Location: southbound between junctions J4A (Birmingham) and J5 (Droitwich) .
Due to: Road traffic collision.
Status : Cleared.
Nearest town: 11.16 miles from Weethley Bank.
Location: northbound between junctions J15 (Warwick) and J16 (Henley) .
Lane Closures : Lane one will be closed.
Due to: Emergency gantry construction is planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.55 miles from Weethley Bank.
Location: southbound at junction J3 (Kidderminster) .
Due to: Congestion.
Normal traffic conditions are expected between 14:15 and 14:30 on 24 April 2024.
Nearest town: 18.71 miles from Weethley Bank.
Location: southbound between junctions J4A (Birmingham) and J5 (Droitwich) .
Due to: Congestion.
Normal traffic conditions are expected between 13:30 and 13:45 on 24 April 2024.
Delay : There are currently delays of 20 minutes against expected traffic.
Earlier
Due to: Caused by an earlier accident.
Nearest town: 12.81 miles from Weethley Bank.
Location: northbound between the junctions with the A44 Evesham East and the A44 Evesham north.
Due to: Congestion.
Normal traffic conditions are expected between 12:45 and 13:00 on 24 April 2024.
Nearest town: 6.62 miles from Weethley Bank.
Location: northbound between the junctions with the A422 and the A3400 .
Due to: Congestion.
Normal traffic conditions are expected between 09:45 and 10:00 on 24 April 2024.
Delay : There are currently delays of 10 minutes against expected traffic.
Nearest town: 8.21 miles from Weethley Bank.
Location: northbound between the A452 and the junction with the A45 Coventry West.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 9 August 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.63 miles from Weethley Bank.
Location: southbound between junctions J14 (Leamington) and J12 (Gaydon) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 23:59 on 30 April 2024.
Nearest town: 16.38 miles from Weethley Bank.
Location: northbound entry slip at junction J5 (Solihull) .
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 12 May 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.07 miles from Weethley Bank.
Location: southbound between junctions J4 (Bromsgrove) and J4A (Birmingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.95 miles from Weethley Bank.
Location: northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 11.78 miles from Weethley Bank.
Location: northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be two of four lanes closed.
Nearest town: 11.32 miles from Weethley Bank.
Location: northbound between junctions J15 (Warwick) and J16 (Henley) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.21 miles from Weethley Bank.
Location: southbound between junctions J16 (Henley) and J15 (Warwick) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 13.03 miles from Weethley Bank.
Location: northbound between the A429 and the junction with the A45 Coventry West.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 26 April 2024.
Nearest town: 17.93 miles from Weethley Bank.
Location: southbound between junctions J5 (Solihull) and J4 (Shirley) .
Due to: Roadworks scheme.
Period : from 21:03 on 16 April 2024 to 06:00 on 11 May 2024.
Nearest town: 17.18 miles from Weethley Bank.
Location: northbound entry slip at junction J4 (Shirley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 April 2024 to 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.81 miles from Weethley Bank.
Location: northbound between junctions J1 (Bromsgrove) and J2 (Birmingham S) .
Lane Closures : The hard shoulder is closed.
Due to: Emergency barrier repairs.
Period : expect disruption until 06:00 on 1 July 2024.
Nearest town: 12.07 miles from Weethley Bank.
Location: northbound between junctions J5 (Solihull) and J8 (Birmingham E) .
Due to: Roadworks scheme.
Period : from 21:00 on 18 April 2024 to 06:00 on 12 May 2024.
Nearest town: 17.07 miles from Weethley Bank.
Location: southbound exit slip at Strensham Services.
Due to: Roadworks scheme.
Period : from 21:00 on 17 April 2024 to 06:00 on 11 May 2024.
Nearest town: 12.62 miles from Weethley Bank.
Location: southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Due to: Roadworks scheme.
Period : from 20:00 on 2 April 2024 to 20:00 on 29 April 2024.
