Location: southbound at junction J36 (Barnsley) .
Due to: Police incident.
Time To Clear : The event is expected to clear between 19:00 and 19:15 on 23 April 2024.
Normal traffic conditions are expected between 19:00 and 19:15 on 23 April 2024.
Delay : There are currently delays of 30 minutes against expected traffic.
Lanes Closed : There are lane closures.
Nearest town: 6.12 miles from Wincobank.
Location: northbound at junction J36 (Barnsley) .
Due to: Police incident.
Time To Clear : The event is expected to clear between 19:15 and 19:30 on 23 April 2024.
Normal traffic conditions are expected between 19:15 and 19:30 on 23 April 2024.
Delay : There are currently delays of 50 minutes against expected traffic.
Lanes Closed : There are lane closures.
Nearest town: 5.81 miles from Wincobank.
Location: westbound between the junctions with the M1 and the A61 .
Due to: Congestion.
Normal traffic conditions are expected between 18:30 and 18:45 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.12 miles from Wincobank.
Location: southbound between the junctions with the M62 and the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 18:45 and 19:00 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.37 miles from Wincobank.
Location: westbound between the junctions with the M1 and the A61 .
Due to: Congestion.
Normal traffic conditions are expected between 18:15 and 18:30 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.12 miles from Wincobank.
Location: northbound between the junctions with the A616 and the M1 .
Due to: Congestion.
Normal traffic conditions are expected between 18:15 and 18:30 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 5.96 miles from Wincobank.
Location: northbound between junctions J34 (Meadowhall) and J35 (Rotherham) .
Due to: Congestion.
Normal traffic conditions are expected between 18:00 and 18:15 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 0.96 miles from Wincobank.
Location: southbound between junctions J37 (Barnsley) and J36 (Barnsley) .
Due to: Congestion.
Normal traffic conditions are expected between 17:45 and 18:00 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 7.76 miles from Wincobank.
Location: northbound between the junctions with the A6178 and the A6109 .
Due to: Congestion.
Normal traffic conditions are expected between 17:45 and 18:00 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 0.97 miles from Wincobank.
Location: northbound between junctions J34 (Meadowhall) and J36 (Barnsley) .
Due to: Congestion.
Normal traffic conditions are expected between 18:00 and 18:15 on 23 April 2024.
Cause : Police incident.
Delay : There are currently delays of 50 minutes against expected traffic.
Nearest town: 3.14 miles from Wincobank.
Location: southbound between junctions J37 (Barnsley) and J36 (Barnsley) .
Due to: Congestion.
Normal traffic conditions are expected between 18:00 and 18:15 on 23 April 2024.
Cause : Police incident.
Delay : There are currently delays of 30 minutes against expected traffic.
Nearest town: 8.36 miles from Wincobank.
Location: southbound between the junctions with the M62 and the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 17:15 and 17:30 on 23 April 2024.
Nearest town: 19.56 miles from Wincobank.
Location: northbound between the junctions with the A6178 and the A6109 .
Due to: Congestion.
Normal traffic conditions are expected between 17:15 and 17:30 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 0.97 miles from Wincobank.
Location: southbound between the junctions with the A6178 and the A6178 .
Due to: Congestion.
Normal traffic conditions are expected between 16:30 and 16:45 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 1 miles from Wincobank.
Location: southbound between the junctions with the M62 and the A639 .
Due to: Congestion.
Normal traffic conditions are expected between 14:45 and 15:00 on 23 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 19.56 miles from Wincobank.
Location: northbound between the A639 and the junction with the M62 .
Due to: Roadworks.
Period : from 20:12 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 16.27 miles from Wincobank.
Location: northbound entry slip at junction J39 (Denby Dale) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 16.84 miles from Wincobank.
Location: northbound between junctions J40 (Wakefield) and J41 (Wakefield) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 19.18 miles from Wincobank.
Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 18.62 miles from Wincobank.
Location: northbound entry slip at junction J40 (Wakefield) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.34 miles from Wincobank.
Location: southbound entry slip at junction J40 (Wakefield) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.25 miles from Wincobank.
