Route Planner to Avoid Traffic
START
FINISH

Traffic Blackwall

SLIGHT
SEVERE
FULL SCREENUPDATED: 04:00
×
×
TODAYToday's weather68°
Light Rain Showers
WIND: 14kts, WNW
FRIToday's weather71°
Light Rain Showers
WIND: 10kts, SSW
SATToday's weather74°
Sunny Intervals
WIND: 13kts, WSW
SUNToday's weather78°
Sunny Intervals
WIND: 12kts, SSE
MONToday's weather84°
Sunny
WIND: 17kts, SW

Current traffic in Blackwall

: ROAD WORKSOn the M25 anti-clockwise between junctions J26 (Waltham Abbey) and J25 (Enfield), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, between 10 pm and 5:30 am, from 9 July 2015 to 6 August 2015.

11.31 miles from Blackwall.

: ROAD WORKSOn the M3 westbound between junctions J1 (Sunbury) and J3 (Woking), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:00 am on 28 March 2017.

21.95 miles from Blackwall.

: ROAD WORKSOn the M3 westbound between junctions J1 (Sunbury) and J3 (Woking), expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 3 November 2014 to 5 am on 28 March 2017.

21.95 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J13 (A30) and J12 (Basingstoke), there are currently delays of 10 mins due to roadworks .

Expect disruption until 11:59 pm on 23 December 2016.

24.12 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J13 (A30) and J12 (Basingstoke), expect delays of up to 10 mins at peak times due to roadworks , from 12:01 am on 22 October 2014 to 11:59 pm on 23 December 2016.

24.12 miles from Blackwall.

: ROAD WORKSOn the M3 eastbound between junctions J3 (Woking) and J1 (Sunbury), expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 3 November 2014 to 5 am on 28 March 2017.

27.95 miles from Blackwall.

: ROAD WORKSOn the M3 eastbound between junctions J3 (Woking) and J1 (Sunbury), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:00 am on 28 March 2017.

27.95 miles from Blackwall.

: ROAD WORKSOn the A13 westbound between the junctions with the A1012 and the A1306 Aveley , expect delays of up to 15 mins at peak times due to roadworks , from 10 pm on 5 March 2015 to 5:30 am on 5 January 2017.

13.24 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J1A (Erith) and J31 (Thurrock), expect delays of up to 10 mins at peak times due to roadworks , between 9 pm and 5:30 am, from 1 July 2015 to 31 July 2015.

11.68 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J11 (Chertsey) and J12 (Basingstoke), expect delays of up to 10 mins at peak times due to roadworks , from 12:01 am on 22 October 2014 to 11:59 pm on 23 December 2016.

24.27 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J11 (Chertsey) and J12 (Basingstoke), there are currently delays of 10 mins due to roadworks .

Expect disruption until 11:59 pm on 23 December 2016.

24.27 miles from Blackwall.

: ROAD WORKSOn the A13 westbound between the junctions with the A1012 and the A1306 Aveley , there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am on 5 January 2017.

13.24 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J2 (London (SE)) and J30 (Dagenham), there are currently delays of 10 mins due to roadworks .

Expect disruption until 12:00 am on 30 October 2015.

12.01 miles from Blackwall.

: ROAD WORKSOn the A13 eastbound between the junctions with the A1306 Aveley and the A1012, expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 5 March 2015 to 5:30 am on 5 January 2017.

10.8 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J30 (Dagenham) and J2 (London (SE)), expect delays of up to 10 mins at peak times due to roadworks , from 12 am on 17 February 2014 to 12 am on 30 October 2015.

11.65 miles from Blackwall.

: ROAD WORKSOn the A13 eastbound between the junctions with the A1306 Aveley and the A1012, there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am on 5 January 2017.

10.8 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J30 (Dagenham) and J2 (London (SE)), there are currently delays of 10 mins due to roadworks .

Expect disruption until 12:00 am on 30 October 2015.

11.65 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J1A (Erith) and J31 (Thurrock), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

11.68 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J26 (Waltham Abbey) and J25 (Enfield), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

11.31 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J8 (Reigate) and J9 (Leatherhead), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, between 10 pm and 5:30 am, from 27 July 2015 to 6 August 2015.

19.97 miles from Blackwall.

: ROAD WORKSOn the M3 eastbound between junctions J3 (Woking) and J1 (Sunbury), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 9 pm on 31 July 2015 to 6 am on 1 August 2015.

27.95 miles from Blackwall.

: RESURFACINGOn the M25 clockwise between junctions J31 (Thurrock) and J1A (Erith), expect delays of up to 10 mins at peak times due to carriageway resurfacing , between 10 pm and 5:30 am, from 27 July 2015 to 1 September 2015.

11.74 miles from Blackwall.

: ROAD WORKSOn the A1(M) southbound between junctions J6 and J4, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 10 pm and 5 am, from 27 July 2015 to 1 August 2015.

21.87 miles from Blackwall.

: RESURFACINGOn the M25 clockwise between junctions J27 (Stansted) and J28 (Chelmsford), minor delays can be expected at peak times due to carriageway resurfacing closing three lanes, between 10 pm and 6 am, from 27 July 2015 to 1 August 2015.

12.54 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J10 (Guildford) and J9 (Leatherhead), expect delays of up to 10 mins at peak times due to roadworks , between 10 pm and 5:30 am, from 27 July 2015 to 4 September 2015.

23.24 miles from Blackwall.

: ROAD WORKSOn the A1(M) northbound between junctions J4 and J6, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 10 pm and 5 am, from 27 July 2015 to 1 August 2015.

22.62 miles from Blackwall.

: RESURFACINGOn the M25 clockwise between junctions J31 (Thurrock) and J1A (Erith), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

11.74 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J8 (Reigate) and J9 (Leatherhead), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

19.97 miles from Blackwall.

: ROAD WORKSOn the A1(M) northbound between junctions J4 and J6, there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 5:00 am.

22.62 miles from Blackwall.

: ROAD WORKSOn the A1(M) southbound between junctions J6 and J4, there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 5:00 am.

21.87 miles from Blackwall.

: RESURFACINGOn the M25 clockwise between junctions J27 (Stansted) and J28 (Chelmsford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 6:00 am.

12.54 miles from Blackwall.

: ROAD WORKSOn the M4 eastbound between junctions J6 (Slough) and J5 (Colnbrook), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 10 pm on 30 July 2015 to 6 am on 31 July 2015.

25.08 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J29 (Romford) and J28 (Chelmsford), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

12.67 miles from Blackwall.

: ROAD WORKSOn the M1 northbound between junctions J1 (North Circular) and J4 (Edgware A41), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

11.37 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, between 10 pm and 5:30 am, from 30 July 2015 to 10 August 2015.

23.25 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J1B (Dartford) and J1A (Erith), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, from 10 pm on 30 July 2015 to 5:30 am on 31 July 2015.

11.25 miles from Blackwall.

: ROAD WORKSOn the A2 from Dartford towards Rochester between the junctions with the M25 and the A2260, there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

13.68 miles from Blackwall.

: ROAD WORKSOn the M4 eastbound between junctions J6 (Slough) and J5 (Colnbrook), there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 6:00 am.

25.08 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

23.25 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J1B (Dartford) and J1A (Erith), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

11.25 miles from Blackwall.

: ROAD WORKSOn the M1 northbound between junctions J1 (North Circular) and J4 (Edgware A41), there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 5:00 am.

11.37 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J29 (Romford) and J28 (Chelmsford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:00 am.

12.67 miles from Blackwall.

: ROAD WORKSOn the M4 eastbound between junctions J2 (N.Circular) and J1 (London), minor delays are possible due to roadworks .

Expect disruption until 11:59 pm on 31 August 2015.

12.38 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J16 (M40) and J17 (Maple Cross), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

23.47 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J29 (Romford) and J31 (Thurrock), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:00 am on 5 January 2017.

12.11 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J31 (Thurrock) and J29 (Romford), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:00 am on 5 January 2017.

11.67 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J29 (Romford) and J31 (Thurrock), expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 2 June 2015 to 5 am on 5 January 2017.

12.11 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J31 (Thurrock) and J29 (Romford), expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 2 June 2015 to 5 am on 5 January 2017.

11.67 miles from Blackwall.

: ROAD WORKSOn the A2 from Dartford towards Rochester between the junctions with the M25 and the A2260, minor delays can be expected at peak times due to roadworks , from 9:09 pm on 30 July 2015 to 5:30 am on 31 July 2015.

13.68 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise between junctions J16 (M40) and J17 (Maple Cross), minor delays can be expected at peak times due to roadworks , from 10:42 pm on 30 July 2015 to 5:30 am on 31 July 2015.

23.47 miles from Blackwall.

: ROAD WORKSOn the M1 northbound between junctions J1 (North Circular) and J5 (Harrow A41), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 11 pm on 31 July 2015 to 5 am on 1 August 2015.

