Route Planner to Avoid Traffic
START
FINISH

Traffic East Grinstead

SLIGHT
SEVERE
FULL SCREENUPDATED: 17:10
×
×

Current traffic in East Grinstead

ROAD WORKSLocation : The M4 westbound between junctions J2 (N.Circular) and J3 (Heathrow) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 27 Sep 2017 to 28 Sep 2017.

29.38 miles from East Grinstead.

ROAD WORKSLocation : The A23 northbound between the junctions with the A281 and the A2300 .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 29 Sep 2017 to 06:00 on 30 Sep 2017.
Schedule : From 20:00 on 3 Oct 2017 to 06:00 on 4 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

14.74 miles from East Grinstead.

ROAD WORKSLocation : The A23 southbound between the junctions with the A2300 and the A281 .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 Sep 2017 to 29 Sep 2017.
Schedule : From 20:00 on 30 Sep 2017 to 06:00 on 1 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

13.68 miles from East Grinstead.

ROAD WORKSLocation : The M23 northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .
Lane Closures : Lane one will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 Sep 2017 to 29 Sep 2017.
Schedule : From 23:00 on 29 Sep 2017 to 05:00 on 30 Sep 2017.
Lanes Closed : There will be one of three lanes closed.

10.53 miles from East Grinstead.

ROAD WORKSLocation : The M3 westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .
Reason : Barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 27 Sep 2017 to 3 Oct 2017.

27.32 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise entry slip at junction J9 (Leatherhead) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 26 Sep 2017 to 05:00 on 27 Sep 2017.
Lanes Closed : All lanes will be closed.

18.5 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise at junction J8 (Reigate) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 26 Sep 2017 to 05:00 on 27 Sep 2017.
Lanes Closed : All lanes will be closed.

12.58 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 26 Sep 2017 to 05:00 on 27 Sep 2017.
Lanes Closed : There will be two of four lanes closed.

20.8 miles from East Grinstead.

ROAD WORKSLocation : The M26 westbound between junction J2A and the M25 .
Lane Closures : Lane two will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 26 Sep 2017 to 05:00 on 27 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

18.56 miles from East Grinstead.

ROAD WORKSLocation : The M26 eastbound between the M25 and junction J2A .
Lane Closures : Lane two will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 26 Sep 2017 to 05:00 on 27 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

16.76 miles from East Grinstead.

ROAD WORKSLocation : The M4 westbound between junctions J2 (N.Circular) and J3 (Heathrow) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 Sep 2017 to 29 Sep 2017.
Lanes Closed : There will be two of three lanes closed.

29.63 miles from East Grinstead.

ROAD WORKSLocation : The M23 southbound between junctions J10 (Crawley) and J11 (Brighton) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 Sep 2017 to 30 Sep 2017.
Schedule : From 20:00 on 2 Oct 2017 to 06:00 on 3 Oct 2017.
Lanes Closed : There will be one of three lanes closed.

5.52 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 Sep 2017 to 29 Sep 2017.
Schedule : From 23:00 on 29 Sep 2017 to 05:30 on 30 Sep 2017.
Lanes Closed : There will be two of four lanes closed.

28.67 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise exit slip at junction J11 (Chertsey) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 Sep 2017 to 29 Sep 2017.
Schedule : From 23:00 on 29 Sep 2017 to 05:30 on 30 Sep 2017.
Lanes Closed : All lanes will be closed.

27.97 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise at junction J11 (Chertsey) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 Sep 2017 to 29 Sep 2017.
Schedule : From 23:00 on 29 Sep 2017 to 05:30 on 30 Sep 2017.
Lanes Closed : There will be two of three lanes closed.

27.97 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : There will be two of four lanes closed.

20.8 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise exit slip at junction J31 (Thurrock) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

28.16 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise.
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

28.48 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J10 (Guildford) and J8 (Reigate) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : There will be three of four lanes closed.

19.89 miles from East Grinstead.

ROAD WORKSLocation : The M26 westbound between junction J2A and the M25 .
Lane Closures : Lane two will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

20.04 miles from East Grinstead.

ROAD WORKSLocation : The M26 eastbound between the M25 and junction J2A .
Lane Closures : Lane two will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

18.17 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : There will be three of four lanes closed.

22.3 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise exit slip at junction J12 (Basingstoke) .
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 28 Sep 2017 to 13 Oct 2017.

29.92 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 Sep 2017 to 05:30 on 27 Sep 2017.
Lanes Closed : There will be three of four lanes closed.

26.81 miles from East Grinstead.

ROAD WORKSLocation : The A3 northbound entry slip from the A31 .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 26 Sep 2017 to 06:00 on 27 Sep 2017.
Schedule : From 22:00 on 3 Oct 2017 to 06:00 on 4 Oct 2017.
Lanes Closed : All lanes will be closed.

27.43 miles from East Grinstead.

ROAD WORKSLocation : The A3 southbound exit slip to the A31 .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 06:00 on 28 Sep 2017.
Schedule : From 22:00 on 4 Oct 2017 to 06:00 on 5 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

27.19 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise entry slip at junction J10 (Guildford) .
Reason : Emergency litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : All lanes will be closed.

23.57 miles from East Grinstead.

ROAD WORKSLocation : The A2 westbound between the M2 and the junction with the A227 .
Lane Closures : Lane four will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 06:00 on 28 Sep 2017.
Lanes Closed : There will be one of four lanes closed.

26.33 miles from East Grinstead.

ROAD WORKSLocation : The M26 eastbound between junctions J2A and J3 .
Lane Closures : Lane two will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 28 Sep 2017 to 05:00 on 29 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

19.61 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Sep 2017 to 05:00 on 29 Sep 2017.
Lanes Closed : There will be one of four lanes closed.

20.72 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise exit slip at junction J8 (Reigate) .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 28 Sep 2017 to 05:00 on 29 Sep 2017.
Schedule : From 22:00 on 29 Sep 2017 to 06:00 on 30 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

12.64 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J8 (Reigate) and J9 (Leatherhead) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Sep 2017 to 05:00 on 29 Sep 2017.
Lanes Closed : There will be three of four lanes closed.

15.6 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 28 Sep 2017 to 05:00 on 29 Sep 2017.
Lanes Closed : There will be two of four lanes closed.

24.49 miles from East Grinstead.

ROAD WORKSLocation : The A3 northbound.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Sep 2017 to 06:00 on 29 Sep 2017.
Schedule : From 22:00 on 5 Oct 2017 to 06:00 on 6 Oct 2017.
Lanes Closed : All lanes will be closed.

28.1 miles from East Grinstead.

ROAD WORKSLocation : The M26 westbound between junctions J3 and J2A .
Lane Closures : Lane two will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 28 Sep 2017 to 05:00 on 29 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

20.64 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J5 (Sevenoaks) and J4 (Bromley) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 27 Sep 2017 to 29 Sep 2017.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 2 Oct 2017 to 6 Oct 2017.

14.62 miles from East Grinstead.

ROAD WORKSLocation : The M23 northbound exit slip at junction J10 (Crawley) .
Lane Closures : Lane two will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 26 Sep 2017 to 06:00 on 27 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

5.5 miles from East Grinstead.

ROAD WORKSLocation : The A27 eastbound between the junctions with the A270 Brighton West and the A293 .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 Sep 2017 to 1 Oct 2017.
Lanes Closed : All lanes will be closed.

20.85 miles from East Grinstead.

ROAD WORKSLocation : The A27 westbound between the junctions with the A293 and the A270 .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 Sep 2017 to 1 Oct 2017.
Lanes Closed : All lanes will be closed.

20.33 miles from East Grinstead.

ROAD WORKSLocation : The A3 southbound between the A320 and the junction with the A283 .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 29 Sep 2017 to 06:00 on 30 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

25.98 miles from East Grinstead.

ROAD WORKSLocation : The M2 westbound between junctions J4 (Gillingham) and J3 (Maidstone) .
Lane Closures : Lane one will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 29 Sep 2017 to 06:00 on 30 Sep 2017.
Lanes Closed : There will be one of three lanes closed.

29.58 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise entry slip at junction J11 (Chertsey) .
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 23:00 on 29 Sep 2017 to 05:00 on 30 Sep 2017.
Lanes Closed : All lanes will be closed.

27.83 miles from East Grinstead.

ROAD WORKSLocation : The M4 westbound between junctions J2 (N.Circular) and J3 (Heathrow) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 23:00 and 05:30 from 29 Sep 2017 to 1 Oct 2017.
Lanes Closed : There will be two of three lanes closed.

29.95 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane Closures : Lane one will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 29 Sep 2017 to 05:00 on 30 Sep 2017.
Lanes Closed : There will be one of four lanes closed.

22.33 miles from East Grinstead.

ROAD WORKSLocation : The M4 westbound between junctions J1 (London) and J3 (Heathrow) .
Lane Closures : Lane one will be closed.
Reason : Roadside drains works are planned.
Status : Pending.
Schedule : From 23:00 on 29 Sep 2017 to 05:00 on 30 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

28.16 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise entry slip at junction J12 (Basingstoke) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 Sep 2017 to 29 Sep 2017.
Schedule : From 22:30 on 29 Sep 2017 to 06:00 on 30 Sep 2017.
Lanes Closed : All lanes will be closed.

29.74 miles from East Grinstead.

ROAD WORKSLocation : The M3 eastbound entry slip at junction J2 (Gatwick M23) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:30 from 30 Sep 2017 to 2 Oct 2017.
Lanes Closed : All lanes will be closed.

29.71 miles from East Grinstead.

ROAD WORKSLocation : The M3 eastbound entry slip at junction J2 (Gatwick M23) from M25 clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:30 from 30 Sep 2017 to 2 Oct 2017.
Lanes Closed : All lanes will be closed.

29.87 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:30 on 30 Sep 2017 to 05:00 on 1 Oct 2017.
Lanes Closed : All lanes will be closed.