Location: southbound exit slip at junction J39 (Denby Dale) .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.06 miles from Wincobank.
Location: northbound between junctions J40 (Wakefield) and J41 (Wakefield) .
Due to: Roadworks scheme.
Period : from 20:10 on 23 April 2024 to 06:00 on 24 April 2024.
Nearest town: 19.34 miles from Wincobank.
Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Due to: Roadworks scheme.
Period : from 20:10 on 23 April 2024 to 06:00 on 24 April 2024.
Nearest town: 19.25 miles from Wincobank.
Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Lane Closures : Lanes 1, 2 and 3 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There are three of four lanes closed.
Nearest town: 12.5 miles from Wincobank.
Location: southbound between junctions J30 (Chesterfield) and J29A (Markham Vale) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There are two of four lanes closed.
Nearest town: 11.72 miles from Wincobank.
Location: northbound exit slip at junction J29A (Markham Vale) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.7 miles from Wincobank.
Location: northbound entry slip at junction J29A (Markham Vale) .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 12.15 miles from Wincobank.
Location: southbound entry slip at junction J30 (Chesterfield) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 10.47 miles from Wincobank.
Location: northbound between junctions J38 (Huddersfield) and J39 (Denby Dale) .
Due to: Roadworks scheme.
Period : from 19:41 on 22 April 2024 to 06:00 on 31 May 2024.
Nearest town: 16.01 miles from Wincobank.
Location: southbound between junctions J5 (Scunthorpe) and J4 (Doncaster) .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 20:00 on 23 April 2024 to 05:00 on 24 April 2024.
Nearest town: 19.28 miles from Wincobank.
Location: southbound exit slip at junction J4 (Doncaster) .
Due to: Litter Clearance.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 19.17 miles from Wincobank.
Location: southbound between junctions J37 (Barnsley) and J36 (Barnsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadside Drains Works.
Period : expect disruption until 15:00 on 23 April 2024.
Nearest town: 8.25 miles from Wincobank.
Location: The A1M southbound between junctions J38 and J37 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 22 April 2024 to 24 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.5 miles from Wincobank.
Location: The A1M northbound between junctions J37 and J38 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.72 miles from Wincobank.
Location: The A1M southbound exit slip at junction J37 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.79 miles from Wincobank.
Location: The A1M southbound at junction J38 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.52 miles from Wincobank.
Location: southbound between the junctions with the A639 and the A638 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.63 miles from Wincobank.
Location: southbound between the A639 and the junction with the A638 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 23 April 2024 to 06:00 on 24 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.9 miles from Wincobank.
Location: northbound between junctions J4 (Doncaster) and J5 (Scunthorpe) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 19.91 miles from Wincobank.
Location: northbound at junction J34 (Meadowhall) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency roadworks.
Period : expect disruption until 06:00 on 12 May 2024.
Nearest town: 1.34 miles from Wincobank.
Location: eastbound between the A628 and the junction with the A629 .
Due to: Roadworks scheme.
Period : from 20:07 on 19 April 2024 to 06:00 on 8 May 2024.
Nearest town: 12.07 miles from Wincobank.
Location: westbound between the A61 and the junction with the A628 .
Due to: Roadworks scheme.
Period : from 20:07 on 19 April 2024 to 06:00 on 9 May 2024.
Nearest town: 5.65 miles from Wincobank.
Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Due to: Roadworks scheme.
Period : from 20:08 on 8 April 2024 to 06:00 on 13 May 2024.
Nearest town: 12.5 miles from Wincobank.
Location: southbound exit slip at junction J33 (Sheffield) .
Due to: Road repairs.
Period : from 10:24 on 8 February 2024 to 06:00 on 10 June 2024.
Nearest town: 3.29 miles from Wincobank.
Location: northbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane two is closed.
Due to: Road repairs.
Period : expect disruption until 06:00 on 10 June 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 3.72 miles from Wincobank.
Location: southbound between the M62 and the junction with the A639 .
Due to: Roadworks scheme.
Period : from 13:12 on 29 January 2024 to 06:00 on 31 August 2024.
Nearest town: 19.66 miles from Wincobank.
