Location: northbound between the A508 and the junction with the A43 .
Due to: Congestion.
Normal traffic conditions are expected between 12:00 and 12:15 on 26 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.41 miles from Church Stowe.
Location: northbound between the junctions with the A508 and the A43 .
Due to: Congestion.
Normal traffic conditions are expected between 11:45 and 12:00 on 26 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.11 miles from Church Stowe.
Location: eastbound at the junction with the M1 .
Due to: Congestion.
Normal traffic conditions are expected between 11:00 and 11:15 on 26 April 2024.
Nearest town: 7.93 miles from Church Stowe.
Location: northbound between the junctions with the A508 and the A43 .
Due to: Congestion.
Normal traffic conditions are expected between 10:45 and 11:00 on 26 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 6.11 miles from Church Stowe.
Location: southbound between junction J1 (Rugby) and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.78 miles from Church Stowe.
Location: northbound between the A421 and the junction with the A508 .
Lane Closures : Lane two will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 05:00 on 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.78 miles from Church Stowe.
Location: northbound between junctions J12 (Gaydon) and J14 (Leamington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.64 miles from Church Stowe.
Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 April 2024.
Nearest town: 14.97 miles from Church Stowe.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 26 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 14.91 miles from Church Stowe.
Location: northbound between junctions J10 (Northampton) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 are closed.
Due to: Barrier repairs.
Period : expect disruption until 06:00 on 26 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 15.91 miles from Church Stowe.
Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Nearest town: 6.54 miles from Church Stowe.
Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Nearest town: 6.59 miles from Church Stowe.
Location: northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.72 miles from Church Stowe.
Location: southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.28 miles from Church Stowe.
Location: southbound between the junctions with the A45 and the A43 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 05:00 on 27 April 2024.
Nearest town: 1.68 miles from Church Stowe.
Location: northbound between the junctions with the A43 and the A45 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 05:00 on 27 April 2024.
Nearest town: 1.74 miles from Church Stowe.
Location: northbound between the junctions with the A43 and the A45 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 05:00 on 27 April 2024.
Nearest town: 1.76 miles from Church Stowe.
Location: westbound between junctions J9 Kettering South and J7 Kettering North.
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.05 miles from Church Stowe.
Location: eastbound between junctions J7 Kettering North and J8 Kettering Central.
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.32 miles from Church Stowe.
Location: southbound exit slip at junction J15A (Northampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 14 May 2024.
Nearest town: 5.49 miles from Church Stowe.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:30 on 26 April 2024 to 06:00 on 27 April 2024.
Nearest town: 17.96 miles from Church Stowe.
Location: southbound exit slip at junction J10 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.32 miles from Church Stowe.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:30 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.96 miles from Church Stowe.
Location: northbound between the junctions with the M40 and the A421 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.43 miles from Church Stowe.
Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Due to: Roadworks scheme.
Period : from 20:09 on 25 April 2024 to 06:00 on 17 May 2024.
Nearest town: 7.69 miles from Church Stowe.
Location: southbound between junctions J20 (Rugby) and J16 (Northampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 20 May 2024.
Nearest town: 14.11 miles from Church Stowe.
Location: westbound.
Due to: Roadworks scheme.
Period : from 23:00 on 18 April 2024 to 06:00 on 4 May 2024.
Nearest town: 16.44 miles from Church Stowe.
Location: eastbound between the M1 and the junction with the A508 Northampton.
Due to: Roadworks scheme.
Period : from 21:30 on 18 April 2024 to 06:00 on 4 May 2024.
Nearest town: 7.98 miles from Church Stowe.
Location: westbound between the junctions with the M1 and the A45 .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 09:00 on 30 November 2024.
Nearest town: 11.89 miles from Church Stowe.
Location: southbound between junction J1 (Rugby) and the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 15:00 from 29 April 2024 to 3 May 2024.
Schedule : Expect disruption everyday between 08:00 and 15:00 from 7 May 2024 to 10 May 2024.
