SLIGHT
SEVERE
FULL SCREEN UPDATED: 13:50 READ ALOUD
×
×

Current traffic in Bromborough Pool

CONGESTIONCLEARED @ 12:58Location : The A550 northbound exit slip to the A494 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 20 Jul 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

7.74 miles from Bromborough Pool. CLEARED @ 12:58

CONGESTIONCLEARED @ 12:48Location : The A41 westbound between the junctions with the A550 and the M53 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 20 Jul 2018.

3.71 miles from Bromborough Pool. CLEARED @ 12:48

CONGESTIONCLEARED @ 08:58Location : The A41 westbound between the junctions with the A550 and the M53 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 08:45 and 09:00 on 20 Jul 2018.

3.71 miles from Bromborough Pool. CLEARED @ 08:58

CONGESTIONCLEARED @ 08:38Location : The A41 westbound at the junction with the A550 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 08:30 and 08:45 on 20 Jul 2018.

3.76 miles from Bromborough Pool. CLEARED @ 08:38

Roadworks

ROAD WORKSLocation : northbound entry slip at junction J8 (Overpool) .

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 Jul 2018 to 05:00 on 21 Jul 2018.

Lanes Closed : All lanes will be closed.

5.25 miles from Bromborough Pool.

ROAD WORKSLocation : northbound at junction J10 (Elton) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 Jul 2018 to 05:30 on 21 Jul 2018.

Lanes Closed : There will be one of two lanes closed.

7.84 miles from Bromborough Pool.

ROAD WORKSLocation : northbound between junctions J11 (Runcorn) and J10 (Elton) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 Jul 2018 to 05:30 on 21 Jul 2018.

Lanes Closed : There will be one of three lanes closed.

8.19 miles from Bromborough Pool.

ROAD WORKSLocation : northbound entry slip at junction J11 (Runcorn) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 Jul 2018 to 05:30 on 21 Jul 2018.

Lanes Closed : There will be one of two lanes closed.

8.58 miles from Bromborough Pool.

ROAD WORKSLocation : northbound at junction J11 (Runcorn) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 Jul 2018 to 05:30 on 21 Jul 2018.

Lanes Closed : There will be one of two lanes closed.

8.44 miles from Bromborough Pool.

ROAD WORKSLocation : northbound exit slip at junction J10 (Elton) .

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 Jul 2018 to 05:30 on 21 Jul 2018.

Lanes Closed : All lanes will be closed.

7.84 miles from Bromborough Pool.

ROAD WORKSLocation : southbound between junctions J2 (Prescot) and J1 (Huyton) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 20 Jul 2018 to 05:30 on 21 Jul 2018.

Lanes Closed : All lanes will be closed.

9.01 miles from Bromborough Pool.

ROAD WORKSLocation : southbound between junctions J3 (Huyton) and J2 (Prescot) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 20 Jul 2018 to 05:30 on 21 Jul 2018.

Lanes Closed : All lanes will be closed.

8.81 miles from Bromborough Pool.


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

CLEARED @ 12:58Location : northbound exit slip to the A494 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 20 July 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

7.74 miles from Bromborough Pool.

53.24--2.99

CLEARED @ 12:48Location : westbound between the junctions with the A550 and the M53 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 20 July 2018.

3.71 miles from Bromborough Pool.

53.3--2.96

CLEARED @ 08:58Location : westbound between the junctions with the A550 and the M53 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 08:45 and 09:00 on 20 July 2018.

3.71 miles from Bromborough Pool.

53.3--2.96

CLEARED @ 08:38Location : westbound at the junction with the A550 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 08:30 and 08:45 on 20 July 2018.

3.76 miles from Bromborough Pool.

53.3--2.96

Location : northbound entry slip at junction J8 (Overpool) .

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:00 on 21 July 2018.

Lanes Closed : All lanes will be closed.

5.25 miles from Bromborough Pool.

53.29--2.91

Location : northbound at junction J10 (Elton) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:30 on 21 July 2018.

Lanes Closed : There will be one of two lanes closed.

7.84 miles from Bromborough Pool.

53.26--2.88

Location : northbound between junctions J11 (Runcorn) and J10 (Elton) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:30 on 21 July 2018.

Lanes Closed : There will be one of three lanes closed.

8.19 miles from Bromborough Pool.