Location: southbound between the M62 and the junction with the A639 .
Due to: Roadworks.
Period : from 13:12 on 29 January 2024 to 06:00 on 31 August 2024.
Nearest town: 18.22 miles from Wincobank.
Location: southbound between junction J1 (Rotherham) and the M1 .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 30 October 2024.
Nearest town: 7.2 miles from Wincobank.
Location: southbound between junctions J31 (Worksop) and J28 (Matlock) .
Due to: Roadworks scheme.
Period : from 20:00 on 5 April 2024 to 06:00 on 13 May 2024.
Nearest town: 10.47 miles from Wincobank.
Location: The A1M northbound.
Due to: Roadworks scheme.
Period : from 09:42 on 9 October 2023 to 06:00 on 31 August 2024.
Nearest town: 12.61 miles from Wincobank.
Location: The A1M northbound.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 August 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.67 miles from Wincobank.
Location: The A1M northbound.
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 August 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 12.61 miles from Wincobank.
Location: southbound between junctions J34 (Meadowhall) and J32 (Doncaster) .
Due to: Roadworks scheme.
Period : from 20:01 on 18 September 2023 to 06:00 on 29 December 2024.
Nearest town: 1.44 miles from Wincobank.
Location: northbound between junctions J35A (Manchester) and J36 (Barnsley) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 31 October 2024.
Nearest town: 4.81 miles from Wincobank.
Location: southbound between junction J1 (Rotherham) and the M1 .
Due to: Roadworks scheme.
Period : from 11:00 on 30 May 2023 to 06:00 on 30 October 2024.
Nearest town: 7.45 miles from Wincobank.
Location: northbound between junctions J34 (Meadowhall) and J35 (Rotherham) .
Due to: Roadworks scheme.
Period : from 20:30 on 15 April 2024 to 06:00 on 31 August 2024.
Nearest town: 1.06 miles from Wincobank.
Location: northbound entry slip at junction North.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 09:00 on 24 April 2024 to 15:00 on 24 April 2024.
Nearest town: 6.64 miles from Wincobank.
Location: The A1M northbound between junctions J34 and J35 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 14.52 miles from Wincobank.
Location: The A1M southbound exit slip at junction J34 .
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.94 miles from Wincobank.
Location: The A1M southbound between junctions J35 and J34 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.37 miles from Wincobank.
Location: The A1M southbound between junctions J36 and J35 .
Lane Closures : Lane two will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.32 miles from Wincobank.
Location: The A1M southbound entry slip at junction J35 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.48 miles from Wincobank.
Location: eastbound between the A628 and the junction with the A6102 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 22 May 2024.
Nearest town: 11.99 miles from Wincobank.
Location: westbound between the A6102 and the junction with the A628 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 22 May 2024.
Nearest town: 9.88 miles from Wincobank.
Location: southbound between junctions J36 (Barnsley) and J34 (Meadowhall) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Nearest town: 4.06 miles from Wincobank.
Location: southbound between junctions J36 (Barnsley) and J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.06 miles from Wincobank.
Location: southbound entry slip at junction J35 (Rotherham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.9 miles from Wincobank.
Location: northbound between the junctions with the A634 and the A614 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.41 miles from Wincobank.
Location: The A1M northbound at junction J34 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15 miles from Wincobank.
Location: northbound between the junctions with the A634 and the A614 .
Lane Closures : Lane two will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.54 miles from Wincobank.
Location: The A1M northbound between junctions J34 and J35 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.15 miles from Wincobank.
Location: northbound between junctions J1 (Rotherham) and J2 .
Lane Closures : Lane three will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 05:30 on 27 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 10.09 miles from Wincobank.
Location: southbound between junctions J2 and J1 (Rotherham) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 05:30 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.3 miles from Wincobank.
Location: The A1M northbound exit slip at junction J35 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.47 miles from Wincobank.
Location: southbound at junction J4 (Doncaster) .
Due to: Litter clearance is planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 05:00 on 27 April 2024.
Nearest town: 19.07 miles from Wincobank.
Location: northbound between junctions J29 (Chesterfield) and J30 (Chesterfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2024 to 10 May 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 14.22 miles from Wincobank.
