Location: eastbound between junctions J11 (Warrington) and J12 (M60) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 12:00 and 12:15 on 9 June 2025.
Normal traffic conditions are expected between 12:00 and 12:15 on 9 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 13.06 miles from Longshaw.

Location: clockwise between junctions J13 (Swinton) and J15 (Bolton) .
Due to: Broken down vehicle.
Status : Cleared.
Nearest town: 14.61 miles from Longshaw.

Location: eastbound between junctions J11 (Warrington) and J12 (M60) .
Lane Closures : The hard shoulder and lane 1 are closed.
Due to: Broken down vehicle.
Time To Clear : The event is expected to clear between 12:15 and 12:30 on 9 June 2025.
Normal traffic conditions are expected between 12:15 and 12:30 on 9 June 2025.
Lanes Closed : There is one of three lanes closed.
Nearest town: 11.63 miles from Longshaw.

Location: The junction of the M57 J7 (Liverpool) and the M58 .
Due to: Congestion.
Normal traffic conditions are expected between 13:45 and 14:00 on 9 June 2025.
Nearest town: 9.38 miles from Longshaw.

Location: westbound at the junction with the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 12:30 and 12:45 on 9 June 2025.
Nearest town: 9.39 miles from Longshaw.

Location: slip road to the M60 southbound .
Due to: Congestion.
Normal traffic conditions are expected between 12:15 and 12:30 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.97 miles from Longshaw.

Location: The junction of the A59 and the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 9 June 2025.
Nearest town: 9.37 miles from Longshaw.

Location: The junction of the A59 and the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 11:15 and 11:30 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.38 miles from Longshaw.

Location: clockwise entry slip at junction J12 (Warrington) from M62 Eastbound.
Due to: Congestion.
Normal traffic conditions are expected between 11:00 and 11:15 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.31 miles from Longshaw.

Location: slip road to the M60 southbound .
Due to: Congestion.
Normal traffic conditions are expected between 10:00 and 10:15 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 14.97 miles from Longshaw.

Location: southbound between the junctions with the A5038 and the A5090 .
Due to: Congestion.
Normal traffic conditions are expected between 09:30 and 09:45 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 11.33 miles from Longshaw.

Location: clockwise at junction J12 (Warrington) .
Due to: Congestion.
Normal traffic conditions are expected between 11:00 and 11:15 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Earlier
Due to: Caused by the earlier broken down vehicle.
Nearest town: 14.54 miles from Longshaw.

Location: eastbound at junction J11 (Warrington) .
Due to: Congestion.
Normal traffic conditions are expected between 09:15 and 09:30 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 12.6 miles from Longshaw.

Location: The junction of the A59 and the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 9 June 2025.
Nearest town: 9.37 miles from Longshaw.

Location: northbound between the junctions with the A5038 and the M58 .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.6 miles from Longshaw.

Location: northbound exit slip at junction J4 (Heswall) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 9 June 2025.
Nearest town: 17.17 miles from Longshaw.

Location: westbound exit slip at junction J7 (Prescot) .
Due to: Congestion.
Normal traffic conditions are expected between 08:45 and 09:00 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.51 miles from Longshaw.

Location: northbound between the junctions with the A5038 and the M58 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.6 miles from Longshaw.

Location: The junction of the A59 and the M57 .
Due to: Congestion.
Normal traffic conditions are expected between 08:30 and 08:45 on 9 June 2025.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 9.38 miles from Longshaw.

Location: northbound between junctions J20 (Macclesfield) and J21A (Manchester) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.98 miles from Longshaw.

Location: northbound entry slip at junction J27 (Parbold) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.52 miles from Longshaw.

Location: northbound exit slip at junction J27 (Parbold) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 5.26 miles from Longshaw.

Location: northbound between junctions J26 (Wigan) and J28 (Leyland) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 3.22 miles from Longshaw.

Location: southbound exit slip at junction J5 .
Lane Closures : Lane two is closed.
Due to: Emergency Roadside Equipment Maintenance.
Period : expect disruption until 15:30 on 9 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 9.97 miles from Longshaw.

Location: southbound at junction J21A (Manchester) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency Roadside Equipment Maintenance.
Period : expect disruption until 17:00 on 9 June 2025.
Nearest town: 9.49 miles from Longshaw.