25.78 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J10 (Guildford) and J11 (Chertsey) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 30 Sep 2017 to 2 Oct 2017.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 2 Oct 2017 to 4 Oct 2017.
Schedule : From 22:00 on 7 Oct 2017 to 06:00 on 8 Oct 2017.
Schedule : From 22:30 on 8 Oct 2017 to 05:30 on 9 Oct 2017.
Lanes Closed : There will be two of four lanes closed.

25.26 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:30 and 05:30 from 1 Oct 2017 to 6 Oct 2017.
Schedule : From 22:30 on 6 Oct 2017 to 06:00 on 7 Oct 2017.
Schedule : From 21:00 on 7 Oct 2017 to 08:00 on 8 Oct 2017.
Schedule : Expect disruption everyday between 21:30 and 05:30 from 8 Oct 2017 to 12 Oct 2017.
Lanes Closed : There will be three of four lanes closed.

26.81 miles from East Grinstead.

ROAD WORKSLocation : The M26 westbound between junction J3 and the M25 .
Lane Closures : Lane two will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 28 Sep 2017 to 05:00 on 29 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

20.51 miles from East Grinstead.

ROAD WORKSLocation : The A21 northbound between the A262 and the junction with the A26 .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 Sep 2017 to 30 Sep 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 Oct 2017 to 7 Oct 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 Oct 2017 to 14 Oct 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 Oct 2017 to 21 Oct 2017.
Lanes Closed : All lanes will be closed.

14.24 miles from East Grinstead.

ROAD WORKSLocation : The M20 westbound between junctions J3 (Sevenoaks) and J1 .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 27 Sep 2017 to 29 Sep 2017.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 9 Oct 2017 to 13 Oct 2017.

19.57 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise entry slip at junction J5 (Sevenoaks) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : All lanes will be closed.

13.72 miles from East Grinstead.

ROAD WORKSLocation : The A21 northbound between the junctions with the A25 and the M25 .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : All lanes will be closed.

13.63 miles from East Grinstead.

ROAD WORKSLocation : The A21 northbound entry slip from the A25 .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Sep 2017 to 05:00 on 28 Sep 2017.
Lanes Closed : All lanes will be closed.

13.41 miles from East Grinstead.

ROAD WORKSLocation : The A3 southbound between the A31 and the junction with the A283 Milford north.
Lane Closures : Lane one will be closed.
Reason : Roadside drains works are planned.
Status : Pending.
Schedule : From 22:00 on 26 Sep 2017 to 06:00 on 27 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

28.2 miles from East Grinstead.

ROAD WORKSLocation : The M20 westbound exit slip at junction J5 (Aylesford) .
Reason : Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 21:00 on 6 Oct 2017 to 06:00 on 7 Oct 2017.
Schedule : From 21:00 on 9 Oct 2017 to 06:00 on 10 Oct 2017.
Lanes Closed : All lanes will be closed.

25.3 miles from East Grinstead.

ROAD WORKSLocation : The M20 westbound exit slip at junction J7 (Maidstone) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 Oct 2017 to 6 Oct 2017.
Lanes Closed : All lanes will be closed.

27.58 miles from East Grinstead.

ROAD WORKSLocation : The M20 westbound exit slip at junction J4 (West Malling) .
Reason : Emergency roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:30 and 06:00 from 25 Sep 2017 to 28 Sep 2017.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 Oct 2017 to 13 Oct 2017.
Lanes Closed : All lanes will be closed.

23.36 miles from East Grinstead.

ROAD WORKSLocation : The A27 westbound entry slip from the A23 .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 26 Sep 2017 to 06:00 on 27 Sep 2017.
Lanes Closed : All lanes will be closed.

18.12 miles from East Grinstead.

ROAD WORKSLocation : The A27 westbound between the junctions with the A280 and the A284 Arundel East.
Lane Closures : Lane one will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 28 Sep 2017 to 06:00 on 29 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

27.92 miles from East Grinstead.

ROAD WORKSLocation : The M3 westbound entry slip at junction J2 (Gatwick M23) from M25 anti-clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:30 from 25 Sep 2017 to 30 Sep 2017.
Lanes Closed : All lanes will be closed.

29.86 miles from East Grinstead.

ROAD WORKSLocation : The A27 westbound between the A283 and the junction with the A2025 .
Lane Closures : Lane two will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 Oct 2017 to 06:00 on 4 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

22.43 miles from East Grinstead.

ROAD WORKSLocation : The A27 eastbound between the A2025 and the junction with the A283 .
Lane Closures : Lane two will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 3 Oct 2017 to 06:00 on 4 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

23.33 miles from East Grinstead.

ROAD WORKSLocation : The A27 westbound between the A24 North and the junction with the A280 .
Lane Closures : Lane two will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 4 Oct 2017 to 06:00 on 5 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

26.01 miles from East Grinstead.

ROAD WORKSLocation : The A27 eastbound between the A280 and the junction with the A24 North.
Lane Closures : Lane two will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 4 Oct 2017 to 06:00 on 5 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

26.96 miles from East Grinstead.

ROAD WORKSLocation : The A27 westbound between the junctions with the A280 and the A284 Arundel East.
Lane Closures : Lane two will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 5 Oct 2017 to 06:00 on 6 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

29.4 miles from East Grinstead.

ROAD WORKSLocation : The A27 westbound between the A277 and the junction with the A23 .
Lane Closures : Lane two will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 2 Oct 2017 to 06:00 on 3 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

17.26 miles from East Grinstead.

ROAD WORKSLocation : The A27 westbound between the junctions with the A280 and the A284 Arundel East.
Lane Closures : Lane two will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 5 Oct 2017 to 06:00 on 6 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

28.34 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J5 (Sevenoaks) and J4 (Bromley) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of three lanes closed.

15.46 miles from East Grinstead.

ROAD WORKSLocation : The M23 northbound at junction J8 (Reigate) .
Lane Closures : Lane two will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 4 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

11.26 miles from East Grinstead.

ROAD WORKSLocation : The M23 southbound between junctions J7 (Crawley) and J8 (Reigate) .
Lane Closures : Lane four will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 4 Oct 2017.
Lanes Closed : There will be one of four lanes closed.

11.75 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J4 (Bromley) and J3 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of three lanes closed.

18.58 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise at junction J3 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of three lanes closed.

20.81 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be three of four lanes closed.

23.25 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of four lanes closed.

23.86 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J3 (Maidstone) and J4 (Bromley) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of three lanes closed.

21.57 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise at junction J3 (Maidstone) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of three lanes closed.

21.68 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 2 Oct 2017 to 05:00 on 3 Oct 2017.
Lanes Closed : There will be two of four lanes closed.

13.98 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise at junction J1B (Dartford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of four lanes closed.

25.01 miles from East Grinstead.

ROAD WORKSLocation : The M26 westbound between junction J2A and the M25 .
Lane Closures : Lane one will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : From 22:00 on 2 Oct 2017 to 05:00 on 3 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

14.4 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise at junction J1B (Dartford) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of four lanes closed.

24.65 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of four lanes closed.

22.68 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of four lanes closed.

23.29 miles from East Grinstead.

ROAD WORKSLocation : The M23 northbound between junctions J8 (Reigate) and J7 (Crawley) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 4 Oct 2017.
Lanes Closed : There will be two of three lanes closed.

11.72 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be three of four lanes closed.

21.5 miles from East Grinstead.

ROAD WORKSLocation : The M3 eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .
Lane Closures : Lane one will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 5 Oct 2017.
Lanes Closed : There will be one of three lanes closed.

27.2 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise at junction J2 (London (SE)) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of three lanes closed.

24.51 miles from East Grinstead.

ROAD WORKSLocation : The M25 clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 2 Oct 2017 to 05:00 on 3 Oct 2017.
Lanes Closed : There will be three of four lanes closed.

20.64 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise at junction J2 (London (SE)) .
Lane Closures : Lane three will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be one of three lanes closed.

23.81 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise at junction J2 (London (SE)) .
Lane Closures : Lane three will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be one of three lanes closed.

23.83 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise at junction J2 (London (SE)) .
Lane Closures : Lane three will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be one of three lanes closed.

24.37 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise at junction J2 (London (SE)) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of four lanes closed.

24.53 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J2 (London (SE)) and J1A (Erith) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Litter clearance is planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of four lanes closed.

24.48 miles from East Grinstead.

ROAD WORKSLocation : The M3 eastbound exit slip at junction J1 (Sunbury) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 5 Oct 2017.
Lanes Closed : All lanes will be closed.

27.2 miles from East Grinstead.

ROAD WORKSLocation : The M4 westbound between junctions J2 (N.Circular) and J3 (Heathrow) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadside drains works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 Oct 2017 to 6 Oct 2017.
Schedule : From 23:00 on 6 Oct 2017 to 05:00 on 7 Oct 2017.
Lanes Closed : There will be two of three lanes closed.

29.66 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 26 Sep 2017 to 29 Sep 2017.
Lanes Closed : There will be two of four lanes closed.

25.59 miles from East Grinstead.

ROAD WORKSLocation : The M3 eastbound entry slip at junction J2 (Gatwick M23) from M25 clockwise.
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:30 from 26 Sep 2017 to 11 Oct 2017.
Lanes Closed : All lanes will be closed.

29.87 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 Sep 2017 to 30 Sep 2017.
Lanes Closed : There will be three of four lanes closed.

26.51 miles from East Grinstead.

ROAD WORKSLocation : The M2 eastbound entry slip at junction J2 (Strood) .
Lane Closures : Lane one will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Sep 2017 to 06:00 on 30 Sep 2017.
Lanes Closed : All lanes will be closed.

27.97 miles from East Grinstead.

ROAD WORKSLocation : The M2 eastbound between junctions J2 (Strood) and J3 (Maidstone) .
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 28 Sep 2017 to 29 Sep 2017.

27.83 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J9 (Leatherhead) and J8 (Reigate) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:30 on 28 Sep 2017 to 16:00 on 28 Sep 2017.

15.36 miles from East Grinstead.

ROAD WORKSLocation : The M25 anticlockwise between junctions J9 (Leatherhead) and J8 (Reigate) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Sep 2017 to 05:00 on 29 Sep 2017.
Lanes Closed : There will be three of four lanes closed.

18.82 miles from East Grinstead.