Location: southbound between junctions J30 (Chesterfield) and J29A (Markham Vale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 27 April 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.23 miles from Wincobank.
Location: southbound entry slip at junction J29A (Markham Vale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.34 miles from Wincobank.
Location: southbound exit slip at junction J29A (Markham Vale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.12 miles from Wincobank.
Location: southbound entry slip at junction J30 (Chesterfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.47 miles from Wincobank.
Location: northbound between junctions J29A (Markham Vale) and J30 (Chesterfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 24 April 2024 to 06:00 on 29 April 2024.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 29 April 2024 to 30 April 2024.
Schedule : From 06:00 on 1 May 2024 to 20:00 on 8 May 2024.
Schedule : From 06:00 on 9 May 2024 to 20:00 on 9 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.72 miles from Wincobank.
Location: northbound entry slip at junction J30 (Chesterfield) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.37 miles from Wincobank.
Location: northbound entry slip at junction J30 (Chesterfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2024 to 10 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 10.37 miles from Wincobank.
Location: southbound exit slip at junction J30 (Chesterfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.23 miles from Wincobank.
Location: southbound between junctions J31 (Worksop) and J28 (Matlock) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 24 April 2024 to 26 April 2024.
Schedule : From 06:00 on 27 April 2024 to 20:00 on 1 May 2024.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 2 May 2024 to 3 May 2024.
Schedule : From 06:00 on 4 May 2024 to 20:00 on 7 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 10.16 miles from Wincobank.
Location: eastbound between the junctions with the A628 and the A6102 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Nearest town: 11.59 miles from Wincobank.
Location: eastbound between the junctions with the A628 and the A6102 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Nearest town: 10.5 miles from Wincobank.
Location: southbound entry slip at junction J35A (Manchester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 10 May 2024 to 06:00 on 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.68 miles from Wincobank.
Location: eastbound entry slip from the A629 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.56 miles from Wincobank.
Location: northbound exit slip at junction J35A (Manchester) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 9 May 2024 to 06:00 on 10 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 4.35 miles from Wincobank.
Location: westbound between the junctions with the M1 and the A61 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Nearest town: 4.84 miles from Wincobank.
Location: eastbound between the junctions with the A61 and the M1 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Nearest town: 5.64 miles from Wincobank.
Location: eastbound exit slip to the A629 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.49 miles from Wincobank.
Location: eastbound exit slip to the A629 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.48 miles from Wincobank.
Location: westbound exit slip to the A629 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.46 miles from Wincobank.
Location: westbound exit slip to the A629 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.45 miles from Wincobank.
Location: westbound entry slip from the A629 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 8 May 2024 to 06:00 on 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.38 miles from Wincobank.
Location: westbound between the junctions with the A6102 and the A628 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Nearest town: 11.43 miles from Wincobank.
Location: westbound between the A6102 and the junction with the A628 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Nearest town: 10.35 miles from Wincobank.
Location: eastbound between the junctions with the A628 and the A6102 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 05:00 on 26 April 2024.
Nearest town: 10.44 miles from Wincobank.
Location: westbound between the junctions with the A6102 and the A628 .
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 05:00 on 26 April 2024.
Nearest town: 10.26 miles from Wincobank.
Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 22 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 May 2024 to 1 June 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.39 miles from Wincobank.
Location: southbound entry slip at junction J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 May 2024 to 1 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.79 miles from Wincobank.
Location: southbound entry slip at junction J39 (Denby Dale) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Schedule : From 20:00 on 4 June 2024 to 06:00 on 5 June 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.79 miles from Wincobank.
Location: southbound at junction J39 (Denby Dale) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 May 2024 to 24 May 2024.
Schedule : From 20:00 on 4 June 2024 to 06:00 on 5 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.06 miles from Wincobank.
Location: southbound between junctions J40 (Wakefield) and J39 (Denby Dale) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 May 2024 to 24 May 2024.
Schedule : From 20:00 on 4 June 2024 to 06:00 on 5 June 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 19.39 miles from Wincobank.