Location: northbound between junctions J20 (Macclesfield) and J21A (Manchester) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.98 miles from Longshaw.

Location: eastbound between junctions J1 (Kirkby) and J3 (Southport) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 6.95 miles from Longshaw.

Location: northbound between junctions J8 and J9 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.13 miles from Longshaw.

Location: northbound between the A5038 and the junction with the M58 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.95 miles from Longshaw.

Location: northbound between the A5038 and the junction with the M58 .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.76 miles from Longshaw.

Location: southbound between junctions J21A (Manchester) and J21 (Warrington) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 10.87 miles from Longshaw.

Location: eastbound entry slip at junction J18 (M60) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.33 miles from Longshaw.

Location: anticlockwise.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.88 miles from Longshaw.

Location: anticlockwise between junctions J9 (Trafford Park) and J8 (Carrington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.42 miles from Longshaw.

Location: anticlockwise exit slip at junction J6 (Sale) .
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.49 miles from Longshaw.

Location: anticlockwise between junctions J8 (Carrington) and J5 (Wythenshawe) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.67 miles from Longshaw.

Location: anticlockwise entry slip at junction J8 (Carrington) .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.83 miles from Longshaw.

Location: anticlockwise entry slip at junction J6 (Sale) .
Lane Closures : Lane one will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.75 miles from Longshaw.

Location: anticlockwise exit slip at junction J5 (Wythenshawe) .
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.85 miles from Longshaw.

Location: southbound between junctions J30 (Manchester) and J29 (Burnley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.26 miles from Longshaw.

Location: northbound at junction J29 (Burnley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.19 miles from Longshaw.

Location: southbound between junctions J3 and J1 to A580.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 14 June 2025.
Nearest town: 13.75 miles from Longshaw.

Location: eastbound between junctions J7 and J6 (Hale) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.24 miles from Longshaw.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 9.1 miles from Longshaw.

Location: northbound between junctions J6 and J8 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 05:00 on 10 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.56 miles from Longshaw.

Location: northbound between junctions J26 (Wigan) and J27 (Parbold) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 July 2025.
Nearest town: 4.37 miles from Longshaw.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 July 2025.
Nearest town: 1.81 miles from Longshaw.

Location: westbound between junctions M6 and J5 (Skelmersdale) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 23:59 on 31 July 2025.
Nearest town: 1.76 miles from Longshaw.

Location: anticlockwise between junctions J17 (Prestwich) and J18 (Leeds) .
Due to: Roadworks scheme.
Period : from 21:00 on 8 June 2025 to 06:00 on 28 June 2025.
Nearest town: 17.97 miles from Longshaw.

Location: clockwise between junction J17 (Prestwich) and the M66 .
Due to: Roadworks scheme.
Period : from 21:00 on 6 June 2025 to 06:00 on 28 June 2025.
Nearest town: 18.02 miles from Longshaw.

Location: southbound exit slip at junction J4 (Heswall) .
Due to: Roadworks scheme.
Period : from 20:04 on 5 June 2025 to 06:00 on 19 September 2025.
Nearest town: 17.14 miles from Longshaw.

Location: northbound between junctions J5 (Bebington) and J2 (West Kirby) .
Due to: Roadworks scheme.
Period : from 20:10 on 2 June 2025 to 06:00 on 19 September 2025.
Nearest town: 17.3 miles from Longshaw.

Location: southbound exit slip at junction J1 (Huyton) to roundabout.
Due to: Emergency Roadworks.
Period : expect disruption until 05:00 on 19 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.36 miles from Longshaw.

Location: eastbound entry slip at junction J6 (Liverpool) from roundabout.
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 31 December 2025.
Nearest town: 8.5 miles from Longshaw.

Location: southbound exit slip at junction J1 (Huyton) to roundabout.
Lane Closures : Lane one is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 31 October 2026.
Lanes Closed : There is one of two lanes closed.
Nearest town: 8.36 miles from Longshaw.

Location: northbound between the A5090 and the junction with the M58 .
Lane Closures : Lane two is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 15:30 on 9 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.77 miles from Longshaw.