Nearest town: 13.19 miles from Weethley Bank.
Location: northbound exit slip at junction J5 (Droitwich) .
Due to: Roadworks scheme.
Period : from 20:01 on 23 April 2024 to 06:00 on 26 April 2024.
Nearest town: 9.56 miles from Weethley Bank.
Location: northbound between junctions J4 (Shirley) and J5 (Solihull) .
Due to: Roadworks scheme.
Period : from 21:00 on 15 April 2024 to 06:00 on 11 May 2024.
Nearest town: 12.04 miles from Weethley Bank.
Location: northbound between the junctions with the A429 and the A452 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.93 miles from Weethley Bank.
Location: northbound between junctions J12 (Gaydon) and J14 (Leamington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.76 miles from Weethley Bank.
Location: southbound between junctions J14 (Leamington) and J12 (Gaydon) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.88 miles from Weethley Bank.
Location: northbound between the A429 and the junction with the A452 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.23 miles from Weethley Bank.
Location: southbound exit slip to the A452 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 May 2024 to 06:00 on 23 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.76 miles from Weethley Bank.
Location: northbound between the A452 and the junction with the A45 Coventry West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 21 May 2024 to 06:00 on 22 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.52 miles from Weethley Bank.
Location: northbound between the junctions with the A452 and the A45 Coventry West.
Lane Closures : Lane one is closed.
Due to: Roadworks.
Period : expect disruption until 15:30 on 24 April 2024.
Lanes Closed : There is one of three lanes closed.
Nearest town: 19.57 miles from Weethley Bank.
Location: northbound between junction J15 (Warwick) and the M42 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.34 miles from Weethley Bank.
Location: slip road to the M42 southbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.45 miles from Weethley Bank.
Location: southbound between junctions J3 (Birmingham S) and J2 (Birmingham S) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 11.76 miles from Weethley Bank.
Location: slip road to the M5 northbound .
Lane Closures : Lane two will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 13.05 miles from Weethley Bank.
Location: southbound between junction J1 (Bromsgrove) and the M5 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Schedule : From 21:00 on 3 May 2024 to 06:00 on 4 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.82 miles from Weethley Bank.
Location: southbound between junctions J2 (Birmingham S) and J1 (Bromsgrove) .
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 May 2024 to 3 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.17 miles from Weethley Bank.
Location: northbound at junction J9 (Tewkesbury) .
Lane Closures : Lane three will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 6 May 2024 to 11 May 2024.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 13 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 20 May 2024 to 25 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.39 miles from Weethley Bank.
Location: northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .
Lane Closures : Lane one will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.35 miles from Weethley Bank.
Location: southbound at junction J2 (Birmingham S) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.27 miles from Weethley Bank.
Location: slip road to the M5 northbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.05 miles from Weethley Bank.
Location: southbound between junction J2 (Birmingham S) and the M5 .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.26 miles from Weethley Bank.
Location: slip road to the M5 southbound .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.05 miles from Weethley Bank.
Location: southbound between junctions J15 (Warwick) and J13 (Leamington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.28 miles from Weethley Bank.
Location: northbound between junctions J12 (Gaydon) and J15 (Warwick) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.76 miles from Weethley Bank.
Location: northbound between junctions J1 (Bromsgrove) and J2 (Birmingham S) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 12.38 miles from Weethley Bank.
Location: northbound between junctions J9 (Tewkesbury) and J8 (Ross on Wye) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.8 miles from Weethley Bank.
Location: southbound between junctions J3 (Kidderminster) and J4A (Birmingham) .
Lane Closures : Lane one will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.06 miles from Weethley Bank.
Location: southbound at junction J3A (M40) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2024 to 09:00 on 28 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 12.75 miles from Weethley Bank.
Location: southbound between junctions J4 (Shirley) and J3A (M40) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2024 to 09:00 on 28 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 13.08 miles from Weethley Bank.