53.25--2.87

Location : northbound entry slip at junction J11 (Runcorn) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:30 on 21 July 2018.

Lanes Closed : There will be one of two lanes closed.

8.58 miles from Bromborough Pool.

53.25--2.87

Location : northbound at junction J11 (Runcorn) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:30 on 21 July 2018.

Lanes Closed : There will be one of two lanes closed.

8.44 miles from Bromborough Pool.

53.25--2.87

Location : northbound exit slip at junction J10 (Elton) .

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:30 on 21 July 2018.

Lanes Closed : All lanes will be closed.

7.84 miles from Bromborough Pool.

53.26--2.88

Location : southbound between junctions J2 (Prescot) and J1 (Huyton) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:30 on 21 July 2018.

Lanes Closed : All lanes will be closed.

9.01 miles from Bromborough Pool.

53.43--2.82

Location : southbound between junctions J3 (Huyton) and J2 (Prescot) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:30 on 21 July 2018.

Lanes Closed : All lanes will be closed.

8.81 miles from Bromborough Pool.

53.43--2.83

Location : eastbound entry slip at junction J6 (Liverpool) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:30 on 21 July 2018.

Lanes Closed : All lanes will be closed.

8.38 miles from Bromborough Pool.

53.41--2.81

Location : northbound between junctions J7 (Overpool) and J6 (Eastham) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:00 on 21 July 2018.

Lanes Closed : There will be one of two lanes closed.

4.66 miles from Bromborough Pool.

53.3--2.92

Location : southbound exit slip at junction J2 (West Kirby) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 06:00 on 21 July 2018.

Lanes Closed : All lanes will be closed.

5.41 miles from Bromborough Pool.

53.4--3.09

Location : northbound between junctions J5 (Bebington) and J4 (Heswall) .

Lane Closures : The hard shoulder is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 23:59 on 31 December 2019.

3.37 miles from Bromborough Pool.

53.3--2.97

Location : southbound between junctions J2 (West Kirby) and J4 (Heswall) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 July 2018 to 05:30 on 21 July 2018.

Lanes Closed : All lanes will be closed.

3.89 miles from Bromborough Pool.

53.38--3.07

Location : northbound.

Lane Closures : Lane one is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 07:00 on 23 August 2018.

Lanes Closed : There is one of two lanes closed.

5.62 miles from Bromborough Pool.

53.39--3.11

Location : southbound entry slip at junction J2 (West Kirby) .

Lane Closures : Lane one is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 07:00 on 23 August 2018.

Lanes Closed : All lanes are closed.

5.26 miles from Bromborough Pool.

53.4--3.09

Location : southbound at junction J7 (Overpool) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 23:59 on 31 December 2018.

4.59 miles from Bromborough Pool.

53.3--2.92

Location : northbound at junction J9 (Ellesmere Port) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 23:59 on 31 December 2018.

5.98 miles from Bromborough Pool.

53.29--2.89

Location : northbound between junctions J5 (Bebington) and J4 (Heswall) .

Lane Closures : Lane three is closed.

Reason : Emergency barrier repairs.

Status : Currently Active.

Period : expect disruption until 23:59 on 31 July 2018.

Lanes Closed : There is one of three lanes closed.

3.17 miles from Bromborough Pool.

53.3--2.98

Location : northbound between the junctions with the A5207 and the M58 .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 24 July 2018 to 06:00 on 28 July 2018.

9.76 miles from Bromborough Pool.

53.49--2.96

Location : northbound between the junctions with the A5207 and the M58 .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 July 2018 to 28 July 2018.

Lanes Closed : There will be two of three lanes closed.

9.82 miles from Bromborough Pool.

53.49--2.96

Location : southbound entry slip at junction J2 (West Kirby) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:30 on 24 July 2018 to 05:00 on 23 August 2018.

5.26 miles from Bromborough Pool.

53.4--3.09

Location : northbound between junctions J3 (Huyton) and J4 (Knowsley) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 25 July 2018 to 06:00 on 28 July 2018.

7.94 miles from Bromborough Pool.

53.43--2.86

Location : northbound between junctions J2 (Prescot) and J4 (Knowsley) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 July 2018 to 28 July 2018.

Lanes Closed : There will be two of three lanes closed.