17.29 miles from Blackwall.

: ROAD WORKSOn the M40 southbound between junctions J2 (Beaconsfield) and J1A (Watford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

25.38 miles from Blackwall.

: ROAD WORKSOn the M25 anti-clockwise between junctions J2 (London (SE)) and J30 (Dagenham), expect delays of up to 30 mins at peak times due to roadworks , from 12 am on 17 February 2014 to 12 am on 30 October 2015.

12.01 miles from Blackwall.

: ROAD WORKSThe A12 from Ipswich towards The M25 entry slip from the A1023 will be closed , due to roadworks, between 9 pm and 6 am, from 20 July 2015 to 8 August 2015.

17.14 miles from Blackwall.

: BARRIER/BRIDGE REPAIRSThe A12 from Ipswich towards The M25 entry slip from the A1023 will be closed , due to barrier repairs, between 8 pm and 6 am, from 16 March 2015 to 8 August 2015.

17.14 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich entry slip from the A1023 will be closed , due to roadworks, between 9 pm and 6 am, from 28 July 2015 to 1 August 2015.

17.35 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich will be closed between the junctions with the M25 and the A414 Chelmsford West , due to roadworks, between 9 pm and 5 am, from 27 July 2015 to 14 August 2015.

14.59 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich exit slip to the A1023 will be closed , due to roadworks, between 9 pm and 6 am, from 27 July 2015 to 14 August 2015.

17.17 miles from Blackwall.

: ROAD WORKSThe M3 westbound will be closed at junction J2 (Gatwick M23), due to roadworks, between 10 pm and 6 am, from 16 July 2015 to 1 August 2015.

24.54 miles from Blackwall.

: ROAD WORKSThe A12 from Ipswich towards The M25 exit slip to the M25 will be closed , due to roadworks, between 9 pm and 6 am, from 27 July 2015 to 9 August 2015.

13.07 miles from Blackwall.

: RESURFACINGThe M3 westbound entry slip at junction J2 (Gatwick M23) will be closed , due to carriageway resurfacing, between 10 pm and 6 am, from 16 July 2015 to 1 August 2015.

24.43 miles from Blackwall.

: RESURFACINGThe M3 westbound entry slip at junction J2 (Gatwick M23) will be closed , due to carriageway resurfacing, between 9 pm and 6 am, from 16 July 2015 to 1 August 2015.

24.65 miles from Blackwall.

: ROAD WORKSThe A13 westbound will be closed between the junctions with the A1012 and the A1306 Aveley , due to roadworks, between 10 pm and 5:30 am, from 13 July 2015 to 1 August 2015.

13.24 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich entry slip from the M25 will be closed , due to roadworks, between 9 pm and 6 am, from 27 July 2015 to 4 August 2015.

13.07 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich entry slip from the M25 will be closed , due to roadworks, between 9 pm and 6 am, from 27 July 2015 to 14 August 2015.

13.07 miles from Blackwall.

: ROAD WORKSThe A12 from Ipswich towards The M25 will be closed between the junctions with the A414 Chelmsford West and the M25, due to roadworks, between 9 pm and 6 am, from 20 July 2015 to 8 August 2015.

18.06 miles from Blackwall.

: ROAD WORKSThe M20 westbound exit slip at junction J1 will be closed , due to roadworks, between 10 pm and 5:30 am, from 23 July 2015 to 1 August 2015.

12.25 miles from Blackwall.

: ROAD WORKSThe M25 anti-clockwise exit slip at junction J3 (Maidstone) will be closed , due to roadworks, between 11 pm and 5:30 am, from 27 July 2015 to 1 August 2015.

12.24 miles from Blackwall.

: ROAD WORKSThe M25 anti-clockwise exit slip at junction J3 (Maidstone) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.24 miles from Blackwall.

: ROAD WORKSThe A13 westbound entry slip from the A126 will be closed , due to roadworks, between 10 pm and 5:30 am, from 13 July 2015 to 1 August 2015.

12.43 miles from Blackwall.

: BARRIER/BRIDGE REPAIRSThe A12 from Ipswich towards The M25 entry slip from the A1023 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

17.14 miles from Blackwall.

: ROAD WORKSThe A12 from Ipswich towards The M25 entry slip from the A1023 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

17.14 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich exit slip to the A1023 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

17.17 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich entry slip from the A1023 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

17.35 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich is closed between the junctions with the M25 and the A414 Chelmsford West , due to roadworks.

Road expected to re-open from 5:00 am.

14.59 miles from Blackwall.

: ROAD WORKSThe A12 from Ipswich towards The M25 exit slip to the M25 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

13.07 miles from Blackwall.

: RESURFACINGThe M3 westbound entry slip at junction J2 (Gatwick M23) is closed , due to roadworks.

Road expected to re-open from 6:00 am.

24.65 miles from Blackwall.

: ROAD WORKSThe A12 from Ipswich towards The M25 is closed between the junctions with the A414 Chelmsford West and the M25, due to roadworks.

Road expected to re-open from 6:00 am.

18.07 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich entry slip from the M25 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

13.07 miles from Blackwall.

: ROAD WORKSThe A12 from The M25 towards Ipswich entry slip from the M25 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

13.07 miles from Blackwall.

: ROAD WORKSThe M3 westbound is closed at junction J2 (Gatwick M23), due to roadworks.

Road expected to re-open from 6:00 am.

24.54 miles from Blackwall.

: RESURFACINGThe M3 westbound entry slip at junction J2 (Gatwick M23) is closed , due to roadworks.

Road expected to re-open from 6:00 am.

24.43 miles from Blackwall.

: ROAD WORKSThe M20 westbound exit slip at junction J1 is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.25 miles from Blackwall.

: ROAD WORKSThe A13 westbound entry slip from the A126 is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.43 miles from Blackwall.

: ROAD WORKSThe A13 westbound is closed between the junctions with the A1012 and the A1306 Aveley , due to roadworks.

Road expected to re-open from 5:30 am.

13.24 miles from Blackwall.

: ROAD WORKSThe M3 eastbound will be closed between junctions J3 (Woking) and J2 (Gatwick M23), due to roadworks, between 10 pm and 6 am, from 1 August 2015 to 28 August 2015.

27.95 miles from Blackwall.

: ROAD WORKSThe M4 westbound exit slip at junction J2 (N.Circular) will be closed , due to roadworks, between 10 pm and 5:30 am, from 27 July 2015 to 15 August 2015.

12.82 miles from Blackwall.

: ROAD WORKSThe M25 clockwise entry slip at junction J31 (Thurrock) will be closed , due to roadworks, between 10 pm and 5:30 am, from 27 July 2015 to 1 August 2015.

11.71 miles from Blackwall.

: ROAD WORKSThe M4 westbound exit slip at junction J2 (N.Circular) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.82 miles from Blackwall.

: ROAD WORKSThe M25 clockwise entry slip at junction J31 (Thurrock) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

11.71 miles from Blackwall.

: ROAD WORKSThe M25 anti-clockwise exit slip at junction J9 (Leatherhead) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

19.98 miles from Blackwall.

: ROAD WORKSThe M25 anti-clockwise exit slip at junction J9 (Leatherhead) will be closed , due to roadworks, between 10 pm and 5:30 am, from 28 July 2015 to 5 August 2015.

19.98 miles from Blackwall.

: RESURFACINGThe M40 southbound exit slip at junction J1A (Watford) will be closed , due to carriageway resurfacing, between 10 pm and 6 am, from 29 July 2015 to 2 August 2015.

23.57 miles from Blackwall.

: RESURFACINGThe M25 anti-clockwise entry slip at junction J16 (M40) From M40 North will be closed , due to carriageway resurfacing, between 10 pm and 5:30 am, from 29 July 2015 to 2 August 2015.

22.77 miles from Blackwall.

: ROAD WORKSThe A20 from Sidcup towards Swanley exit slip to the M25 will be closed , due to roadworks, between 10 pm and 5:30 am, from 29 July 2015 to 3 August 2015.

12.03 miles from Blackwall.

: RESURFACINGThe M40 southbound exit slip at junction J1A (Watford) is closed , due to roadworks.

Road expected to re-open from 6:00 am.

23.57 miles from Blackwall.

: RESURFACINGThe M25 anti-clockwise entry slip at junction J16 (M40) From M40 North is closed , due to roadworks.

Road expected to re-open from 5:30 am.

22.77 miles from Blackwall.

: ROAD WORKSThe A20 from Sidcup towards Swanley exit slip to the M25 is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.03 miles from Blackwall.

: ROAD WORKSThe A1(M) northbound entry slip at junction J3 will be closed , due to roadworks, from 10:30 pm on 30 July 2015 to 5 am on 31 July 2015.

20.46 miles from Blackwall.

: ROAD WORKSThe M25 clockwise exit slip at junction J22 (St Albans) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

18.28 miles from Blackwall.

