Current traffic in Dartford Crossing

ROAD WORKSLocation : The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Schedule : Expect disruption everyday between 20:30 and 05:30 from 26 Feb 2018 to 2 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

1.27 miles from Dartford Crossing.

ROAD WORKSLocation : The A2 eastbound at the junction with the M25 .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 26 Feb 2018 to 2 Mar 2018.

2.9 miles from Dartford Crossing.

ROAD WORKSLocation : The A20 eastbound exit slip to the M25 .
Reason : Emergency litter clearance is planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 05:00 on 24 Feb 2018.
Lanes Closed : All lanes will be closed.

6.01 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise entry slip at junction J1A (Erith) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 25 Feb 2018 to 05:00 on 26 Feb 2018.
Lanes Closed : All lanes will be closed.

1.08 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 25 Feb 2018 to 05:00 on 26 Feb 2018.
Lanes Closed : All lanes will be closed.

0.48 miles from Dartford Crossing.

ROAD WORKSLocation : The M20 westbound exit slip at junction J1 .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 22:00 on 22 Feb 2018 to 05:30 on 23 Feb 2018.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Lanes Closed : All lanes will be closed.

5.97 miles from Dartford Crossing.

ROAD WORKSLocation : The M20 westbound at junction J1 .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Lanes Closed : All lanes will be closed.

5.95 miles from Dartford Crossing.

ROAD WORKSLocation : The M20 westbound between junctions J3 (Sevenoaks) and J1 .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Lanes Closed : There will be two of three lanes closed.

5.97 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise entry slip at junction J3 (Maidstone) from M20.
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Lanes Closed : All lanes will be closed.

5.97 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .
Lane Closures : Lane one will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 26 Feb 2018 to 05:00 on 27 Feb 2018.
Lanes Closed : There will be one of four lanes closed.

6.86 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise at junction J29 (Romford) .
Lane Closures : Lane one will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 26 Feb 2018 to 05:00 on 27 Feb 2018.
Lanes Closed : There will be one of three lanes closed.

7.27 miles from Dartford Crossing.

ROAD WORKSLocation : The A2 eastbound exit slip to the M25 .
Lane Closures : Lane two will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 Feb 2018 to 2 Mar 2018.
Schedule : From 23:00 on 2 Mar 2018 to 06:00 on 3 Mar 2018.
Lanes Closed : There will be one of two lanes closed.

2.93 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise exit slip at junction J29 (Romford) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 26 Feb 2018 to 05:00 on 27 Feb 2018.
Lanes Closed : All lanes will be closed.

7.33 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise exit slip at junction J2 (London (SE)) .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 Feb 2018 to 2 Mar 2018.
Schedule : From 23:00 on 2 Mar 2018 to 06:00 on 3 Mar 2018.
Lanes Closed : There will be one of two lanes closed.

2.28 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

6.5 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

9.43 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Feb 2018 to 05:00 on 28 Feb 2018.
Lanes Closed : There will be two of four lanes closed.

9.73 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise at junction J29 (Romford) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be one of three lanes closed.

7.27 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise at junction J29 (Romford) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be one of three lanes closed.

7.83 miles from Dartford Crossing.

ROAD WORKSLocation : The M20 eastbound between junctions J1 and J3 (Sevenoaks) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 22:00 on 26 Feb 2018 to 05:00 on 27 Feb 2018.
Lanes Closed : There will be two of three lanes closed.

7.65 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise between junctions J31 (Thurrock) and J1A (Erith) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 05:00 on 24 Feb 2018.
Lanes Closed : There will be three of four lanes closed.

0.91 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise exit slip at junction J28 (Chelmsford) southbound.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Lanes Closed : All lanes will be closed.

9.98 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise between junctions J29 (Romford) and J30 (Dagenham) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

7.26 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

7.83 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 Mar 2018 to 05:00 on 2 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

4.08 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise at junction J29 (Romford) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 Mar 2018 to 05:00 on 2 Mar 2018.
Lanes Closed : There will be one of three lanes closed.