Nearest town: 15.14 miles from Church Stowe.
Location: southbound entry slip at junction J15A (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.86 miles from Church Stowe.
Location: southbound exit slip at junction J15A (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.49 miles from Church Stowe.
Location: southbound between the junctions with the A428 DIRFT East and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 May 2024 to 11 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.57 miles from Church Stowe.
Location: northbound between junctions J15A (Northampton) and J16 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 May 2024 to 9 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.76 miles from Church Stowe.
Location: eastbound between the junctions with the A45 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 13 May 2024 to 06:00 on 14 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2024 to 18 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.22 miles from Church Stowe.
Location: northbound entry slip at junction J18 (Daventry) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 May 2024 to 11 May 2024.
Schedule : From 20:00 on 14 May 2024 to 06:00 on 15 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.42 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J17 (Watford Gap) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 11 May 2024 to 20:00 on 13 May 2024.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 14 May 2024 to 17 May 2024.
Schedule : From 06:00 on 18 May 2024 to 06:00 on 20 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.22 miles from Church Stowe.
Location: northbound between junctions J15A (Northampton) and J16 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.76 miles from Church Stowe.
Location: southbound between junctions J16 (Northampton) and J15 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 2 May 2024.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 21:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.6 miles from Church Stowe.
Location: southbound entry slip at junction J15 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.96 miles from Church Stowe.
Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 18 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.76 miles from Church Stowe.
Location: northbound between junctions J17 (Watford Gap) and J19 (Rugby) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 8 May 2024 to 10 May 2024.
Schedule : From 06:00 on 11 May 2024 to 20:00 on 13 May 2024.
Schedule : From 06:00 on 14 May 2024 to 06:00 on 20 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.01 miles from Church Stowe.
Location: northbound between junctions J18 (Daventry) and J19 (Rugby) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2024 to 06:00 on 29 April 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.51 miles from Church Stowe.
Location: northbound between junctions J17 (Watford Gap) and J19 (Rugby) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 April 2024 to 2 May 2024.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 May 2024 to 11 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.01 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.21 miles from Church Stowe.
Location: southbound between junctions J20 (Rugby) and J18 (Daventry) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2024 to 06:00 on 29 April 2024.
Schedule : From 20:00 on 9 May 2024 to 06:00 on 10 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.55 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 11 May 2024 to 20:00 on 13 May 2024.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 14 May 2024 to 17 May 2024.
Schedule : From 06:00 on 18 May 2024 to 06:00 on 20 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.39 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 2 May 2024.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.11 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2024 to 29 April 2024.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Schedule : From 20:00 on 9 May 2024 to 06:00 on 10 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.21 miles from Church Stowe.
Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.71 miles from Church Stowe.
Location: southbound between junctions J15A (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.32 miles from Church Stowe.
Location: northbound exit slip at junction J18 (Daventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.14 miles from Church Stowe.
Location: southbound exit slip at junction J18 (Daventry) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.65 miles from Church Stowe.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 19:00 on 1 May 2024 to 23:59 on 3 May 2024.
Nearest town: 15.43 miles from Church Stowe.
Location: northbound between the junctions with the A45 and the A361 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 05:00 on 3 May 2024.
Nearest town: 8.79 miles from Church Stowe.
Location: southbound between the junctions with the A361 and the A45 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 05:00 on 3 May 2024.
Nearest town: 8.86 miles from Church Stowe.
Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Nearest town: 9.19 miles from Church Stowe.
Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Nearest town: 9.14 miles from Church Stowe.
Location: eastbound between junctions J9 Kettering South and J10 Burton Latimer.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 05:00 on 3 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.13 miles from Church Stowe.
Location: southbound between junctions J15 (Northampton) and J13 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 1 May 2024 to 05:00 on 2 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.39 miles from Church Stowe.
Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 05:00 on 3 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.94 miles from Church Stowe.
Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.71 miles from Church Stowe.
Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2024 to 05:00 on 1 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.28 miles from Church Stowe.
Location: southbound exit slip at junction J16 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 11:00 on 2 May 2024 to 15:30 on 2 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.93 miles from Church Stowe.
Location: northbound between junctions J15A (Northampton) and J16 (Northampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 10 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 May 2024 to 18 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.78 miles from Church Stowe.
Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 10 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 17 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 3.72 miles from Church Stowe.
Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 3 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 7.69 miles from Church Stowe.
Location: northbound between junctions J17 (Watford Gap) and J19 (Rugby) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.67 miles from Church Stowe.
Location: northbound between junctions J16 (Northampton) and J19 (Rugby) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2024 to 06:00 on 28 April 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 6.12 miles from Church Stowe.
Location: northbound between junctions J16 (Northampton) and J18 (Daventry) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 10 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 May 2024 to 18 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 2.93 miles from Church Stowe.
Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 22:00 on 1 May 2024 to 05:00 on 2 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.86 miles from Church Stowe.
Location: northbound between junctions J14 (Milton Keynes) and J15 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 1 May 2024 to 3 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.83 miles from Church Stowe.
Location: northbound exit slip at junction J15 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 1 May 2024 to 3 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.12 miles from Church Stowe.
Location: westbound between the junctions with the A428 and the A508 Northampton.
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 10 May 2024 to 05:00 on 11 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.44 miles from Church Stowe.
Location: westbound between the A508 Northampton and the junction with the M1 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 10 May 2024 to 05:00 on 11 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.07 miles from Church Stowe.
Location: northbound between the junctions with the A43 and the A45 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 05:00 on 1 May 2024.
Nearest town: 3.78 miles from Church Stowe.
Location: southbound between the junctions with the A45 and the A43 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 05:00 on 1 May 2024.
Nearest town: 3.63 miles from Church Stowe.
Location: southbound between the A508 and the junction with the A509 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 18 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.79 miles from Church Stowe.
Location: southbound exit slip to the A509 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 18 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.95 miles from Church Stowe.
Location: southbound between the A509 and the junction with the A4146 South.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.55 miles from Church Stowe.
Location: southbound between the A509 and the junction with the A4146 North.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 18 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.29 miles from Church Stowe.
Location: southbound entry slip from the A421 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.78 miles from Church Stowe.
Location: southbound exit slip to the A421 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 18 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.58 miles from Church Stowe.
Location: southbound between the junctions with the A43 and the A508 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 16 May 2024.
Nearest town: 6.62 miles from Church Stowe.
Location: northbound between the junctions with the A508 and the A43 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 16 May 2024.
Nearest town: 6.91 miles from Church Stowe.
Location: southbound between junctions J11 (Banbury) and J10 (Northampton) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2024 to 06:00 on 28 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.38 miles from Church Stowe.
Location: northbound between junctions J9 (Bicester) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2024 to 06:00 on 28 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.64 miles from Church Stowe.
Location: southbound between junction J1 (Rugby) and the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 15:00 from 30 April 2024 to 3 May 2024.
Schedule : Expect disruption everyday between 08:00 and 15:00 from 7 May 2024 to 9 May 2024.
Nearest town: 15.14 miles from Church Stowe.
Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.02 miles from Church Stowe.
Location: eastbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.13 miles from Church Stowe.
Location: eastbound between junctions J8 Kettering Central and J9 Kettering South.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.05 miles from Church Stowe.
Location: eastbound entry slip at junction J9 Kettering South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.21 miles from Church Stowe.
Location: northbound between the junctions with the A43 and the A45 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 05:00 on 30 April 2024.
Nearest town: 3.62 miles from Church Stowe.
Location: northbound between the junctions with the A43 and the A45 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 13:00 on 29 April 2024 to 20:00 on 29 April 2024.
Nearest town: 3.54 miles from Church Stowe.
Location: southbound between the junctions with the A45 and the A43 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 05:00 on 30 April 2024.
