Location: westbound exit slip at junction J7 (Maidstone) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 13:30 and 13:45 on 27 April 2024.
Normal traffic conditions are expected between 13:15 and 13:30 on 27 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.46 miles from Graveney.
Location: westbound between junctions J12 (Cheriton) and J11A (Channel Tunnel) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Vehicle tyre change.
Time To Clear : The event is expected to clear between 12:15 and 12:30 on 27 April 2024.
Normal traffic conditions are expected between 12:15 and 12:30 on 27 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 17.27 miles from Graveney.
Location: westbound between the junctions with the A28 and the M2 .
Due to: Congestion.
Normal traffic conditions are expected between 14:45 and 15:00 on 27 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 1.14 miles from Graveney.
Location: westbound at junction J7 (Maidstone) .
Due to: Congestion.
Normal traffic conditions are expected between 13:45 and 14:00 on 27 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.58 miles from Graveney.
Location: westbound exit slip at junction J6 (Maidstone) .
Due to: Congestion.
Normal traffic conditions are expected between 13:30 and 13:45 on 27 April 2024.
Nearest town: 18.22 miles from Graveney.
Location: westbound entry slip at junction J7 (Maidstone) .
Due to: Congestion.
Normal traffic conditions are expected between 13:45 and 14:00 on 27 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.58 miles from Graveney.
Location: westbound between the junctions with the A28 and the M2 .
Due to: Congestion.
Normal traffic conditions are expected between 12:30 and 12:45 on 27 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 1.14 miles from Graveney.
Location: westbound exit slip at junction J7 (Maidstone) .
Due to: Congestion.
Normal traffic conditions are expected between 15:00 and 15:15 on 27 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 16.43 miles from Graveney.
Location: westbound entry slip at junction J6 (Maidstone) .
Due to: Congestion.
Normal traffic conditions are expected between 17:45 and 18:00 on 27 April 2024.
Earlier
Due to: Caused by the earlier emergency barrier repairs.
Nearest town: 18.72 miles from Graveney.
Location: westbound entry slip at junction J7 (Maidstone) .
Due to: Congestion.
Normal traffic conditions are expected between 16:15 and 16:30 on 27 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 17.38 miles from Graveney.
Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Due to: Emergency barrier repairs.
Status : Cleared.
Nearest town: 18.43 miles from Graveney.
Location: westbound between junctions J6 (Maidstone) and J5 (Aylesford) .
Due to: Emergency barrier repairs.
Period : from 10:10 on 27 April 2024 to 16:00 on 27 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 18.01 miles from Graveney.
Location: eastbound between junctions J5 (Maidstone) and J7 (Canterbury) .
Due to: Roadworks.
Period : from 15:54 on 23 April 2024 to 06:00 on 14 May 2024.
Nearest town: 13.52 miles from Graveney.
Location: westbound at junction J7 (Maidstone) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 13 May 2024.
Nearest town: 16.43 miles from Graveney.
Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:16 on 22 April 2024 to 06:00 on 14 May 2024.
Nearest town: 15.26 miles from Graveney.
Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 August 2024.
Lanes Closed : All lanes are closed.
Nearest town: 9.26 miles from Graveney.
Location: northbound.
Due to: Roadworks scheme.
Period : from 07:40 on 22 March 2024 to 06:00 on 22 August 2024.
Nearest town: 9.38 miles from Graveney.
Location: northbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 August 2024.
Lanes Closed : All lanes are closed.
Nearest town: 9.38 miles from Graveney.
Location: northbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 22 August 2024.
Lanes Closed : All lanes are closed.
Nearest town: 9.41 miles from Graveney.
Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 May 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 6.02 miles from Graveney.
Location: southbound between the A250 Queenborough and the junction with the A2 .
Due to: Roadworks scheme.
Period : from 20:04 on 2 January 2024 to 06:00 on 15 January 2025.
Nearest town: 9.61 miles from Graveney.
Location: The junction of the A249 and the A2500 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.43 miles from Graveney.
Location: southbound.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : All lanes are closed.
Nearest town: 9.26 miles from Graveney.
Location: southbound between the A250 Queenborough and the junction with the A2 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.61 miles from Graveney.
Location: westbound entry slip at junction J5 (Maidstone) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 05:00 on 12 June 2024.
Lanes Closed : All lanes are closed.
Nearest town: 11.8 miles from Graveney.
Location: northbound.
Due to: Roadworks.
Period : from 04:49 on 22 September 2023 to 07:00 on 2 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 9.94 miles from Graveney.
Location: northbound.
Due to: Roadworks.
Period : expect disruption until 07:00 on 2 December 2024.
Lanes Closed : All lanes are closed.
Nearest town: 9.99 miles from Graveney.
Location: northbound between the A2 and the junction with the A2500 .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 15 January 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.76 miles from Graveney.
Location: northbound.
Due to: Roadworks.
Period : expect disruption until 20:00 on 31 October 2024.
Lanes Closed : All lanes are closed.
Nearest town: 11.87 miles from Graveney.
Location: eastbound between junctions J8 (Maidstone) and J10 (Ashford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.81 miles from Graveney.