7.48 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise exit slip at junction J2 (London (SE)) .
Lane Closures : Lane two will be closed.
Reason : Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 22:00 on 1 Mar 2018 to 05:00 on 2 Mar 2018.
Lanes Closed : There will be one of two lanes closed.

3.06 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise between junctions J29 (Romford) and J30 (Dagenham) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 Mar 2018 to 05:00 on 2 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

7.26 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise exit slip at junction J2 (London (SE)) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 Mar 2018 to 05:00 on 4 Feb 2019.
Lanes Closed : There will be one of two lanes closed.

2.39 miles from Dartford Crossing.

ROAD WORKSLocation : The A2 eastbound exit slip to the M25 .
Lane Closures : Lane one will be closed.
Reason : Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 22:00 on 1 Mar 2018 to 05:00 on 2 Mar 2018.
Lanes Closed : There will be one of two lanes closed.

2.93 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 clockwise exit slip at junction J2 (London (SE)) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 Mar 2018 to 05:00 on 2 Mar 2018.
Lanes Closed : All lanes will be closed.

2.34 miles from Dartford Crossing.

ROAD WORKSLocation : The M25 anticlockwise entry slip at junction J1A (Erith) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 Feb 2018 to 05:00 on 25 Feb 2018.
Lanes Closed : All lanes will be closed.

1.08 miles from Dartford Crossing.

ROAD WORKSLocation : The A20 eastbound between the junctions with the A223 and the M25 .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency litter clearance is planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 05:00 on 24 Feb 2018.
Lanes Closed : There will be two of three lanes closed.

6.32 miles from Dartford Crossing.

CONGESTIONLocation : The A2 westbound between the M25 and the junction with the A223 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 20:00 and 20:15 on 23 Feb 2018.
Delay : There are currently delays of 50 minutes against expected traffic.

4 miles from Dartford Crossing.

CONGESTIONLocation : The M25 anticlockwise.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 18:15 and 18:30 on 23 Feb 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

1.75 miles from Dartford Crossing.

CONGESTIONLocation : The A2 westbound entry slip from the A282 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 18:15 and 18:30 on 23 Feb 2018.

2.89 miles from Dartford Crossing.

CONGESTIONCLEARED @ 18:06Location : The M25 anticlockwise exit slip at junction J3 (Maidstone) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 18:00 and 18:15 on 23 Feb 2018.

6.19 miles from Dartford Crossing. CLEARED @ 18:06

CONGESTIONCLEARED @ 18:06Location : The M25 clockwise exit slip at junction J3 (Maidstone) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 18:00 and 18:15 on 23 Feb 2018.

5.83 miles from Dartford Crossing. CLEARED @ 18:06

CONGESTIONCLEARED @ 17:56Location : The M20 westbound exit slip at junction J1 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:45 and 18:00 on 23 Feb 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

5.96 miles from Dartford Crossing. CLEARED @ 17:56

CONGESTIONCLEARED @ 17:36Location : The M25 anticlockwise exit slip at junction J30 (Dagenham) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:30 and 17:45 on 23 Feb 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

1.85 miles from Dartford Crossing. CLEARED @ 17:36

CONGESTIONCLEARED @ 16:26Location : The A2 westbound exit slip to the A2018 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:15 and 16:30 on 23 Feb 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

3.9 miles from Dartford Crossing. CLEARED @ 16:26

CONGESTIONCLEARED @ 16:16Location : The M25 anticlockwise.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:15 and 16:30 on 23 Feb 2018.

1.75 miles from Dartford Crossing. CLEARED @ 16:16

CONGESTIONCLEARED @ 13:56Location : The M25 clockwise exit slip at junction J2 (London (SE)) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 23 Feb 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

2.5 miles from Dartford Crossing. CLEARED @ 13:56

CONGESTIONCLEARED @ 13:16Location : The M25 anticlockwise at junction J1A (Erith) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:15 and 13:30 on 23 Feb 2018.