Location: southbound at junction J39 (Denby Dale) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 22 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.06 miles from Wincobank.
Location: southbound entry slip at junction J40 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 15 May 2024 to 06:00 on 16 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.25 miles from Wincobank.
Location: southbound between junctions J39 (Denby Dale) and J38 (Huddersfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 22 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 May 2024 to 1 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.34 miles from Wincobank.
Location: southbound exit slip at junction J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 May 2024 to 24 May 2024.
Schedule : From 20:00 on 4 June 2024 to 06:00 on 5 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.06 miles from Wincobank.
Location: southbound exit slip at junction J40 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 8 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.58 miles from Wincobank.
Location: northbound between junctions J28 (Matlock) and J30 (Chesterfield) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 25 April 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 16.9 miles from Wincobank.
Location: northbound entry slip at junction J29 (Chesterfield) .
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 April 2024 to 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 15.56 miles from Wincobank.
Location: northbound between junctions J28 (Matlock) and J29 (Chesterfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 9 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 18.29 miles from Wincobank.
Location: southbound entry slip at junction J29 (Chesterfield) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Schedule : From 20:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.66 miles from Wincobank.
Location: southbound exit slip at junction J29 (Chesterfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.28 miles from Wincobank.
Location: southbound between junctions J29 (Chesterfield) and J28 (Matlock) .
Lane Closures : Lane four will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 May 2024 to 13 May 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 16.93 miles from Wincobank.
Location: southbound entry slip at junction J34 (Meadowhall) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.22 miles from Wincobank.
Location: southbound at junction J33 (Sheffield) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 26 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 3.29 miles from Wincobank.
Location: southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 26 April 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 2.31 miles from Wincobank.
Location: southbound at junction J33 (Sheffield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.29 miles from Wincobank.
Location: southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 1.65 miles from Wincobank.
Location: southbound at junction J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 1.1 miles from Wincobank.
Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 26 April 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 3.74 miles from Wincobank.
Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.74 miles from Wincobank.
Location: northbound at junction J33 (Sheffield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 3.72 miles from Wincobank.
Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 4.92 miles from Wincobank.
Location: slip road to the M1 northbound .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 6.83 miles from Wincobank.
Location: northbound between junctions J32 (Doncaster) and J34 (Meadowhall) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 26 April 2024.
Nearest town: 6.37 miles from Wincobank.
Location: northbound between junctions J33 (Sheffield) and J34 (Meadowhall) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 3.19 miles from Wincobank.
Location: northbound at junction J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 6.37 miles from Wincobank.
Location: northbound between junctions J1 (Rotherham) and J2 .
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 09:00 on 24 April 2024 to 18:00 on 24 April 2024.
Nearest town: 11.6 miles from Wincobank.
Location: southbound between junctions J32 (Doncaster) and J31 (Worksop) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 6.65 miles from Wincobank.
Location: northbound between junctions J30 (Chesterfield) and J31 (Worksop) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 10.22 miles from Wincobank.
Location: northbound entry slip at junction J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.84 miles from Wincobank.
Location: northbound between junctions J38 (Huddersfield) and J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.01 miles from Wincobank.
Location: northbound between junctions J38 (Huddersfield) and J40 (Wakefield) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 1 May 2024.
Nearest town: 16.01 miles from Wincobank.
Location: northbound between junctions J39 (Denby Dale) and J40 (Wakefield) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 17.26 miles from Wincobank.
Location: southbound between junctions J33 (Sheffield) and J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 5.17 miles from Wincobank.
Location: southbound at junction J32 (Doncaster) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road marking works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 5.83 miles from Wincobank.
Location: northbound at junction J39 (Denby Dale) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 05:00 on 25 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 16.53 miles from Wincobank.
Location: northbound entry slip at junction J39 (Denby Dale) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 05:00 on 25 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 16.84 miles from Wincobank.
Location: northbound between junctions J39 (Denby Dale) and J40 (Wakefield) .
Lane Closures : Lane one will be closed.
Due to: Roadside equipment maintenance is planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 05:00 on 25 April 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 17.26 miles from Wincobank.