Nearest town: 3.44 miles from Church Stowe.
Location: southbound between the junctions with the A45 and the A43 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 13:00 on 29 April 2024 to 20:00 on 29 April 2024.
Nearest town: 3.5 miles from Church Stowe.
Location: northbound between junctions J1 (Rugby) and J2 (Coventry) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 09:00 on 29 April 2024 to 17:00 on 29 April 2024.
Nearest town: 18.04 miles from Church Stowe.
Location: northbound at the junction with the A422 Brackley South.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2024 to 05:00 on 9 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.23 miles from Church Stowe.
Location: southbound between the A422 Brackley East and the junction with the A421 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2024 to 05:00 on 9 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.18 miles from Church Stowe.
Location: westbound between the A428 and the junction with the A508 Northampton.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 April 2024 to 06:00 on 20 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 9.38 miles from Church Stowe.
Location: westbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.98 miles from Church Stowe.
Location: southbound entry slip at junction J15A (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.86 miles from Church Stowe.
Location: southbound exit slip at junction J15A (Northampton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.49 miles from Church Stowe.
Location: northbound between junctions J15A (Northampton) and J16 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 May 2024 to 9 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.76 miles from Church Stowe.
Location: northbound between junctions J15A (Northampton) and J16 (Northampton) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 7 May 2024 to 06:00 on 9 May 2024.
Nearest town: 5.76 miles from Church Stowe.
Location: northbound between junctions J15A (Northampton) and J16 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.76 miles from Church Stowe.
Location: southbound between junctions J16 (Northampton) and J15 (Northampton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 2 May 2024.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 21:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 4.6 miles from Church Stowe.
Location: southbound entry slip at junction J15 (Northampton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.96 miles from Church Stowe.
Location: southbound between junctions J15A (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.32 miles from Church Stowe.
Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.71 miles from Church Stowe.
Location: southbound between the junctions with the A428 DIRFT East and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 May 2024 to 11 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.57 miles from Church Stowe.
Location: northbound entry slip at junction J18 (Daventry) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.42 miles from Church Stowe.
Location: southbound between junctions J18 (Daventry) and J16 (Northampton) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.76 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 11 May 2024 to 06:00 on 13 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.22 miles from Church Stowe.
Location: southbound between junction J1 (Rugby) and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.78 miles from Church Stowe.
Location: northbound between junctions J17 (Watford Gap) and J19 (Rugby) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 8 May 2024 to 10 May 2024.
Schedule : From 06:00 on 11 May 2024 to 06:00 on 13 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 9.01 miles from Church Stowe.
Location: northbound between junctions J17 (Watford Gap) and J19 (Rugby) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 April 2024 to 2 May 2024.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 May 2024 to 11 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 9.01 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 2 May 2024.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.11 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 April 2024 to 29 April 2024.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Schedule : From 20:00 on 9 May 2024 to 06:00 on 10 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 13.21 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 13.21 miles from Church Stowe.
Location: southbound between junctions J20 (Rugby) and J18 (Daventry) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2024 to 06:00 on 29 April 2024.
Schedule : From 20:00 on 9 May 2024 to 06:00 on 10 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.55 miles from Church Stowe.
Location: southbound between junctions J19 (Rugby) and J18 (Daventry) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 11 May 2024 to 06:00 on 13 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.39 miles from Church Stowe.
Location: northbound exit slip at junction J18 (Daventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.14 miles from Church Stowe.
Location: southbound exit slip at junction J18 (Daventry) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.65 miles from Church Stowe.
Location: southbound between junctions J15 (Northampton) and J13 (Milton Keynes) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2024 to 05:00 on 3 May 2024.
Nearest town: 13.28 miles from Church Stowe.
Location: eastbound exit slip at junction J8 Kettering Central.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19 miles from Church Stowe.
Location: westbound between junctions J9 Kettering South and J8 Kettering Central.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.98 miles from Church Stowe.