0.99 miles from Dartford Crossing. CLEARED @ 13:16

CONGESTIONCLEARED @ 12:56Location : The M25 clockwise between junctions J31 (Thurrock) and J1A (Erith) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 23 Feb 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

0.22 miles from Dartford Crossing. CLEARED @ 12:56

Roadworks


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location : westbound entry slip from the A282 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 18:15 and 18:30 on 23 February 2018.

2.89 miles from Dartford Crossing.

51.43-0.24

CLEARED @ 18:06Location : anticlockwise exit slip at junction J3 (Maidstone) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 18:00 and 18:15 on 23 February 2018.

6.19 miles from Dartford Crossing.

51.39-0.19

CLEARED @ 18:06Location : clockwise exit slip at junction J3 (Maidstone) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 18:00 and 18:15 on 23 February 2018.

5.83 miles from Dartford Crossing.

51.39-0.2

CLEARED @ 17:56Location : westbound exit slip at junction J1 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:45 and 18:00 on 23 February 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

5.96 miles from Dartford Crossing.

51.39-0.2

Location : anticlockwise.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 18:15 and 18:30 on 23 February 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

1.75 miles from Dartford Crossing.

51.49-0.27

CLEARED @ 17:36Location : anticlockwise exit slip at junction J30 (Dagenham) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:30 and 17:45 on 23 February 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

1.85 miles from Dartford Crossing.

51.49-0.27

CLEARED @ 16:26Location : westbound exit slip to the A2018 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:15 and 16:30 on 23 February 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

3.9 miles from Dartford Crossing.

51.43-0.18

Location : westbound between the M25 and the junction with the A223 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 20:00 and 20:15 on 23 February 2018.

Delay : There are currently delays of 50 minutes against expected traffic.

4 miles from Dartford Crossing.

51.44-0.17

CLEARED @ 16:16Location : anticlockwise.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:15 and 16:30 on 23 February 2018.

1.75 miles from Dartford Crossing.

51.49-0.27

CLEARED @ 13:56Location : clockwise exit slip at junction J2 (London (SE)) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 23 February 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

2.5 miles from Dartford Crossing.

51.43-0.24

CLEARED @ 13:16Location : anticlockwise at junction J1A (Erith) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:15 and 13:30 on 23 February 2018.

0.99 miles from Dartford Crossing.

51.45-0.24

CLEARED @ 12:56Location : clockwise between junctions J31 (Thurrock) and J1A (Erith) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 12:45 and 13:00 on 23 February 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

0.22 miles from Dartford Crossing.

51.47-0.26

Location : eastbound between the junctions with the A223 and the M25 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency litter clearance is planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 05:00 on 24 February 2018.

Lanes Closed : There will be two of three lanes closed.

6.32 miles from Dartford Crossing.

51.4-0.16

Albert Road junction with Saville Road (All Directions): There is a reported building fire at this location.

All restrictions have now been lifted.

There are no reports of congestion in the area.

9.49 miles from Dartford Crossing.

51.5-0.04

Ripple Road (Eastbound) - Lane three (of three) blocked due to a broken down vehicle.

The accident has been cleared and lane three has been reopened to traffic.

Traffic flows are returning to normal for the time of day.

7.37 miles from Dartford Crossing.

51.53-0.12

Station Road (All Directions)at the junction of Longlands Road will have various road closures in place for the duration of the works.

7.11 miles from Dartford Crossing.

51.43-0.1

High Street (All Directions) at the junction of Homefield Rise - Temporary Traffic Signals to facilitate works Traffic is moving well.

9.17 miles from Dartford Crossing.

51.38-0.1

Newham Way (Eastbound) at the junction of Noel Road - All lanes now open.

All lanes now open.

9.77 miles from Dartford Crossing.

51.52-0.05

Station Road (All Directions) between Valence Avenue and Broomfield Road - Temporary traffic signals in operation to facilitate resurfacing works.

8.85 miles from Dartford Crossing.