MAJOR EVENTWarning, congestion may occur around The Queen Elizabeth Olympic Park in London because of an event taking place: The Great Willy Waddle (around 6:30pm).

29.15 miles from East Grinstead.

MAJOR EVENTPossible delays to traffic in this vicinity for an event: Kim Yong-Ik at Korean Cultural Centre UK, London between 10:00am - 6:00pm.

27.41 miles from East Grinstead.

MAJOR EVENTWarning, congestion may occur around Satoshi Global in London because of an event taking place: Bitcoin For Dummies London (between 6:00pm - 7:30pm).

28.23 miles from East Grinstead.

MAJOR EVENTWarning, congestion may occur around One Poultry in London because of an event taking place: Barry Cawston Are We There Yet? 2017 (between 12:00pm - 6:00pm).

27.58 miles from East Grinstead.

MAJOR EVENTAdvance warning: The Bitcoin For Dummies is taking place at Satoshi Global and may have an impact on the traffic in London between 6:00pm - 7:30pm.

28.23 miles from East Grinstead.

ROAD WORKSLocation : The A27 eastbound entry slip from the A293 .
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 20:01 on 11 Sep 2017 to 06:00 on 23 Sep 2017.

20.04 miles from East Grinstead.

ROAD WORKSLocation : The A21 northbound between the A262 and the junction with the A26 .
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 20:01 on 25 Sep 2017 to 06:00 on 4 Nov 2017.

14.24 miles from East Grinstead.

CONGESTIONLocation : The M25 anticlockwise.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

28.54 miles from East Grinstead.

CONGESTIONLocation : The M25 clockwise exit slip at Cobham Services.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:45 and 17:00 on 26 Sep 2017.

21.33 miles from East Grinstead.

CONGESTIONLocation : The M23 southbound exit slip at junction J9 (Gatwick Airport) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

5.89 miles from East Grinstead.

CONGESTIONLocation : The A23 northbound entry slip from the A27 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:45 and 17:00 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

18.2 miles from East Grinstead.

CONGESTIONLocation : The A2 westbound exit slip to the A227 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:45 and 17:00 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

26.28 miles from East Grinstead.

ROAD WORKSLocation : The M3 westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:30 from 26 Sep 2017 to 30 Sep 2017.
Lanes Closed : All lanes will be closed.

28.54 miles from East Grinstead.

ROAD WORKSCLEARED @ 15:02Location : The M25 clockwise between junctions J11 (Chertsey) and J13 (A30) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 Sep 2017 to 29 Sep 2017.
Schedule : From 23:00 on 29 Sep 2017 to 06:00 on 30 Sep 2017.
Lanes Closed : All lanes will be closed.

29.36 miles from East Grinstead. CLEARED @ 15:02

CONGESTIONCLEARED @ 16:31Location : The A259 eastbound between the junctions with the A269 Bexhill West and the A269 Bexhill East.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:15 and 16:30 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

28.26 miles from East Grinstead. CLEARED @ 16:31

CONGESTIONCLEARED @ 16:32Location : The M25 anticlockwise at junction J1A (Erith) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:30 and 16:45 on 26 Sep 2017.

25.86 miles from East Grinstead. CLEARED @ 16:32

CONGESTIONCLEARED @ 16:31Location : The A3 southbound exit slip to the M25 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:30 and 16:45 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

23.54 miles from East Grinstead. CLEARED @ 16:31

CONGESTIONCLEARED @ 16:11Location : The A2 westbound exit slip to the A227 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:00 and 16:15 on 26 Sep 2017.

26.28 miles from East Grinstead. CLEARED @ 16:11

CONGESTIONCLEARED @ 15:52Location : The M25 anticlockwise at junction J1A (Erith) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 26 Sep 2017.

25.86 miles from East Grinstead. CLEARED @ 15:52

CONGESTIONCLEARED @ 15:51Location : The M20 westbound exit slip at junction J1 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 26 Sep 2017.

20.87 miles from East Grinstead. CLEARED @ 15:51

CONGESTIONCLEARED @ 15:12Location : The M25 anticlockwise at junction J1A (Erith) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:15 and 15:30 on 26 Sep 2017.

25.86 miles from East Grinstead. CLEARED @ 15:12

CONGESTIONCLEARED @ 15:42Location : The M25 anticlockwise entry slip at junction J1A (Erith) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

25.77 miles from East Grinstead. CLEARED @ 15:42

CONGESTIONCLEARED @ 15:21Location : The A27 eastbound exit slip to the A23 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:15 and 15:30 on 26 Sep 2017.

18.11 miles from East Grinstead. CLEARED @ 15:21

CONGESTIONCLEARED @ 15:11Location : The M20 westbound entry slip at junction J2 (Paddock Wood) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:00 and 15:15 on 26 Sep 2017.

19.68 miles from East Grinstead. CLEARED @ 15:11

CONGESTIONCLEARED @ 15:01Location : The A27 eastbound entry slip from the A23 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 14:45 and 15:00 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

18.03 miles from East Grinstead. CLEARED @ 15:01

CONGESTIONCLEARED @ 14:51Location : The A259 westbound between the junctions with the A269 Bexhill West and the A27 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 14:45 and 15:00 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

26.92 miles from East Grinstead. CLEARED @ 14:51

CONGESTIONCLEARED @ 15:02Location : The M25 anticlockwise.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:00 and 15:15 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

28.54 miles from East Grinstead. CLEARED @ 15:02

CONGESTIONCLEARED @ 14:01Location : The M23 southbound exit slip at junction J8 (Reigate) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

11.51 miles from East Grinstead. CLEARED @ 14:01

CONGESTIONCLEARED @ 14:31Location : The A259 westbound between the junctions with the A269 Bexhill West and the A27 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 14:15 and 14:30 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

27.12 miles from East Grinstead. CLEARED @ 14:31

CONGESTIONCLEARED @ 13:21Location : The A259 westbound between the junctions with the A269 Bexhill West and the A27 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:15 and 13:30 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

26.92 miles from East Grinstead. CLEARED @ 13:21

CONGESTIONCLEARED @ 12:52Location : The M25 anticlockwise at junction J1A (Erith) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 26 Sep 2017.

25.86 miles from East Grinstead. CLEARED @ 12:52

CONGESTIONCLEARED @ 12:00Location : The A3 southbound.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 11:45 and 12:00 on 26 Sep 2017.

26.58 miles from East Grinstead. CLEARED @ 12:00

CONGESTIONCLEARED @ 12:11Location : The A259 westbound between the junctions with the A269 Bexhill West and the A27 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:00 and 12:15 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

26.92 miles from East Grinstead. CLEARED @ 12:11

BROKEN DOWN VEHICLECLEARED @ 11:42Location : The M25 anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .
Lane Closures : Lane one is closed.
Reason : Broken down vehicle.
Status : Currently Active.
Time To Clear : The event is expected to clear between 12:15 and 12:30 on 26 Sep 2017.
Lanes Closed : There is one of four lanes closed.

10.44 miles from East Grinstead. CLEARED @ 11:42

CONGESTIONCLEARED @ 12:11Location : The A21 southbound exit slip to the A225 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:00 and 12:15 on 26 Sep 2017.

12.99 miles from East Grinstead. CLEARED @ 12:11

CONGESTIONCLEARED @ 11:22Location : The M25 anticlockwise entry slip at junction J1A (Erith) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 11:15 and 11:30 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

25.77 miles from East Grinstead. CLEARED @ 11:22

CONGESTIONCLEARED @ 11:12Location : The M25 clockwise exit slip at junction J2 (London (SE)) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 11:00 and 11:15 on 26 Sep 2017.

24.37 miles from East Grinstead. CLEARED @ 11:12

CONGESTIONCLEARED @ 11:12Location : The M4 eastbound entry slip at junction J2 (N.Circular) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 11:15 and 11:30 on 26 Sep 2017.

28.57 miles from East Grinstead. CLEARED @ 11:12

CONGESTIONCLEARED @ 11:21Location : The A259 westbound between the junctions with the A269 Bexhill West and the A27 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 11:15 and 11:30 on 26 Sep 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

27.12 miles from East Grinstead. CLEARED @ 11:21

Roadworks

Your Traffic Comments


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways Agency

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location : westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:30 from 26 September 2017 to 30 September 2017.

Lanes Closed : All lanes will be closed.

28.54 miles from East Grinstead.

51.4--0.5

CLEARED @ 15:02Location : clockwise between junctions J11 (Chertsey) and J13 (A30) .

Lane Closures : Lanes 1, 2, 3 and 4 will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 September 2017 to 29 September 2017.

Schedule : From 23:00 on 29 September 2017 to 06:00 on 30 September 2017.

Lanes Closed : All lanes will be closed.

29.36 miles from East Grinstead.

51.39--0.53

Location : westbound exit slip to the A227 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:45 and 17:00 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

26.28 miles from East Grinstead.

51.41-0.36

Location : northbound entry slip from the A27 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:45 and 17:00 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

18.2 miles from East Grinstead.

50.87--0.15

Location : southbound exit slip at junction J9 (Gatwick Airport) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

5.89 miles from East Grinstead.

51.16--0.13

Location : clockwise exit slip at Cobham Services.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:45 and 17:00 on 26 September 2017.

21.33 miles from East Grinstead.

51.31--0.41

Location : anticlockwise.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

28.54 miles from East Grinstead.

51.49-0.27

CLEARED @ 16:31Location : eastbound between the junctions with the A269 Bexhill West and the A269 Bexhill East.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:15 and 16:30 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

28.26 miles from East Grinstead.

50.85-0.47

CLEARED @ 16:32Location : anticlockwise at junction J1A (Erith) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:30 and 16:45 on 26 September 2017.

25.86 miles from East Grinstead.

51.45-0.24

CLEARED @ 16:31Location : southbound exit slip to the M25 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:30 and 16:45 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

23.54 miles from East Grinstead.

51.32--0.45

CLEARED @ 16:11Location : westbound exit slip to the A227 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:00 and 16:15 on 26 September 2017.

26.28 miles from East Grinstead.

51.41-0.36

CLEARED @ 15:52Location : anticlockwise at junction J1A (Erith) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 26 September 2017.

