Location: southbound between the junctions with the A610 and the A61 Derby.
Due to: Congestion.
Normal traffic conditions are expected between 04:30 and 04:45 on 16 May 2026.
Nearest town: 5 miles from Allenton.

Location: northbound between the junctions with the A6 and the M1 .
Due to: Congestion.
Normal traffic conditions are expected between 03:15 and 03:30 on 16 May 2026.
Nearest town: 7.59 miles from Allenton.

Location: northbound between the junctions with the A6 and the A52 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 May 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 2.27 miles from Allenton.

Location: eastbound entry slip from the A5111 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 May 2026 to 17 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 2.73 miles from Allenton.

Location: northbound between the A6 and the junction with the A52 .
Due to: Roadworks scheme.
Period : from 20:06 on 15 May 2026 to 06:00 on 17 May 2026.
Nearest town: 2.27 miles from Allenton.

Location: northbound between the A6 and the junction with the A52 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 May 2026.
Lanes Closed : All lanes are closed.
Nearest town: 2.67 miles from Allenton.

Location: westbound entry slip from the A5111 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 May 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 2.73 miles from Allenton.

Location: northbound between the A61 Derby and the junction with the A610 .
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 16 May 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 6.59 miles from Allenton.

Location: southbound between the A610 and the junction with the A61 Derby.
Lane Closures : Lane two is closed.
Due to: Barrier repairs.
Period : expect disruption until 05:00 on 16 May 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.65 miles from Allenton.

Location: northbound between junctions J24 (E.
Mids Airport) and J26 (Nottingham) .
Due to: Roadworks scheme.
Period : from 20:05 on 15 May 2026 to 06:00 on 4 June 2026.
Nearest town: 7.26 miles from Allenton.

Location: southbound between junctions J23A (Tamworth) and J23 .
Due to: Roadworks scheme.
Period : from 20:02 on 15 May 2026 to 06:00 on 4 June 2026.
Nearest town: 9.23 miles from Allenton.

Location: northbound between junctions J23 and J23A (Tamworth) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 09:00 on 30 November 2026.
Nearest town: 10.57 miles from Allenton.

Location: southbound at junction J11 (Burton upon Trent) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 May 2026 to 06:00 on 27 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.7 miles from Allenton.

Location: southbound between junctions M1 and J13 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 May 2026 to 22 May 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 May 2026 to 30 May 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 June 2026 to 6 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.52 miles from Allenton.

Location: southbound between junction J12 and the M42 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 May 2026 to 06:00 on 27 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.06 miles from Allenton.

Location: northbound between junction J14 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 June 2026 to 6 June 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.39 miles from Allenton.

Location: southbound between the junctions with the A5111 and the A50 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.1 miles from Allenton.

Location: southbound between the A6 and the junction with the A5111 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.73 miles from Allenton.

Location: southbound between the junctions with the A5111 and the A516 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.18 miles from Allenton.

Location: southbound between the junctions with the A516 and the A50 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.1 miles from Allenton.

Location: northbound at the junction with the A52 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.47 miles from Allenton.

Location: southbound at the junction with the A5111 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.23 miles from Allenton.

Location: northbound between the A516 and the junction with the A52 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.12 miles from Allenton.

Location: northbound between the junctions with the A50 and the A5111 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.11 miles from Allenton.

Location: southbound.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.67 miles from Allenton.

Location: northbound between the A52 and the junction with the A6 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.49 miles from Allenton.

Location: eastbound between the junctions with the A5111 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 05:00 on 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.88 miles from Allenton.

Location: southbound between junctions J26 (Nottingham) and J25 (Nottingham) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 May 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 8.22 miles from Allenton.

Location: northbound between junctions J24 (E.
Mids Airport) and J26 (Nottingham) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 May 2026.
Lanes Closed : There is one of four lanes closed.
Nearest town: 7.08 miles from Allenton.

Location: eastbound between the A5111 and the junction with the M1 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2026 to 06:00 on 21 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.89 miles from Allenton.

Location: eastbound between the junctions with the A5111 and the M1 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 May 2026 to 06:00 on 21 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.32 miles from Allenton.

Location: southbound between the junctions with the A6 and the A52 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2026 to 05:00 on 21 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.5 miles from Allenton.

Location: southbound between the junctions with the A52 and the A5111 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2026 to 05:00 on 21 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.45 miles from Allenton.

Location: northbound at the junction with the A52 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2026 to 05:00 on 21 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.48 miles from Allenton.

Location: eastbound between the A516 and the junction with the A38 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2026 to 05:00 on 21 May 2026.
Schedule : From 20:00 on 28 May 2026 to 05:00 on 29 May 2026.
Schedule : From 20:00 on 2 June 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.77 miles from Allenton.

Location: eastbound.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2026 to 05:00 on 21 May 2026.
Schedule : From 20:00 on 28 May 2026 to 05:00 on 29 May 2026.
Schedule : From 20:00 on 2 June 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 5.35 miles from Allenton.

Location: eastbound entry slip from the A516 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2026 to 05:00 on 21 May 2026.
Schedule : From 20:00 on 28 May 2026 to 05:00 on 29 May 2026.
Schedule : From 20:00 on 2 June 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.5 miles from Allenton.

Location: eastbound exit slip to the A38 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2026 to 05:00 on 21 May 2026.
Schedule : From 20:00 on 28 May 2026 to 05:00 on 29 May 2026.
Schedule : From 20:00 on 2 June 2026 to 05:00 on 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 4.8 miles from Allenton.

Location: northbound between junctions J23A (Tamworth) and J25 (Nottingham) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 June 2026 to 5 June 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.9 miles from Allenton.