Location: southbound between the M57 and the junction with the A5090 .
Lane Closures : Lane two is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 15:30 on 9 June 2025.
Lanes Closed : There is one of two lanes closed.
Nearest town: 10.21 miles from Longshaw.

Location: eastbound between junctions J12 (Runcorn) and J11 (Runcorn) .
Due to: Roadworks scheme.
Period : from 20:00 on 5 June 2025 to 06:00 on 28 June 2025.
Nearest town: 13.78 miles from Longshaw.

Location: southbound between junctions J6 (Kirkby) and J1 (Huyton) .
Due to: Roadworks scheme.
Period : from 20:00 on 2 June 2025 to 06:00 on 29 June 2025.
Nearest town: 7.22 miles from Longshaw.

Location: westbound at junction J9 (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 1 August 2025.
Nearest town: 14.46 miles from Longshaw.

Location: southbound between junctions J4 (Knowsley) and J1 (Huyton) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 7.14 miles from Longshaw.

Location: southbound between junctions J5 (St Helens) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 7.42 miles from Longshaw.

Location: southbound between junctions J7 (Liverpool) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 9.36 miles from Longshaw.

Location: northbound between junctions J4 (Knowsley) and J5 (St Helens) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 7.16 miles from Longshaw.

Location: northbound between junctions J1 (Huyton) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.39 miles from Longshaw.

Location: northbound entry slip at junction J1 (Huyton) from roundabout.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.56 miles from Longshaw.

Location: northbound between junctions J4 (Knowsley) and J7 (Liverpool) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 7.5 miles from Longshaw.

Location: southbound between junctions J2 (Prescot) and J1 (Huyton) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 8.24 miles from Longshaw.

Location: northbound entry slip at junction J2 from A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 14.82 miles from Longshaw.

Location: southbound exit slip at junction J1 to A580.
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 14.08 miles from Longshaw.

Location: southbound between the M6 and junction J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 15.68 miles from Longshaw.

Location: northbound between junctions J2 and J9 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 13.87 miles from Longshaw.

Location: northbound between junction J9 and the M6 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 14.47 miles from Longshaw.

Location: southbound between the M6 and junction J2 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 31 March 2026.
Nearest town: 15.5 miles from Longshaw.

Location: westbound exit slip at junction J6 (Liverpool) to roundabout.
Due to: Emergency barrier repairs.
Period : from 05:00 on 27 January 2025 to 06:00 on 19 December 2025.
Lanes Closed : All lanes are closed.
Nearest town: 8.39 miles from Longshaw.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 00:00 on 29 June 2025.
Nearest town: 15.04 miles from Longshaw.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 June 2025.
Nearest town: 15.04 miles from Longshaw.

Location: eastbound between junctions J1 (M6) and J2 (Manchester) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 14.3 miles from Longshaw.

Location: eastbound between junctions J1A (Preston) and J1 (M6) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 14.37 miles from Longshaw.

Location: westbound between junctions J4 (Blackburn) and J3 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.34 miles from Longshaw.

Location: eastbound between junctions J4 (Blackburn) and J5 (Shadsworth) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 17.44 miles from Longshaw.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 15.89 miles from Longshaw.

Location: eastbound between junctions J2 (Manchester) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 14.66 miles from Longshaw.

Location: westbound between junctions J4 (Blackburn) and J1A (Preston) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.5 miles from Longshaw.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 18.46 miles from Longshaw.

Location: eastbound between junctions J3 (Blackburn) and J4 (Blackburn) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 March 2026.
Nearest town: 16.6 miles from Longshaw.

Location: northbound at junction J1 (Huyton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.53 miles from Longshaw.

Location: northbound between junctions J1 (Huyton) and J2 (Prescot) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.39 miles from Longshaw.

Location: northbound between junctions J1 (Huyton) and J2 (Prescot) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 11 June 2025 to 05:00 on 12 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.2 miles from Longshaw.

Location: northbound entry slip at junction J1 (Huyton) from roundabout.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.56 miles from Longshaw.

Location: southbound exit slip at junction J5 .
Lane Closures : Lane two will be closed.
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 05:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 9.97 miles from Longshaw.

Location: southbound exit slip at junction J21 (Warrington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.57 miles from Longshaw.

Location: southbound at junction J21A (Manchester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.89 miles from Longshaw.

