ROAD WORKSLocation : The M5 northbound exit slip at junction J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 05:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

20.51 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound exit slip at junction J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 05:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

20.7 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J6 (Worcester) and J7 (Worcester) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : There will be two of three lanes closed.

16.79 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound entry slip at junction J8 (Ross on Wye) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 22 Nov 2017 to 24 Nov 2017.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 27 Nov 2017 to 30 Nov 2017.

16.53 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Reason : Emergency road marking works are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

20.66 miles from Five Bridges.

ROAD WORKSLocation : The M50 westbound between the M5 and junction J2 (Hereford) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 22 Nov 2017 to 24 Nov 2017.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 27 Nov 2017 to 30 Nov 2017.

16.54 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J7 (Worcester) and J6 (Worcester) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : There will be two of three lanes closed.

16.1 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J6 (Worcester) and J4A (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

16.79 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound entry slip at junction J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency road marking works are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

20.52 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound entry slip at junction J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 05:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

20.69 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound at junction J4A (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

25.18 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound at junction J4A (Birmingham) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 05:00 on 23 Dec 2017.
Lanes Closed : There will be one of two lanes closed.

25.14 miles from Five Bridges.

ROAD WORKSLocation : The A40 eastbound between the junctions with the A4137 and the A49 .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 4 Dec 2017 to 7 Dec 2017.
Lanes Closed : All lanes will be closed.

14.22 miles from Five Bridges.

ROAD WORKSLocation : The A40 eastbound between the junctions with the A4137 and the A49 .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

14.1 miles from Five Bridges.

ROAD WORKSLocation : The A40 westbound between the junctions with the A449 and the A49 .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

13.77 miles from Five Bridges.

ROAD WORKSLocation : The A40 eastbound between the junctions with the A49 and the A449 .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

13.97 miles from Five Bridges.

ROAD WORKSLocation : The A40 eastbound between the junctions with the A49 and the A449 .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

13.97 miles from Five Bridges.

ROAD WORKSLocation : The A40 eastbound between the junctions with the A49 and the A449 .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 4 Dec 2017 to 7 Dec 2017.
Lanes Closed : All lanes will be closed.

13.97 miles from Five Bridges.

ROAD WORKSLocation : The A40 westbound between the junctions with the A49 and the A4137 .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

14.01 miles from Five Bridges.

ROAD WORKSLocation : The A40 westbound between the junctions with the A49 and the A4137 .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

14.01 miles from Five Bridges.

ROAD WORKSLocation : The M50 eastbound between junction J4 (S.
Wales) and the M5 .
Lane Closures : The hard shoulder is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 17:00 on 21 Nov 2017.

12.63 miles from Five Bridges.

ROAD WORKSLocation : The M50 eastbound between junctions J4 (S.
Wales) and J3 (Newent) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Horticultural works.
Status : Currently Active.
Period : expect disruption until 17:00 on 21 Nov 2017.
Lanes Closed : There is one of two lanes closed.

12.7 miles from Five Bridges.

ROAD WORKSLocation : The M50 westbound between junctions J2 (Hereford) and J4 (S.
Wales) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 22 Nov 2017 to 24 Nov 2017.
Schedule : Expect disruption everyday between 09:00 and 17:00 from 27 Nov 2017 to 30 Nov 2017.

10.06 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

24.91 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 05:00 on 23 Dec 2017.
Lanes Closed : There will be one of four lanes closed.

24.91 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound at junction J4A (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : There will be two of three lanes closed.

24.68 miles from Five Bridges.

ROAD WORKSLocation : The M42 northbound entry slip at junction J4A from M5 North.
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

24.68 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J7 (Worcester) and J6 (Worcester) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 Nov 2017 to 05:00 on 22 Nov 2017.
Lanes Closed : There will be one of three lanes closed.

14.59 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J6 (Worcester) and J5 (Droitwich) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 Nov 2017 to 05:00 on 22 Nov 2017.
Lanes Closed : There will be one of four lanes closed.