: ROAD WORKSThe M25 anti-clockwise entry slip at junction J29 (Romford) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

12.82 miles from Blackwall.

: ROAD WORKSThe A1(M) northbound entry slip at junction J4 will be closed , due to roadworks, from 10:30 pm on 30 July 2015 to 5 am on 31 July 2015.

20.57 miles from Blackwall.

: ROAD WORKSThe A1(M) northbound entry slip at junction J3 will be closed , due to roadworks, from 10:30 pm on 30 July 2015 to 5 am on 31 July 2015.

19.45 miles from Blackwall.

: ROAD WORKSThe A1(M) northbound will be closed between junctions J3 and J4, due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

19.89 miles from Blackwall.

: ROAD WORKSThe A1089 southbound exit slip to the A126 will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

15.33 miles from Blackwall.

: ROAD WORKSThe M25 anti-clockwise entry slip at junction J15 (Slough) from the M4 westbound will be closed , due to roadworks, from 11 pm on 31 July 2015 to 5 am on 1 August 2015.

21.24 miles from Blackwall.

: ROAD WORKSThe M25 clockwise entry slip at junction J15 (Slough) from the M4 westbound will be closed , due to roadworks, from 11 pm on 31 July 2015 to 5 am on 1 August 2015.

21.34 miles from Blackwall.

: ROAD WORKSThe A13 westbound is closed between the junctions with the A1012 and the M25, due to roadworks.

Road expected to re-open from 5:30 am.

13.24 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise at junction J10 (Guildford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

23.6 miles from Blackwall.

: ROAD WORKSThe A1(M) northbound is closed between junctions J3 and J4, due to roadworks.

Road expected to re-open from 5:00 am.

19.89 miles from Blackwall.

: ROAD WORKSThe A1(M) northbound entry slip at junction J3 is closed , due to roadworks.

Road expected to re-open from 5:00 am.

19.45 miles from Blackwall.

: ROAD WORKSThe M25 anti-clockwise exit slip at junction J7 (Gatwick) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

18.38 miles from Blackwall.

: ROAD WORKSThe M25 clockwise exit slip at junction J22 (St Albans) will be closed , due to roadworks, from 9:51 pm on 30 July 2015 to 5 am on 31 July 2015.

18.28 miles from Blackwall.

: ROAD WORKSThe M25 anti-clockwise exit slip at junction J7 (Gatwick) will be closed , due to roadworks, from 10:50 pm on 30 July 2015 to 5:30 am on 31 July 2015.

18.38 miles from Blackwall.

: ROAD WORKSOn the M25 clockwise at junction J10 (Guildford), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, between 10 pm and 5:30 am, from 30 July 2015 to 10 August 2015.

23.6 miles from Blackwall.

: ROAD WORKSThe M25 anti-clockwise entry slip from Cobham Services will be closed , due to roadworks, from 10:05 pm on 30 July 2015 to 5 am on 31 July 2015.

22.74 miles from Blackwall.

: ROAD WORKSThe M2 westbound entry slip at junction J4 (Gillingham) will be closed , due to roadworks, from 8:27 pm on 30 July 2015 to 6 am on 31 July 2015.

28.02 miles from Blackwall.

: ROAD WORKSThe A13 westbound will be closed between the junctions with the A1012 and the M25, due to roadworks, from 9:31 pm on 30 July 2015 to 5:30 am on 31 July 2015.

13.24 miles from Blackwall.

: ROAD WORKSCLEARED @ 23:50The M25 clockwise entry slip at junction J26 (Waltham Abbey) is closed , due to roadworks.

Road expected to re-open from 5:00 am on 31 July 2015.

11.28 miles from Blackwall.

CLEARED @ 23:50

: ROAD WORKSCLEARED @ 03:20The A1(M) northbound entry slip at junction J4 is closed , due to roadworks.

Road expected to re-open from 5:00 am.

20.57 miles from Blackwall.

CLEARED @ 03:20

: ROAD WORKSCLEARED @ 03:20The A1(M) northbound entry slip at junction J3 is closed , due to roadworks.

Road expected to re-open from 5:00 am.

19.45 miles from Blackwall.

CLEARED @ 03:20

: ROAD WORKSCLEARED @ 02:30The M25 anti-clockwise entry slip from Cobham Services is closed , due to roadworks.

Road expected to re-open from 5:00 am.

22.74 miles from Blackwall.

CLEARED @ 02:30

: ROAD WORKSCLEARED @ 01:00The M25 clockwise entry slip at junction J22 (St Albans) is closed , due to roadworks.

Road expected to re-open from 5:00 am.

18.29 miles from Blackwall.

CLEARED @ 01:00

: ROAD WORKSCLEARED @ 02:00The A1089 southbound exit slip to the A126 is closed , due to roadworks.

Road expected to re-open from 5:00 am.

15.33 miles from Blackwall.

CLEARED @ 02:00

: ROAD WORKSCLEARED @ 01:10The M1 southbound exit slip at junction J6 (Watford A405) is closed , due to roadworks.

Road expected to re-open from 5:00 am on 31 July 2015.

20.87 miles from Blackwall.

CLEARED @ 01:10

: ROAD WORKSCLEARED @ 01:10The M1 southbound entry slip at junction J6 (Watford A405) is closed , due to roadworks.

Road expected to re-open from 5:00 am on 31 July 2015.

20.87 miles from Blackwall.

CLEARED @ 01:10

: ROAD WORKSCLEARED @ 02:10The M25 anti-clockwise entry slip at junction J29 (Romford) is closed , due to roadworks.

Road expected to re-open from 5:00 am.

12.82 miles from Blackwall.

CLEARED @ 02:10

: ROAD WORKSCLEARED @ 01:30The M25 clockwise exit slip at junction J22 (St Albans) is closed , due to roadworks.

Road expected to re-open from 5:00 am on 31 July 2015.

18.28 miles from Blackwall.

CLEARED @ 01:30

: ROAD WORKSCLEARED @ 01:30The M25 clockwise exit slip at junction J22 (St Albans) is closed , due to roadworks.

Road expected to re-open from 5:00 am.

18.28 miles from Blackwall.

CLEARED @ 01:30

: ROAD WORKSCLEARED @ 01:50The M2 westbound entry slip at junction J4 (Gillingham) is closed , due to roadworks.

Road expected to re-open from 6:00 am.

28.02 miles from Blackwall.

CLEARED @ 01:50

: ROAD WORKSCLEARED @ 01:20The M1 southbound exit slip at junction J6 (Watford A405) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

20.87 miles from Blackwall.

CLEARED @ 01:20

: ROAD WORKSCLEARED @ 01:20The M25 clockwise entry slip at junction J22 (St Albans) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

18.29 miles from Blackwall.

CLEARED @ 01:20

: ROAD WORKSCLEARED @ 01:20The M1 southbound entry slip at junction J6 (Watford A405) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

20.87 miles from Blackwall.

CLEARED @ 01:20

: ROAD WORKSCLEARED @ 01:10On the M1 southbound between junctions J6 (Watford A405) and J5 (Harrow A41), there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 5:00 am on 31 July 2015.

20.07 miles from Blackwall.

CLEARED @ 01:10

: CONGESTIONCLEARED @ 23:00On the A21 northbound between the junctions with the A262 and the M25, there are currently delays of 10 mins due to heavy traffic .

Normal traffic conditions expected from 11:30 pm.

29.77 miles from Blackwall.

CLEARED @ 23:00

: ROAD WORKSCLEARED @ 01:20On the M1 southbound between junctions J6 (Watford A405) and J5 (Harrow A41), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

20.07 miles from Blackwall.

CLEARED @ 01:20

: ROAD WORKSCLEARED @ 02:30On the M25 anti-clockwise between junctions J10 (Guildford) and J9 (Leatherhead), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

23.24 miles from Blackwall.

CLEARED @ 02:30

Roadworks

Your Comments


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving on the road. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 3 points on your licence and a fine of £100. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways Agency

Official source of traffic updates for the Blackwall and national area.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

The A13 westbound will be closed between the junctions with the A1012 and the M25, due to roadworks, from 9:31 pm on 30 July 2015 to 5:30 am on 31 July 2015.

13.24 miles from Blackwall.

The M2 westbound entry slip at junction J4 (Gillingham) will be closed , due to roadworks, from 8:27 pm on 30 July 2015 to 6 am on 31 July 2015.

28.02 miles from Blackwall.

The M25 anti-clockwise entry slip from Cobham Services will be closed , due to roadworks, from 10:05 pm on 30 July 2015 to 5 am on 31 July 2015.

22.74 miles from Blackwall.

On the M25 clockwise at junction J10 (Guildford), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, between 10 pm and 5:30 am, from 30 July 2015 to 10 August 2015.

23.6 miles from Blackwall.

The M25 anti-clockwise exit slip at junction J7 (Gatwick) will be closed , due to roadworks, from 10:50 pm on 30 July 2015 to 5:30 am on 31 July 2015.