Location: southbound between junctions J22 (Newton le Willows) and J21A (Manchester) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.41 miles from Longshaw.

Location: eastbound exit slip at junction J10 (M6) .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.82 miles from Longshaw.

Location: southbound entry slip at junction J21A (Manchester) from M62 Eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.89 miles from Longshaw.

Location: westbound at junction J10 (M6) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.54 miles from Longshaw.

Location: southbound entry slip at junction J21A (Manchester) from M62 Westbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.48 miles from Longshaw.

Location: northbound exit slip at junction J21 (Warrington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 June 2025 to 29 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 July 2025 to 6 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.08 miles from Longshaw.

Location: southbound between junctions J21A (Manchester) and J20 (Macclesfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 July 2025 to 5 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.11 miles from Longshaw.

Location: southbound entry slip at junction J21 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 12 June 2025 to 06:00 on 13 June 2025.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 16 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.9 miles from Longshaw.

Location: southbound between junctions J21A (Manchester) and J20 (Macclesfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 12 June 2025 to 06:00 on 13 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.11 miles from Longshaw.

Location: northbound between junctions J20 (Macclesfield) and J21 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.99 miles from Longshaw.

Location: northbound between junctions J20 (Macclesfield) and J21 (Warrington) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 June 2025 to 29 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 July 2025 to 6 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.99 miles from Longshaw.

Location: southbound between junctions J21A (Manchester) and J20 (Macclesfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.06 miles from Longshaw.

Location: southbound at junction J21A (Manchester) .
Due to: Emergency roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 08:00 on 10 June 2025 to 17:00 on 10 June 2025.
Nearest town: 9.49 miles from Longshaw.

Location: northbound at junction J20 (Macclesfield) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 14.21 miles from Longshaw.

Location: northbound at junction J20 (Macclesfield) .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.45 miles from Longshaw.

Location: eastbound between junctions J7 (Prescot) and J8 (Warrington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 05:00 on 17 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.29 miles from Longshaw.

Location: clockwise between junctions J13 (Swinton) and J15 (Bolton) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 00:30 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.27 miles from Longshaw.

Location: southbound between junctions J6 and J5 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.54 miles from Longshaw.

Location: northbound between the junctions with the A565 and the A567 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.41 miles from Longshaw.

Location: eastbound between junctions J8 (Warrington) and J9 (Warrington) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 05:00 on 17 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.35 miles from Longshaw.

Location: eastbound entry slip at BurtonWood Services.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 05:00 on 17 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.54 miles from Longshaw.

Location: eastbound exit slip at junction J9 (Warrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 05:00 on 17 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.98 miles from Longshaw.

Location: eastbound exit slip at BurtonWood Services.
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 05:00 on 17 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.45 miles from Longshaw.

Location: clockwise between junctions J6 (Sale) and J8 (Carrington) through lane.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.54 miles from Longshaw.

Location: clockwise exit slip at junction J6 (Sale) .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.81 miles from Longshaw.

Location: clockwise between junctions J5 (Wythenshawe) and J6 (Sale) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.19 miles from Longshaw.

Location: eastbound between junctions J7 (Prescot) and J8 (Warrington) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 14 June 2025 to 05:00 on 15 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.54 miles from Longshaw.

Location: southbound at junction J2 from M61 to A580.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.08 miles from Longshaw.

Location: southbound at junction J2 from A666 to A580.
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.03 miles from Longshaw.

Location: eastbound between junctions J7 and J6 (Hale) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 June 2025 to 05:00 on 15 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.19 miles from Longshaw.

Location: eastbound at junction J7 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 June 2025 to 05:00 on 15 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.56 miles from Longshaw.

Location: westbound between junctions J6 (Hale) and J8 .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 14 June 2025 to 05:00 on 15 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 19.17 miles from Longshaw.

Location: northbound between junctions J2 (Bury) and J1 (Ramsbottom) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.55 miles from Longshaw.

Location: northbound between junctions J2 (Bury) and J1 (Ramsbottom) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.29 miles from Longshaw.

Location: northbound between junctions J3 (Radcliffe) and J2 (Bury) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.18 miles from Longshaw.

Location: westbound between junctions J8 (Warrington) and J7 (Prescot) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 14 June 2025 to 05:00 on 15 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.49 miles from Longshaw.