16.79 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J6 (Worcester) and J4 (Bromsgrove) .
Reason : Roadworks scheme is planned.
Status : Pending.
Schedule : From 21:00 on 21 Nov 2017 to 06:00 on 16 Dec 2017.

15.55 miles from Five Bridges.

ROAD WORKSLocation : The A40 westbound between the junctions with the A49 and the A4137 .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 27 Nov 2017 to 1 Dec 2017.
Lanes Closed : All lanes will be closed.

14.01 miles from Five Bridges.

ROAD WORKSLocation : The A40 westbound between the junctions with the A449 and the A49 .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 27 Nov 2017 to 1 Dec 2017.
Lanes Closed : All lanes will be closed.

13.74 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J7 (Worcester) and J6 (Worcester) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 22 Nov 2017 to 06:00 on 23 Nov 2017.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be one of three lanes closed.

15.33 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J5 (Droitwich) and J6 (Worcester) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 Nov 2017 to 2 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

20.29 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J5 (Droitwich) and J6 (Worcester) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 Dec 2017 to 8 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

18.86 miles from Five Bridges.

ROAD WORKSLocation : The M42 slip road to the M5 southbound .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 Nov 2017 to 06:00 on 22 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

25.47 miles from Five Bridges.

ROAD WORKSLocation : The M42 slip road to the M5 southbound .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 Nov 2017 to 30 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

25.47 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound at junction J4A (Birmingham) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 Nov 2017 to 06:00 on 22 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

25.11 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 21:03 on 20 Nov 2017 to 06:00 on 8 Dec 2017.

25.11 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 Nov 2017 to 30 Nov 2017.
Lanes Closed : There will be one of four lanes closed.

21.36 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 Nov 2017 to 28 Nov 2017.
Lanes Closed : There will be two of four lanes closed.

23.75 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J5 (Droitwich) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 Nov 2017 to 06:00 on 22 Nov 2017.
Lanes Closed : There will be one of four lanes closed.

24.91 miles from Five Bridges.

ROAD WORKSLocation : The M42 southbound between junction J2 (Birmingham S) and the M5 .
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 21:02 on 20 Nov 2017 to 06:00 on 30 Nov 2017.

26.43 miles from Five Bridges.

ROAD WORKSLocation : The M42 southbound between junctions J2 (Birmingham S) and J1 (Bromsgrove) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 21 Nov 2017 to 06:00 on 22 Nov 2017.
Lanes Closed : There will be one of three lanes closed.

26.43 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J11A (Gloucester) and J11 (Cheltenham) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 Nov 2017 to 05:00 on 24 Nov 2017.
Lanes Closed : There will be one of three lanes closed.

22.5 miles from Five Bridges.

ROAD WORKSLocation : The M42 southbound entry slip at junction J2 (Birmingham S) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 23 Nov 2017 to 05:00 on 24 Nov 2017.
Lanes Closed : All lanes will be closed.

29.43 miles from Five Bridges.

ROAD WORKSLocation : The M50 eastbound between junction J2 (Hereford) and the M5 .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 30 Nov 2017 to 2 Dec 2017.
Lanes Closed : All lanes will be closed.

10.19 miles from Five Bridges.

ROAD WORKSLocation : The M50 eastbound between junctions J2 (Hereford) and J1 (Malvern) .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 Nov 2017 to 30 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

10.19 miles from Five Bridges.

ROAD WORKSLocation : The M50 westbound between junctions J1 (Malvern) and J2 (Hereford) .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 30 Nov 2017 to 2 Dec 2017.
Lanes Closed : There will be one of two lanes closed.

15.77 miles from Five Bridges.

ROAD WORKSLocation : The M50 westbound between the M5 and junction J2 (Hereford) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 Nov 2017 to 30 Nov 2017.
Lanes Closed : All lanes will be closed.

16.52 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J7 (Worcester) and J6 (Worcester) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 Nov 2017 to 16 Dec 2017.
Lanes Closed : There will be two of three lanes closed.

15.71 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound entry slip at junction J6 (Worcester) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 Nov 2017 to 16 Dec 2017.
Lanes Closed : All lanes will be closed.

