January 2025 to 28 January 2025.
Schedule : From 21:00 on 23 February 2025 to 06:00 on 24 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.96 miles from Ashe.
Location: northbound between the A33 and the junction with the A272 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 January 2025 to 28 January 2025.
Schedule : From 21:00 on 23 February 2025 to 06:00 on 24 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.57 miles from Ashe.
Location: northbound between the junctions with the A343 and the A4 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 24 January 2025 to 06:00 on 25 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.19 miles from Ashe.
Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 March 2025 to 15 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 22 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 29 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 March 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.63 miles from Ashe.
Location: westbound at junction J14 (Hungerford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 March 2025 to 15 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 17 March 2025 to 22 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 March 2025 to 29 March 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 31 March 2025 to 5 April 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.38 miles from Ashe.
Location: eastbound exit slip at junction J14 (Hungerford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 31 January 2025 to 06:00 on 1 February 2025.
Schedule : From 21:00 on 7 February 2025 to 06:00 on 8 February 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 February 2025 to 15 February 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 February 2025 to 28 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.91 miles from Ashe.
Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.3 miles from Ashe.
Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 January 2025 to 25 January 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 January 2025 to 30 January 2025.
Schedule : From 20:00 on 7 February 2025 to 06:00 on 8 February 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.56 miles from Ashe.
Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 February 2025 to 12 February 2025.
Schedule : From 20:00 on 13 February 2025 to 06:00 on 14 February 2025.
Schedule : From 20:00 on 17 February 2025 to 06:00 on 18 February 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.25 miles from Ashe.
Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 January 2025 to 29 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.81 miles from Ashe.
Location: eastbound at junction J11 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 January 2025 to 23 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.27 miles from Ashe.
Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 January 2025 to 23 January 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.78 miles from Ashe.
Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 February 2025 to 06:00 on 5 February 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.3 miles from Ashe.
Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 4 February 2025 to 06:00 on 5 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.81 miles from Ashe.
Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.69 miles from Ashe.
Location: eastbound at junction J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.27 miles from Ashe.
Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.29 miles from Ashe.
Location: eastbound between junctions J11 (Basingstoke) and J10 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2025 to 06:00 on 28 January 2025.
Schedule : From 20:00 on 3 February 2025 to 06:00 on 4 February 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.69 miles from Ashe.
Location: eastbound at junction J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2025 to 06:00 on 28 January 2025.
Schedule : From 20:00 on 3 February 2025 to 06:00 on 4 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.27 miles from Ashe.
Location: eastbound between junctions J12 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 January 2025 to 06:00 on 28 January 2025.
Schedule : From 20:00 on 3 February 2025 to 06:00 on 4 February 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.78 miles from Ashe.
Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 January 2025 to 06:00 on 22 January 2025.
Schedule : From 20:00 on 23 January 2025 to 06:00 on 24 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.21 miles from Ashe.
Location: westbound between junctions J11 (Basingstoke) and J12 (Reading) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.21 miles from Ashe.
Location: westbound at junction J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 January 2025 to 06:00 on 22 January 2025.
Schedule : From 20:00 on 23 January 2025 to 06:00 on 24 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.49 miles from Ashe.
Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 January 2025 to 06:00 on 22 January 2025.
Schedule : From 20:00 on 23 January 2025 to 06:00 on 24 January 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.27 miles from Ashe.
Location: westbound at junction J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.29 miles from Ashe.
Location: westbound at junction J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.49 miles from Ashe.
Location: westbound between junctions J10 (Reading) and J11 (Basingstoke) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 31 January 2025 to 06:00 on 1 February 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.58 miles from Ashe.
Location: westbound exit slip at junction J12 (Reading) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.29 miles from Ashe.
Location: northbound between the A303 and the junction with the A4 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 23 January 2025 to 06:00 on 24 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.14 miles from Ashe.
Location: northbound exit slip to the A343 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 23 January 2025 to 06:00 on 24 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.46 miles from Ashe.
Location: northbound entry slip from the A343 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 23 January 2025 to 06:00 on 24 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.43 miles from Ashe.
Location: northbound exit slip to the A343 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 23 January 2025 to 06:00 on 24 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.48 miles from Ashe.
Location: westbound between the A3057 and the junction with the A342 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 January 2025 to 06:00 on 24 January 2025.
Nearest town: 11.62 miles from Ashe.
Location: westbound entry slip from the A342 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 January 2025 to 06:00 on 24 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.21 miles from Ashe.
Location: westbound between the A3057 and the junction with the A338 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 January 2025 to 06:00 on 24 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.62 miles from Ashe.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 January 2025 to 25 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.37 miles from Ashe.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 January 2025 to 06:00 on 25 January 2025.
Nearest town: 11.37 miles from Ashe.
Location: westbound exit slip at junction J9 (Winchester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 January 2025 to 25 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.05 miles from Ashe.
Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2025 to 23 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.64 miles from Ashe.
Location: eastbound entry slip at junction J12 (Reading) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 19 January 2025.
Lanes Closed : All lanes are closed.
Nearest town: 15.35 miles from Ashe.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.85 miles from Ashe.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 6.16 miles from Ashe.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.02 miles from Ashe.
Location: northbound between the A303 and the junction with the A343 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 17 January 2025 to 06:00 on 18 January 2025.
Schedule : From 21:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.71 miles from Ashe.
Location: eastbound exit slip at junction J6 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 January 2025 to 06:00 on 17 January 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2025 to 6 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.46 miles from Ashe.
Location: westbound exit slip at junction J6 (Basingstoke) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 January 2025 to 06:00 on 17 January 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 February 2025 to 6 February 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.91 miles from Ashe.
Location: southbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.68 miles from Ashe.
Location: southbound between the A343 and the junction with the A303 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 4.74 miles from Ashe.
Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.48 miles from Ashe.
Location: northbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 4.86 miles from Ashe.
Location: northbound between the A303 and the junction with the A343 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 22 January 2025 to 06:00 on 23 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.17 miles from Ashe.
Location: southbound between the junctions with the A343 and the A303 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 21 January 2025 to 06:00 on 22 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 5.21 miles from Ashe.
Location: eastbound between junctions J13 (Newbury) and J12 (Reading) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 January 2025 to 06:00 on 22 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.09 miles from Ashe.
Location: northbound between the A303 and the junction with the A343 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 January 2025 to 06:00 on 22 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.24 miles from Ashe.
Location: southbound between the A4 and the junction with the A303 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 January 2025 to 06:00 on 22 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.14 miles from Ashe.
Location: eastbound.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.89 miles from Ashe.
Location: westbound between junctions J14 (Hungerford) and J15 (Swindon) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 January 2025 to 06:00 on 3 May 2025.
Nearest town: 17.63 miles from Ashe.
Location: westbound entry slip at junction J5 (Hook) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 20 January 2025 to 06:00 on 21 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.27 miles from Ashe.
Location: westbound between junctions J8 (Andover) and J9 (Winchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 23 January 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.35 miles from Ashe.
Location: eastbound between junctions J15 (Swindon) and J14 (Hungerford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 20 January 2025 to 15:30 on 20 January 2025.
Nearest town: 19.66 miles from Ashe.
Location: westbound between junctions J11 (Winchester) and J12 (Eastleigh) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 January 2025 to 25 January 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.37 miles from Ashe.
Location: northbound at the junction with the A325 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 January 2025 to 25 January 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.86 miles from Ashe.
Location: westbound between junctions J13 (Newbury) and J14 (Hungerford) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 20 January 2025 to 24 January 2025.
Nearest town: 17.16 miles from Ashe.