Location: westbound exit slip at junction J7 (Prescot) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 14 June 2025 to 05:00 on 15 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.44 miles from Longshaw.

Location: southbound between the A56 and junction J2 (Bury) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.98 miles from Longshaw.

Location: southbound entry slip at junction J1 (Ramsbottom) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.32 miles from Longshaw.

Location: southbound exit slip at junction J2 (Bury) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.53 miles from Longshaw.

Location: eastbound between junctions J8 (Warrington) and J9 (Warrington) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 14 June 2025 to 05:00 on 15 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.48 miles from Longshaw.

Location: northbound at junction J2 (West Kirby) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.98 miles from Longshaw.

Location: northbound between junctions J2 (West Kirby) and J1 (Bidston) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.86 miles from Longshaw.

Location: westbound entry slip at junction J8 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 14 June 2025 to 05:00 on 15 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.46 miles from Longshaw.

Location: northbound between junction J2 (Bury) and the A56 .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.61 miles from Longshaw.

Location: southbound between junctions A666 and J2 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.94 miles from Longshaw.

Location: southbound entry slip at junction .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.1 miles from Longshaw.

Location: southbound entry slip at junction J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:00 on 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.01 miles from Longshaw.

Location: eastbound entry slip at junction J15 (Ellesmere Port) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:00 on 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.95 miles from Longshaw.

Location: northbound between junctions J11 (Runcorn) and J10 (Elton) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:00 on 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.89 miles from Longshaw.

Location: southbound entry slip at junction J10 (Elton) .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:00 on 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.35 miles from Longshaw.

Location: southbound between junctions J9 (Ellesmere Port) and J10 (Elton) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:00 on 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.79 miles from Longshaw.

Location: northbound at junction J10 (Elton) .
Lane Closures : Lane two will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:00 on 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.48 miles from Longshaw.

Location: southbound between junctions J10 (Elton) and J12 (Chester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 13 June 2025 to 05:00 on 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.16 miles from Longshaw.

Location: eastbound between junctions J1 (Kirkby) and J3 (Southport) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 13 June 2025 to 15 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.48 miles from Longshaw.

Location: eastbound between the M57 and junction J1 (Kirkby) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 13 June 2025 to 15 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.88 miles from Longshaw.

Location: westbound at junction J1 (Kirkby) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 13 June 2025 to 15 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.29 miles from Longshaw.

Location: westbound between junctions J3 (Southport) and J1 (Kirkby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 13 June 2025 to 15 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.2 miles from Longshaw.

Location: westbound between junctions J12 (Runcorn) and J14 (Helsby) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.21 miles from Longshaw.

Location: northbound between the A5090 and the junction with the A5038 .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 14 June 2025 to 05:00 on 15 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.57 miles from Longshaw.

Location: northbound between the A567 and the junction with the A5038 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 07:00 from 13 June 2025 to 15 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.86 miles from Longshaw.

Location: northbound between the junctions with the A565 and the A567 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 07:00 from 13 June 2025 to 15 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.41 miles from Longshaw.

Location: southbound at the junction with the A567 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 07:00 from 13 June 2025 to 15 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.88 miles from Longshaw.

Location: southbound between the junctions with the A5090 and the A567 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 07:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.83 miles from Longshaw.

Location: southbound between the A5038 and the junction with the A565 .
Lane Closures : Lane one will be closed.
Due to: Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 07:00 from 14 June 2025 to 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 11.58 miles from Longshaw.

Location: anticlockwise exit slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 12 June 2025 to 06:00 on 13 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.21 miles from Longshaw.

Location: clockwise exit slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.73 miles from Longshaw.

Location: southbound between junctions J3 (Radcliffe) and J4 (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 19.05 miles from Longshaw.

Location: anticlockwise entry slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : From 23:59 on 21 June 2025 to 06:00 on 22 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2025 to 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.97 miles from Longshaw.

Location: anticlockwise entry slip at junction J17 (Prestwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 17.97 miles from Longshaw.

Location: clockwise entry slip at junction J17 (Prestwich) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 21 June 2025.
Schedule : From 23:59 on 21 June 2025 to 06:00 on 22 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2025 to 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.02 miles from Longshaw.