Location: eastbound entry slip at junction J7 Kettering North.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.5 miles from Church Stowe.
Location: westbound exit slip at junction J8 Kettering Central.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.83 miles from Church Stowe.
Location: westbound entry slip at junction J8 Kettering Central.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.8 miles from Church Stowe.
Location: eastbound between junctions J7 Kettering North and J9 Kettering South.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.32 miles from Church Stowe.
Location: eastbound entry slip at junction J3 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.27 miles from Church Stowe.
Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.21 miles from Church Stowe.
Location: westbound entry slip at junction J9 Kettering South.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.13 miles from Church Stowe.
Location: eastbound exit slip at Rothwell Lodge Services (J5).
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.76 miles from Church Stowe.
Location: eastbound entry slip at Rothwell Lodge Services (J5).
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.79 miles from Church Stowe.
Location: westbound between junctions J7 Kettering North and J3 Rothwell.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.35 miles from Church Stowe.
Location: westbound.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.79 miles from Church Stowe.
Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.81 miles from Church Stowe.
Location: eastbound between junctions J3 Rothwell and J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 13:00 on 1 May 2024 to 20:00 on 1 May 2024.
Nearest town: 19.08 miles from Church Stowe.
Location: eastbound entry slip at junction J8 Kettering Central.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.86 miles from Church Stowe.
Location: eastbound exit slip at junction J3 Rothwell.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.08 miles from Church Stowe.
Location: eastbound exit slip at junction J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.26 miles from Church Stowe.
Location: eastbound entry slip at junction J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.39 miles from Church Stowe.
Location: eastbound entry slip at junction J4 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.64 miles from Church Stowe.
Location: westbound exit slip at junction J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.42 miles from Church Stowe.
Location: westbound entry slip at junction J6 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.38 miles from Church Stowe.
Location: westbound exit slip at junction J7 Kettering North.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.35 miles from Church Stowe.
Location: westbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.44 miles from Church Stowe.
Location: eastbound exit slip at junction J7 Kettering North.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.51 miles from Church Stowe.
Location: eastbound between junctions J2 Kelmarsh and J3 Rothwell.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.64 miles from Church Stowe.
Location: westbound entry slip at junction J3 Rothwell.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.19 miles from Church Stowe.
Location: westbound exit slip at junction J3 Rothwell.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.4 miles from Church Stowe.
Location: westbound exit slip at junction J4 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.68 miles from Church Stowe.
Location: westbound entry slip at junction J7 Kettering North.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.47 miles from Church Stowe.
Location: westbound between the A445 and the junction with the A46 Coventry East.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.25 miles from Church Stowe.
Location: westbound between the A508 Northampton and the junction with the M1 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.07 miles from Church Stowe.
Location: westbound between the junctions with the A428 and the A508 Northampton.
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.44 miles from Church Stowe.
Location: westbound between the junctions with the A43 and the A428 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.27 miles from Church Stowe.
Location: eastbound between the M1 and the junction with the A508 Northampton.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.98 miles from Church Stowe.
Location: westbound.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.94 miles from Church Stowe.
Location: northbound between junctions J17 (Watford Gap) and J18 (Daventry) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 28 April 2024 to 06:00 on 20 May 2024.
Nearest town: 9.01 miles from Church Stowe.
Location: northbound between junctions J15A (Northampton) and J19 (Rugby) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 27 April 2024 to 06:00 on 18 May 2024.
Nearest town: 4.78 miles from Church Stowe.
Location: southbound entry slip at junction J14 (Milton Keynes) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 17 May 2024 to 05:00 on 18 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.09 miles from Church Stowe.
Location: southbound between junctions J15 (Northampton) and J14 (Milton Keynes) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 17 May 2024 to 05:00 on 18 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 18.29 miles from Church Stowe.
Location: southbound between junctions J14 (Milton Keynes) and J11 (Luton) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 17 May 2024 to 05:00 on 18 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.79 miles from Church Stowe.