16.59 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J6 (Worcester) and J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 Nov 2017 to 1 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

18.94 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J6 (Worcester) and J4A (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 Nov 2017 to 29 Nov 2017.
Lanes Closed : There will be two of four lanes closed.

18.95 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J6 (Worcester) and J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 Nov 2017 to 16 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

16.79 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 Dec 2017 to 5 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

22.04 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 Dec 2017 to 7 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

22.83 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 Nov 2017 to 29 Nov 2017.
Lanes Closed : There will be two of three lanes closed.

24.68 miles from Five Bridges.

ROAD WORKSLocation : The M42 southbound between junction J2 (Birmingham S) and the M5 .
Lane Closures : Lane two will be closed.
Reason : Barrier repairs are planned.
Status : Pending.
Schedule : From 21:45 on 22 Nov 2017 to 06:00 on 23 Nov 2017.
Lanes Closed : There will be one of three lanes closed.

29.29 miles from Five Bridges.

ROAD WORKSLocation : The M42 northbound between the M5 and junction J2 (Birmingham S) .
Lane Closures : Lane two will be closed.
Reason : Barrier repairs are planned.
Status : Pending.
Schedule : From 21:45 on 22 Nov 2017 to 06:00 on 23 Nov 2017.
Lanes Closed : There will be one of three lanes closed.

25.96 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J7 (Worcester) and J4A (Birmingham) .
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 20:03 on 6 Nov 2017 to 06:00 on 23 Dec 2017.

16.1 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J7 (Worcester) .
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 20:03 on 6 Nov 2017 to 06:00 on 23 Dec 2017.

25.18 miles from Five Bridges.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 21:02 on 7 Nov 2017 to 05:00 on 23 Dec 2017.

25.14 miles from Five Bridges.

ROAD WORKSLocation : The A40 eastbound between the junctions with the A4137 and the A49 .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

14.22 miles from Five Bridges.

ROAD WORKSLocation : The A40 westbound between the junctions with the A449 and the A49 .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 Nov 2017 to 25 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

13.77 miles from Five Bridges.

ROAD WORKSLocation : The M42 northbound between junctions J1 (Bromsgrove) and J2 (Birmingham S) .
Lane Closures : The hard shoulder is closed.
Reason : Emergency roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 3 Mar 2018.

27.57 miles from Five Bridges.

ROAD WORKSLocation : The M5 northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 21 Nov 2017 to 06:00 on 22 Nov 2017.
Lanes Closed : There will be two of three lanes closed.

13.27 miles from Five Bridges.

CONGESTIONCLEARED @ 14:57Location : The A417 northbound between the junctions with the M5 and the A38 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 14:45 and 15:00 on 21 Nov 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

22.35 miles from Five Bridges. CLEARED @ 14:57

CONGESTIONCLEARED @ 14:07Location : The A49 northbound between the A438 and the junction with the A4103 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 14:00 and 14:15 on 21 Nov 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

9.55 miles from Five Bridges. CLEARED @ 14:07

CONGESTIONCLEARED @ 12:57Location : The A49 northbound between the A466 and the junction with the A438 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 21 Nov 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

9.97 miles from Five Bridges. CLEARED @ 12:57

CONGESTIONCLEARED @ 12:17Location : The A49 southbound between the junctions with the A4103 and the A438 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:15 and 12:30 on 21 Nov 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

9.32 miles from Five Bridges. CLEARED @ 12:17

CONGESTIONCLEARED @ 12:07Location : The A49 northbound between the A466 and the junction with the A438 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:00 and 12:15 on 21 Nov 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

9.97 miles from Five Bridges. CLEARED @ 12:07

CONGESTIONCLEARED @ 11:08Location : The M5 southbound exit slip at junction J4 (Bromsgrove) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 11:00 and 11:15 on 21 Nov 2017.

27.13 miles from Five Bridges. CLEARED @ 11:08

CONGESTIONCLEARED @ 10:38Location : The M5 southbound exit slip at junction J5 (Droitwich) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 10:30 and 10:45 on 21 Nov 2017.