Location: westbound between junctions J10A and J9 (Ashford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.38 miles from Graveney.
Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 05:00 on 4 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.86 miles from Graveney.
Location: westbound exit slip to the A2050 Canterbury South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.15 miles from Graveney.
Location: southbound between the M20 and the junction with the A2042 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.81 miles from Graveney.
Location: northbound between the junctions with the A2042 and the M20 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.14 miles from Graveney.
Location: eastbound between the M2 and the junction with the A28 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Nearest town: 1.1 miles from Graveney.
Location: eastbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 1.11 miles from Graveney.
Location: eastbound between the M2 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.1 miles from Graveney.
Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.87 miles from Graveney.
Location: westbound between the A260 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.64 miles from Graveney.
Location: eastbound exit slip at junction J7 (Canterbury) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.33 miles from Graveney.
Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 05:00 on 1 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.15 miles from Graveney.
Location: eastbound between junctions J8 (Maidstone) and J9 (Ashford) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 05:00 on 1 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.57 miles from Graveney.
Location: eastbound exit slip to the A2050 Canterbury West.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2024 to 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.93 miles from Graveney.
Location: eastbound between the A2050 Canterbury South and the junction with the A256 Whitfield West .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.11 miles from Graveney.
Location: eastbound entry slip from the A260 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.82 miles from Graveney.
Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.49 miles from Graveney.
Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.11 miles from Graveney.
Location: westbound between the A260 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.45 miles from Graveney.
Location: eastbound between junctions J9 (Ashford) and J11 (Canterbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.99 miles from Graveney.
Location: westbound between junctions J11 (Canterbury) and J10A .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.45 miles from Graveney.
Location: westbound entry slip from the A260 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2024 to 06:00 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.79 miles from Graveney.
Location: westbound between the A260 and the junction with the A28 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2024 to 06:00 on 2 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.52 miles from Graveney.
Location: westbound between junctions J9 (Ashford) and J8 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:30 on 1 May 2024 to 05:00 on 2 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.36 miles from Graveney.
Location: eastbound between junctions J3 (Maidstone) and J4 (Gillingham) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 05:00 on 1 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.55 miles from Graveney.
Location: eastbound between the junctions with the A2050 Canterbury South and the A260 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 28 April 2024 to 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.62 miles from Graveney.
Location: westbound exit slip to the A260 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.65 miles from Graveney.
Location: westbound between the A256 Whitfield West and the junction with the A260 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.86 miles from Graveney.
Location: eastbound between the A256 Whitfield West and the junction with the A258 .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 02:00 on 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.05 miles from Graveney.
Location: eastbound between the junctions with the A260 and the A256 Dover West.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 05:00 on 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.94 miles from Graveney.
Location: eastbound between the junctions with the A260 and the A256 Whitfield West .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 02:00 on 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.81 miles from Graveney.
Location: westbound at the junction with the A256 Whitfield West.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 02:00 on 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.06 miles from Graveney.
Location: eastbound between junctions J5 (Maidstone) and J6 (Faversham) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 19 July 2024.
Nearest town: 6.02 miles from Graveney.
Location: eastbound between junctions J11A (Channel Tunnel) and J12 (Cheriton) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2024 to 05:00 on 29 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.38 miles from Graveney.
Location: eastbound between junctions J5 (Maidstone) and J7 (Canterbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 5 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2024 to 12 May 2024.
Schedule : From 20:00 on 13 May 2024 to 06:00 on 14 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 11.79 miles from Graveney.
Location: eastbound at junction J13 (Folkestone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 1 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2024 to 6 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.9 miles from Graveney.
Location: eastbound between the M20 and the junction with the A260 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 1 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2024 to 6 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.02 miles from Graveney.
Location: eastbound between the A260 and the junction with the A256 Dover West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 15 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 1 June 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 3 June 2024 to 6 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.82 miles from Graveney.
Location: westbound entry slip from the A256 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.77 miles from Graveney.
Location: eastbound at the junction with the A256 Whitfield West.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.04 miles from Graveney.
Location: westbound exit slip to the A256 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.97 miles from Graveney.
Location: westbound between junctions J10 (Ashford) and J9 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.48 miles from Graveney.
Location: westbound between the junctions with the A256 Dover West and the A260 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.36 miles from Graveney.
Location: eastbound between the M20 and the junction with the A256 Dover West.
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.16 miles from Graveney.
Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2024 to 11 May 2024.
Schedule : From 20:00 on 13 May 2024 to 06:00 on 14 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.26 miles from Graveney.
Location: westbound exit slip at junction J6 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 April 2024 to 6 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.84 miles from Graveney.
Location: eastbound between junctions J6 (Maidstone) and J6 (Maidstone) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2024 to 06:00 on 29 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.39 miles from Graveney.
Location: eastbound between the junctions with the A260 and the A256 Dover West.
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2024 to 06:00 on 29 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19 miles from Graveney.
Location: eastbound between the M20 and the junction with the A260 .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2024 to 06:00 on 6 June 2024.
Nearest town: 18.02 miles from Graveney.