25.86 miles from East Grinstead.

51.45-0.24

CLEARED @ 15:51Location : westbound exit slip at junction J1 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 26 September 2017.

20.87 miles from East Grinstead.

51.39-0.2

CLEARED @ 15:12Location : anticlockwise at junction J1A (Erith) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:15 and 15:30 on 26 September 2017.

25.86 miles from East Grinstead.

51.45-0.24

CLEARED @ 15:42Location : anticlockwise entry slip at junction J1A (Erith) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

25.77 miles from East Grinstead.

51.45-0.24

CLEARED @ 15:21Location : eastbound exit slip to the A23 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:15 and 15:30 on 26 September 2017.

18.11 miles from East Grinstead.

50.87--0.15

CLEARED @ 15:11Location : westbound entry slip at junction J2 (Paddock Wood) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:00 and 15:15 on 26 September 2017.

19.68 miles from East Grinstead.

51.31-0.32

CLEARED @ 15:01Location : eastbound entry slip from the A23 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 14:45 and 15:00 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

18.03 miles from East Grinstead.

50.87--0.15

CLEARED @ 14:51Location : westbound between the junctions with the A269 Bexhill West and the A27 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 14:45 and 15:00 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

26.92 miles from East Grinstead.

50.84-0.43

CLEARED @ 15:02Location : anticlockwise.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:00 and 15:15 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

28.54 miles from East Grinstead.

51.49-0.27

CLEARED @ 14:01Location : southbound exit slip at junction J8 (Reigate) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

11.51 miles from East Grinstead.

51.27--0.13

CLEARED @ 14:31Location : westbound between the junctions with the A269 Bexhill West and the A27 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 14:15 and 14:30 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

27.12 miles from East Grinstead.

50.85-0.43

CLEARED @ 13:21Location : westbound between the junctions with the A269 Bexhill West and the A27 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:15 and 13:30 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

26.92 miles from East Grinstead.

50.84-0.43

CLEARED @ 12:52Location : anticlockwise at junction J1A (Erith) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 26 September 2017.

25.86 miles from East Grinstead.

51.45-0.24

CLEARED @ 12:00Location : southbound.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 11:45 and 12:00 on 26 September 2017.

26.58 miles from East Grinstead.

51.24--0.6

CLEARED @ 12:11Location : westbound between the junctions with the A269 Bexhill West and the A27 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:00 and 12:15 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

26.92 miles from East Grinstead.

50.84-0.43

CLEARED @ 11:42Location : anticlockwise between junctions J6 (East Grinstead) and J5 (Sevenoaks) .

Lane Closures : Lane one is closed.

Reason : Broken down vehicle.

Status : Currently Active.

Time To Clear : The event is expected to clear between 12:15 and 12:30 on 26 September 2017.

Lanes Closed : There is one of four lanes closed.

10.44 miles from East Grinstead.

51.27--0.02

CLEARED @ 12:11Location : southbound exit slip to the A225 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:00 and 12:15 on 26 September 2017.

12.99 miles from East Grinstead.

51.24-0.21

CLEARED @ 11:22Location : anticlockwise entry slip at junction J1A (Erith) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 11:15 and 11:30 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

25.77 miles from East Grinstead.

51.45-0.24

CLEARED @ 11:12Location : clockwise exit slip at junction J2 (London (SE)) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 11:00 and 11:15 on 26 September 2017.

24.37 miles from East Grinstead.

51.43-0.24

CLEARED @ 11:12Location : eastbound entry slip at junction J2 (N.Circular) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 11:15 and 11:30 on 26 September 2017.

28.57 miles from East Grinstead.

51.49--0.3

CLEARED @ 11:21Location : westbound between the junctions with the A269 Bexhill West and the A27 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 11:15 and 11:30 on 26 September 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

27.12 miles from East Grinstead.

50.85-0.43

Location : northbound between the A262 and the junction with the A26 .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:01 on 25 September 2017 to 06:00 on 4 November 2017.

14.24 miles from East Grinstead.

51.14-0.31

Location : eastbound entry slip from the A293 .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:01 on 11 September 2017 to 06:00 on 23 September 2017.

20.04 miles from East Grinstead.

50.85--0.21

Rotherhithe Tunnel (All Directions) - Tunnel has fully re-opened.

Traffic flows are returning to normal for time of day.

Tunnel has fully re-opened.

Traffic flows are returning to normal for time of day.

26.62 miles from East Grinstead.

51.5--0.05

Hampstead Road junction with Harrington Square (Southbound): There is a low defective road sign at this location.

The sign has now been made safe.

29.34 miles from East Grinstead.

51.53--0.14

Hanover Street (Both Directions) at the junction of Regent Street - Road closure due to a crane operation Hanover Street is open.

27.97 miles from East Grinstead.

51.51--0.14

Cross Deep (All Directions) junction with Grotto Road.

All closures have been removed - Traffic flows have returned to normal in the area

26.4 miles from East Grinstead.

51.44--0.34

Tolworth Rise North (Northbound) - Lane restriction on on-slip to northbound A3 at the junction of Fairmead due to emergency gas works.

Restrictions have been removed.

All lanes open.

21.53 miles from East Grinstead.

51.38--0.28

St Paul's Way (Both Directions) between Burgess Street and Bow Common Lane - Road closure to facilitate roadworks No restrictions in place.

27.78 miles from East Grinstead.

51.52--0.02

Leatherhead Road (Northbound).

Traffic is moving well.

Traffic is moving well.

20.37 miles from East Grinstead.

51.34--0.32

Harleyford Road junction with Kennington Oval (Northbound) There is a collision at this location.

Traffic is moving well.

25.78 miles from East Grinstead.

51.48--0.12

Clapham Common North Side (Eastbound) at the junction of Long Road .

Road reopened and traffic is moving well.

24.42 miles from East Grinstead.

51.46--0.14

Albert Road junction with Saville Road (All Directions): There is a reported building fire at this location.

All restrictions have now been lifted.

There are no reports of congestion in the area.

26.75 miles from East Grinstead.

51.5-0.04

Marylebone Road (All Directions) at the junction of Park Crescent the traffic signals are not working correctly.

Traffic is flowing normally for the time of day.

28.67 miles from East Grinstead.

51.52--0.15

Buckingham Palace Road (All Directions) at the junction of Buckingham Gate - Temporary traffic signals in operation to facilitate road works.

The temporary traffic lights have been removed and traffic flows have returned to normal.

26.96 miles from East Grinstead.

51.5--0.14

West Hill (westbound) between Keswick Road and Portinscale Road.

Partial lane one restriction.

All lanes have reopened on West Hill -Works are complete - Traffic flows have returned to normal

24.78 miles from East Grinstead.

51.45--0.21

Gunnersbury Avenue (North Circular Road) (Southbound) at the junction of Power Road - Collision vehicles have now been cleared.

Traffic flowing well in the area.

28.43 miles from East Grinstead.

51.49--0.28

Praed Street (northbound) at the junction of Edgware Road - A broken down van is blocking the middle lane.

Vehicle has been recovered.

28.57 miles from East Grinstead.

51.52--0.17

High Holborn (All Directions) at the junction of Endell Street - The traffic lights are not working.

Signals have been restored.

27.98 miles from East Grinstead.

51.52--0.13

Goodge Street at the junction of Tottenham Court Road - Lane one (of two) is closed due to a burst water main No visible lane restrictions in place.

28.34 miles from East Grinstead.

51.52--0.13

Wellington Road (Northbound) at the junction of Grove End Road - The traffic signals have been damaged.

Police are partially blocking the junction for safety reasons.

No restrictions in place.

29.64 miles from East Grinstead.

51.53--0.17

Bromley Common (Southbound) at the junction of Crown Lane - There is a collision at this location.

The southbound carriageway is blocked due a collision.

Police are directing traffic.

Expect delays

18.99 miles from East Grinstead.

51.39-0.04

Romford Road (Both Directions) between Upton Lane and Green Street - Romford Road has reopened in both directions Romford Road has reopened in both directions, and vehicles that remain parked at the scene are not causing an obstruction.

Traffic is flowing normally.

29.78 miles from East Grinstead.

51.55-0.03

Norwood Road (Southbound) at the junction of Robson Road - Waterworks completed.

Traffic is moving well.

22.2 miles from East Grinstead.

51.43--0.1

Newham Way (Eastbound) at the junction of Noel Road - All lanes now open.

All lanes now open.

27.98 miles from East Grinstead.

51.52-0.05

Trinity Road (Both Directions) at the junction of Eatonville Road - Temporary traffic signals will be in place to facilitate water works.

23.12 miles from East Grinstead.

51.44--0.16

Threadneedle Street (Eastbound) at the junction of Bishopsgate - A parked lorry is causing an obstruction.

Broken down vehicle has been moved.

Traffic flowing well.

27.63 miles from East Grinstead.

51.51--0.08

Victoria Street (Westbound) between Artillery Row and Bressenden Place.

There will be a westbound closure to facilitate drainage works.

26.78 miles from East Grinstead.

51.5--0.14

A4 Piccadilly (Eastbound) at the junction of Old Bond Street - lane restriction due in to facilitate crane operation.

Currently no visible restrictions.

Traffic flow is light with no delays.

27.62 miles from East Grinstead.

51.51--0.14

Battersea Park Road (Eastbound) at the junction of Battersea Bridge Road - Lane one is closed due to an emergency gas leak Traffic flows are normal for the time of day.

25.42 miles from East Grinstead.

51.47--0.17

Essex Road at the junction with Cross Street - Restrictions in place to facilitate urgent water works All works now complete and restrictions now removed.

29.37 miles from East Grinstead.

51.54--0.1

The road will be closed northbound with a contra flow in operation.

City Road is open in both directions - Traffic is light and flowing well

28.08 miles from East Grinstead.

51.52--0.09

On Tolworth Broadway (Southbound) at the junction with A3 Tolworth Roundabout, there is a broken down vehicle blocking lane two of three).

Approach with caution.

All lanes have reopened.

Traffic is flowing well.

21.44 miles from East Grinstead.

