Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Lane Closures : The hard shoulder is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 10:45 and 11:00 on 12 September 2025.
Normal traffic conditions are expected between 11:15 and 11:30 on 12 September 2025.
Nearest town: 14.53 miles from Ardeley.

Location: northbound between the junctions with the A4280 and the A1 .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 09:30 and 09:45 on 12 September 2025.
Normal traffic conditions are expected between 09:30 and 09:45 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.4 miles from Ardeley.

Location: northbound exit slip at junction J11 (Luton) .
Lane Closures : Lane two is closed.
Due to: Road traffic collision.
Time To Clear : The event is expected to clear between 09:30 and 09:45 on 12 September 2025.
Normal traffic conditions are expected between 09:30 and 09:45 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 15.48 miles from Ardeley.

Location: southbound exit slip at junction J12 (Flitwick) .
Lane Closures : Lane one is closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 09:45 and 10:00 on 12 September 2025.
Normal traffic conditions are expected between 09:45 and 10:00 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.57 miles from Ardeley.

Green Street (All Directions) at the junction of Jute Lane - The level crossing barriers are now working.
Fault now repaired.
Nearest town: 19 miles from Ardeley.

Location: clockwise exit slip at junction J24 (Potters Bar) .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.82 miles from Ardeley.

Location: southbound between the junctions with the A421 and the A603 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.44 miles from Ardeley.

Location: eastbound between the junctions with the M1 and the A405 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.33 miles from Ardeley.

Location: The junction of the A414 and the A1M .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.26 miles from Ardeley.

Location: northbound between the junctions with the A412 and the M1 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 12 September 2025.
Nearest town: 19.21 miles from Ardeley.

Location: anticlockwise exit slip at junction J21A (Watword) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.35 miles from Ardeley.

Location: anticlockwise exit slip at junction J22 (St Albans) .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.14 miles from Ardeley.

Location: northbound exit slip at junction J7 (Chelmsford) .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.6 miles from Ardeley.

Location: The junction of the A414 and the A1M .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 12 September 2025.
Nearest town: 11.26 miles from Ardeley.

Location: clockwise exit slip at junction J21A (Watword) .
Due to: Congestion.
Normal traffic conditions are expected between 08:00 and 08:15 on 12 September 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 18.36 miles from Ardeley.

Location: eastbound between the junctions with the M1 and the A405 .
Due to: Congestion.
Normal traffic conditions are expected between 07:30 and 07:45 on 12 September 2025.
Nearest town: 17.33 miles from Ardeley.

Location: southbound between junctions J13 (Milton Keynes) and J12 (Flitwick) .
Due to: Congestion.
Normal traffic conditions are expected between 07:45 and 08:00 on 12 September 2025.
Delay : There are currently delays of 15 minutes against expected traffic.
Nearest town: 19.2 miles from Ardeley.

Location: southbound at the junction with the A428 .
Due to: Congestion.
Normal traffic conditions are expected between 08:15 and 08:30 on 12 September 2025.
Cause : Broken down vehicle.
Nearest town: 19.68 miles from Ardeley.

Location: clockwise between junctions J25 (Enfield) and J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.85 miles from Ardeley.

Location: northbound between the junctions with the A6001 Biggleswade South and the A6001 Biggleswade North.
Lane Closures : Lane one is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 11.53 miles from Ardeley.

Location: northbound at the junction with the A603 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.04 miles from Ardeley.

Location: southbound between the A421 and the junction with the A603 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.06 miles from Ardeley.

Location: southbound between the junctions with the A603 and the A6001 Biggleswade North.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.03 miles from Ardeley.

Location: The A1M southbound between junctions J4 and J2 .
Lane Closures : Lane three is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 12 September 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.82 miles from Ardeley.

Location: clockwise between junctions J21A (Watword) and J22 (St Albans) .
Lane Closures : Lanes 3 and 4 are closed.
Due to: Planned Roadworks.
Period : expect disruption until 05:00 on 12 September 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 16.82 miles from Ardeley.

Location: anticlockwise between junctions J23 (Hatfield) and J22 (St Albans) .
Lane Closures : Lanes 3 and 4 are closed.
Due to: Planned Roadworks.
Period : expect disruption until 05:00 on 12 September 2025.
Lanes Closed : There are two of four lanes closed.
Nearest town: 16.24 miles from Ardeley.