18.38 miles from Blackwall.

The M25 clockwise exit slip at junction J22 (St Albans) will be closed , due to roadworks, from 9:51 pm on 30 July 2015 to 5 am on 31 July 2015.

18.28 miles from Blackwall.

CLEARED @ 23:50The M25 clockwise entry slip at junction J26 (Waltham Abbey) is closed , due to roadworks.

Road expected to re-open from 5:00 am on 31 July 2015.

11.28 miles from Blackwall.

The M25 anti-clockwise exit slip at junction J7 (Gatwick) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

18.38 miles from Blackwall.

CLEARED @ 03:20The A1(M) northbound entry slip at junction J4 is closed , due to roadworks.

Road expected to re-open from 5:00 am.

20.57 miles from Blackwall.

The A1(M) northbound entry slip at junction J3 is closed , due to roadworks.

Road expected to re-open from 5:00 am.

19.45 miles from Blackwall.

CLEARED @ 03:20The A1(M) northbound entry slip at junction J3 is closed , due to roadworks.

Road expected to re-open from 5:00 am.

19.45 miles from Blackwall.

The A1(M) northbound is closed between junctions J3 and J4, due to roadworks.

Road expected to re-open from 5:00 am.

19.89 miles from Blackwall.

CLEARED @ 02:30The M25 anti-clockwise entry slip from Cobham Services is closed , due to roadworks.

Road expected to re-open from 5:00 am.

22.74 miles from Blackwall.

CLEARED @ 01:00The M25 clockwise entry slip at junction J22 (St Albans) is closed , due to roadworks.

Road expected to re-open from 5:00 am.

18.29 miles from Blackwall.

CLEARED @ 02:00The A1089 southbound exit slip to the A126 is closed , due to roadworks.

Road expected to re-open from 5:00 am.

15.33 miles from Blackwall.

CLEARED @ 01:10The M1 southbound exit slip at junction J6 (Watford A405) is closed , due to roadworks.

Road expected to re-open from 5:00 am on 31 July 2015.

20.87 miles from Blackwall.

On the M25 clockwise at junction J10 (Guildford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

23.6 miles from Blackwall.

CLEARED @ 01:10The M1 southbound entry slip at junction J6 (Watford A405) is closed , due to roadworks.

Road expected to re-open from 5:00 am on 31 July 2015.

20.87 miles from Blackwall.

CLEARED @ 02:10The M25 anti-clockwise entry slip at junction J29 (Romford) is closed , due to roadworks.

Road expected to re-open from 5:00 am.

12.82 miles from Blackwall.

CLEARED @ 01:30The M25 clockwise exit slip at junction J22 (St Albans) is closed , due to roadworks.

Road expected to re-open from 5:00 am on 31 July 2015.

18.28 miles from Blackwall.

CLEARED @ 01:30The M25 clockwise exit slip at junction J22 (St Albans) is closed , due to roadworks.

Road expected to re-open from 5:00 am.

18.28 miles from Blackwall.

The A13 westbound is closed between the junctions with the A1012 and the M25, due to roadworks.

Road expected to re-open from 5:30 am.

13.24 miles from Blackwall.

CLEARED @ 01:50The M2 westbound entry slip at junction J4 (Gillingham) is closed , due to roadworks.

Road expected to re-open from 6:00 am.

28.02 miles from Blackwall.

The M25 clockwise entry slip at junction J15 (Slough) from the M4 westbound will be closed , due to roadworks, from 11 pm on 31 July 2015 to 5 am on 1 August 2015.

21.34 miles from Blackwall.

The M25 anti-clockwise entry slip at junction J15 (Slough) from the M4 westbound will be closed , due to roadworks, from 11 pm on 31 July 2015 to 5 am on 1 August 2015.

21.24 miles from Blackwall.

The A1089 southbound exit slip to the A126 will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

15.33 miles from Blackwall.

The A1(M) northbound will be closed between junctions J3 and J4, due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

19.89 miles from Blackwall.

The A1(M) northbound entry slip at junction J3 will be closed , due to roadworks, from 10:30 pm on 30 July 2015 to 5 am on 31 July 2015.

19.45 miles from Blackwall.

The A1(M) northbound entry slip at junction J4 will be closed , due to roadworks, from 10:30 pm on 30 July 2015 to 5 am on 31 July 2015.

20.57 miles from Blackwall.

CLEARED @ 01:20The M1 southbound exit slip at junction J6 (Watford A405) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

20.87 miles from Blackwall.

CLEARED @ 01:20The M25 clockwise entry slip at junction J22 (St Albans) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

18.29 miles from Blackwall.

The M25 anti-clockwise entry slip at junction J29 (Romford) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

12.82 miles from Blackwall.

CLEARED @ 01:20The M1 southbound entry slip at junction J6 (Watford A405) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

20.87 miles from Blackwall.

The M25 clockwise exit slip at junction J22 (St Albans) will be closed , due to roadworks, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

18.28 miles from Blackwall.

The A1(M) northbound entry slip at junction J3 will be closed , due to roadworks, from 10:30 pm on 30 July 2015 to 5 am on 31 July 2015.

20.46 miles from Blackwall.

The A20 from Sidcup towards Swanley exit slip to the M25 is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.03 miles from Blackwall.

The M25 anti-clockwise entry slip at junction J16 (M40) From M40 North is closed , due to roadworks.

Road expected to re-open from 5:30 am.

22.77 miles from Blackwall.

The M40 southbound exit slip at junction J1A (Watford) is closed , due to roadworks.

Road expected to re-open from 6:00 am.

23.57 miles from Blackwall.

The A20 from Sidcup towards Swanley exit slip to the M25 will be closed , due to roadworks, between 10 pm and 5:30 am, from 29 July 2015 to 3 August 2015.

12.03 miles from Blackwall.

The M25 anti-clockwise entry slip at junction J16 (M40) From M40 North will be closed , due to carriageway resurfacing, between 10 pm and 5:30 am, from 29 July 2015 to 2 August 2015.

22.77 miles from Blackwall.

The M40 southbound exit slip at junction J1A (Watford) will be closed , due to carriageway resurfacing, between 10 pm and 6 am, from 29 July 2015 to 2 August 2015.

23.57 miles from Blackwall.

The M25 anti-clockwise exit slip at junction J9 (Leatherhead) will be closed , due to roadworks, between 10 pm and 5:30 am, from 28 July 2015 to 5 August 2015.

19.98 miles from Blackwall.

The M25 anti-clockwise exit slip at junction J9 (Leatherhead) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

19.98 miles from Blackwall.

The M25 clockwise entry slip at junction J31 (Thurrock) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

11.71 miles from Blackwall.

The M4 westbound exit slip at junction J2 (N.Circular) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.82 miles from Blackwall.

The M25 clockwise entry slip at junction J31 (Thurrock) will be closed , due to roadworks, between 10 pm and 5:30 am, from 27 July 2015 to 1 August 2015.

11.71 miles from Blackwall.

The M4 westbound exit slip at junction J2 (N.Circular) will be closed , due to roadworks, between 10 pm and 5:30 am, from 27 July 2015 to 15 August 2015.

12.82 miles from Blackwall.

The M3 eastbound will be closed between junctions J3 (Woking) and J2 (Gatwick M23), due to roadworks, between 10 pm and 6 am, from 1 August 2015 to 28 August 2015.

27.95 miles from Blackwall.

The A13 westbound is closed between the junctions with the A1012 and the A1306 Aveley , due to roadworks.

Road expected to re-open from 5:30 am.

13.24 miles from Blackwall.

The A13 westbound entry slip from the A126 is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.43 miles from Blackwall.

The M20 westbound exit slip at junction J1 is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.25 miles from Blackwall.

The M3 westbound entry slip at junction J2 (Gatwick M23) is closed , due to roadworks.

Road expected to re-open from 6:00 am.

24.43 miles from Blackwall.

The M3 westbound is closed at junction J2 (Gatwick M23), due to roadworks.

Road expected to re-open from 6:00 am.

24.54 miles from Blackwall.

The A12 from The M25 towards Ipswich entry slip from the M25 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

13.07 miles from Blackwall.

The A12 from The M25 towards Ipswich entry slip from the M25 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

13.07 miles from Blackwall.

The A12 from Ipswich towards The M25 is closed between the junctions with the A414 Chelmsford West and the M25, due to roadworks.

Road expected to re-open from 6:00 am.

18.07 miles from Blackwall.

The M3 westbound entry slip at junction J2 (Gatwick M23) is closed , due to roadworks.

Road expected to re-open from 6:00 am.

24.65 miles from Blackwall.

The A12 from Ipswich towards The M25 exit slip to the M25 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

13.07 miles from Blackwall.

The A12 from The M25 towards Ipswich is closed between the junctions with the M25 and the A414 Chelmsford West , due to roadworks.

Road expected to re-open from 5:00 am.

14.59 miles from Blackwall.