51.38--0.28

Strand (Eastbound) at the junction of Burleigh Street Contractors have attended to manhole.

Restrictions have been removed.

27.59 miles from East Grinstead.

51.51--0.12

Trafalgar Road (Eastbound) at the junction of Park Row - Lane blocked due to a broken down tanker The broken down has now been removed and all lanes are open.

Traffic is flowing well

25.3 miles from East Grinstead.

51.48-0

Talgarth Road (Westbound) between Gliddon Road North End Road - Lane one is blocked following a collision.

Traffic is slow moving on approach, expect delays.

27.15 miles from East Grinstead.

51.49--0.21

Sydenham Road (Both Directions) at the junction of Larkbere Road - Reports of an accident at this location.

Traffic is flowing well.

21.48 miles from East Grinstead.

51.43--0.04

Lane closure to facilitate water works There are no reports of congestion in the area.

26.2 miles from East Grinstead.

51.48--0.18

Limehouse Link Tunnel (Eastbound) - lane one blocked due to broken down car.

Vehicle has now been recovered.

All lanes now reopen.

Traffic flowing well.

27.08 miles from East Grinstead.

51.51--0.03

City Road (All Directions) at the junction of Leonard Street - Temporary traffic signals in operation to facilitate road works.

No restrictions in place - Traffic light and flowing well

28.34 miles from East Grinstead.

51.52--0.09

Greenwich High Road (Westbound) at the junction of Greenwich South Street - now clear.

Traffic is moving well.

24.96 miles from East Grinstead.

51.48--0.01

Hammersmith Flyover - lane 2 will be closed in both directions overnight for inspection works.

27.34 miles from East Grinstead.

51.49--0.22

Battersea Rise (Eastbound) at the junction of St John's Road - Lane one closure in place to remove and build a bus shelter.

24.71 miles from East Grinstead.

51.46--0.17

Purley Way (Northbound) between Whitestone Way and Commerce Way - Lane closure for BT works.

18.35 miles from East Grinstead.

51.37--0.12

Marsham Street (All Directions) at the junction of Page Street - Lane restrictions controlled by three-way temporary traffic signals to facilitate telecomm ducting works.

Restrictions have been removed and all lanes are open.

26.51 miles from East Grinstead.

51.49--0.13

Caledonian Road (Southbound) at the junction of Omega Place - Lane restrictions to facilitate water works No restrictions in the area.

Traffic is free flowing.

28.99 miles from East Grinstead.

51.53--0.12

West Hill (Westbound) at the junction of Upper Richmond Road - Lane two blocked due to broken down van.

The broken down van has been recovered and traffic flows ahve returned to normal.

24.83 miles from East Grinstead.

51.46--0.2

Blackwall Tunnel Northern Approach (Southbound) at the junction of East India Dock Road - Congestion due cleared.

A12 Southbound traffic flows have returned to normal for the time of day.

27.34 miles from East Grinstead.

51.51--0.01

Gracechurch Street (Both Directions) at the junction of Lombard Street.

Lane one closed to facilitate repairs to a blockage.

Traffic is flowing well in the area.

27.44 miles from East Grinstead.

51.51--0.08

Dulwich Common (Both Directions) at the junction of Ryecotes Mead - All lanes are now open.

All lanes are now open.

Traffic is flowing well in the area.

22.72 miles from East Grinstead.

51.44--0.08

Rotherhithe Tunnel (Northbound) there is a broken down vehicle paritally blocking the road.

Approach with care.

The tunnel has been opened in both directions.

Traffic is light and flowing well in the area.

27.2 miles from East Grinstead.

51.51--0.04

Giltspur Street (All Directions) closed to facilitate an event.

No restrictions in place.

27.92 miles from East Grinstead.

51.52--0.1

Road closed for telecoms work.

Diversions in operation.

The tunnel remains closed.

Use an alternative route.

26.91 miles from East Grinstead.

51.5--0.09

Horn Lane (All Directions) at the junction of Rectory Road - Three-way temporary signals in operation to facilitate works by BT.

Traffic is flowing well in the area.

29.26 miles from East Grinstead.

51.51--0.27

Hampstead Road (Southbound) at the junction of William Road - Burst water main at this location has now bee repaired.

Southbound bus lane is now open.

Traffic is free flowing in the area.

28.8 miles from East Grinstead.

51.53--0.14

Clapham Road (Both Directions) at the junction of Lingham Street- there is a collision at this location.

Road reopened - accident cleared

24.89 miles from East Grinstead.

51.47--0.12

Sidcup By-pass Road (Eastbound) at the junction of Crittlls Corner - The A20 will be closed between Crittalls Corner and the M25 J3 for overnight works.

21.23 miles from East Grinstead.

51.41-0.11

Cranley Gardens junction with Old Brompton Road (All directions).

Temporary traffic signals in operation to facilitate roadworks No reported delays in the area.

26.81 miles from East Grinstead.

51.49--0.18

Blackwall Tunnel (Southbound Bore) (Southbound): the broken down motorcycle in the tunnel has been removed.

All congestion resulting from this broken down vehicle has cleared (although tailback remain at the present time - see separate entry).

26.98 miles from East Grinstead.

51.51-0

Ludgate Circus (All Directions) - there is a early morning ceremonial rehearsal taking place involving full road closures from The Aldwych to Mansion House.

All closures have now been lifted, residual delays are clearing from High Holborn area.

27.6 miles from East Grinstead.

51.51--0.09

Purley Way (Northbound) between Whitestone Way and Commerce Way - Lane restrictions to facilitate carriageway chamber access works for new connections.

(Night works only)

18.27 miles from East Grinstead.

51.37--0.12

Dover House Road (Both Directions) at the junction of Upper Richmond Road - There will be stop / go boards in operation due to works in the area.

Works have now finished.

25.87 miles from East Grinstead.

51.46--0.24

High Street (All Directions) at the junction of Grosvenor Road - two way temporary traffic signals will be in operation to facilitate gas works.

There are no restrictions in place at the present time.

Traffic is flowing normally.

17.95 miles from East Grinstead.

51.38--0.02

Beckenham Grove (Both Directions) between Scott's Lane and Shortlands Road - road closure to facilitate carriageway resurfacing.

Use other route.

19.92 miles from East Grinstead.

51.4--0.01

Knightsbridge (Westbound) at the junction of Wilton Place - Restriction has been lifted.

All lanes are open.

27.31 miles from East Grinstead.

51.5--0.16

High Street (All Directions) at the junction of Homefield Rise - Temporary Traffic Signals to facilitate works Traffic is moving well.

18.57 miles from East Grinstead.

51.38-0.1

New Fetter Lane (All Directions) between Holborn Viaduct and Roundabout Bartlett Court - closed for crane operation.

27.98 miles from East Grinstead.

51.52--0.11

Nine Elms Lane (Eastbound) at the junction of St George's Wharf - Lane one closed to facilitate the removal of hoarding.

25.85 miles from East Grinstead.

51.48--0.13

Euston Road (Westbound) at the junction of Argyle Street - Lane one closed overnight to facilitate subway works.

28.91 miles from East Grinstead.

51.53--0.12

The Avenue (Southbound) at the junction of Windmill Drive - Lane one restrictions with single alternate lane traffic controlled by STOP / GO boards for BT works.

Traffic is flowing well in the area.

24.12 miles from East Grinstead.

51.46--0.15

Western Avenue (Eastbound) near the junction of Victoria Road lane one blocked by a broken down van.

Vehicle has been recovered.

Traffis is flowing well.

29.88 miles from East Grinstead.

51.52--0.26

Shooters Hill Road (All Directions) The traffic lights at the junction are now working.

Traffic is moving well.

24.66 miles from East Grinstead.

51.47-0.02

Ripple Road (Eastbound) - Lane three (of three) blocked due to a broken down vehicle.

The accident has been cleared and lane three has been reopened to traffic.

Traffic flows are returning to normal for the time of day.

29.29 miles from East Grinstead.

51.53-0.12

Bromley Common (Southbound) at the junction of Johnson Road - Road now reopened.

Traffic is moving well.

19 miles from East Grinstead.

51.39-0.03

Thurston Road (Both Directions) at the junction of Leathwell Road - The road will be closed overnight to facilitate bridge maintenance works.

24.26 miles from East Grinstead.

51.47--0.02

Praed Street (All Directions) at the junction of Spring Street - Temporary traffic signals in operation to facilitate water works Traffic is flowing well.

28.38 miles from East Grinstead.

51.52--0.18

High Street (Both Directions) at the junction of Cambridge Road - 2-way temporary traffic signals in operation to facilitate new gas connection now removed.

Traffic is moving well.

22.27 miles from East Grinstead.

51.4--0.26

Limehouse Link Tunnel (Westbound) Lane one is blocked by a broken down vehicle.

The vehicle has now been removed - all lanes are open.

27.08 miles from East Grinstead.

51.51--0.03

Sanderstead Hill (Both Directions) at the junction of Sundown Avenue - Possible lane closures because of a collision.

The road has reopened.

15.51 miles from East Grinstead.

51.34--0.08

Grosvenor Gardens (All Directions) at the junction of Hobart Place one lane closed northbound and one lane closed eastbound on Hobart Place for works by Thames Water.

All lane restrictions have now been removed on Grosvenor Gardens and Hobart Place.

Traffic flows have returned to normal in the area.

26.94 miles from East Grinstead.

51.5--0.15

Great Dover Street (Southbound) at the junction of Silvester Street - Lane one width restriction to facilitate a new supply scheme by UK Power Networks.

Times: Monday to Friday 08:00 - 17:00, Saturday 09:00 - 13:00, Sunday 10:00 - 13:00 Bus lane restriction in place.

Traffic is moving well on approach.

26.71 miles from East Grinstead.

51.5--0.09

A501 Marylebone Road (Both Directions) between Lisson Grove and Seymour Place - All lanes are currently open on Marylebone Road - Traffic is flowing well.

No restrictions currently in place.

28.64 miles from East Grinstead.

51.52--0.16

Oxford Street junction with Davies Street - Single alternate lane traffic controlled by STOP / GO boards or temporary traffic signals to facilitate works Works take place overnight between 2200-0600hrs.