51.57-0.13

A13 Ripple Road (Eastbound) just after the entry slip from Lodge Avenue - All lanes reopened following a collision.

Traffic flows are normal for the time of day.

7.71 miles from Dartford Crossing.

51.53-0.11

Sidcup By-pass Road (Eastbound) at the junction of Crittlls Corner - The A20 will be closed between Crittalls Corner and the M25 J3 for overnight works.

7.19 miles from Dartford Crossing.

51.41-0.11

Beresford Street (Both Directions) at the junction of Macbean Street - One lane closed to facilitate the creation of a new road junction for a hotel complex.

Lane one (of two) closure in place.

Traffic is moving well on approach.

8.42 miles from Dartford Crossing.

51.49-0.07

Rainham Road North junction with Oxlow Lane (All Directions): The traffic lights are not working at this location.

The signals have now been repaired.

7.22 miles from Dartford Crossing.

51.55-0.16

Location : anticlockwise entry slip at junction J1A (Erith) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 24 February 2018 to 05:00 on 25 February 2018.

Lanes Closed : All lanes will be closed.

1.08 miles from Dartford Crossing.

51.45-0.24

Location : clockwise exit slip at junction J2 (London (SE)) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 1 March 2018 to 05:00 on 2 March 2018.

Lanes Closed : All lanes will be closed.

2.34 miles from Dartford Crossing.

51.43-0.24

Location : eastbound exit slip to the M25 .

Lane Closures : Lane one will be closed.

Reason : Emergency roadside drains works are planned.

Status : Pending.

Schedule : From 22:00 on 1 March 2018 to 05:00 on 2 March 2018.

Lanes Closed : There will be one of two lanes closed.

2.93 miles from Dartford Crossing.

51.43-0.23

Location : clockwise exit slip at junction J2 (London (SE)) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 1 March 2018 to 05:00 on 4 February 2019.

Lanes Closed : There will be one of two lanes closed.

2.39 miles from Dartford Crossing.

51.43-0.24

Location : clockwise between junctions J29 (Romford) and J30 (Dagenham) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 1 March 2018 to 05:00 on 2 March 2018.

Lanes Closed : There will be two of four lanes closed.

7.26 miles from Dartford Crossing.

51.57-0.29

Location : anticlockwise exit slip at junction J2 (London (SE)) .

Lane Closures : Lane two will be closed.

Reason : Emergency roadside drains works are planned.

Status : Pending.

Schedule : From 22:00 on 1 March 2018 to 05:00 on 2 March 2018.

Lanes Closed : There will be one of two lanes closed.

3.06 miles from Dartford Crossing.

51.42-0.24

Location : clockwise at junction J29 (Romford) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 1 March 2018 to 05:00 on 2 March 2018.

Lanes Closed : There will be one of three lanes closed.

7.48 miles from Dartford Crossing.

51.57-0.29

Location : anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 1 March 2018 to 05:00 on 2 March 2018.

Lanes Closed : There will be two of four lanes closed.

4.08 miles from Dartford Crossing.

51.52-0.27

Location : anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be two of four lanes closed.

7.83 miles from Dartford Crossing.

51.58-0.28

Location : clockwise between junctions J29 (Romford) and J30 (Dagenham) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be two of four lanes closed.

7.26 miles from Dartford Crossing.

51.57-0.29

Location : clockwise exit slip at junction J28 (Chelmsford) southbound.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Lanes Closed : All lanes will be closed.

9.98 miles from Dartford Crossing.

51.61-0.26

Location : clockwise between junctions J31 (Thurrock) and J1A (Erith) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 05:00 on 24 February 2018.

Lanes Closed : There will be three of four lanes closed.

0.91 miles from Dartford Crossing.

51.48-0.27

Location : eastbound between junctions J1 and J3 (Sevenoaks) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 22:00 on 26 February 2018 to 05:00 on 27 February 2018.

Lanes Closed : There will be two of three lanes closed.

7.65 miles from Dartford Crossing.