Location: anticlockwise exit slip at junction J18 (Leeds) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.35 miles from Longshaw.

Location: southbound at junction J4 (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.16 miles from Longshaw.

Location: northbound entry slip at junction J4 (Manchester) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2025 to 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.19 miles from Longshaw.

Location: southbound between junctions J3 (Radcliffe) and J4 (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 19.05 miles from Longshaw.

Location: slip road to the M66 northbound .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2025 to 24 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.14 miles from Longshaw.

Location: clockwise between junctions J15 (Bolton) and J18 (Leeds) .
Lane Closures : Lanes 3 and 4 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 9 June 2025 to 06:00 on 10 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.93 miles from Longshaw.

Location: clockwise between junctions J15 (Bolton) and J18 (Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 22 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 June 2025 to 26 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.92 miles from Longshaw.

Location: clockwise between junctions J15 (Bolton) and J18 (Leeds) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2025 to 24 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 15.93 miles from Longshaw.

Location: eastbound at junction J18 (M60) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 June 2025 to 24 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.01 miles from Longshaw.

Location: westbound entry slip at junction J2 (Eccles) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Schedule : From 23:59 on 26 June 2025 to 06:00 on 27 June 2025.
Schedule : From 21:00 on 27 June 2025 to 06:00 on 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.31 miles from Longshaw.

Location: westbound between junctions J3 (A57) and J2 (Eccles) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 25 June 2025 to 06:00 on 26 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.47 miles from Longshaw.

Location: westbound at junction J2 (Eccles) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 25 June 2025 to 06:00 on 26 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 16.65 miles from Longshaw.

Location: westbound between junctions J2 (Eccles) and J1 (M60/M62) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 23:59 on 25 June 2025 to 06:00 on 26 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.04 miles from Longshaw.

Location: southbound entry slip at junction J28 (Leyland) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.86 miles from Longshaw.

Location: southbound exit slip at junction J28 (Leyland) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.8 miles from Longshaw.

Location: westbound exit slip at junction J1 (M6) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:00 on 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.29 miles from Longshaw.

Location: southbound entry slip at junction J29 (Burnley) from M65 West.
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.24 miles from Longshaw.

Location: southbound entry slip at junction J29 (Burnley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 12 June 2025 to 05:00 on 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 14.23 miles from Longshaw.

Location: eastbound between junctions J11 (Warrington) and J12 (M60) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.75 miles from Longshaw.

Location: northbound between junctions J8 and J9 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.14 miles from Longshaw.

Location: northbound between junctions J2 (Bury) and J1 (Ramsbottom) .
Lane Closures : Lane two will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.63 miles from Longshaw.

Location: northbound between junction J1 (Ramsbottom) and the A56 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 19.39 miles from Longshaw.

Location: southbound between junctions J9 and J8 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.83 miles from Longshaw.

Location: northbound between junctions J6 (Kirkby) and J7 (Liverpool) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 7.98 miles from Longshaw.

Location: southbound between junctions J7 (Liverpool) and J6 (Kirkby) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 12 June 2025 to 06:00 on 13 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.92 miles from Longshaw.

Location: westbound between junctions J3 (Southport) and J1 (Kirkby) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 05:00 on 11 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 5.66 miles from Longshaw.

Location: westbound between junction J1 (Kirkby) and the M57 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 10 June 2025 to 05:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.29 miles from Longshaw.

Location: eastbound between junctions J11 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 June 2025 to 06:00 on 10 June 2025.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Schedule : From 20:00 on 16 June 2025 to 06:00 on 17 June 2025.
Schedule : From 20:00 on 21 June 2025 to 06:00 on 22 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.36 miles from Longshaw.

Location: eastbound between junctions J11 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.33 miles from Longshaw.

Location: eastbound entry slip at junction J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2025 to 06:00 on 18 June 2025.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.21 miles from Longshaw.

Location: eastbound between junctions J12 (Runcorn) and J11 (Runcorn) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.91 miles from Longshaw.

Location: eastbound between junctions J12 (Runcorn) and J11 (Runcorn) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : From 20:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 June 2025 to 28 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.78 miles from Longshaw.

Location: eastbound between junctions J12 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 17 June 2025 to 06:00 on 18 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.59 miles from Longshaw.