Location: anticlockwise exit slip at junction J22 (St Albans) .
Lane Closures : Lane one is closed.
Due to: Planned Roadworks.
Period : expect disruption until 05:00 on 12 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.12 miles from Ardeley.

Location: The A1M southbound between junctions J10 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 15:30 on 12 September 2025.
Nearest town: 5.83 miles from Ardeley.

Location: The A1M southbound at junction J8 .
Lane Closures : The hard shoulder is closed.
Due to: Horticultural works.
Period : expect disruption until 15:30 on 12 September 2025.
Nearest town: 4.61 miles from Ardeley.

Location: southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 13 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.03 miles from Ardeley.

Location: northbound between junctions J6 (Watford A405) and J9 (Dunstable A5) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 19 December 2025.
Nearest town: 18.6 miles from Ardeley.

Location: northbound between the A6 Bedford south and the junction with the A4280 .
Due to: Roadworks scheme.
Period : from 20:04 on 1 September 2025 to 06:00 on 8 October 2025.
Nearest town: 19.94 miles from Ardeley.

Location: northbound.
Due to: Roadworks scheme.
Period : from 21:00 on 10 September 2025 to 05:00 on 20 October 2025.
Nearest town: 17.86 miles from Ardeley.

Location: northbound between the junctions with the A4280 and the A1 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2027.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.6 miles from Ardeley.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Due to: Roadside Equipment Maintenance.
Period : from 23:39 on 10 September 2025 to 05:00 on 18 September 2025.
Nearest town: 15.11 miles from Ardeley.

Location: southbound between junctions J11A and J10 (Luton Airport) .
Due to: Roadside Equipment Maintenance.
Period : from 22:00 on 19 July 2025 to 05:00 on 21 September 2025.
Nearest town: 16.34 miles from Ardeley.

Location: northbound between junctions J9 (Dunstable A5) and J14 (Milton Keynes) .
Due to: Roadside Equipment Maintenance.
Period : from 09:20 on 8 August 2025 to 05:00 on 18 September 2025.
Nearest town: 14.29 miles from Ardeley.

Location: The A1M northbound between junctions J8 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 12:00 on 8 December 2025.
Nearest town: 4.64 miles from Ardeley.

Location: southbound between junctions J10 (Saffron Walden) and J8 (Bishops Stortford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.19 miles from Ardeley.

Location: northbound between junctions J8A (Stansted) and J10 (Saffron Walden) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.96 miles from Ardeley.

Location: anticlockwise entry slip at junction J27 (Stansted) From M11 North.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 19 September 2025 to 16:00 on 19 September 2025.
Nearest town: 19.88 miles from Ardeley.

Location: northbound exit slip at junction J6 (Hatfield) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 19 September 2025 to 16:00 on 19 September 2025.
Nearest town: 19.99 miles from Ardeley.

Location: southbound exit slip at junction J10 (Luton Airport) .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.26 miles from Ardeley.

Location: southbound between junctions J11 (Luton) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.44 miles from Ardeley.

Location: northbound exit slip at junction J10 (Luton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.27 miles from Ardeley.

Location: northbound entry slip from the A5135 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:30 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : From 22:00 on 22 September 2025 to 05:30 on 23 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.6 miles from Ardeley.

Location: southbound between the M25 and the junction with the A5135 .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:30 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : From 22:00 on 22 September 2025 to 05:30 on 23 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.63 miles from Ardeley.

Location: The A1M southbound at junction J1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:30 on 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Schedule : From 22:00 on 22 September 2025 to 05:30 on 23 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.48 miles from Ardeley.

Location: anticlockwise between junctions J25 (Enfield) and J24 (Potters Bar) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:30 on 19 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 16.5 miles from Ardeley.

Location: The A1M southbound between junctions J6 and J4 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:30 on 19 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.66 miles from Ardeley.

Location: northbound between junctions J11A and J14 (Milton Keynes) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.36 miles from Ardeley.

Location: northbound between junctions J9 (Dunstable A5) and J11A .
Lane Closures : Lanes 1, 2, 3, 4 and 5 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.98 miles from Ardeley.

Location: southbound between the junctions with the A505 and the M11 SPUR .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.38 miles from Ardeley.

Location: The A1M northbound between junctions J4 and J6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 17 September 2025 to 18 September 2025.
Nearest town: 9.8 miles from Ardeley.

Location: The A1M northbound at junction J6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 September 2025 to 05:30 on 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.44 miles from Ardeley.