8.62 miles from Bromborough Pool.

53.43--2.83

Location : northbound entry slip at junction J3 (Huyton) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 July 2018 to 28 July 2018.

Lanes Closed : All lanes will be closed.

7.94 miles from Bromborough Pool.

53.43--2.86

Location : southbound between junctions J10 (Elton) and J12 (Chester) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 24 July 2018 to 07:00 on 2 August 2018.

7.7 miles from Bromborough Pool.

53.26--2.88

Location : westbound between the A540 and the junction with the A550 .

Lane Closures : Lane one will be closed.

Reason : Barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:30 from 23 July 2018 to 25 July 2018.

Lanes Closed : There will be one of two lanes closed.

7.7 miles from Bromborough Pool.

53.24--2.95

Location : westbound entry slip from the A540 .

Reason : Barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:30 from 23 July 2018 to 25 July 2018.

Lanes Closed : All lanes will be closed.

7.76 miles from Bromborough Pool.

53.24--2.95

Location : southbound between junctions J4 (Heswall) and J5 (Bebington) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 July 2018 to 26 July 2018.

Lanes Closed : There will be two of three lanes closed.

2.92 miles from Bromborough Pool.

53.31--2.99

Location : eastbound entry slip at junction J15 (Ellesmere Port) from the M53 northbound.

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 23 July 2018 to 07:00 on 4 August 2018.

9.11 miles from Bromborough Pool.

53.24--2.86

Location : eastbound entry slip at junction J15 (Ellesmere Port) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 24 July 2018 to 07:00 on 25 July 2018.

Schedule : From 21:00 on 26 July 2018 to 07:00 on 27 July 2018.

Schedule : Expect disruption everyday between 21:00 and 07:00 from 31 July 2018 to 2 August 2018.

Lanes Closed : All lanes will be closed.

8.27 miles from Bromborough Pool.

53.25--2.87

Location : eastbound entry slip at junction J15 (Ellesmere Port) from the M53 northbound.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 23 July 2018 to 07:00 on 24 July 2018.

Schedule : From 21:00 on 25 July 2018 to 07:00 on 26 July 2018.

Schedule : From 21:00 on 31 July 2018 to 07:00 on 1 August 2018.

Schedule : Expect disruption everyday between 21:00 and 07:00 from 2 August 2018 to 4 August 2018.

Lanes Closed : All lanes will be closed.

9.11 miles from Bromborough Pool.

53.24--2.86

Location : southbound entry slip at junction J11 (Runcorn) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 24 July 2018 to 07:00 on 25 July 2018.

Schedule : From 21:00 on 26 July 2018 to 07:00 on 27 July 2018.

Schedule : Expect disruption everyday between 21:00 and 07:00 from 31 July 2018 to 2 August 2018.

Lanes Closed : All lanes will be closed.

8.79 miles from Bromborough Pool.

53.25--2.86

Location : northbound entry slip at junction J11 (Runcorn) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 23 July 2018 to 07:00 on 24 July 2018.

Schedule : From 21:00 on 25 July 2018 to 07:00 on 26 July 2018.

Schedule : From 21:00 on 31 July 2018 to 07:00 on 1 August 2018.

Schedule : Expect disruption everyday between 21:00 and 07:00 from 2 August 2018 to 4 August 2018.

Lanes Closed : All lanes will be closed.

8.59 miles from Bromborough Pool.

53.25--2.87

Location : southbound at junction J10 (Elton) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 24 July 2018 to 07:00 on 25 July 2018.

Schedule : From 21:00 on 26 July 2018 to 07:00 on 27 July 2018.

Schedule : Expect disruption everyday between 21:00 and 07:00 from 31 July 2018 to 2 August 2018.

Lanes Closed : All lanes will be closed.

7.7 miles from Bromborough Pool.

53.26--2.88

Location : southbound between junctions J10 (Elton) and J12 (Chester) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 24 July 2018 to 07:00 on 25 July 2018.

Schedule : From 21:00 on 26 July 2018 to 07:00 on 27 July 2018.

Schedule : Expect disruption everyday between 21:00 and 07:00 from 31 July 2018 to 2 August 2018.

Lanes Closed : All lanes will be closed.

7.7 miles from Bromborough Pool.