Delays possible between these times.

28.06 miles from East Grinstead.

51.51--0.15

Park Lane (Southbound) at the junction of Hyde Park Corner - Congestion on approach.

Congestion has cleared.

27.32 miles from East Grinstead.

51.5--0.15

Hardman Road (All Directions) at the junction of Dupree Road - Lane restrictions to facilitate roadworks All restrictions have been removed - Traffic flows have returned to normal

25.63 miles from East Grinstead.

51.49-0.02

Marylebone Road (Eastbound) lane one closed due to a broken down van.

Vehicle has been recovered.

28.64 miles from East Grinstead.

51.52--0.17

Wardour Street (Both Directions) between Brewer Street and D'arblay Street works have ended.

Works have ended

27.81 miles from East Grinstead.

51.51--0.13

Gracechurch Street (Southbound) at the junction of Bell Inn Yard - lane restrictions due to water works

27.52 miles from East Grinstead.

51.51--0.08

Station Road (All Directions)at the junction of Longlands Road will have various road closures in place for the duration of the works.

22.42 miles from East Grinstead.

51.43-0.1

Greyhound Lane (Both Directions) at the junction of Streatham High Road - 2 way temporary traffic signals in operation to facilitate carriageway resurfacing.

21.64 miles from East Grinstead.

51.42--0.13

Limehouse Link Tunnel (Both Directions) - Closure overnight to facilitate works

27.26 miles from East Grinstead.

51.51--0.04

Heston Road (All Directions) at the junction of Wheatlands - Temporary signals in operation to facilitate resurfacing works.

Expect some delays while the restrictions are in place.

29.86 miles from East Grinstead.

51.49--0.37

Beresford Street (Both Directions) at the junction of Macbean Street - One lane closed to facilitate the creation of a new road junction for a hotel complex.

Lane one (of two) closure in place.

Traffic is moving well on approach.

26.18 miles from East Grinstead.

51.49-0.07

Nightingale Lane (Both Directions) between Bolingbroke Grove and Balham Hill - road closed to facilitate carriageway resurfacing.

Expect delays on approach.

23.77 miles from East Grinstead.

51.45--0.16

Balham Station Road (Both Directions) between Bedford Hill and Balham High Road - Road closed to facilitate carriageway resurfacing.

Use other routes.

23.19 miles from East Grinstead.

51.44--0.15

Charterhouse Street (Both Directions) between St John Street and East Poultry Avenue - full closure due to crane operation on weekends only.

Drivers are advised to use an alternative route when closures are in place.

Road remains open at present.

28.06 miles from East Grinstead.

51.52--0.1

East Road at the junction with Brunswick Place - There will be lane restrictions in place due to works.

Works ended

28.51 miles from East Grinstead.

51.53--0.09

Burlington Road between High Street and Malden Way (Kingston By Pass) - road is closed due to a fire.

Traffic is flowing well.

21.86 miles from East Grinstead.

51.4--0.24

Blackfriars Underpass (Westbound) - broken down vehicle removed.

Vehicle removed.

Traffic is moving well.

27.47 miles from East Grinstead.

51.51--0.1

Oxford Street (Eastbound) at the junction of Marble Arch - lane closure to facilitate bus shelter maintenance.

28.08 miles from East Grinstead.

51.51--0.16

Leman Street (Southbound) at the junction of Alie Street - lane closure to facilitate new water connection to property by Thames Water.

No visible restrictions in place.

27.54 miles from East Grinstead.

51.51--0.07

Notting Hill Gate (Westbound) at the junction of Campden Hill Road.

Road closure following a collision.

Notting Hill Gate westbound has reopened following the earlier road trafic collision.

Traffic is flowing well in the area.

28.2 miles from East Grinstead.

51.51--0.2

A13 Ripple Road (Eastbound) just after the entry slip from Lodge Avenue - All lanes reopened following a collision.

Traffic flows are normal for the time of day.

29.31 miles from East Grinstead.

51.53-0.11

SFM Asset: 06/000001Shooters Hill Road (All Directions) at the junction of Prince Of Wales Road - The traffic lights are not working The traffic lights are not working at this junction, approach with care

24.69 miles from East Grinstead.

51.47-0.02

King William Street (All Directions) at the junction of Clements Lane - Stop/Go board in operation to facilitate a crane operation.

27.43 miles from East Grinstead.

51.51--0.09

Victoria Street (Westbound) between Bressenden Place and Artillery Row - closed to facilitate drainage works.

26.81 miles from East Grinstead.

51.5--0.14

Warwick Road (Northbound) at the junction of Kensington High Street - Lane 1 closure for water works

27.48 miles from East Grinstead.

51.5--0.21

Euston Road (Eastbound) at the junction of Crestfield Street - Lane one closed overnight outside Kings Cross station to facilitate pavement works.

28.94 miles from East Grinstead.

51.53--0.12

Lampton Road (Both Directions) at the junction of Alexandra Road - Temporary signals in operation to facilitate resurfacing works.

28.9 miles from East Grinstead.

51.47--0.37

Bugsby's Way (Both Directions) at the junction of Peninsular Park Road - lane closure to enable Network Rail to carry out bridge repainting programme.

25.84 miles from East Grinstead.

51.49-0.02

Lavender Hill (All Directions) at the junction of Falcon Road - Four-way temporary signals in operation to facilitate gully repairs.

24.75 miles from East Grinstead.

51.46--0.17

Farnborough Common (Both Directions) at the junction of Hilda Vale Road - Temporary signals in operation to facilitate resurfacing works.

17.31 miles from East Grinstead.

51.36-0.06

Bromley Road (All Directions) at the junction of Beckenham Hill Road - Temporary Traffic Signals in operation to facilitate works

21.47 miles from East Grinstead.

51.43--0.01

Middleton Road (Both Directions) between Bishopsford Road and St Helier Avenue - road closure to facilitate carriageway resurfacing.

Local diversion in place.

20.13 miles from East Grinstead.

51.39--0.18

Advance warning: The Bitcoin For Dummies is taking place at Satoshi Global and may have an impact on the traffic in London between 6:00pm - 7:30pm.

28.23 miles from East Grinstead.

51.52--0.1

Warning, congestion may occur around One Poultry in London because of an event taking place: Barry Cawston Are We There Yet? 2017 (between 12:00pm - 6:00pm).

27.58 miles from East Grinstead.

51.51--0.09

Warning, congestion may occur around Satoshi Global in London because of an event taking place: Bitcoin For Dummies London (between 6:00pm - 7:30pm).

28.23 miles from East Grinstead.

51.52--0.1

Possible delays to traffic in this vicinity for an event: Kim Yong-Ik at Korean Cultural Centre UK, London between 10:00am - 6:00pm.

27.41 miles from East Grinstead.

51.51--0.13

Warning, congestion may occur around The Queen Elizabeth Olympic Park in London because of an event taking place: The Great Willy Waddle (around 6:30pm).

29.15 miles from East Grinstead.

51.54--0.02

Location : anticlockwise between junctions J9 (Leatherhead) and J8 (Reigate) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 September 2017 to 05:00 on 29 September 2017.

Lanes Closed : There will be three of four lanes closed.

18.82 miles from East Grinstead.

51.31--0.32

Location : anticlockwise between junctions J9 (Leatherhead) and J8 (Reigate) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 09:30 on 28 September 2017 to 16:00 on 28 September 2017.

15.36 miles from East Grinstead.

51.28--0.26

Location : eastbound between junctions J2 (Strood) and J3 (Maidstone) .

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 28 September 2017 to 29 September 2017.

27.83 miles from East Grinstead.

51.37-0.48

Location : eastbound entry slip at junction J2 (Strood) .

Lane Closures : Lane one will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 September 2017 to 06:00 on 30 September 2017.

Lanes Closed : All lanes will be closed.

27.97 miles from East Grinstead.

51.38-0.47

Location : anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 27 September 2017 to 30 September 2017.

Lanes Closed : There will be three of four lanes closed.

26.51 miles from East Grinstead.

51.36--0.49

Location : eastbound entry slip at junction J2 (Gatwick M23) from M25 clockwise.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:30 from 26 September 2017 to 11 October 2017.

Lanes Closed : All lanes will be closed.

29.87 miles from East Grinstead.

51.4--0.54

Location : anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:30 from 26 September 2017 to 29 September 2017.

Lanes Closed : There will be two of four lanes closed.

25.59 miles from East Grinstead.

51.45-0.24

Location : westbound between junctions J2 (N.Circular) and J3 (Heathrow) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of three lanes closed.

29.66 miles from East Grinstead.

51.5--0.34

Location : eastbound exit slip at junction J1 (Sunbury) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 5 October 2017.

Lanes Closed : All lanes will be closed.

27.2 miles from East Grinstead.

51.42--0.42

Location : anticlockwise between junctions J2 (London (SE)) and J1A (Erith) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of four lanes closed.

24.48 miles from East Grinstead.

51.43-0.24

Location : anticlockwise at junction J2 (London (SE)) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of four lanes closed.

24.53 miles from East Grinstead.

51.43-0.24

Location : anticlockwise at junction J2 (London (SE)) .

Lane Closures : Lane three will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be one of three lanes closed.

24.37 miles from East Grinstead.

51.43-0.24

Location : anticlockwise at junction J2 (London (SE)) .

Lane Closures : Lane three will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be one of three lanes closed.

23.83 miles from East Grinstead.

51.42-0.24

Location : anticlockwise at junction J2 (London (SE)) .

Lane Closures : Lane three will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be one of three lanes closed.

23.81 miles from East Grinstead.

51.42-0.24

Location : clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 2 October 2017 to 05:00 on 3 October 2017.

Lanes Closed : There will be three of four lanes closed.

20.64 miles from East Grinstead.

51.31--0.38

Location : clockwise at junction J2 (London (SE)) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of three lanes closed.

24.51 miles from East Grinstead.

51.43-0.24

Location : eastbound between junctions J2 (Gatwick M23) and J1 (Sunbury) .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 5 October 2017.

Lanes Closed : There will be one of three lanes closed.

27.2 miles from East Grinstead.