20.67 miles from Five Bridges. CLEARED @ 10:38

CONGESTIONCLEARED @ 10:37Location : The A417 southbound between the junctions with the A46 and the A436 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 10:30 and 10:45 on 21 Nov 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

25.48 miles from Five Bridges. CLEARED @ 10:37

CONGESTIONCLEARED @ 10:27Location : The A49 northbound between the A438 and the junction with the A4103 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 10:00 and 10:15 on 21 Nov 2017.

9.55 miles from Five Bridges. CLEARED @ 10:27

CONGESTIONCLEARED @ 10:07Location : The A49 northbound between the junctions with the A438 and the A4103 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 08:00 and 08:15 on 21 Nov 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

9.34 miles from Five Bridges. CLEARED @ 10:07

CONGESTIONCLEARED @ 10:17Location : The A40 eastbound between the junctions with the A4136 and the A48 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 08:00 and 08:15 on 21 Nov 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

19.25 miles from Five Bridges. CLEARED @ 10:17

ROAD WORKSCLEARED @ 10:18Location : The M5 northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 Nov 2017 to 29 Nov 2017.
Lanes Closed : There will be two of three lanes closed.

24.68 miles from Five Bridges. CLEARED @ 10:18

ROAD WORKSCLEARED @ 10:18Location : The M5 northbound between junctions J6 (Worcester) and J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 Nov 2017 to 23 Nov 2017.
Lanes Closed : There will be two of four lanes closed.

16.79 miles from Five Bridges. CLEARED @ 10:18

ROAD WORKSCLEARED @ 10:18Location : The M5 northbound between junctions J6 (Worcester) and J4A (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 Nov 2017 to 29 Nov 2017.
Lanes Closed : There will be two of four lanes closed.

18.95 miles from Five Bridges. CLEARED @ 10:18

ROAD WORKSCLEARED @ 10:18Location : The M5 northbound between junctions J6 (Worcester) and J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 Nov 2017 to 1 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

18.94 miles from Five Bridges. CLEARED @ 10:18

ROAD WORKSCLEARED @ 10:18Location : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 Dec 2017 to 7 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

22.83 miles from Five Bridges. CLEARED @ 10:18

ROAD WORKSCLEARED @ 10:18Location : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 Dec 2017 to 5 Dec 2017.
Lanes Closed : There will be two of four lanes closed.

22.04 miles from Five Bridges. CLEARED @ 10:18

ROAD WORKSCLEARED @ 10:18Location : The M5 northbound entry slip at junction J6 (Worcester) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 Nov 2017 to 23 Nov 2017.
Lanes Closed : All lanes will be closed.

16.59 miles from Five Bridges. CLEARED @ 10:18

ROAD WORKSCLEARED @ 10:18Location : The M5 northbound between junctions J7 (Worcester) and J6 (Worcester) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 Nov 2017 to 23 Nov 2017.
Lanes Closed : There will be two of three lanes closed.

15.71 miles from Five Bridges. CLEARED @ 10:18

Roadworks

Your Traffic Comments


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

CLEARED @ 14:57Location : northbound between the junctions with the M5 and the A38 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 14:45 and 15:00 on 21 November 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

22.35 miles from Five Bridges.

51.86--2.18

Location : northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Barrier repairs are planned.

Status : Pending.

Schedule : From 21:30 on 21 November 2017 to 06:00 on 22 November 2017.

Lanes Closed : There will be two of three lanes closed.

13.27 miles from Five Bridges.

52.13--2.2

CLEARED @ 14:07Location : northbound between the A438 and the junction with the A4103 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 14:00 and 14:15 on 21 November 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

9.55 miles from Five Bridges.

52.06--2.72

CLEARED @ 12:57Location : northbound between the A466 and the junction with the A438 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 21 November 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

9.97 miles from Five Bridges.

52.04--2.72

CLEARED @ 12:17Location : southbound between the junctions with the A4103 and the A438 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:15 and 12:30 on 21 November 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

9.32 miles from Five Bridges.

52.07--2.72

CLEARED @ 12:07Location : northbound between the A466 and the junction with the A438 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:00 and 12:15 on 21 November 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

9.97 miles from Five Bridges.

