Location: westbound entry slip at junction J6 (Maidstone) .
Due to: Roadworks.
Period : from 20:29 on 23 April 2024 to 05:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 20 miles from Newenden.
Location: westbound between the A268 and the junction with the A2101 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 24 April 2024 to 18:00 on 26 April 2024.
Nearest town: 7.16 miles from Newenden.
Location: eastbound between the A2101 and the junction with the A268 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:00 on 24 April 2024 to 18:00 on 26 April 2024.
Nearest town: 7.13 miles from Newenden.
Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Emergency roadworks.
Period : expect disruption until 14:00 on 24 May 2024.
Nearest town: 13.5 miles from Newenden.
Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Emergency roadworks.
Period : expect disruption until 14:00 on 24 May 2024.
Nearest town: 13.5 miles from Newenden.
Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Emergency roadworks.
Period : expect disruption until 08:15 on 24 April 2024.
Nearest town: 13.5 miles from Newenden.
Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Emergency roadworks.
Period : expect disruption until 08:15 on 24 April 2024.
Nearest town: 13.51 miles from Newenden.
Location: eastbound between the junctions with the A269 Bexhill East and the A2036 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2024 to 8 May 2024.
Nearest town: 12.64 miles from Newenden.
Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Emergency roadworks.
Period : expect disruption until 20:00 on 25 April 2024.
Nearest town: 6.35 miles from Newenden.
Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Emergency roadworks.
Period : expect disruption until 20:00 on 25 April 2024.
Nearest town: 6.34 miles from Newenden.
Location: southbound between the A26 and the junction with the A228 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.67 miles from Newenden.
Location: northbound between the junctions with the A228 and the A26 .
Lane Closures : Lane two is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There is one of two lanes closed.
Nearest town: 17.4 miles from Newenden.
Location: eastbound between the junctions with the A27 and the A269 Bexhill West.
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 24 April 2024.
Nearest town: 13.29 miles from Newenden.
Location: westbound between the junctions with the A269 Bexhill West and the A27 .
Due to: Emergency roadworks.
Period : expect disruption until 05:00 on 24 April 2024.
Nearest town: 13.28 miles from Newenden.
Location: eastbound between the A268 and the junction with the A2070 .
Due to: Horticultural works.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 7.45 miles from Newenden.
Location: westbound between the A2070 and the junction with the A268 .
Due to: Horticultural works.
Period : expect disruption until 05:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 10.9 miles from Newenden.
Location: westbound at junction J7 (Maidstone) .
Lane Closures : The hard shoulder is closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 13 May 2024.
Nearest town: 19.12 miles from Newenden.
Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Due to: Roadworks scheme.
Period : from 20:16 on 22 April 2024 to 06:00 on 14 May 2024.
Nearest town: 18.52 miles from Newenden.
Location: westbound between junctions J10A and J9 (Ashford) .
Due to: Roadworks scheme.
Period : from 20:14 on 22 April 2024 to 06:00 on 25 April 2024.
Nearest town: 15.71 miles from Newenden.
Location: westbound between junctions J10A and J9 (Ashford) .
Lane Closures : Lanes 1 and 2 will be closed.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 24 April 2024 to 06:00 on 25 April 2024.
Lanes Closed : There will be two of three lanes closed.
Nearest town: 15.71 miles from Newenden.
Location: eastbound between junctions J9 (Ashford) and J10A .
Due to: Roadworks scheme.
Period : from 20:14 on 22 April 2024 to 06:00 on 24 April 2024.
Nearest town: 15.23 miles from Newenden.
Location: eastbound between junctions J9 (Ashford) and J10A .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 15.23 miles from Newenden.
Location: northbound between the A262 and the junction with the M25 .
Due to: Roadworks scheme.
Period : from 20:13 on 10 April 2024 to 06:00 on 19 December 2024.
Nearest town: 14.29 miles from Newenden.
Location: southbound between the A2100 north of Battle and the junction with the A28 .
Due to: Roadworks scheme.
Period : from 20:07 on 22 April 2024 to 06:00 on 4 May 2024.
Nearest town: 6.19 miles from Newenden.
Location: northbound between the A28 and the junction with the A2100 north of Battle.
Due to: Roadworks scheme.
Period : from 20:07 on 22 April 2024 to 06:00 on 4 May 2024.