51.42--0.42

Location : anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be three of four lanes closed.

21.5 miles from East Grinstead.

51.4-0.2

Location : northbound between junctions J8 (Reigate) and J7 (Crawley) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 4 October 2017.

Lanes Closed : There will be two of three lanes closed.

11.72 miles from East Grinstead.

51.27--0.13

Location : anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of four lanes closed.

23.29 miles from East Grinstead.

51.42-0.23

Location : anticlockwise between junctions J3 (Maidstone) and J2 (London (SE)) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of four lanes closed.

22.68 miles from East Grinstead.

51.41-0.22

Location : clockwise at junction J1B (Dartford) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of four lanes closed.

24.65 miles from East Grinstead.

51.44-0.24

Location : westbound between junction J2A and the M25 .

Lane Closures : Lane one will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 2 October 2017 to 05:00 on 3 October 2017.

Lanes Closed : There will be one of two lanes closed.

14.4 miles from East Grinstead.

51.3-0.15

Location : clockwise at junction J1B (Dartford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of four lanes closed.

25.01 miles from East Grinstead.

51.44-0.24

Location : clockwise between junctions J5 (Sevenoaks) and J6 (East Grinstead) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 2 October 2017 to 05:00 on 3 October 2017.

Lanes Closed : There will be two of four lanes closed.

13.98 miles from East Grinstead.

51.29-0.14

Location : clockwise at junction J3 (Maidstone) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of three lanes closed.

21.68 miles from East Grinstead.

51.4-0.2

Location : clockwise between junctions J3 (Maidstone) and J4 (Bromley) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of three lanes closed.

21.57 miles from East Grinstead.

51.4-0.2

Location : clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of four lanes closed.

23.86 miles from East Grinstead.

51.42-0.24

Location : clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be three of four lanes closed.

23.25 miles from East Grinstead.

51.42-0.23

Location : anticlockwise at junction J3 (Maidstone) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of three lanes closed.

20.81 miles from East Grinstead.

51.39-0.19

Location : anticlockwise between junctions J4 (Bromley) and J3 (Maidstone) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of three lanes closed.

18.58 miles from East Grinstead.

51.36-0.16

Location : southbound between junctions J7 (Crawley) and J8 (Reigate) .

Lane Closures : Lane four will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 4 October 2017.

Lanes Closed : There will be one of four lanes closed.

11.75 miles from East Grinstead.

51.27--0.14

Location : northbound at junction J8 (Reigate) .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 4 October 2017.

Lanes Closed : There will be one of two lanes closed.

11.26 miles from East Grinstead.

51.26--0.13

Location : anticlockwise between junctions J5 (Sevenoaks) and J4 (Bromley) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 2 October 2017 to 6 October 2017.

Schedule : From 23:00 on 6 October 2017 to 05:00 on 7 October 2017.

Lanes Closed : There will be two of three lanes closed.

15.46 miles from East Grinstead.

51.31-0.16

Location : westbound between the junctions with the A280 and the A284 Arundel East.

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 5 October 2017 to 06:00 on 6 October 2017.

Lanes Closed : There will be one of two lanes closed.

28.34 miles from East Grinstead.

50.84--0.5

Location : westbound between the A277 and the junction with the A23 .

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 2 October 2017 to 06:00 on 3 October 2017.

Lanes Closed : There will be one of two lanes closed.

17.26 miles from East Grinstead.

50.87--0.02

Location : westbound between the junctions with the A280 and the A284 Arundel East.

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 5 October 2017 to 06:00 on 6 October 2017.

Lanes Closed : There will be one of two lanes closed.

29.4 miles from East Grinstead.

50.84--0.53

Location : eastbound between the A280 and the junction with the A24 North.

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 4 October 2017 to 06:00 on 5 October 2017.

Lanes Closed : There will be one of two lanes closed.

26.96 miles from East Grinstead.

50.84--0.45

Location : westbound between the A24 North and the junction with the A280 .

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 4 October 2017 to 06:00 on 5 October 2017.

Lanes Closed : There will be one of two lanes closed.

26.01 miles from East Grinstead.

50.84--0.42

Location : eastbound between the A2025 and the junction with the A283 .

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 3 October 2017 to 06:00 on 4 October 2017.

Lanes Closed : There will be one of two lanes closed.

23.33 miles from East Grinstead.

50.84--0.32

Location : westbound between the A283 and the junction with the A2025 .

Lane Closures : Lane two will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 3 October 2017 to 06:00 on 4 October 2017.

Lanes Closed : There will be one of two lanes closed.

22.43 miles from East Grinstead.

50.84--0.29

Location : westbound entry slip at junction J2 (Gatwick M23) from M25 anti-clockwise.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:30 from 25 September 2017 to 30 September 2017.

Lanes Closed : All lanes will be closed.

29.86 miles from East Grinstead.

51.4--0.54

Location : westbound between the junctions with the A280 and the A284 Arundel East.

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 28 September 2017 to 06:00 on 29 September 2017.

Lanes Closed : There will be one of two lanes closed.

27.92 miles from East Grinstead.

50.84--0.48

Location : westbound entry slip from the A23 .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 26 September 2017 to 06:00 on 27 September 2017.

Lanes Closed : All lanes will be closed.

18.12 miles from East Grinstead.

50.87--0.15

Location : westbound exit slip at junction J4 (West Malling) .

Reason : Emergency roadside drains works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:30 and 06:00 from 25 September 2017 to 28 September 2017.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 10 October 2017 to 13 October 2017.

Lanes Closed : All lanes will be closed.

23.36 miles from East Grinstead.

51.31-0.43

Location : westbound exit slip at junction J7 (Maidstone) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency roadside drains works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 3 October 2017 to 6 October 2017.

Lanes Closed : All lanes will be closed.

27.58 miles from East Grinstead.

51.29-0.56

Location : westbound exit slip at junction J5 (Aylesford) .

Reason : Emergency roadside drains works are planned.

Status : Pending.

Schedule : From 21:00 on 6 October 2017 to 06:00 on 7 October 2017.

Schedule : From 21:00 on 9 October 2017 to 06:00 on 10 October 2017.

Lanes Closed : All lanes will be closed.

25.3 miles from East Grinstead.

51.3-0.49

Location : southbound between the A31 and the junction with the A283 Milford north.

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 22:00 on 26 September 2017 to 06:00 on 27 September 2017.

Lanes Closed : There will be one of two lanes closed.

28.2 miles from East Grinstead.

51.21--0.65

Location : northbound entry slip from the A25 .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : All lanes will be closed.

13.41 miles from East Grinstead.

51.28-0.15

Location : northbound between the junctions with the A25 and the M25 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : All lanes will be closed.

13.63 miles from East Grinstead.

51.29-0.14

Location : anticlockwise entry slip at junction J5 (Sevenoaks) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : All lanes will be closed.

13.72 miles from East Grinstead.

51.29-0.14

Location : westbound between junctions J3 (Sevenoaks) and J1 .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 27 September 2017 to 29 September 2017.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 2 October 2017 to 6 October 2017.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 9 October 2017 to 13 October 2017.

19.57 miles from East Grinstead.

51.31-0.31

Location : northbound between the A262 and the junction with the A26 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 26 September 2017 to 30 September 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 October 2017 to 7 October 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 9 October 2017 to 14 October 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 16 October 2017 to 21 October 2017.

Lanes Closed : All lanes will be closed.

14.24 miles from East Grinstead.

51.14-0.31

Location : westbound between junction J3 and the M25 .

Lane Closures : Lane two will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 28 September 2017 to 05:00 on 29 September 2017.

Lanes Closed : There will be one of two lanes closed.

20.51 miles from East Grinstead.

51.31-0.35

Location : anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:30 and 05:30 from 1 October 2017 to 6 October 2017.

Schedule : From 22:30 on 6 October 2017 to 06:00 on 7 October 2017.

Schedule : From 21:00 on 7 October 2017 to 08:00 on 8 October 2017.

Schedule : Expect disruption everyday between 21:30 and 05:30 from 8 October 2017 to 12 October 2017.

Lanes Closed : There will be three of four lanes closed.

26.81 miles from East Grinstead.

51.36--0.5

Location : clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 30 September 2017 to 2 October 2017.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 2 October 2017 to 4 October 2017.

Schedule : From 22:00 on 7 October 2017 to 06:00 on 8 October 2017.

Schedule : From 22:30 on 8 October 2017 to 05:30 on 9 October 2017.

Lanes Closed : There will be two of four lanes closed.

25.26 miles from East Grinstead.

51.34--0.48

Location : anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:30 on 30 September 2017 to 05:00 on 1 October 2017.

Lanes Closed : All lanes will be closed.

25.78 miles from East Grinstead.

51.45-0.24

Location : eastbound entry slip at junction J2 (Gatwick M23) from M25 clockwise.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:30 from 30 September 2017 to 2 October 2017.

Lanes Closed : All lanes will be closed.

29.87 miles from East Grinstead.

51.4--0.54

Location : eastbound entry slip at junction J2 (Gatwick M23) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:30 from 30 September 2017 to 2 October 2017.

Lanes Closed : All lanes will be closed.

29.71 miles from East Grinstead.

51.4--0.53

Location : clockwise entry slip at junction J12 (Basingstoke) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 September 2017 to 29 September 2017.

Schedule : From 22:30 on 29 September 2017 to 06:00 on 30 September 2017.

Lanes Closed : All lanes will be closed.

29.74 miles from East Grinstead.

51.4--0.53

Location : westbound between junctions J1 (London) and J3 (Heathrow) .

Lane Closures : Lane one will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 23:00 on 29 September 2017 to 05:00 on 30 September 2017.

Lanes Closed : There will be one of two lanes closed.

28.16 miles from East Grinstead.

51.49--0.28

Location : clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Lane Closures : Lane one will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 23:00 on 29 September 2017 to 05:00 on 30 September 2017.

Lanes Closed : There will be one of four lanes closed.

22.33 miles from East Grinstead.

51.31--0.43

Location : westbound between junctions J2 (N.Circular) and J3 (Heathrow) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 23:00 and 05:30 from 29 September 2017 to 1 October 2017.