The A12 from The M25 towards Ipswich entry slip from the A1023 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

17.35 miles from Blackwall.

The A12 from The M25 towards Ipswich exit slip to the A1023 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

17.17 miles from Blackwall.

The A12 from Ipswich towards The M25 entry slip from the A1023 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

17.14 miles from Blackwall.

The A12 from Ipswich towards The M25 entry slip from the A1023 is closed , due to roadworks.

Road expected to re-open from 6:00 am.

17.14 miles from Blackwall.

The A13 westbound entry slip from the A126 will be closed , due to roadworks, between 10 pm and 5:30 am, from 13 July 2015 to 1 August 2015.

12.43 miles from Blackwall.

The M25 anti-clockwise exit slip at junction J3 (Maidstone) is closed , due to roadworks.

Road expected to re-open from 5:30 am.

12.24 miles from Blackwall.

The M25 anti-clockwise exit slip at junction J3 (Maidstone) will be closed , due to roadworks, between 11 pm and 5:30 am, from 27 July 2015 to 1 August 2015.

12.24 miles from Blackwall.

The M20 westbound exit slip at junction J1 will be closed , due to roadworks, between 10 pm and 5:30 am, from 23 July 2015 to 1 August 2015.

12.25 miles from Blackwall.

The A12 from Ipswich towards The M25 will be closed between the junctions with the A414 Chelmsford West and the M25, due to roadworks, between 9 pm and 6 am, from 20 July 2015 to 8 August 2015.

18.06 miles from Blackwall.

The A12 from The M25 towards Ipswich entry slip from the M25 will be closed , due to roadworks, between 9 pm and 6 am, from 27 July 2015 to 14 August 2015.

13.07 miles from Blackwall.

The A12 from The M25 towards Ipswich entry slip from the M25 will be closed , due to roadworks, between 9 pm and 6 am, from 27 July 2015 to 4 August 2015.

13.07 miles from Blackwall.

The A13 westbound will be closed between the junctions with the A1012 and the A1306 Aveley , due to roadworks, between 10 pm and 5:30 am, from 13 July 2015 to 1 August 2015.

13.24 miles from Blackwall.

The M3 westbound entry slip at junction J2 (Gatwick M23) will be closed , due to carriageway resurfacing, between 9 pm and 6 am, from 16 July 2015 to 1 August 2015.

24.65 miles from Blackwall.

The M3 westbound entry slip at junction J2 (Gatwick M23) will be closed , due to carriageway resurfacing, between 10 pm and 6 am, from 16 July 2015 to 1 August 2015.

24.43 miles from Blackwall.

The A12 from Ipswich towards The M25 exit slip to the M25 will be closed , due to roadworks, between 9 pm and 6 am, from 27 July 2015 to 9 August 2015.

13.07 miles from Blackwall.

The M3 westbound will be closed at junction J2 (Gatwick M23), due to roadworks, between 10 pm and 6 am, from 16 July 2015 to 1 August 2015.

24.54 miles from Blackwall.

The A12 from The M25 towards Ipswich exit slip to the A1023 will be closed , due to roadworks, between 9 pm and 6 am, from 27 July 2015 to 14 August 2015.

17.17 miles from Blackwall.

The A12 from The M25 towards Ipswich will be closed between the junctions with the M25 and the A414 Chelmsford West , due to roadworks, between 9 pm and 5 am, from 27 July 2015 to 14 August 2015.

14.59 miles from Blackwall.

The A12 from The M25 towards Ipswich entry slip from the A1023 will be closed , due to roadworks, between 9 pm and 6 am, from 28 July 2015 to 1 August 2015.

17.35 miles from Blackwall.

The A12 from Ipswich towards The M25 entry slip from the A1023 will be closed , due to barrier repairs, between 8 pm and 6 am, from 16 March 2015 to 8 August 2015.

17.14 miles from Blackwall.

The A12 from Ipswich towards The M25 entry slip from the A1023 will be closed , due to roadworks, between 9 pm and 6 am, from 20 July 2015 to 8 August 2015.

17.14 miles from Blackwall.

On the M25 anti-clockwise between junctions J2 (London (SE)) and J30 (Dagenham), expect delays of up to 30 mins at peak times due to roadworks , from 12 am on 17 February 2014 to 12 am on 30 October 2015.

12.01 miles from Blackwall.

On the M40 southbound between junctions J2 (Beaconsfield) and J1A (Watford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

25.38 miles from Blackwall.

On the M1 northbound between junctions J1 (North Circular) and J5 (Harrow A41), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 11 pm on 31 July 2015 to 5 am on 1 August 2015.

17.29 miles from Blackwall.

On the M25 clockwise between junctions J16 (M40) and J17 (Maple Cross), minor delays can be expected at peak times due to roadworks , from 10:42 pm on 30 July 2015 to 5:30 am on 31 July 2015.

23.47 miles from Blackwall.

On the A2 from Dartford towards Rochester between the junctions with the M25 and the A2260, minor delays can be expected at peak times due to roadworks , from 9:09 pm on 30 July 2015 to 5:30 am on 31 July 2015.

13.68 miles from Blackwall.

On the M25 anti-clockwise between junctions J31 (Thurrock) and J29 (Romford), expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 2 June 2015 to 5 am on 5 January 2017.

11.67 miles from Blackwall.

On the M25 clockwise between junctions J29 (Romford) and J31 (Thurrock), expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 2 June 2015 to 5 am on 5 January 2017.

12.11 miles from Blackwall.

On the M25 anti-clockwise between junctions J31 (Thurrock) and J29 (Romford), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:00 am on 5 January 2017.

11.67 miles from Blackwall.

On the M25 clockwise between junctions J29 (Romford) and J31 (Thurrock), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:00 am on 5 January 2017.

12.11 miles from Blackwall.

On the M25 clockwise between junctions J16 (M40) and J17 (Maple Cross), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

23.47 miles from Blackwall.

On the M4 eastbound between junctions J2 (N.Circular) and J1 (London), minor delays are possible due to roadworks .

Expect disruption until 11:59 pm on 31 August 2015.

12.38 miles from Blackwall.

On the M25 anti-clockwise between junctions J29 (Romford) and J28 (Chelmsford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:00 am.

12.67 miles from Blackwall.

On the M1 northbound between junctions J1 (North Circular) and J4 (Edgware A41), there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 5:00 am.

11.37 miles from Blackwall.

CLEARED @ 01:10On the M1 southbound between junctions J6 (Watford A405) and J5 (Harrow A41), there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 5:00 am on 31 July 2015.

20.07 miles from Blackwall.

On the M25 anti-clockwise between junctions J1B (Dartford) and J1A (Erith), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

11.25 miles from Blackwall.

On the M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

23.25 miles from Blackwall.

On the M4 eastbound between junctions J6 (Slough) and J5 (Colnbrook), there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 6:00 am.

25.08 miles from Blackwall.

CLEARED @ 23:00On the A21 northbound between the junctions with the A262 and the M25, there are currently delays of 10 mins due to heavy traffic .

Normal traffic conditions expected from 11:30 pm.

29.77 miles from Blackwall.

On the A2 from Dartford towards Rochester between the junctions with the M25 and the A2260, there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

13.68 miles from Blackwall.

On the M25 anti-clockwise between junctions J1B (Dartford) and J1A (Erith), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, from 10 pm on 30 July 2015 to 5:30 am on 31 July 2015.

11.25 miles from Blackwall.

On the M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, between 10 pm and 5:30 am, from 30 July 2015 to 10 August 2015.

23.25 miles from Blackwall.

On the M1 northbound between junctions J1 (North Circular) and J4 (Edgware A41), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

11.37 miles from Blackwall.

On the M25 anti-clockwise between junctions J29 (Romford) and J28 (Chelmsford), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

12.67 miles from Blackwall.

CLEARED @ 01:20On the M1 southbound between junctions J6 (Watford A405) and J5 (Harrow A41), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 10 pm on 30 July 2015 to 5 am on 31 July 2015.

20.07 miles from Blackwall.

On the M4 eastbound between junctions J6 (Slough) and J5 (Colnbrook), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 10 pm on 30 July 2015 to 6 am on 31 July 2015.

25.08 miles from Blackwall.

CLEARED @ 02:30On the M25 anti-clockwise between junctions J10 (Guildford) and J9 (Leatherhead), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

23.24 miles from Blackwall.

On the M25 clockwise between junctions J27 (Stansted) and J28 (Chelmsford), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 6:00 am.

12.54 miles from Blackwall.

On the A1(M) southbound between junctions J6 and J4, there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 5:00 am.

21.87 miles from Blackwall.

On the A1(M) northbound between junctions J4 and J6, there are currently delays of 10 mins due to roadworks closing two lanes.

Expect disruption until 5:00 am.

22.62 miles from Blackwall.

On the M25 clockwise between junctions J8 (Reigate) and J9 (Leatherhead), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

19.97 miles from Blackwall.