Location: The A1M northbound between junctions J4 and J6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 September 2025 to 05:30 on 17 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.68 miles from Ardeley.

Location: The A1M northbound exit slip at junction J6 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 16 September 2025 to 05:30 on 17 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.44 miles from Ardeley.

Location: northbound between junctions J9 (Newmarket) and J11 (Royston) .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 September 2025 to 05:00 on 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.69 miles from Ardeley.

Location: southbound between junctions J11 (Royston) and J10 (Saffron Walden) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 September 2025 to 05:00 on 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.88 miles from Ardeley.

Location: southbound between junctions J10 (Saffron Walden) and J8 (Bishops Stortford) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 September 2025 to 05:00 on 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.24 miles from Ardeley.

Location: southbound between junctions J8 (Bishops Stortford) and J7A .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 16 September 2025 to 05:00 on 17 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.5 miles from Ardeley.

Location: northbound between junctions J6 (Watford A405) and J8 (Hemel Hstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 September 2025 to 17 September 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.71 miles from Ardeley.

Location: southbound exit slip at junction J9 (Dunstable A5) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.91 miles from Ardeley.

Location: southbound between the M25 and the junction with the A5135 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.73 miles from Ardeley.

Location: The A1M southbound at junction J1 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.07 miles from Ardeley.

Location: The A1M southbound between junctions J3 and J1 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.07 miles from Ardeley.

Location: southbound exit slip at junction J6 (Hatfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.69 miles from Ardeley.

Location: northbound between junctions J12 (Flitwick) and J13 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.65 miles from Ardeley.

Location: northbound at junction J12 (Flitwick) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.5 miles from Ardeley.

Location: northbound entry slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:00 on 16 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.48 miles from Ardeley.

Location: clockwise entry slip at junction J27 (Stansted) From M11 South.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.82 miles from Ardeley.

Location: southbound between junctions J7 (Chelmsford) and J6 (Hatfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.57 miles from Ardeley.

Location: The A1M southbound between junctions J6 and J4 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:30 on 16 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.45 miles from Ardeley.

Location: The A1M southbound entry slip at junction J6 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:30 on 16 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.14 miles from Ardeley.

Location: The A1M northbound between junctions J4 and J6 .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 22:00 on 15 September 2025 to 05:30 on 16 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.18 miles from Ardeley.

Location: northbound between the junctions with the A5183 and the A4012 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 19 September 2025.
Nearest town: 19.76 miles from Ardeley.

Location: southbound between the junctions with the A4012 and the A5183 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 19 September 2025.
Nearest town: 19.85 miles from Ardeley.

Location: westbound at the junction with the M1 J10.
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 16 October 2025 to 05:00 on 17 October 2025.
Schedule : From 22:00 on 20 October 2025 to 05:00 on 21 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.97 miles from Ardeley.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 15 September 2025 to 19 September 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 22 September 2025 to 26 September 2025.
Nearest town: 15 miles from Ardeley.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : There will be two of five lanes closed.
Nearest town: 15 miles from Ardeley.

Location: northbound between junctions J10 (Luton Airport) and J11 (Luton) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 15 September 2025 to 19 September 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 22 September 2025 to 26 September 2025.
Nearest town: 14.41 miles from Ardeley.

Location: northbound between junctions J6 (Watford A405) and J9 (Dunstable A5) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 15 September 2025 to 19 September 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 22 September 2025 to 26 September 2025.
Nearest town: 18.29 miles from Ardeley.

Location: northbound between junctions J6 (Watford A405) and J9 (Dunstable A5) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.36 miles from Ardeley.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 15 September 2025 to 19 September 2025.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 22 September 2025 to 26 September 2025.
Nearest town: 14.6 miles from Ardeley.

Location: northbound between junctions J9 (Dunstable A5) and J10 (Luton Airport) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 13 October 2025 to 18 October 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 20 October 2025 to 25 October 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.6 miles from Ardeley.

Location: northbound at junction J6 (Hatfield) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 15 September 2025 to 16:00 on 15 September 2025.
Nearest town: 19.87 miles from Ardeley.

Location: The A1M northbound between junctions J4 and J5 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 15 September 2025 to 16 September 2025.
Nearest town: 11.39 miles from Ardeley.

Location: southbound between junctions J6A (St Albans) and J6 (Watford A405) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 14 September 2025 to 05:30 on 15 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.5 miles from Ardeley.