52.04--2.72

CLEARED @ 11:08Location : southbound exit slip at junction J4 (Bromsgrove) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 11:00 and 11:15 on 21 November 2017.

27.13 miles from Five Bridges.

52.38--2.05

CLEARED @ 10:38Location : southbound exit slip at junction J5 (Droitwich) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 10:30 and 10:45 on 21 November 2017.

20.67 miles from Five Bridges.

52.29--2.12

CLEARED @ 10:37Location : southbound between the junctions with the A46 and the A436 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 10:30 and 10:45 on 21 November 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

25.48 miles from Five Bridges.

51.84--2.11

CLEARED @ 10:27Location : northbound between the A438 and the junction with the A4103 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 10:00 and 10:15 on 21 November 2017.

9.55 miles from Five Bridges.

52.06--2.72

CLEARED @ 10:07Location : northbound between the junctions with the A438 and the A4103 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 08:00 and 08:15 on 21 November 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

9.34 miles from Five Bridges.

52.07--2.72

CLEARED @ 10:17Location : eastbound between the junctions with the A4136 and the A48 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 08:00 and 08:15 on 21 November 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

19.25 miles from Five Bridges.

51.87--2.28

Location : northbound between junctions J1 (Bromsgrove) and J2 (Birmingham S) .

Lane Closures : The hard shoulder is closed.

Reason : Emergency roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 3 March 2018.

27.57 miles from Five Bridges.

52.35--1.99

Location : westbound between the junctions with the A449 and the A49 .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2017 to 25 November 2017.

Lanes Closed : There will be one of two lanes closed.

13.77 miles from Five Bridges.

51.92--2.6

Location : eastbound between the junctions with the A4137 and the A49 .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2017 to 25 November 2017.

Lanes Closed : There will be one of two lanes closed.

14.22 miles from Five Bridges.

51.91--2.61

Location : southbound between junctions J4A (Birmingham) and J6 (Worcester) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 21:02 on 7 November 2017 to 05:00 on 23 December 2017.

25.14 miles from Five Bridges.

52.35--2.07

Location : southbound between junctions J4A (Birmingham) and J7 (Worcester) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:03 on 6 November 2017 to 06:00 on 23 December 2017.

25.18 miles from Five Bridges.

52.36--2.07

Location : northbound between junctions J7 (Worcester) and J4A (Birmingham) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:03 on 6 November 2017 to 06:00 on 23 December 2017.

16.1 miles from Five Bridges.

52.2--2.16

Location : northbound between the M5 and junction J2 (Birmingham S) .

Lane Closures : Lane two will be closed.

Reason : Barrier repairs are planned.

Status : Pending.

Schedule : From 21:45 on 22 November 2017 to 06:00 on 23 November 2017.

Lanes Closed : There will be one of three lanes closed.

25.96 miles from Five Bridges.

52.36--2.05

Location : southbound between junction J2 (Birmingham S) and the M5 .

Lane Closures : Lane two will be closed.

Reason : Barrier repairs are planned.

Status : Pending.

Schedule : From 21:45 on 22 November 2017 to 06:00 on 23 November 2017.

Lanes Closed : There will be one of three lanes closed.

29.29 miles from Five Bridges.

52.36--1.95

Location : northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 November 2017 to 29 November 2017.

Lanes Closed : There will be two of three lanes closed.

24.68 miles from Five Bridges.

52.35--2.08

Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 December 2017 to 7 December 2017.

Lanes Closed : There will be two of four lanes closed.

22.83 miles from Five Bridges.

52.32--2.1

Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 December 2017 to 5 December 2017.

Lanes Closed : There will be two of four lanes closed.

22.04 miles from Five Bridges.

52.31--2.1

Location : northbound between junctions J6 (Worcester) and J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 November 2017 to 16 December 2017.

Lanes Closed : There will be two of four lanes closed.

16.79 miles from Five Bridges.

52.22--2.16

Location : northbound between junctions J6 (Worcester) and J4A (Birmingham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 November 2017 to 29 November 2017.

Lanes Closed : There will be two of four lanes closed.

18.95 miles from Five Bridges.

52.26--2.14

Location : northbound between junctions J6 (Worcester) and J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 November 2017 to 1 December 2017.