Location: southbound between junctions J3A (M40) and J3 (Birmingham S) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 27 April 2024 to 09:00 on 28 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 12.08 miles from Weethley Bank.
Location: southbound between junctions J15 (Warwick) and J13 (Leamington) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.32 miles from Weethley Bank.
Location: northbound between junctions J13 (Leamington) and J15 (Warwick) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 21:30 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.79 miles from Weethley Bank.
Location: northbound entry slip at junction J2 (Birmingham S) .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2024 to 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.34 miles from Weethley Bank.
Location: southbound between the junctions with the A3400 and the A422 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Nearest town: 8.05 miles from Weethley Bank.
Location: northbound between the junctions with the A422 and the A3400 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Nearest town: 7.89 miles from Weethley Bank.
Location: northbound entry slip at junction J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.84 miles from Weethley Bank.
Location: northbound exit slip at junction J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 10.63 miles from Weethley Bank.
Location: southbound between junctions J7 (Worcester) and J8 (Ross on Wye) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 10.68 miles from Weethley Bank.
Location: northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 11.6 miles from Weethley Bank.
Location: southbound between junctions J2 (Dudley) and J3 (Kidderminster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 19.14 miles from Weethley Bank.
Location: southbound between junctions J2 (Dudley) and J3 (Kidderminster) .
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 19.14 miles from Weethley Bank.
Location: southbound exit slip at junction J3 (Kidderminster) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Nearest town: 18.95 miles from Weethley Bank.
Location: northbound between junctions J4 (Bromsgrove) and J3 (Kidderminster) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 17.98 miles from Weethley Bank.
Location: eastbound.
Lane Closures : Lane two will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.69 miles from Weethley Bank.
Location: southbound at junction J9 (Tewkesbury) .
Lane Closures : Lane three will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 24 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 29 April 2024 to 3 May 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.22 miles from Weethley Bank.
Location: northbound between the junctions with the A429 and the A452 .
Lane Closures : Lanes 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 26 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 17.93 miles from Weethley Bank.
Location: southbound exit slip at junction J8 (Ross on Wye) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:06 on 19 April 2024 to 05:00 on 20 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.69 miles from Weethley Bank.
Location: southbound between junctions J7 (Worcester) and J8 (Ross on Wye) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.65 miles from Weethley Bank.
Location: northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 April 2024 to 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 19.9 miles from Weethley Bank.
Location: southbound between junctions J4 (Shirley) and J3A (M40) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.73 miles from Weethley Bank.
Location: southbound between the M42 southbound and junction J15 (Warwick) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 12.75 miles from Weethley Bank.
Location: southbound exit slip at junction J4 (Shirley) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 14.98 miles from Weethley Bank.
Location: northbound between junctions J4 (Shirley) and J5 (Solihull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 24 April 2024 to 27 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 14.7 miles from Weethley Bank.
Location: northbound at junction J5 (Solihull) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 May 2024 to 11 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.87 miles from Weethley Bank.
Location: southbound between junctions J5 (Solihull) and J4 (Shirley) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 17.18 miles from Weethley Bank.
Location: southbound entry slip at junction J5 (Solihull) .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 May 2024 to 11 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 16.97 miles from Weethley Bank.
Location: southbound between junctions J5 (Solihull) and J4 (Shirley) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 April 2024 to 06:00 on 27 April 2024.
Schedule : From 21:00 on 7 May 2024 to 06:00 on 8 May 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 16.14 miles from Weethley Bank.
Location: southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be three of four lanes closed.
Nearest town: 11.2 miles from Weethley Bank.
Location: southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Lane Closures : Lane one will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 06:00 on 27 April 2024 to 20:00 on 29 April 2024.
Lanes Closed : There will be one of four lanes closed.
Nearest town: 12.82 miles from Weethley Bank.
Location: northbound between junctions J5 (Solihull) and J6 (Birmingham E) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 18:00 on 24 April 2024.
Nearest town: 18.6 miles from Weethley Bank.