On the M25 clockwise between junctions J31 (Thurrock) and J1A (Erith), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

11.74 miles from Blackwall.

On the A1(M) northbound between junctions J4 and J6, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 10 pm and 5 am, from 27 July 2015 to 1 August 2015.

22.62 miles from Blackwall.

On the M25 anti-clockwise between junctions J10 (Guildford) and J9 (Leatherhead), expect delays of up to 10 mins at peak times due to roadworks , between 10 pm and 5:30 am, from 27 July 2015 to 4 September 2015.

23.24 miles from Blackwall.

On the M25 clockwise between junctions J27 (Stansted) and J28 (Chelmsford), minor delays can be expected at peak times due to carriageway resurfacing closing three lanes, between 10 pm and 6 am, from 27 July 2015 to 1 August 2015.

12.54 miles from Blackwall.

On the A1(M) southbound between junctions J6 and J4, expect delays of up to 10 mins at peak times due to roadworks closing two lanes, between 10 pm and 5 am, from 27 July 2015 to 1 August 2015.

21.87 miles from Blackwall.

On the M25 clockwise between junctions J31 (Thurrock) and J1A (Erith), expect delays of up to 10 mins at peak times due to carriageway resurfacing , between 10 pm and 5:30 am, from 27 July 2015 to 1 September 2015.

11.74 miles from Blackwall.

On the M3 eastbound between junctions J3 (Woking) and J1 (Sunbury), expect delays of up to 10 mins at peak times due to roadworks closing two lanes, from 9 pm on 31 July 2015 to 6 am on 1 August 2015.

27.95 miles from Blackwall.

On the M25 clockwise between junctions J8 (Reigate) and J9 (Leatherhead), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, between 10 pm and 5:30 am, from 27 July 2015 to 6 August 2015.

19.97 miles from Blackwall.

On the M25 anti-clockwise between junctions J26 (Waltham Abbey) and J25 (Enfield), there are currently delays of 10 mins due to roadworks closing three lanes.

Expect disruption until 5:30 am.

11.31 miles from Blackwall.

On the M25 anti-clockwise between junctions J1A (Erith) and J31 (Thurrock), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am.

11.68 miles from Blackwall.

On the M25 clockwise between junctions J30 (Dagenham) and J2 (London (SE)), there are currently delays of 10 mins due to roadworks .

Expect disruption until 12:00 am on 30 October 2015.

11.65 miles from Blackwall.

On the A13 eastbound between the junctions with the A1306 Aveley and the A1012, there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am on 5 January 2017.

10.8 miles from Blackwall.

On the M25 clockwise between junctions J30 (Dagenham) and J2 (London (SE)), expect delays of up to 10 mins at peak times due to roadworks , from 12 am on 17 February 2014 to 12 am on 30 October 2015.

11.65 miles from Blackwall.

On the A13 eastbound between the junctions with the A1306 Aveley and the A1012, expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 5 March 2015 to 5:30 am on 5 January 2017.

10.8 miles from Blackwall.

On the M25 anti-clockwise between junctions J2 (London (SE)) and J30 (Dagenham), there are currently delays of 10 mins due to roadworks .

Expect disruption until 12:00 am on 30 October 2015.

12.01 miles from Blackwall.

On the A13 westbound between the junctions with the A1012 and the A1306 Aveley , there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:30 am on 5 January 2017.

13.24 miles from Blackwall.

On the M25 clockwise between junctions J11 (Chertsey) and J12 (Basingstoke), there are currently delays of 10 mins due to roadworks .

Expect disruption until 11:59 pm on 23 December 2016.

24.27 miles from Blackwall.

On the M25 clockwise between junctions J11 (Chertsey) and J12 (Basingstoke), expect delays of up to 10 mins at peak times due to roadworks , from 12:01 am on 22 October 2014 to 11:59 pm on 23 December 2016.

24.27 miles from Blackwall.

On the M25 anti-clockwise between junctions J1A (Erith) and J31 (Thurrock), expect delays of up to 10 mins at peak times due to roadworks , between 9 pm and 5:30 am, from 1 July 2015 to 31 July 2015.

11.68 miles from Blackwall.

On the A13 westbound between the junctions with the A1012 and the A1306 Aveley , expect delays of up to 15 mins at peak times due to roadworks , from 10 pm on 5 March 2015 to 5:30 am on 5 January 2017.

13.24 miles from Blackwall.

On the M3 eastbound between junctions J3 (Woking) and J1 (Sunbury), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:00 am on 28 March 2017.

27.95 miles from Blackwall.

On the M3 eastbound between junctions J3 (Woking) and J1 (Sunbury), expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 3 November 2014 to 5 am on 28 March 2017.

27.95 miles from Blackwall.

On the M25 anti-clockwise between junctions J13 (A30) and J12 (Basingstoke), expect delays of up to 10 mins at peak times due to roadworks , from 12:01 am on 22 October 2014 to 11:59 pm on 23 December 2016.

24.12 miles from Blackwall.

On the M25 anti-clockwise between junctions J13 (A30) and J12 (Basingstoke), there are currently delays of 10 mins due to roadworks .

Expect disruption until 11:59 pm on 23 December 2016.

24.12 miles from Blackwall.

On the M3 westbound between junctions J1 (Sunbury) and J3 (Woking), expect delays of up to 10 mins at peak times due to roadworks , from 10 pm on 3 November 2014 to 5 am on 28 March 2017.

21.95 miles from Blackwall.

On the M3 westbound between junctions J1 (Sunbury) and J3 (Woking), there are currently delays of 10 mins due to roadworks .

Expect disruption until 5:00 am on 28 March 2017.

21.95 miles from Blackwall.

On the M25 anti-clockwise between junctions J26 (Waltham Abbey) and J25 (Enfield), expect delays of up to 10 mins at peak times due to roadworks closing three lanes, between 10 pm and 5:30 am, from 9 July 2015 to 6 August 2015.

11.31 miles from Blackwall.

Essex Road at the junction with Cross Street - Restrictions in place to facilitate urgent water works All works now complete and restrictions now removed.

4.51 miles from Blackwall.

High Street (Both Directions) at the junction of Cambridge Road - 2-way temporary traffic signals in operation to facilitate new gas connection now removed.

Traffic is moving well.

13.58 miles from Blackwall.

Dover House Road (Both Directions) at the junction of Upper Richmond Road - There will be stop / go boards in operation due to works in the area.

Works have now finished.

10.88 miles from Blackwall.

Praed Street (All Directions) at the junction of Spring Street - Temporary traffic signals in operation to facilitate water works Traffic is flowing well.

7.58 miles from Blackwall.

High Street Harlesden (All Directions) at the junction of Wendover Road - Faulty traffic signals The traffic signals have been repaired.

10.72 miles from Blackwall.

Walthamstow Avenue (North Circular Road) (Eastbound) On approach to the Crooked Billet Roundabout.

Partial restriction of the off slip towards the roundabout due to an accident.

The collision has been cleared.

All lanes are open.

6.26 miles from Blackwall.

Stamford Hill (All Directions) at the junction of Clapton Common - The traffic signals at this junction are out of order.

Trafic is back to normal

5 miles from Blackwall.

Beckenham Grove (Both Directions) between Scott's Lane and Shortlands Road - road closure to facilitate carriageway resurfacing.

Use other route.

7.73 miles from Blackwall.

Green Street (All Directions) at the junction of Jute Lane - The level crossing barriers are now working.

Fault now repaired.

9.7 miles from Blackwall.

Burlington Road between High Street and Malden Way (Kingston By Pass) - road is closed due to a fire.

Traffic is flowing well.

13.26 miles from Blackwall.

Balham Station Road (Both Directions) between Bedford Hill and Balham High Road - Road closed to facilitate carriageway resurfacing.

Use other routes.

8.24 miles from Blackwall.

Trafalgar Road (Eastbound) at the junction of Park Row - Lane blocked due to a broken down tanker The broken down has now been removed and all lanes are open.

Traffic is flowing well

2.35 miles from Blackwall.

Dulwich Common (Both Directions) at the junction of Ryecotes Mead - All lanes are now open.

All lanes are now open.

Traffic is flowing well in the area.

6.18 miles from Blackwall.

Horn Lane (All Directions) at the junction of Rectory Road - Three-way temporary signals in operation to facilitate works by BT.

Traffic is flowing well in the area.

11.75 miles from Blackwall.

Talgarth Road (Westbound) between Gliddon Road North End Road - Lane one is blocked following a collision.

Traffic is slow moving on approach, expect delays.

9.35 miles from Blackwall.

Sydenham Road (Both Directions) at the junction of Larkbere Road - Reports of an accident at this location.

Traffic is flowing well.

6.42 miles from Blackwall.

Lane closure to facilitate water works There are no reports of congestion in the area.

8.18 miles from Blackwall.