Lanes Closed : There will be two of three lanes closed.

29.95 miles from East Grinstead.

51.49--0.37

Location : clockwise entry slip at junction J11 (Chertsey) .

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 23:00 on 29 September 2017 to 05:00 on 30 September 2017.

Lanes Closed : All lanes will be closed.

27.83 miles from East Grinstead.

51.38--0.51

Location : westbound between junctions J4 (Gillingham) and J3 (Maidstone) .

Lane Closures : Lane one will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2017 to 06:00 on 30 September 2017.

Lanes Closed : There will be one of three lanes closed.

29.58 miles from East Grinstead.

51.33-0.57

Location : southbound between the A320 and the junction with the A283 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 29 September 2017 to 06:00 on 30 September 2017.

Lanes Closed : There will be one of two lanes closed.

25.98 miles from East Grinstead.

51.25--0.58

Location : westbound between the junctions with the A293 and the A270 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2017 to 1 October 2017.

Lanes Closed : All lanes will be closed.

20.33 miles from East Grinstead.

50.86--0.24

Location : eastbound between the junctions with the A270 Brighton West and the A293 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 September 2017 to 1 October 2017.

Lanes Closed : All lanes will be closed.

20.85 miles from East Grinstead.

50.85--0.24

Location : northbound exit slip at junction J10 (Crawley) .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 26 September 2017 to 06:00 on 27 September 2017.

Lanes Closed : There will be one of two lanes closed.

5.5 miles from East Grinstead.

51.13--0.14

Location : anticlockwise between junctions J5 (Sevenoaks) and J4 (Bromley) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 27 September 2017 to 29 September 2017.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 2 October 2017 to 6 October 2017.

14.62 miles from East Grinstead.

51.3-0.15

Location : westbound between junctions J3 and J2A .

Lane Closures : Lane two will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 28 September 2017 to 05:00 on 29 September 2017.

Lanes Closed : There will be one of two lanes closed.

20.64 miles from East Grinstead.

51.31-0.35

Location : northbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 September 2017 to 06:00 on 29 September 2017.

Schedule : From 22:00 on 5 October 2017 to 06:00 on 6 October 2017.

Lanes Closed : All lanes will be closed.

28.1 miles from East Grinstead.

51.22--0.65

Location : clockwise between junctions J10 (Guildford) and J11 (Chertsey) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 28 September 2017 to 05:00 on 29 September 2017.

Lanes Closed : There will be two of four lanes closed.

24.49 miles from East Grinstead.

51.33--0.47

Location : clockwise between junctions J8 (Reigate) and J9 (Leatherhead) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 September 2017 to 05:00 on 29 September 2017.

Lanes Closed : There will be three of four lanes closed.

15.6 miles from East Grinstead.

51.28--0.26

Location : anticlockwise exit slip at junction J8 (Reigate) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 28 September 2017 to 05:00 on 29 September 2017.

Schedule : From 22:00 on 29 September 2017 to 06:00 on 30 September 2017.

Lanes Closed : There will be one of two lanes closed.

12.64 miles from East Grinstead.

51.26--0.2

Location : clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 September 2017 to 05:00 on 29 September 2017.

Lanes Closed : There will be one of four lanes closed.

20.72 miles from East Grinstead.

51.31--0.38

Location : eastbound between junctions J2A and J3 .

Lane Closures : Lane two will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 28 September 2017 to 05:00 on 29 September 2017.

Lanes Closed : There will be one of two lanes closed.

19.61 miles from East Grinstead.

51.3-0.33

Location : westbound between the M2 and the junction with the A227 .

Lane Closures : Lane four will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 06:00 on 28 September 2017.

Lanes Closed : There will be one of four lanes closed.

26.33 miles from East Grinstead.

51.41-0.37

Location : clockwise entry slip at junction J10 (Guildford) .

Reason : Emergency litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : All lanes will be closed.

23.57 miles from East Grinstead.

51.32--0.45

Location : southbound exit slip to the A31 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 06:00 on 28 September 2017.

Schedule : From 22:00 on 4 October 2017 to 06:00 on 5 October 2017.

Lanes Closed : There will be one of two lanes closed.

27.19 miles from East Grinstead.

51.23--0.62

Location : northbound entry slip from the A31 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 September 2017 to 06:00 on 27 September 2017.

Schedule : From 22:00 on 3 October 2017 to 06:00 on 4 October 2017.

Lanes Closed : All lanes will be closed.

27.43 miles from East Grinstead.

51.23--0.62

Location : anticlockwise between junctions J11 (Chertsey) and J10 (Guildford) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 26 September 2017 to 05:30 on 27 September 2017.

Lanes Closed : There will be three of four lanes closed.

26.81 miles from East Grinstead.

51.36--0.5

Location : anticlockwise exit slip at junction J12 (Basingstoke) .

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 28 September 2017 to 13 October 2017.

29.92 miles from East Grinstead.

51.4--0.54

Location : clockwise between junctions J2 (London (SE)) and J3 (Maidstone) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : There will be three of four lanes closed.

22.3 miles from East Grinstead.

51.41-0.21

Location : eastbound between the M25 and junction J2A .

Lane Closures : Lane two will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : There will be one of two lanes closed.

18.17 miles from East Grinstead.

51.3-0.28

Location : westbound between junction J2A and the M25 .

Lane Closures : Lane two will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : There will be one of two lanes closed.

20.04 miles from East Grinstead.

51.3-0.34

Location : anticlockwise between junctions J10 (Guildford) and J8 (Reigate) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : There will be three of four lanes closed.

19.89 miles from East Grinstead.

51.31--0.35

Location : clockwise.

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : There will be one of two lanes closed.

28.48 miles from East Grinstead.

51.49-0.27

Location : anticlockwise exit slip at junction J31 (Thurrock) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : There will be one of two lanes closed.

28.16 miles from East Grinstead.

51.48-0.27

Location : clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 27 September 2017 to 05:00 on 28 September 2017.

Lanes Closed : There will be two of four lanes closed.

20.8 miles from East Grinstead.

51.31--0.39

Location : anticlockwise at junction J11 (Chertsey) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 September 2017 to 29 September 2017.

Schedule : From 23:00 on 29 September 2017 to 05:30 on 30 September 2017.

Lanes Closed : There will be two of three lanes closed.

27.97 miles from East Grinstead.

51.38--0.51

Location : anticlockwise exit slip at junction J11 (Chertsey) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 September 2017 to 29 September 2017.

Schedule : From 23:00 on 29 September 2017 to 05:30 on 30 September 2017.

Lanes Closed : All lanes will be closed.

27.97 miles from East Grinstead.

51.38--0.51

Location : anticlockwise between junctions J12 (Basingstoke) and J11 (Chertsey) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 27 September 2017 to 29 September 2017.

Schedule : From 23:00 on 29 September 2017 to 05:30 on 30 September 2017.

Lanes Closed : There will be two of four lanes closed.

28.67 miles from East Grinstead.

51.39--0.52

Location : southbound between junctions J10 (Crawley) and J11 (Brighton) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 September 2017 to 30 September 2017.

Schedule : From 20:00 on 2 October 2017 to 06:00 on 3 October 2017.

Lanes Closed : There will be one of three lanes closed.

5.52 miles from East Grinstead.

51.14--0.14

Location : westbound between junctions J2 (N.Circular) and J3 (Heathrow) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 September 2017 to 29 September 2017.

Lanes Closed : There will be two of three lanes closed.

29.63 miles from East Grinstead.

51.5--0.34

Location : eastbound between the M25 and junction J2A .

Lane Closures : Lane two will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 26 September 2017 to 05:00 on 27 September 2017.

Lanes Closed : There will be one of two lanes closed.

16.76 miles from East Grinstead.

51.3-0.24

Location : westbound between junction J2A and the M25 .

Lane Closures : Lane two will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 26 September 2017 to 05:00 on 27 September 2017.

Lanes Closed : There will be one of two lanes closed.

18.56 miles from East Grinstead.

51.3-0.29

Location : clockwise between junctions J9 (Leatherhead) and J10 (Guildford) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Litter clearance is planned.

Status : Pending.

Schedule : From 22:00 on 26 September 2017 to 05:00 on 27 September 2017.

Lanes Closed : There will be two of four lanes closed.

20.8 miles from East Grinstead.

51.31--0.39

Location : anticlockwise at junction J8 (Reigate) .

Lane Closures : Lanes 1, 2, 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 September 2017 to 05:00 on 27 September 2017.

Lanes Closed : All lanes will be closed.

12.58 miles from East Grinstead.

51.26--0.2

Location : clockwise entry slip at junction J9 (Leatherhead) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 September 2017 to 05:00 on 27 September 2017.

Lanes Closed : All lanes will be closed.

18.5 miles from East Grinstead.

51.3--0.32

Location : westbound between junctions J1 (Sunbury) and J2 (Gatwick M23) .

Reason : Barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 27 September 2017 to 3 October 2017.

27.32 miles from East Grinstead.

51.39--0.47

Location : northbound between junctions J9 (Gatwick Airport) and J8 (Reigate) .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 September 2017 to 29 September 2017.

Schedule : From 23:00 on 29 September 2017 to 05:00 on 30 September 2017.

Lanes Closed : There will be one of three lanes closed.

10.53 miles from East Grinstead.

51.25--0.12

Location : southbound between the junctions with the A2300 and the A281 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 27 September 2017 to 29 September 2017.

Schedule : From 20:00 on 30 September 2017 to 06:00 on 1 October 2017.

Lanes Closed : There will be one of two lanes closed.

13.68 miles from East Grinstead.

50.95--0.19

Location : northbound between the junctions with the A281 and the A2300 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 29 September 2017 to 06:00 on 30 September 2017.

Schedule : From 20:00 on 3 October 2017 to 06:00 on 4 October 2017.

Lanes Closed : There will be one of two lanes closed.

14.74 miles from East Grinstead.

50.94--0.2

Location : westbound between junctions J2 (N.Circular) and J3 (Heathrow) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 27 September 2017 to 28 September 2017.

29.38 miles from East Grinstead.

51.49--0.33