Lanes Closed : There will be two of four lanes closed.

18.94 miles from Five Bridges.

52.26--2.14

Location : northbound entry slip at junction J6 (Worcester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 November 2017 to 16 December 2017.

Lanes Closed : All lanes will be closed.

16.59 miles from Five Bridges.

52.21--2.16

Location : northbound between junctions J7 (Worcester) and J6 (Worcester) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 November 2017 to 16 December 2017.

Lanes Closed : There will be two of three lanes closed.

15.71 miles from Five Bridges.

52.19--2.17

Location : westbound between the M5 and junction J2 (Hereford) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 November 2017 to 30 November 2017.

Lanes Closed : All lanes will be closed.

16.52 miles from Five Bridges.

52.05--2.14

Location : westbound between junctions J1 (Malvern) and J2 (Hereford) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 30 November 2017 to 2 December 2017.

Lanes Closed : There will be one of two lanes closed.

15.77 miles from Five Bridges.

52.04--2.16

Location : eastbound between junctions J2 (Hereford) and J1 (Malvern) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 27 November 2017 to 30 November 2017.

Lanes Closed : There will be one of two lanes closed.

10.19 miles from Five Bridges.

52--2.36

Location : eastbound between junction J2 (Hereford) and the M5 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 30 November 2017 to 2 December 2017.

Lanes Closed : All lanes will be closed.

10.19 miles from Five Bridges.

52--2.36

Location : southbound entry slip at junction J2 (Birmingham S) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 23 November 2017 to 05:00 on 24 November 2017.

Lanes Closed : All lanes will be closed.

29.43 miles from Five Bridges.

52.36--1.95

Location : northbound between junctions J11A (Gloucester) and J11 (Cheltenham) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 November 2017 to 05:00 on 24 November 2017.

Lanes Closed : There will be one of three lanes closed.

22.5 miles from Five Bridges.

51.87--2.16

Location : southbound between junctions J2 (Birmingham S) and J1 (Bromsgrove) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 November 2017 to 06:00 on 22 November 2017.

Lanes Closed : There will be one of three lanes closed.

26.43 miles from Five Bridges.

52.36--2.03

Location : southbound between junction J2 (Birmingham S) and the M5 .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 21:02 on 20 November 2017 to 06:00 on 30 November 2017.

26.43 miles from Five Bridges.

52.36--2.03

Location : southbound between junctions J4A (Birmingham) and J5 (Droitwich) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 November 2017 to 06:00 on 22 November 2017.

Lanes Closed : There will be one of four lanes closed.

24.91 miles from Five Bridges.

52.35--2.07

Location : southbound between junctions J4A (Birmingham) and J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 November 2017 to 28 November 2017.

Lanes Closed : There will be two of four lanes closed.

23.75 miles from Five Bridges.

52.33--2.08

CLEARED @ 10:18Location : northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 November 2017 to 29 November 2017.

Lanes Closed : There will be two of three lanes closed.

24.68 miles from Five Bridges.

52.35--2.08

CLEARED @ 10:18Location : northbound between junctions J6 (Worcester) and J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 November 2017 to 23 November 2017.

Lanes Closed : There will be two of four lanes closed.

16.79 miles from Five Bridges.

52.22--2.16

CLEARED @ 10:18Location : northbound between junctions J6 (Worcester) and J4A (Birmingham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 23 November 2017 to 29 November 2017.

Lanes Closed : There will be two of four lanes closed.

18.95 miles from Five Bridges.

52.26--2.14

CLEARED @ 10:18Location : northbound between junctions J6 (Worcester) and J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 29 November 2017 to 1 December 2017.

Lanes Closed : There will be two of four lanes closed.

18.94 miles from Five Bridges.

52.26--2.14

Location : southbound between junctions J4A (Birmingham) and J6 (Worcester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 November 2017 to 30 November 2017.

Lanes Closed : There will be one of four lanes closed.

21.36 miles from Five Bridges.

52.3--2.11

Location : southbound between junctions J4A (Birmingham) and J6 (Worcester) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 21:03 on 20 November 2017 to 06:00 on 8 December 2017.