Nearest town: 7.72 miles from Newenden.
Location: westbound between the A2070 and the junction with the A268 .
Due to: Road repairs.
Period : expect disruption until 18:00 on 27 September 2024.
Nearest town: 7.12 miles from Newenden.
Location: eastbound between the A268 and the junction with the A2070 .
Due to: Road repairs.
Period : expect disruption until 18:00 on 27 September 2024.
Nearest town: 7.34 miles from Newenden.
Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Road repairs.
Period : expect disruption until 18:00 on 27 September 2024.
Nearest town: 7.44 miles from Newenden.
Location: westbound between the junctions with the A2070 and the A268 .
Due to: Road repairs.
Period : expect disruption until 18:00 on 27 September 2024.
Nearest town: 8.12 miles from Newenden.
Location: northbound exit slip to the A228 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.83 miles from Newenden.
Location: southbound between the junctions with the A265 and the A2100 north of Battle.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 30 April 2024 to 3 May 2024.
Nearest town: 5.78 miles from Newenden.
Location: northbound between the junctions with the A2100 north of Battle and the A265 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 30 April 2024 to 3 May 2024.
Nearest town: 5.79 miles from Newenden.
Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Nearest town: 6.81 miles from Newenden.
Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Nearest town: 7.06 miles from Newenden.
Location: westbound between junctions J10 (Ashford) and J9 (Ashford) .
Lane Closures : Lane one will be closed.
Due to: Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.45 miles from Newenden.
Location: northbound exit slip to the A228 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.83 miles from Newenden.
Location: northbound exit slip to the A228 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.87 miles from Newenden.
Location: northbound between the junctions with the A262 and the A228 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Nearest town: 13.63 miles from Newenden.
Location: southbound between the junctions with the A228 and the A262 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 1 May 2024 to 06:00 on 2 May 2024.
Nearest town: 13.79 miles from Newenden.
Location: northbound between the junctions with the A262 and the A228 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Nearest town: 12.82 miles from Newenden.
Location: southbound between the junctions with the A228 and the A262 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Nearest town: 13 miles from Newenden.
Location: northbound between the junctions with the A262 and the A228 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Nearest town: 11.73 miles from Newenden.
Location: southbound between the junctions with the A228 and the A262 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 April 2024 to 06:00 on 30 April 2024.
Nearest town: 11.94 miles from Newenden.
Location: northbound between the junctions with the A228 and the A26 .
Lane Closures : Lane one will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 30 April 2024 to 06:00 on 1 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.04 miles from Newenden.
Location: northbound entry slip from the A228 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 9 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 15.84 miles from Newenden.
Location: eastbound between the A27 and the junction with the A269 Bexhill West.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.84 miles from Newenden.
Location: westbound between the A269 Bexhill West and the junction with the A27 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 1 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 13.27 miles from Newenden.
Location: westbound between junctions J8 (Maidstone) and J7 (Maidstone) .
Lane Closures : Lanes 1 and 2 are closed.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : There are two of three lanes closed.
Nearest town: 18.52 miles from Newenden.
Location: northbound between the A228 and the junction with the A225 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 17.64 miles from Newenden.
Location: northbound entry slip from the A26 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.26 miles from Newenden.
Location: northbound exit slip to the A26 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.22 miles from Newenden.
Location: northbound entry slip from the A26 .
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.91 miles from Newenden.
Location: northbound.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 26 April 2024 to 06:00 on 27 April 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.94 miles from Newenden.
Location: eastbound between junctions J10 (Ashford) and J10A .
Lane Closures : Lane one will be closed.
Due to: Barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : There will be one of three lanes closed.
Nearest town: 15.7 miles from Newenden.
Location: northbound between the junctions with the A26 Tonbridge West and the A225 .
Lane Closures : Lane one will be closed.
Due to: Horticultural works are planned.
Status : Pending.
Schedule : From 20:00 on 25 April 2024 to 06:00 on 26 April 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 19.37 miles from Newenden.
Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 24 April 2024 to 26 April 2024.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 April 2024 to 30 April 2024.
Schedule : From 09:30 on 21 May 2024 to 15:30 on 21 May 2024.
Nearest town: 7.08 miles from Newenden.