Location: southbound between junctions J9 (Dunstable A5) and J8 (Hemel Hstead) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 September 2025 to 05:00 on 14 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 16.24 miles from Ardeley.

Location: southbound exit slip at junction J8 (Hemel Hstead) .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 September 2025 to 05:00 on 14 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.06 miles from Ardeley.

Location: eastbound between the junctions with the A4147 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 13 September 2025 to 05:00 on 14 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.76 miles from Ardeley.

Location: northbound between the A421 and the junction with the A14 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 September 2025 to 4 October 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 6 October 2025 to 10 October 2025.
Schedule : From 21:00 on 10 October 2025 to 05:00 on 13 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.69 miles from Ardeley.

Location: northbound between the junctions with the A603 and the A4280 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.43 miles from Ardeley.

Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 September 2025 to 05:00 on 22 September 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 September 2025 to 4 October 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 6 October 2025 to 10 October 2025.
Schedule : From 21:00 on 10 October 2025 to 05:00 on 13 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.86 miles from Ardeley.

Location: southbound between the A421 and the junction with the A603 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 September 2025 to 05:00 on 22 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.62 miles from Ardeley.

Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 September 2025 to 05:00 on 22 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19 miles from Ardeley.

Location: northbound between the junctions with the A603 and the A421 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 September 2025 to 05:00 on 22 September 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 6 October 2025 to 10 October 2025.
Schedule : From 21:00 on 10 October 2025 to 05:00 on 13 October 2025.
Schedule : From 21:00 on 17 October 2025 to 05:00 on 20 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.41 miles from Ardeley.

Location: northbound between the junctions with the A603 and the A421 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 September 2025 to 05:00 on 22 September 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 29 September 2025 to 4 October 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 6 October 2025 to 10 October 2025.
Schedule : From 21:00 on 10 October 2025 to 05:00 on 13 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.8 miles from Ardeley.

Location: The A1M northbound between junctions J3 and J4 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 16:00 on 12 September 2025.
Nearest town: 12.86 miles from Ardeley.

Location: northbound between the A6001 Biggleswade North and the junction with the A603 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.42 miles from Ardeley.

Location: southbound at the junction with the A6001 Biggleswade North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.4 miles from Ardeley.

Location: northbound at the junction with the A6001 Biggleswade North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.4 miles from Ardeley.

Location: southbound between the A603 and the junction with the A6001 Biggleswade North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.93 miles from Ardeley.

Location: northbound between the junctions with the A6001 Biggleswade South and the A6001 Biggleswade North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.2 miles from Ardeley.

Location: southbound between the junctions with the A6001 Biggleswade North and the A6001 Biggleswade South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.38 miles from Ardeley.

Location: northbound between the junctions with the A507 and the A6001 Biggleswade South .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.87 miles from Ardeley.

Location: northbound between the junctions with the A6001 Biggleswade South and the A6001 Biggleswade North.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.53 miles from Ardeley.

Location: southbound at the junction with the A6001 Biggleswade South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.51 miles from Ardeley.

Location: southbound between the junctions with the A6001 Biggleswade North and the A6001 Biggleswade South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.18 miles from Ardeley.

Location: northbound between the junctions with the A507 and the A6001 Biggleswade South .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.17 miles from Ardeley.

Location: northbound at the junction with the A6001 Biggleswade South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.49 miles from Ardeley.

Location: southbound between the junctions with the A6001 Biggleswade South and the A507 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.5 miles from Ardeley.

Location: southbound between the junctions with the A6001 Biggleswade North and the A6001 Biggleswade South.
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.06 miles from Ardeley.

Location: anticlockwise entry slip at junction J25 (Enfield) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.01 miles from Ardeley.

Location: anticlockwise at junction J25 (Enfield) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.08 miles from Ardeley.

Location: anticlockwise between junctions J26 (Waltham Abbey) and J25 (Enfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 17.44 miles from Ardeley.

Location: anticlockwise exit slip at junction J24 (Potters Bar) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.65 miles from Ardeley.

Location: anticlockwise entry slip at junction J24 (Potters Bar) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.81 miles from Ardeley.

Location: anticlockwise between junctions J25 (Enfield) and J23 (Hatfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 11 September 2025 to 05:00 on 12 September 2025.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.07 miles from Ardeley.

Location: anticlockwise exit slip at junction J23 (Hatfield) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 18 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.38 miles from Ardeley.