51.36-0.27

Location : clockwise at junction J29 (Romford) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be one of three lanes closed.

7.83 miles from Dartford Crossing.

51.58-0.28

Location : anticlockwise at junction J29 (Romford) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be one of three lanes closed.

7.27 miles from Dartford Crossing.

51.57-0.29

Location : clockwise between junctions J28 (Chelmsford) and J29 (Romford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 February 2018 to 05:00 on 28 February 2018.

Lanes Closed : There will be two of four lanes closed.

9.73 miles from Dartford Crossing.

51.61-0.27

Location : clockwise between junctions J28 (Chelmsford) and J29 (Romford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be two of four lanes closed.

9.43 miles from Dartford Crossing.

51.6-0.27

Location : anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be two of four lanes closed.

6.5 miles from Dartford Crossing.

51.56-0.29

Location : clockwise exit slip at junction J2 (London (SE)) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 February 2018 to 2 March 2018.

Schedule : From 23:00 on 2 March 2018 to 06:00 on 3 March 2018.

Lanes Closed : There will be one of two lanes closed.

2.28 miles from Dartford Crossing.

51.43-0.24

Location : anticlockwise exit slip at junction J29 (Romford) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 26 February 2018 to 05:00 on 27 February 2018.

Lanes Closed : All lanes will be closed.

7.33 miles from Dartford Crossing.

51.57-0.29

Location : eastbound exit slip to the M25 .

Lane Closures : Lane two will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 February 2018 to 2 March 2018.

Schedule : From 23:00 on 2 March 2018 to 06:00 on 3 March 2018.

Lanes Closed : There will be one of two lanes closed.

2.93 miles from Dartford Crossing.

51.43-0.23

Location : anticlockwise at junction J29 (Romford) .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 26 February 2018 to 05:00 on 27 February 2018.

Lanes Closed : There will be one of three lanes closed.

7.27 miles from Dartford Crossing.

51.57-0.29

Location : anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 26 February 2018 to 05:00 on 27 February 2018.

Lanes Closed : There will be one of four lanes closed.

6.86 miles from Dartford Crossing.

51.56-0.29

Location : anticlockwise entry slip at junction J3 (Maidstone) from M20.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Lanes Closed : All lanes will be closed.

5.97 miles from Dartford Crossing.

51.39-0.2

Location : westbound between junctions J3 (Sevenoaks) and J1 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Lanes Closed : There will be two of three lanes closed.

5.97 miles from Dartford Crossing.

51.38-0.24

Location : westbound at junction J1 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Lanes Closed : All lanes will be closed.

5.95 miles from Dartford Crossing.

51.39-0.21

Location : westbound exit slip at junction J1 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 22:00 on 22 February 2018 to 05:30 on 23 February 2018.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Lanes Closed : All lanes will be closed.

5.97 miles from Dartford Crossing.

51.39-0.2

Location : anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 25 February 2018 to 05:00 on 26 February 2018.

Lanes Closed : All lanes will be closed.

0.48 miles from Dartford Crossing.

51.46-0.25

Location : anticlockwise entry slip at junction J1A (Erith) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 25 February 2018 to 05:00 on 26 February 2018.

Lanes Closed : All lanes will be closed.

1.08 miles from Dartford Crossing.

51.45-0.24

Location : eastbound exit slip to the M25 .

Reason : Emergency litter clearance is planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 05:00 on 24 February 2018.

Lanes Closed : All lanes will be closed.

6.01 miles from Dartford Crossing.

51.39-0.19

Location : eastbound at the junction with the M25 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 26 February 2018 to 2 March 2018.

2.9 miles from Dartford Crossing.

51.43-0.23

Location : anticlockwise between junctions J1A (Erith) and J31 (Thurrock) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 23 February 2018 to 06:00 on 24 February 2018.

Schedule : Expect disruption everyday between 20:30 and 05:30 from 26 February 2018 to 2 March 2018.

Lanes Closed : There will be two of four lanes closed.

1.27 miles from Dartford Crossing.