25.11 miles from Five Bridges.

52.35--2.07

Location : southbound at junction J4A (Birmingham) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 November 2017 to 06:00 on 22 November 2017.

Lanes Closed : There will be one of two lanes closed.

25.11 miles from Five Bridges.

52.35--2.07

Location : slip road to the M5 southbound .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 28 November 2017 to 30 November 2017.

Lanes Closed : There will be one of two lanes closed.

25.47 miles from Five Bridges.

52.35--2.06

Location : slip road to the M5 southbound .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 November 2017 to 06:00 on 22 November 2017.

Lanes Closed : There will be one of two lanes closed.

25.47 miles from Five Bridges.

52.35--2.06

CLEARED @ 10:18Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 5 December 2017 to 7 December 2017.

Lanes Closed : There will be two of four lanes closed.

22.83 miles from Five Bridges.

52.32--2.1

CLEARED @ 10:18Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 1 December 2017 to 5 December 2017.

Lanes Closed : There will be two of four lanes closed.

22.04 miles from Five Bridges.

52.31--2.1

CLEARED @ 10:18Location : northbound entry slip at junction J6 (Worcester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 November 2017 to 23 November 2017.

Lanes Closed : All lanes will be closed.

16.59 miles from Five Bridges.

52.21--2.16

Location : southbound between junctions J5 (Droitwich) and J6 (Worcester) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 4 December 2017 to 8 December 2017.

Lanes Closed : There will be two of four lanes closed.

18.86 miles from Five Bridges.

52.26--2.14

Location : southbound between junctions J5 (Droitwich) and J6 (Worcester) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 November 2017 to 2 December 2017.

Lanes Closed : There will be two of four lanes closed.

20.29 miles from Five Bridges.

52.28--2.12

CLEARED @ 10:18Location : northbound between junctions J7 (Worcester) and J6 (Worcester) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 November 2017 to 23 November 2017.

Lanes Closed : There will be two of three lanes closed.

15.71 miles from Five Bridges.

52.19--2.17

Location : northbound between junctions J7 (Worcester) and J6 (Worcester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 November 2017 to 06:00 on 23 November 2017.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be one of three lanes closed.

15.33 miles from Five Bridges.

52.18--2.17

Location : westbound between the junctions with the A449 and the A49 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 21 November 2017 to 25 November 2017.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 27 November 2017 to 1 December 2017.

Lanes Closed : All lanes will be closed.

13.74 miles from Five Bridges.

51.92--2.59

Location : westbound between the junctions with the A49 and the A4137 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 21 November 2017 to 25 November 2017.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 27 November 2017 to 1 December 2017.

Lanes Closed : All lanes will be closed.

14.01 miles from Five Bridges.

51.92--2.6

Location : northbound between junctions J6 (Worcester) and J4 (Bromsgrove) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 21 November 2017 to 06:00 on 16 December 2017.

15.55 miles from Five Bridges.

52.19--2.17

Location : northbound between junctions J6 (Worcester) and J5 (Droitwich) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 November 2017 to 05:00 on 22 November 2017.

Lanes Closed : There will be one of four lanes closed.

16.79 miles from Five Bridges.

52.22--2.16

Location : northbound between junctions J7 (Worcester) and J6 (Worcester) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 21 November 2017 to 05:00 on 22 November 2017.

Lanes Closed : There will be one of three lanes closed.

14.59 miles from Five Bridges.

52.17--2.18

Location : northbound entry slip at junction J4A from M5 North.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

24.68 miles from Five Bridges.

52.35--2.08

Location : northbound at junction J4A (Birmingham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : There will be two of three lanes closed.

24.68 miles from Five Bridges.

52.35--2.08

Location : southbound between junctions J4A (Birmingham) and J6 (Worcester) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 05:00 on 23 December 2017.

Lanes Closed : There will be one of four lanes closed.

24.91 miles from Five Bridges.

52.35--2.07

Location : southbound between junctions J4A (Birmingham) and J6 (Worcester) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : There will be two of four lanes closed.

24.91 miles from Five Bridges.