53.26--2.88

Location : northbound exit slip at junction J10 (Elton) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 23 July 2018 to 07:00 on 24 July 2018.

Schedule : From 21:00 on 25 July 2018 to 07:00 on 26 July 2018.

Schedule : From 21:00 on 31 July 2018 to 07:00 on 1 August 2018.

Schedule : Expect disruption everyday between 21:00 and 07:00 from 2 August 2018 to 4 August 2018.

Lanes Closed : All lanes will be closed.

7.84 miles from Bromborough Pool.

53.26--2.88

Location : northbound.

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 23 July 2018 to 05:00 on 27 July 2018.

5.62 miles from Bromborough Pool.

53.39--3.11

Location : northbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 July 2018 to 27 July 2018.

Lanes Closed : All lanes will be closed.

5.62 miles from Bromborough Pool.

53.39--3.11

Location : eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 July 2018 to 27 July 2018.

Lanes Closed : All lanes will be closed.

5.6 miles from Bromborough Pool.

53.41--3.07

Location : eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 July 2018 to 27 July 2018.

Lanes Closed : All lanes will be closed.

5.6 miles from Bromborough Pool.

53.41--3.07

Location : northbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 July 2018 to 27 July 2018.

Lanes Closed : All lanes will be closed.

5.64 miles from Bromborough Pool.

53.41--3.08

Location : southbound entry slip at junction J2 (West Kirby) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 July 2018 to 27 July 2018.

Lanes Closed : All lanes will be closed.

5.26 miles from Bromborough Pool.

53.4--3.09

Location : northbound at junction J2 (West Kirby) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 23 July 2018 to 27 July 2018.

Lanes Closed : All lanes will be closed.

5.1 miles from Bromborough Pool.

53.4--3.09

Location : northbound between the A5038 and the junction with the M58 .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 06:00 on 22 July 2018 to 14:00 on 22 July 2018.

Lanes Closed : There will be one of three lanes closed.

9.41 miles from Bromborough Pool.

53.48--2.96

Location : northbound between the A567 and the junction with the A5207 .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 06:00 on 22 July 2018 to 14:00 on 22 July 2018.

Lanes Closed : There will be one of two lanes closed.

8.24 miles from Bromborough Pool.

53.47--3

Location : southbound between the A5207 and the junction with the A567 .

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 06:00 on 22 July 2018 to 14:00 on 22 July 2018.

Lanes Closed : There will be one of two lanes closed.

9.74 miles from Bromborough Pool.

53.49--2.96

Location : southbound between junctions J2 (West Kirby) and J3 (Tranmere) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 21 July 2018 to 05:00 on 22 July 2018.

5.25 miles from Bromborough Pool.

53.4--3.09

Location : southbound between junctions J2 (West Kirby) and J3 (Tranmere) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 July 2018 to 05:00 on 22 July 2018.

Lanes Closed : All lanes will be closed.

5.25 miles from Bromborough Pool.

53.4--3.09

Location : southbound at junction J2 (West Kirby) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 July 2018 to 05:00 on 22 July 2018.

Lanes Closed : All lanes will be closed.

5.14 miles from Bromborough Pool.

53.4--3.09

Location : northbound at junction J2 (West Kirby) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 July 2018 to 05:00 on 22 July 2018.

Lanes Closed : There will be one of two lanes closed.

5 miles from Bromborough Pool.

53.39--3.09

Location : northbound between junctions J3 (Tranmere) and J2 (West Kirby) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 July 2018 to 05:00 on 22 July 2018.

Lanes Closed : There will be one of three lanes closed.

3.54 miles from Bromborough Pool.

53.37--3.07

Location : southbound exit slip at junction J3 (Tranmere) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 July 2018 to 05:00 on 22 July 2018.

Lanes Closed : All lanes will be closed.

3.7 miles from Bromborough Pool.

53.37--3.07

Location : northbound between the junctions with the A5207 and the M58 .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 06:00 on 21 July 2018 to 14:00 on 21 July 2018.

Lanes Closed : There will be one of three lanes closed.

9.76 miles from Bromborough Pool.

53.49--2.96

Location : southbound between the M57 and the junction with the A5207 .

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 06:00 on 21 July 2018 to 14:00 on 21 July 2018.

Lanes Closed : There will be one of three lanes closed.

9.99 miles from Bromborough Pool.