Location: westbound between the junctions with the A2070 and the A268 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 24 April 2024 to 26 April 2024.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 April 2024 to 30 April 2024.
Schedule : From 09:30 on 21 May 2024 to 15:30 on 21 May 2024.
Nearest town: 7.18 miles from Newenden.
Location: eastbound between the junctions with the A268 and the A2070 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 28 May 2024 to 31 May 2024.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 3 June 2024 to 7 June 2024.
Nearest town: 7.08 miles from Newenden.
Location: westbound between the junctions with the A2070 and the A268 .
Due to: Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 28 May 2024 to 31 May 2024.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 3 June 2024 to 7 June 2024.
Nearest town: 7.16 miles from Newenden.
Location: westbound between the junctions with the A2036 and the A269 Bexhill East.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 April 2024 to 27 April 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 4 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 6 May 2024 to 8 May 2024.
Nearest town: 12.63 miles from Newenden.
Location: southbound between the A265 and the junction with the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 5.78 miles from Newenden.
Location: northbound between the A2100 north of Battle and the junction with the A265 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 7 May 2024 to 11 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 13 May 2024 to 18 May 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 20 May 2024 to 24 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.46 miles from Newenden.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 1 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 8.77 miles from Newenden.
Location: southbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 28 May 2024 to 1 June 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 7.63 miles from Newenden.
Location: southbound between the junctions with the A2100 north of Battle and the A28 .
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 7.18 miles from Newenden.
Location: northbound between the A28 and the junction with the A2100 north of Battle.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.34 miles from Newenden.
Location: northbound between the junctions with the A28 and the A2100 north of Battle.
Due to: Roadworks.
Period : expect disruption until 06:00 on 24 April 2024.
Lanes Closed : All lanes are closed.
Nearest town: 8.08 miles from Newenden.
Location: southbound between the A2100 north of Battle and the junction with the A28 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 30 April 2024 to 4 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 6.19 miles from Newenden.
Location: northbound between the A26 Tonbridge East and the junction with the M25 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 8 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 15 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.22 miles from Newenden.
Location: northbound entry slip from the A26 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 8 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 15 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.26 miles from Newenden.
Location: northbound entry slip from the A26 .
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 8 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 15 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.91 miles from Newenden.
Location: northbound.
Due to: Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 December 2024 to 8 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 December 2024 to 15 December 2024.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 December 2024 to 19 December 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.94 miles from Newenden.
Location: southbound at the junction with the A26 .
Lane Closures : Lane one will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.19 miles from Newenden.
Location: southbound entry slip from the A26 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : From 20:00 on 2 May 2024 to 06:00 on 3 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.25 miles from Newenden.
Location: northbound between the A228 and the junction with the A26 Tonbridge East.
Lane Closures : Lane one will be closed.
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 2 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.17 miles from Newenden.
Location: northbound exit slip to the A26 .
Due to: Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 April 2024 to 2 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.22 miles from Newenden.
Location: northbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 1 June 2024.
Nearest town: 8.77 miles from Newenden.
Location: southbound.
Due to: Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 7 May 2024 to 06:00 on 1 June 2024.
Nearest town: 5.97 miles from Newenden.
Location: southbound exit slip to the A26 .
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 26 April 2024 to 13:00 on 26 April 2024.
Schedule : From 10:00 on 3 May 2024 to 13:00 on 3 May 2024.
Schedule : From 10:00 on 10 May 2024 to 13:00 on 10 May 2024.
Schedule : From 10:00 on 17 May 2024 to 13:00 on 17 May 2024.
Lanes Closed : All lanes will be closed.
Nearest town: 18.36 miles from Newenden.
Location: southbound between the junctions with the A26 Tonbridge West and the A26 Tonbridge East.
Lane Closures : Lane one will be closed.
Due to: Emergency roadworks are planned.
Status : Pending.
Schedule : From 10:00 on 26 April 2024 to 13:00 on 26 April 2024.
Schedule : From 10:00 on 3 May 2024 to 13:00 on 3 May 2024.
Schedule : From 10:00 on 10 May 2024 to 13:00 on 10 May 2024.
Schedule : From 10:00 on 17 May 2024 to 13:00 on 17 May 2024.
Lanes Closed : There will be one of two lanes closed.
Nearest town: 18.56 miles from Newenden.