52.35--2.07

Location : westbound between junctions J2 (Hereford) and J4 (S.

Wales) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 22 November 2017 to 24 November 2017.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 27 November 2017 to 30 November 2017.

10.06 miles from Five Bridges.

52--2.37

Location : eastbound between junctions J4 (S.

Wales) and J3 (Newent) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 17:00 on 21 November 2017.

Lanes Closed : There is one of two lanes closed.

12.7 miles from Five Bridges.

51.93--2.55

Location : eastbound between junction J4 (S.

Wales) and the M5 .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 17:00 on 21 November 2017.

12.63 miles from Five Bridges.

51.93--2.5

Location : westbound between the junctions with the A49 and the A4137 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2017 to 25 November 2017.

Lanes Closed : There will be one of two lanes closed.

14.01 miles from Five Bridges.

51.92--2.6

Location : westbound between the junctions with the A49 and the A4137 .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2017 to 25 November 2017.

Lanes Closed : There will be one of two lanes closed.

14.01 miles from Five Bridges.

51.92--2.6

Location : eastbound between the junctions with the A49 and the A449 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 4 December 2017 to 7 December 2017.

Lanes Closed : All lanes will be closed.

13.97 miles from Five Bridges.

51.92--2.6

Location : eastbound between the junctions with the A49 and the A449 .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2017 to 25 November 2017.

Lanes Closed : There will be one of two lanes closed.

13.97 miles from Five Bridges.

51.92--2.6

Location : eastbound between the junctions with the A49 and the A449 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2017 to 25 November 2017.

Lanes Closed : There will be one of two lanes closed.

13.97 miles from Five Bridges.

51.92--2.6

Location : westbound between the junctions with the A449 and the A49 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2017 to 25 November 2017.

Lanes Closed : There will be one of two lanes closed.

13.77 miles from Five Bridges.

51.92--2.6

Location : eastbound between the junctions with the A4137 and the A49 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 21 November 2017 to 25 November 2017.

Lanes Closed : There will be one of two lanes closed.

14.1 miles from Five Bridges.

51.92--2.6

Location : eastbound between the junctions with the A4137 and the A49 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 4 December 2017 to 7 December 2017.

Lanes Closed : All lanes will be closed.

14.22 miles from Five Bridges.

51.91--2.61

Location : southbound at junction J4A (Birmingham) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 05:00 on 23 December 2017.

Lanes Closed : There will be one of two lanes closed.

25.14 miles from Five Bridges.

52.35--2.07

Location : southbound at junction J4A (Birmingham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

25.18 miles from Five Bridges.

52.36--2.07

Location : southbound entry slip at junction J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 05:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

20.69 miles from Five Bridges.

52.29--2.12

Location : northbound entry slip at junction J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency road marking works are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

20.52 miles from Five Bridges.

52.29--2.12

Location : northbound between junctions J6 (Worcester) and J4A (Birmingham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : There will be two of four lanes closed.

16.79 miles from Five Bridges.

52.22--2.16

Location : northbound between junctions J7 (Worcester) and J6 (Worcester) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : There will be two of three lanes closed.

16.1 miles from Five Bridges.

52.2--2.16

Location : westbound between the M5 and junction J2 (Hereford) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 22 November 2017 to 24 November 2017.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 27 November 2017 to 30 November 2017.

16.54 miles from Five Bridges.

52.05--2.14

Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Reason : Emergency road marking works are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

20.66 miles from Five Bridges.

52.29--2.12

Location : northbound entry slip at junction J8 (Ross on Wye) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 22 November 2017 to 24 November 2017.

Schedule : Expect disruption everyday between 09:00 and 17:00 from 27 November 2017 to 30 November 2017.

16.53 miles from Five Bridges.

52.05--2.14

Location : southbound between junctions J6 (Worcester) and J7 (Worcester) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : There will be two of three lanes closed.

16.79 miles from Five Bridges.

52.22--2.16

Location : southbound exit slip at junction J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 05:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

20.7 miles from Five Bridges.

52.29--2.12

Location : northbound exit slip at junction J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 05:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

20.51 miles from Five Bridges.

52.28--2.12