Location: eastbound between junctions J12 (Runcorn) and J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2025 to 13 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.59 miles from Longshaw.

Location: eastbound entry slip at junction J11 (Runcorn) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2025 to 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.21 miles from Longshaw.

Location: westbound between junctions J10 (Northwich) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : From 22:00 on 2 July 2025 to 06:00 on 3 July 2025.
Schedule : From 20:00 on 3 July 2025 to 06:00 on 4 July 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 July 2025 to 10 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.6 miles from Longshaw.

Location: westbound between junctions J10 (Northwich) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.5 miles from Longshaw.

Location: westbound between junctions J10 (Northwich) and J11 (Runcorn) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 13 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 18 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.83 miles from Longshaw.

Location: westbound entry slip at junction J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 13 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 18 June 2025.
Schedule : From 21:00 on 4 July 2025 to 06:00 on 5 July 2025.
Schedule : From 21:00 on 7 July 2025 to 06:00 on 8 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.85 miles from Longshaw.

Location: westbound between junctions J9 (Preston) and J10 (Northwich) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2025 to 13 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 June 2025 to 18 June 2025.
Schedule : From 20:00 on 23 June 2025 to 06:00 on 24 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.88 miles from Longshaw.

Location: eastbound entry slip at junction J12 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.77 miles from Longshaw.

Location: westbound between junctions J9 (Preston) and J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 19 June 2025 to 21 June 2025.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 June 2025 to 26 June 2025.
Schedule : From 20:00 on 4 July 2025 to 06:00 on 5 July 2025.
Schedule : From 20:00 on 7 July 2025 to 06:00 on 8 July 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.88 miles from Longshaw.

Location: eastbound exit slip at junction J11 (Runcorn) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 19 June 2025 to 06:00 on 20 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.33 miles from Longshaw.

Location: eastbound exit slip at junction J10 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 18 June 2025 to 06:00 on 19 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 20 June 2025 to 22 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.74 miles from Longshaw.

Location: westbound exit slip at junction J11 (Runcorn) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 06:00 on 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.24 miles from Longshaw.

Location: westbound exit slip at junction J11 (Runcorn) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 13 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 18 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : From 22:00 on 2 July 2025 to 06:00 on 3 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 13.24 miles from Longshaw.

Location: southbound exit slip at junction J1 to A580.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 08:00 on 12 June 2025 to 16:00 on 12 June 2025.
Nearest town: 14.39 miles from Longshaw.

Location: eastbound between junctions J7 (Prescot) and J8 (Warrington) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.29 miles from Longshaw.

Location: westbound between junctions J10 (M6) and J9 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.77 miles from Longshaw.

Location: eastbound at junction J9 (Warrington) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 7.98 miles from Longshaw.

Location: westbound at junction J9 (Warrington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.28 miles from Longshaw.

Location: westbound entry slip at junction J9 (Warrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.13 miles from Longshaw.

Location: eastbound between junctions J8 (Warrington) and J9 (Warrington) .
Lane Closures : Lane three will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 7.48 miles from Longshaw.

Location: southbound between junctions J11 (Runcorn) and J12 (Chester) .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.96 miles from Longshaw.

Location: westbound exit slip at junction J8 (Warrington) .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:00 from 11 June 2025 to 13 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 7.49 miles from Longshaw.

Location: southbound between the junctions with the M56 and the M6 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 11 June 2025 to 05:00 on 12 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.96 miles from Longshaw.

Location: southbound exit slip at junction J21 (Warrington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.57 miles from Longshaw.

Location: eastbound exit slip at junction J10 (M6) .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.82 miles from Longshaw.

Location: southbound at junction J21A (Manchester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 8.89 miles from Longshaw.

Location: southbound between junctions J22 (Newton le Willows) and J21A (Manchester) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 8.41 miles from Longshaw.

Location: southbound entry slip at junction J21A (Manchester) from M62 Eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.89 miles from Longshaw.

Location: westbound at junction J10 (M6) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 9.54 miles from Longshaw.

Location: southbound entry slip at junction J21A (Manchester) from M62 Westbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 9.48 miles from Longshaw.

Location: northbound exit slip at junction J21 (Warrington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 27 June 2025 to 29 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 July 2025 to 6 July 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 12.08 miles from Longshaw.