Location: northbound between junctions J38 (Huddersfield) and J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 16.01 miles from Wincobank.
Location: northbound exit slip at junction J39 (Denby Dale) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 31 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.42 miles from Wincobank.
Location: northbound at junction J34 (Meadowhall) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 29 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 0.93 miles from Wincobank.
Location: northbound between junctions J34 (Meadowhall) and J35 (Rotherham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 1.28 miles from Wincobank.
Location: northbound between junctions J34 (Meadowhall) and J35 (Rotherham) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 20:00 on 29 April 2024.
Lanes Closed : There is one of four lanes closed.
Nearest town: 1.03 miles from Wincobank.
Location: northbound exit slip at junction J35 (Rotherham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 2.53 miles from Wincobank.
Location: southbound between junction J2 and the M1 .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 05:00 on 25 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 8.23 miles from Wincobank.
Location: southbound entry slip at junction J1 (Rotherham) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 05:00 on 25 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.42 miles from Wincobank.
Location: southbound exit slip at junction J1 (Rotherham) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 05:00 on 25 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 7.52 miles from Wincobank.
Location: southbound entry slip at junction J29 (Chesterfield) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2024 to 06:00 on 13 May 2024.
Nearest town: 15.66 miles from Wincobank.
Location: southbound entry slip at junction J3 (Doncaster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 May 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.89 miles from Wincobank.
Location: southbound between junctions J5 (Scunthorpe) and J4 (Doncaster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2024 to 18 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.51 miles from Wincobank.
Location: southbound exit slip at junction J4 (Doncaster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 May 2024 to 18 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.17 miles from Wincobank.
Location: southbound exit slip at junction J4 (Doncaster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 14 May 2024 to 16 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 19.17 miles from Wincobank.
Location: westbound between the junctions with the A6024 and the A57 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 05:00 on 30 April 2024.
Nearest town: 19.28 miles from Wincobank.
Location: eastbound between the junctions with the A57 and the A6024 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 05:00 on 30 April 2024.
Nearest town: 19.36 miles from Wincobank.
Location: southbound between the M62 and the junction with the A639 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 24 April 2024 to 31 August 2024.
Lanes Closed : There may be lane closures.
Nearest town: 19.64 miles from Wincobank.
Location: northbound between the A639 and the junction with the M62 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 06:00 and 20:00 from 24 April 2024 to 31 August 2024.
Lanes Closed : There may be lane closures.
Nearest town: 16.32 miles from Wincobank.
Location: northbound between junctions J32 (Doncaster) and J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 July 2024 to 10:00 on 7 July 2024.
Schedule : From 20:00 on 13 July 2024 to 10:00 on 14 July 2024.
Schedule : From 20:00 on 5 October 2024 to 10:00 on 6 October 2024.
Schedule : From 20:00 on 12 October 2024 to 10:00 on 13 October 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 4.54 miles from Wincobank.
Location: southbound between junctions J34 (Meadowhall) and J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 July 2024 to 10:00 on 7 July 2024.
Schedule : From 20:00 on 13 July 2024 to 10:00 on 14 July 2024.
Schedule : From 20:00 on 5 October 2024 to 10:00 on 6 October 2024.
Schedule : From 23:00 on 12 October 2024 to 10:00 on 13 October 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 1.65 miles from Wincobank.
Location: southbound entry slip at junction J34 (Meadowhall) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 July 2024 to 10:00 on 7 July 2024.
Schedule : From 20:00 on 13 July 2024 to 10:00 on 14 July 2024.
Schedule : From 20:00 on 5 October 2024 to 10:00 on 6 October 2024.
Schedule : From 23:00 on 12 October 2024 to 10:00 on 13 October 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 1.22 miles from Wincobank.
Location: northbound exit slip at junction J33 (Sheffield) .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 6 July 2024 to 10:00 on 7 July 2024.
Schedule : From 20:00 on 13 July 2024 to 10:00 on 14 July 2024.
Schedule : From 20:00 on 5 October 2024 to 10:00 on 6 October 2024.
Schedule : From 20:00 on 12 October 2024 to 10:00 on 13 October 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 3.72 miles from Wincobank.