Battersea Park Road (Eastbound) at the junction of Battersea Bridge Road - Lane one is closed due to an emergency gas leak Traffic flows are normal for the time of day.

7.75 miles from Blackwall.

Greenwich High Road (Westbound) at the junction of Greenwich South Street - now clear.

Traffic is moving well.

2.73 miles from Blackwall.

Swakeleys Roundabout - There is a broken down car on the eastbound on slip road to the A40.

All lanes are open.

20.37 miles from Blackwall.

Hampstead Road junction with Harrington Square (Southbound): There is a low defective road sign at this location.

The sign has now been made safe.

6.08 miles from Blackwall.

Clapham Common North Side (Eastbound) at the junction of Long Road .

Road reopened and traffic is moving well.

7.27 miles from Blackwall.

Harleyford Road junction with Kennington Oval (Northbound) There is a collision at this location.

Traffic is moving well.

5.44 miles from Blackwall.

Lordship Lane (All Directions) at the junction of The Roundway - Collision - Lordship Lane is blocked eastbound -Slow moving traffic on approach All roads have reopened.

Traffic is flowing well.

6.87 miles from Blackwall.

Edgware Road West Hendon Broadway junction with Cool Oak Lane (All Directions).

There is a reported collision at this location.

All lanes are open.

11.03 miles from Blackwall.

Finchley Road junction with Goldhurst Terrace (All Directions).

The Traffic lights at this junction are now working.

The Traffic lights at this junction are now working.

7.98 miles from Blackwall.

West Hill (westbound) between Keswick Road and Portinscale Road.

Partial lane one restriction.

All lanes have reopened on West Hill -Works are complete - Traffic flows have returned to normal

10.01 miles from Blackwall.

Marylebone Road (Eastbound) lane one closed due to a broken down van.

Vehicle has been recovered.

7.32 miles from Blackwall.

Threadneedle Street (Eastbound) at the junction of Bishopsgate - A parked lorry is causing an obstruction.

Broken down vehicle has been moved.

Traffic flowing well.

3.62 miles from Blackwall.

East Road at the junction with Brunswick Place - There will be lane restrictions in place due to works.

Works ended

3.85 miles from Blackwall.

Stoke Newington High Street (Both Directions) at the junction of Stoke Newington Church Street.

Traffic lights are working.

Traffic signals are on and working.

Traffic is moving well.

4.5 miles from Blackwall.

Lampton Road (Both Directions) at the junction of Alexandra Road - Temporary Traffic Signals to facilitate junction improvements works Traffic is flowing well.

16.05 miles from Blackwall.

Crownfield Road (All Directions) at the junction of A112 Leyton High Road - Temporary signals in operation due to bus shelter upgrade works.

(Sundays Only)

2.43 miles from Blackwall.

Battersea Rise (Eastbound) at the junction of St John's Road - Lane one closure in place to remove and build a bus shelter.

8.15 miles from Blackwall.

Bowes Road (North Circular Road) (All Directions) - The traffic signals are not operating under central computer control at this junction.

Traffic signals at this location are now on and working.

8.11 miles from Blackwall.

Blackfriars Underpass (Westbound) - broken down vehicle removed.

Vehicle removed.

Traffic is moving well.

4.35 miles from Blackwall.

Knightsbridge (Westbound) at the junction of Wilton Place - Restriction has been lifted.

All lanes are open.

6.81 miles from Blackwall.

Gracechurch Street (Both Directions) at the junction of Lombard Street.

Lane one closed to facilitate repairs to a blockage.

Traffic is flowing well in the area.

3.63 miles from Blackwall.

Blackwall Tunnel Northern Approach (Southbound) at the junction of East India Dock Road - Congestion due cleared.

A12 Southbound traffic flows have returned to normal for the time of day.

0.47 miles from Blackwall.

Angel Road (North Circular Road) (All Directions) at the junction of the Cooks Ferry Flyover - The A406 has been fully reopened eastbound with one lane reopened in the westbound carriageway.

All lanes open with traffic flowing well.

6.85 miles from Blackwall.

Rainham Road North junction with Oxlow Lane (All Directions): The traffic lights are not working at this location.

The signals have now been repaired.

7.32 miles from Blackwall.

Romford Road (Both Directions) between Upton Lane and Green Street - Romford Road has reopened in both directions Romford Road has reopened in both directions, and vehicles that remain parked at the scene are not causing an obstruction.

Traffic is flowing normally.

2.44 miles from Blackwall.

Rotherhithe Tunnel (Northbound) there is a broken down vehicle paritally blocking the road.

Approach with care.

The tunnel has been opened in both directions.

Traffic is light and flowing well in the area.

1.94 miles from Blackwall.

Trinity Road (Both Directions) at the junction of Eatonville Road - Temporary traffic signals will be in place to facilitate water works.

8.85 miles from Blackwall.

Notting Hill Gate (Westbound) at the junction of Campden Hill Road.

Road closure following a collision.

Notting Hill Gate westbound has reopened following the earlier road trafic collision.

Traffic is flowing well in the area.

8.61 miles from Blackwall.

Rotherhithe Tunnel (All Directions) - Tunnel has fully re-opened.

Traffic flows are returning to normal for time of day.

Tunnel has fully re-opened.

Traffic flows are returning to normal for time of day.

2.41 miles from Blackwall.

Aldermans Hill at the junction with Green Lanes - There will be temporary signals in operation due to a crane in the area.

No restrictions in place.

8.4 miles from Blackwall.

Bromley Common (Southbound) at the junction of Crown Lane - There is a collision at this location.

The southbound carriageway is blocked due a collision.

Police are directing traffic.

Expect delays

8.93 miles from Blackwall.

A4 Piccadilly (Both Directions) at the junction of Old Bond Street - Lane restrictions in both directions to facilitate building maintenance works.

Lane restrictions have been cleared.

6.08 miles from Blackwall.

Albert Road junction with Saville Road (All Directions): There is a reported building fire at this location.

All restrictions have now been lifted.

There are no reports of congestion in the area.

2.15 miles from Blackwall.

Ludgate Circus (All Directions) - there is a early morning ceremonial rehearsal taking place involving full road closures from The Aldwych to Mansion House.

All closures have now been lifted, residual delays are clearing from High Holborn area.

4.09 miles from Blackwall.

Cranley Gardens junction with Old Brompton Road (All directions).

Temporary traffic signals in operation to facilitate roadworks No reported delays in the area.

7.94 miles from Blackwall.

Marsham Street (All Directions) at the junction of Page Street - Lane restrictions controlled by three-way temporary traffic signals to facilitate telecomm ducting works.

Restrictions have been removed and all lanes are open.

5.77 miles from Blackwall.

Station Road (All Directions)at the junction of Longlands Road will have various road closures in place for the duration of the works.

7.22 miles from Blackwall.

Limehouse Link Tunnel (Eastbound) - lane one blocked due to broken down car.

Vehicle has now been recovered.

All lanes now reopen.

Traffic flowing well.

1.48 miles from Blackwall.

Nine Elms Lane (Eastbound) at the junction of St George's Wharf - Lane one closed to facilitate the removal of hoarding.

5.9 miles from Blackwall.

Station Road (All Directions) between Valence Avenue and Broomfield Road - Temporary traffic signals in operation to facilitate resurfacing works.

6.53 miles from Blackwall.

Seven Sisters Road (Both Directions) at the junction of A10 Tottenham High Road- The road will be closed overnight to facilitate works.

5.5 miles from Blackwall.

Shooters Hill Road (All Directions) The traffic lights at the junction are now working.

Traffic is moving well.

3.09 miles from Blackwall.

Crooked Billet Underpass (Westbound) - Lane closure overnight to facilitate works The restrictions have been removed.

5.85 miles from Blackwall.

Grosvenor Gardens (All Directions) at the junction of Hobart Place one lane closed northbound and one lane closed eastbound on Hobart Place for works by Thames Water.

All lane restrictions have now been removed on Grosvenor Gardens and Hobart Place.

Traffic flows have returned to normal in the area.

6.47 miles from Blackwall.

SFM Asset: 06/000001Shooters Hill Road (All Directions) at the junction of Prince Of Wales Road - The traffic lights are not working The traffic lights are not working at this junction, approach with care

3.06 miles from Blackwall.

The Parkway (Northbound) at the junction of North Hyde Road - Road is now fully open.

Traffic is moving well.

17.7 miles from Blackwall.

West Hill (Westbound) at the junction of Upper Richmond Road - Lane two blocked due to broken down van.

The broken down van has been recovered and traffic flows ahve returned to normal.

9.69 miles from Blackwall.

Caledonian Road (Southbound) at the junction of Omega Place - Lane restrictions to facilitate water works No restrictions in the area.

Traffic is free flowing.

5.3 miles from Blackwall.

Western Avenue (Eastbound) near the junction with Alperton Lane - Collision - Lane one reopened.

Traffic is flowing well for the time of day.

13.35 miles from Blackwall.