Location: southbound between junctions J21A (Manchester) and J20 (Macclesfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 June 2025 to 06:00 on 21 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 June 2025 to 26 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 2 July 2025 to 5 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.11 miles from Longshaw.

Location: southbound entry slip at junction J21 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 12 June 2025 to 06:00 on 13 June 2025.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 16 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 25 June 2025 to 28 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 11.9 miles from Longshaw.

Location: southbound between junctions J21A (Manchester) and J20 (Macclesfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 12 June 2025 to 06:00 on 13 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 16 June 2025 to 20 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 June 2025 to 28 June 2025.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 June 2025 to 2 July 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.11 miles from Longshaw.

Location: northbound between junctions J20 (Macclesfield) and J21 (Warrington) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 12.99 miles from Longshaw.

Location: northbound between junctions J20 (Macclesfield) and J21 (Warrington) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 28 June 2025.
Lanes Closed : There are three of four lanes closed.
Nearest town: 12.99 miles from Longshaw.

Location: southbound between junctions J21A (Manchester) and J20 (Macclesfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 13 June 2025 to 05:00 on 14 June 2025.
Schedule : From 21:00 on 15 June 2025 to 05:00 on 16 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 10.06 miles from Longshaw.

Location: northbound at junction J1 (Huyton) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 8.53 miles from Longshaw.

Location: northbound between junctions J1 (Huyton) and J2 (Prescot) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.39 miles from Longshaw.

Location: northbound entry slip at junction J1 (Huyton) from roundabout.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 12 June 2025 to 14 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.56 miles from Longshaw.

Location: clockwise entry slip at junction J11 (Irlam) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 10 June 2025 to 05:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.64 miles from Longshaw.

Location: clockwise between junctions J10 (Trafford Park) and J12 (Warrington) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 10 June 2025 to 05:00 on 11 June 2025.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.55 miles from Longshaw.

Location: clockwise entry slip at junction J10 (Trafford Park) .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 10 June 2025 to 05:00 on 11 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.48 miles from Longshaw.

Location: southbound between junctions J8 and J6 .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 10 June 2025 to 12 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.32 miles from Longshaw.

Location: eastbound between junctions J1 (M60/M62) and J2 (Eccles) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 10 June 2025 to 12 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 14.82 miles from Longshaw.

Location: clockwise exit slip at junction J6 (Sale) .
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 18.81 miles from Longshaw.

Location: clockwise at junction J6 (Sale) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 June 2025 to 12 June 2025.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 18.67 miles from Longshaw.

Location: northbound between junctions J2 (Prescot) and J4 (Knowsley) .
Lane Closures : The hard shoulder is closed.
Due to: Barrier repairs.
Period : expect disruption until 18:00 on 9 June 2025.
Nearest town: 7.26 miles from Longshaw.

Location: eastbound at junction J5 (Shadsworth) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 13 June 2025.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 18.4 miles from Longshaw.

Location: westbound entry slip at junction J5 (Shadsworth) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Nearest town: 18.61 miles from Longshaw.

Location: eastbound entry slip at junction J5 (Shadsworth) .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 13 June 2025.
Nearest town: 18.65 miles from Longshaw.

Location: eastbound between junctions J5 (Shadsworth) and J6 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 9 June 2025 to 13 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.46 miles from Longshaw.

Location: westbound between junctions J5 (Shadsworth) and J4 (Blackburn) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 12 June 2025 to 14 June 2025.
Schedule : From 21:00 on 16 June 2025 to 06:00 on 17 June 2025.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.69 miles from Longshaw.

Location: northbound entry slip at junction J21A (Manchester) from M62 eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.89 miles from Longshaw.

Location: eastbound exit slip at junction J10 (M6) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.82 miles from Longshaw.

Location: westbound between junctions J10 (M6) and J9 (Warrington) .
Lane Closures : Lane four will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 8.97 miles from Longshaw.

Location: southbound entry slip at junction J21A (Manchester) from M62 Eastbound.
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.89 miles from Longshaw.

Location: eastbound entry slip at junction J9 (Warrington) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 9 June 2025 to 11 June 2025.
Lanes Closed : All lanes will be closed.
Nearest town: 8.11 miles from Longshaw.