Location: clockwise entry slip at junction J21 (M1) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 15 September 2025 to 19 September 2025.
Schedule : From 23:00 on 19 September 2025 to 06:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.49 miles from Ardeley.

Location: northbound between junctions J6 (Watford A405) and J8 (Hemel Hstead) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 September 2025 to 17 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.68 miles from Ardeley.

Location: northbound between junctions J6 (Watford A405) and J8 (Hemel Hstead) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 September 2025 to 17 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.36 miles from Ardeley.

Location: northbound between junctions J8 (Hemel Hstead) and J10 (Luton Airport) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 September 2025 to 17 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.67 miles from Ardeley.

Location: northbound between junctions J6 (Watford A405) and J6A (St Albans) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 September 2025 to 17 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.6 miles from Ardeley.

Location: northbound exit slip at junction J9 (Dunstable A5) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 15 September 2025 to 17 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.07 miles from Ardeley.

Location: southbound between junctions J8 (Bishops Stortford) and J7A .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 20 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.68 miles from Ardeley.

Location: northbound between junctions J7 (Chelmsford) and J7A .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 20 September 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.83 miles from Ardeley.

Location: southbound at junction J8 (Bishops Stortford) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 20 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.78 miles from Ardeley.

Location: eastbound between the M11 and the junction with the A131 South.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.82 miles from Ardeley.

Location: eastbound between the M11 and the junction with the A131 South.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.82 miles from Ardeley.

Location: eastbound between the M11 and the junction with the A131 South.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 16 September 2025 to 05:00 on 17 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.65 miles from Ardeley.

Location: westbound between the A131 South and the junction with the M11 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.75 miles from Ardeley.

Location: northbound between the A600 and the junction with the A4280 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 October 2025 to 8 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.18 miles from Ardeley.

Location: northbound between the A6 Bedford central and the junction with the A4280 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 13 September 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.94 miles from Ardeley.

Location: northbound between the junctions with the A6 Bedford central and the A603 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 October 2025 to 8 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.48 miles from Ardeley.

Location: southbound between the junctions with the A4280 and the A603 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 October 2025 to 8 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.39 miles from Ardeley.

Location: eastbound between the junctions with the M11 and the A131 South.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 20 September 2025.
Schedule : From 21:00 on 22 September 2025 to 05:00 on 23 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.77 miles from Ardeley.

Location: westbound between the junctions with the A131 South and the M11 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 12 September 2025 to 05:00 on 13 September 2025.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 15 September 2025 to 20 September 2025.
Schedule : From 21:00 on 22 September 2025 to 05:00 on 23 September 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.46 miles from Ardeley.

Location: clockwise between junctions J23 (Hatfield) and J24 (Potters Bar) .
Lane Closures : Lane one is closed.
Due to: Emergency roadworks.
Period : expect disruption until 16:00 on 12 September 2025.
Lanes Closed : There is one of four lanes closed.
Nearest town: 17.29 miles from Ardeley.

Location: southbound between junctions J11A and J9 (Dunstable A5) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.08 miles from Ardeley.

Location: southbound between the junctions with the A603 and the A6 Bedford central.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 20 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.46 miles from Ardeley.

Location: southbound between the junctions with the A603 and the A6 Bedford central.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 September 2025 to 06:00 on 13 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 September 2025 to 20 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 September 2025 to 27 September 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2025 to 4 October 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.17 miles from Ardeley.

Location: southbound exit slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.68 miles from Ardeley.

Location: southbound entry slip at junction J12 (Flitwick) .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.39 miles from Ardeley.

Location: southbound between junctions J10 (Luton Airport) and J8 (Hemel Hstead) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.21 miles from Ardeley.

Location: northbound between junctions J8 (Hemel Hstead) and J9 (Dunstable A5) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 17 September 2025 to 05:00 on 18 September 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 15.6 miles from Ardeley.

Location: southbound entry slip at junction J11 (Luton) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 15.44 miles from Ardeley.

Location: northbound between junctions J11 (Luton) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 18 September 2025 to 05:00 on 19 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.78 miles from Ardeley.

Location: southbound entry slip at junction J11A .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.12 miles from Ardeley.

Location: southbound exit slip at junction J11A .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.34 miles from Ardeley.

Location: southbound between junctions J12 (Flitwick) and J11A .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 20 September 2025 to 05:00 on 21 September 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.47 miles from Ardeley.

Location: southbound exit slip at Toddington Services.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 19 September 2025 to 05:00 on 20 September 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.82 miles from Ardeley.