Location: northbound between junctions J23A (Tamworth) and J25 (Nottingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 May 2026 to 22 May 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 May 2026 to 28 May 2026.
Schedule : From 20:00 on 29 May 2026 to 06:00 on 30 May 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.9 miles from Allenton.

Location: northbound entry slip at junction J24 (E.
Mids Airport) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.58 miles from Allenton.

Location: northbound entry slip at junction J24A (Stoke, Derby) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2026 to 22 May 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 May 2026 to 28 May 2026.
Schedule : From 20:00 on 29 May 2026 to 06:00 on 30 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.97 miles from Allenton.

Location: eastbound between the junctions with the A6 and the M1 J24A .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 May 2026 to 22 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.68 miles from Allenton.

Location: southbound between junctions J23A (Tamworth) and J23 .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 16 May 2026.
Lanes Closed : There are two of three lanes closed.
Nearest town: 9.23 miles from Allenton.

Location: southbound between junctions J23A (Tamworth) and J23 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 May 2026 to 06:00 on 29 May 2026.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 June 2026 to 3 June 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.22 miles from Allenton.

Location: southbound between the M1 and junction J14 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 19 May 2026 to 05:00 on 20 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.19 miles from Allenton.

Location: southbound at junction J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 19 May 2026 to 05:00 on 20 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.01 miles from Allenton.

Location: southbound between junctions J24 (E.
Mids Airport) and J23A (Tamworth) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 19 May 2026 to 05:00 on 20 May 2026.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 7.87 miles from Allenton.

Location: southbound exit slip at junction J23A (Tamworth) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 19 May 2026 to 05:00 on 20 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.01 miles from Allenton.

Location: westbound entry slip from the A516 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 19 May 2026 to 22 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.66 miles from Allenton.

Location: westbound between the A38 and the junction with the A511 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 19 May 2026 to 22 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.25 miles from Allenton.

Location: southbound entry slip at junction J25 (Nottingham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 June 2026 to 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.32 miles from Allenton.

Location: southbound exit slip at junction J25 (Nottingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 June 2026 to 3 June 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 7.36 miles from Allenton.

Location: northbound between the junctions with the A516 and the A5111 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 3.12 miles from Allenton.

Location: northbound between the junctions with the A50 and the A5111 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.11 miles from Allenton.

Location: southbound between junctions J26 (Nottingham) and J24A (Stoke, Derby) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 June 2026 to 3 June 2026.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.16 miles from Allenton.

Location: northbound between the junctions with the A6 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.59 miles from Allenton.

Location: northbound between the junctions with the A6 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.77 miles from Allenton.

Location: northbound between the junctions with the A42 and the A6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.9 miles from Allenton.

Location: southbound between the M1 and the junction with the A6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.61 miles from Allenton.

Location: northbound exit slip at junction J23A (Tamworth) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.33 miles from Allenton.

Location: The junction of the A42 and the M1 J23A .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.16 miles from Allenton.

Location: The junction of the A42 and the M1 J23A .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.06 miles from Allenton.

Location: southbound between the junctions with the A52 and the A6 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 May 2026 to 06:00 on 27 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.58 miles from Allenton.

Location: northbound between the A6 and the junction with the A52 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 May 2026 to 22 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.1 miles from Allenton.

Location: southbound entry slip at junction J22 (Leicester) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 15:00 from 18 May 2026 to 19 May 2026.
Schedule : Expect disruption everyday between 09:00 and 15:00 from 4 June 2026 to 5 June 2026.
Nearest town: 14.98 miles from Allenton.

Location: southbound between junctions J22 (Leicester) and J21A (Leicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2026 to 22 May 2026.
Schedule : From 20:00 on 26 May 2026 to 06:00 on 27 May 2026.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.64 miles from Allenton.

Location: southbound entry slip at junction J22 (Leicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 20 May 2026 to 06:00 on 21 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.96 miles from Allenton.

Location: northbound entry slip at junction J22 (Leicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.85 miles from Allenton.

Location: northbound exit slip at junction J22 (Leicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 19 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 15.15 miles from Allenton.

Location: southbound exit slip at junction J22 (Leicester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2026 to 06:00 on 22 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 14.5 miles from Allenton.

Location: eastbound exit slip to the A516 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 05:00 on 19 May 2026.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 26 May 2026 to 28 May 2026.
Lanes Closed : All lanes will be closed.
Nearest town: 6.81 miles from Allenton.

Location: southbound between junction M1 and the M42 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 6 June 2026.
Nearest town: 7.52 miles from Allenton.

Location: northbound between junctions J24 (E.
Mids Airport) and J25 (Nottingham) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 18 May 2026 to 06:00 on 5 June 2026.
Nearest town: 7.73 miles from Allenton.

Location: eastbound between the A6 and the junction with the M1 J24A .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 18 May 2026 to 05:00 on 19 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.49 miles from Allenton.

Location: westbound between the A6 and the junction with the A521 Blythe Bridge East.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 18 May 2026 to 05:00 on 19 May 2026.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.43 miles from Allenton.

Location: westbound between the M1 and the junction with the A6 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 19:00 on 18 May 2026 to 05:00 on 19 May 2026.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.68 miles from Allenton.

Location: northbound between the A610 and the junction with the A61 Alfreton.
Lane Closures : Lane one is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 06:00 on 16 May 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.55 miles from Allenton.

Location: northbound between junctions J23 and J23A (Tamworth) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 19 May 2026 to 06:00 on 22 May 2026.
Nearest town: 10.95 miles from Allenton.