Forty Avenue (All Directions) at the junction of Preston Road.

Lane restrictions in place due to a collision.

The road has reopened.

12.94 miles from Blackwall.

A13 Ripple Road (Eastbound) just after the entry slip from Lodge Avenue - All lanes reopened following a collision.

Traffic flows are normal for the time of day.

5.03 miles from Blackwall.

Clapham Road (Both Directions) at the junction of Lingham Street- there is a collision at this location.

Road reopened - accident cleared

6.22 miles from Blackwall.

A501 Marylebone Road (Both Directions) between Lisson Grove and Seymour Place - All lanes are currently open on Marylebone Road - Traffic is flowing well.

No restrictions currently in place.

7.06 miles from Blackwall.

Archway Road (All Directions) at the junction of Tollhouse Way - Signal upgrade works.

Expect delays when restrictions in operation.

Works are currently confined to the footways and central reservations.

6.69 miles from Blackwall.

Sanderstead Hill (Both Directions) at the junction of Sundown Avenue - Possible lane closures because of a collision.

The road has reopened.

12.89 miles from Blackwall.

High Street (All Directions) at the junction of Homefield Rise - Temporary Traffic Signals to facilitate works Traffic is moving well.

10.69 miles from Blackwall.

Leatherhead Road (Northbound).

Traffic is moving well.

Traffic is moving well.

18.36 miles from Blackwall.

Road closed for telecoms work.

Diversions in operation.

The tunnel remains closed.

Use an alternative route.

3.81 miles from Blackwall.

Euston Road (Westbound) at the junction of Argyle Street - Lane one closed overnight to facilitate subway works.

5.42 miles from Blackwall.

Blackwall Tunnel (Southbound Bore) (Southbound): the broken down motorcycle in the tunnel has been removed.

All congestion resulting from this broken down vehicle has cleared (although tailback remain at the present time - see separate entry).

0.69 miles from Blackwall.

Park Lane (Southbound) at the junction of Hyde Park Corner - Congestion on approach.

Congestion has cleared.

6.6 miles from Blackwall.

All lanes reopened.

Traffic is moving well.

14.34 miles from Blackwall.

The Avenue (Southbound) at the junction of Windmill Drive - Lane one restrictions with single alternate lane traffic controlled by STOP / GO boards for BT works.

Traffic is flowing well in the area.

7.76 miles from Blackwall.

Buckingham Palace Road (All Directions) at the junction of Buckingham Gate - Temporary traffic signals in operation to facilitate road works.

The temporary traffic lights have been removed and traffic flows have returned to normal.

6.25 miles from Blackwall.

Western Avenue (Eastbound) near the junction of Victoria Road lane one blocked by a broken down van.

Vehicle has been recovered.

Traffis is flowing well.

11.33 miles from Blackwall.

Leman Street (Southbound) at the junction of Alie Street - lane closure to facilitate new water connection to property by Thames Water.

No visible restrictions in place.

3.05 miles from Blackwall.

Newham Way (Eastbound) at the junction of Noel Road - All lanes now open.

All lanes now open.

2.03 miles from Blackwall.

Norwood Road (Southbound) at the junction of Robson Road - Waterworks completed.

Traffic is moving well.

7.29 miles from Blackwall.

Lordship Lane (All Directions) at the junction of Bruce Grove - Temporary traffic lights in place due to water works Traffic is flowing well in the area.

6.5 miles from Blackwall.

Oxford Street junction with Davies Street - Single alternate lane traffic controlled by STOP / GO boards or temporary traffic signals to facilitate works Works take place overnight between 2200-0600hrs.

Delays possible between these times.

6.41 miles from Blackwall.

Southend Road (North Circular Road) at the junction of Wadham Road - All lanes are now open.

All lanes are now open.

Traffic is flowing well.

5.71 miles from Blackwall.

Southgate Circus junction with Chase Side(All Directions) There is a collision at this location.

Traffic is flowing well.

9.71 miles from Blackwall.

St Paul's Way (Both Directions) between Burgess Street and Bow Common Lane - Road closure to facilitate roadworks No restrictions in place.

1.01 miles from Blackwall.

Nightingale Lane (Both Directions) between Bolingbroke Grove and Balham Hill - road closed to facilitate carriageway resurfacing.

Expect delays on approach.

8.47 miles from Blackwall.

On Tolworth Broadway (Southbound) at the junction with A3 Tolworth Roundabout, there is a broken down vehicle blocking lane two of three).

Approach with caution.

All lanes have reopened.

Traffic is flowing well.

15.39 miles from Blackwall.

Praed Street (northbound) at the junction of Edgware Road - A broken down van is blocking the middle lane.

Vehicle has been recovered.

7.28 miles from Blackwall.

Wellington Road (Northbound) at the junction of Grove End Road - The traffic signals have been damaged.

Police are partially blocking the junction for safety reasons.

No restrictions in place.

7.59 miles from Blackwall.

Limehouse Link Tunnel (Both Directions) - Closure overnight to facilitate works

1.73 miles from Blackwall.

Heston Road (All Directions) at the junction of Wheatlands - Temporary signals in operation to facilitate resurfacing works.

Expect some delays while the restrictions are in place.

16.11 miles from Blackwall.

Hanover Street (Both Directions) at the junction of Regent Street - Road closure due to a crane operation Hanover Street is open.

6.09 miles from Blackwall.

Sidcup By-pass Road (Eastbound) at the junction of Crittlls Corner - The A20 will be closed between Crittalls Corner and the M25 J3 for overnight works.

8.64 miles from Blackwall.

Purley Way (Northbound) between Whitestone Way and Commerce Way - Lane closure for BT works.

11.06 miles from Blackwall.

Strand (Eastbound) at the junction of Burleigh Street Contractors have attended to manhole.

Restrictions have been removed.

5.16 miles from Blackwall.

High Street (All Directions) at the junction of Grosvenor Road - two way temporary traffic signals will be in operation to facilitate gas works.

There are no restrictions in place at the present time.

Traffic is flowing normally.

9.73 miles from Blackwall.

Limehouse Link Tunnel (Westbound) Lane one is blocked by a broken down vehicle.

The vehicle has now been removed - all lanes are open.

1.5 miles from Blackwall.

High Holborn (All Directions) at the junction of Endell Street - The traffic lights are not working.

Signals have been restored.

5.44 miles from Blackwall.

Gunnersbury Avenue (North Circular Road) (Southbound) at the junction of Power Road - Collision vehicles have now been cleared.

Traffic flowing well in the area.

12.25 miles from Blackwall.

Lavender Hill (All Directions) at the junction of Falcon Road - Four-way temporary signals in operation to facilitate gully repairs.

8.13 miles from Blackwall.

Bromley Common (Southbound) at the junction of Johnson Road - Road now reopened.

Traffic is moving well.

8.89 miles from Blackwall.

Hampstead Road (Southbound) at the junction of William Road - Burst water main at this location has now bee repaired.

Southbound bus lane is now open.

Traffic is free flowing in the area.

5.97 miles from Blackwall.

Watling Avenue (All Directions) at the junction of Orange Hill Road .

Traffic signals have been restored.

Traffic signals have been restored.

12.75 miles from Blackwall.

Hardman Road (All Directions) at the junction of Dupree Road - Lane restrictions to facilitate roadworks All restrictions have been removed - Traffic flows have returned to normal

2.29 miles from Blackwall.

The road will be closed northbound with a contra flow in operation.

City Road is open in both directions - Traffic is light and flowing well

3.76 miles from Blackwall.

Giltspur Street (All Directions) closed to facilitate an event.

No restrictions in place.

4.44 miles from Blackwall.

Marylebone Road (All Directions) at the junction of Park Crescent the traffic signals are not working correctly.

Traffic is flowing normally for the time of day.

6.38 miles from Blackwall.

Great Dover Street (Southbound) at the junction of Silvester Street - Lane one width restriction to facilitate a new supply scheme by UK Power Networks.

Times: Monday to Friday 08:00 - 17:00, Saturday 09:00 - 13:00, Sunday 10:00 - 13:00 Bus lane restriction in place.

Traffic is moving well on approach.

4.14 miles from Blackwall.

Thurston Road (Both Directions) at the junction of Leathwell Road - The road will be closed overnight to facilitate bridge maintenance works.

3.46 miles from Blackwall.

Hammersmith Flyover - lane 2 will be closed in both directions overnight for inspection works.

9.68 miles from Blackwall.

Kymberley Road (One Way System) between Headstone Road and College Road - Road closure to facilitate resurfacing works

15.18 miles from Blackwall.

Goodge Street at the junction of Tottenham Court Road - Lane one (of two) is closed due to a burst water main No visible lane restrictions in place.

5.77 miles from Blackwall.

City Road (All Directions) at the junction of Leonard Street - Temporary traffic signals in operation to facilitate road works.

No restrictions in place - Traffic light and flowing well

3.8 miles from Blackwall.