Route Planner to Avoid Traffic
START
FINISH
Loading Traffic Details

Traffic Baschurch

SLIGHT
SEVERE
FULL SCREENUPDATED: 16:44
×
×

Current traffic in Baschurch

ROAD WORKSLocation : The A49 southbound between the A5 south of Shrewsbury and the junction with the A489 .
Reason : Lighting repairs are planned.
Status : Pending.
Schedule : From 20:00 on 15 Dec 2017 to 06:00 on 16 Dec 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 Dec 2017 to 23 Dec 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 Dec 2017 to 31 Dec 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 Jan 2018 to 6 Jan 2018.
Lanes Closed : All lanes will be closed.

8.29 miles from Baschurch.

ROAD WORKSLocation : The M54 eastbound between junctions J6 (Telford W) and J5 (Telford) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 Dec 2017 to 06:00 on 19 Dec 2017.
Lanes Closed : There will be two of three lanes closed.

17.18 miles from Baschurch.

ROAD WORKSLocation : The M54 westbound between junctions J5 (Telford) and J6 (Telford W) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 Dec 2017 to 06:00 on 19 Dec 2017.
Lanes Closed : There will be two of three lanes closed.

18.36 miles from Baschurch.

ROAD WORKSLocation : The M54 eastbound between junctions J5 (Telford) and J4 (Telford E) .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 Dec 2017 to 06:00 on 19 Dec 2017.
Lanes Closed : There will be one of two lanes closed.

18.43 miles from Baschurch.

ROAD WORKSLocation : The M54 westbound between junctions J4 (Telford E) and J5 (Telford) .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 Dec 2017 to 06:00 on 19 Dec 2017.
Lanes Closed : There will be one of two lanes closed.

20.44 miles from Baschurch.

ROAD WORKSLocation : The M54 eastbound between junctions J7 (Wellington) and J6 (Telford W) .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 Dec 2017 to 06:00 on 19 Dec 2017.
Lanes Closed : There will be one of two lanes closed.

14.65 miles from Baschurch.

ROAD WORKSLocation : The M54 westbound between junctions J6 (Telford W) and J7 (Wellington) .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 Dec 2017 to 06:00 on 19 Dec 2017.
Lanes Closed : There will be one of two lanes closed.

17.18 miles from Baschurch.

ROAD WORKSLocation : The M6 northbound between junctions J13 (Stafford) and J14 (Stafford) .
Lane Closures : The hard shoulder is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 19:00 on 18 Dec 2017.

29.56 miles from Baschurch.

ROAD WORKSLocation : The M6 northbound between junctions J15 (Stoke on Trent) and J16 (Stoke on Trent) .
Lane Closures : The hard shoulder is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 19:00 on 18 Dec 2017.

29.6 miles from Baschurch.

ROAD WORKSLocation : The M6 southbound between junctions J16 (Stoke on Trent) and J15 (Stoke on Trent) .
Lane Closures : The hard shoulder is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 19:00 on 18 Dec 2017.

29.53 miles from Baschurch.

ROAD WORKSLocation : The M6 southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : The hard shoulder is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 19:00 on 18 Dec 2017.

29.62 miles from Baschurch.

ROAD WORKSLocation : The M54 westbound exit slip at junction J5 (Telford) .
Lane Closures : Lane one will be closed.
Reason : Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 Dec 2017 to 22 Dec 2017.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 Jan 2018 to 11 Dec 2018.
Lanes Closed : There will be one of two lanes closed.

18.53 miles from Baschurch.

ROAD WORKSLocation : The M54 eastbound exit slip at junction J5 (Telford) .
Lane Closures : Lane one will be closed.
Reason : Bridge repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 Dec 2017 to 22 Dec 2017.
Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 Jan 2018 to 11 Dec 2018.
Lanes Closed : There will be one of two lanes closed.

18.66 miles from Baschurch.

ROAD WORKSLocation : The M6 southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 Dec 2017 to 06:00 on 22 Dec 2017.
Lanes Closed : There will be two of three lanes closed.

29.45 miles from Baschurch.

ROAD WORKSLocation : The A55 eastbound between the junctions with the A41 and the A51 .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 20 Dec 2017 to 05:00 on 21 Dec 2017.
Lanes Closed : All lanes will be closed.

26.88 miles from Baschurch.

ROAD WORKSLocation : The M6 southbound between junctions J16 (Stoke on Trent) and J15 (Stoke on Trent) .
Lane Closures : The hard shoulder is closed.
Reason : Emergency barrier repairs.
Status : Currently Active.
Period : expect disruption until 16:30 on 18 Dec 2017.

28.08 miles from Baschurch.

ROAD WORKSLocation : The M6 northbound between junctions J15 (Stoke on Trent) and J16 (Stoke on Trent) .
Lane Closures : The hard shoulder is closed.
Reason : Emergency barrier repairs.
Status : Currently Active.
Period : expect disruption until 16:30 on 18 Dec 2017.

28.5 miles from Baschurch.

ROAD WORKSLocation : The M6 southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .
Lane Closures : Lane three will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 Dec 2017 to 06:00 on 22 Dec 2017.
Lanes Closed : There will be one of three lanes closed.

29.33 miles from Baschurch.

ROAD WORKSLocation : The M6 northbound between junctions J14 (Stafford) and J15 (Stoke on Trent) .
Lane Closures : Lane three will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 21 Dec 2017 to 06:00 on 22 Dec 2017.
Lanes Closed : There will be one of three lanes closed.

29.63 miles from Baschurch.

ROAD WORKSLocation : The M6 northbound between junctions J16 (Stoke on Trent) and J19 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 Dec 2017 to 1 Feb 2018.
Lanes Closed : There will be two of three lanes closed.

29.72 miles from Baschurch.

CONGESTIONLocation : The A483 northbound between the A5156 and the junction with the A55 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 18 Dec 2017.
Delay : There are currently delays of 15 minutes against expected traffic.

25.66 miles from Baschurch.

CONGESTIONLocation : The A55 westbound exit slip to the A483 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:30 and 16:45 on 18 Dec 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

26.19 miles from Baschurch.

ROAD WORKSLocation : The A49 northbound between the A489 and the junction with the A5 south of Shrewsbury.
Reason : Lighting repairs are planned.
Status : Pending.
Schedule : From 20:00 on 15 Dec 2017 to 06:00 on 16 Dec 2017.
Schedule : From 20:00 on 18 Dec 2017 to 06:00 on 23 Dec 2017.
Schedule : From 20:00 on 25 Dec 2017 to 06:00 on 30 Dec 2017.
Schedule : From 20:00 on 1 Jan 2018 to 06:00 on 6 Jan 2018.
Lanes Closed : All lanes will be closed.

8.64 miles from Baschurch.

CONGESTIONCLEARED @ 16:16Location : The A483 southbound between the junctions with the A55 and the A5156 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:15 and 16:30 on 18 Dec 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

25.65 miles from Baschurch. CLEARED @ 16:16

CONGESTIONCLEARED @ 15:47Location : The A49 southbound between the A489 and the junction with the A4113 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 18 Dec 2017.

23.61 miles from Baschurch. CLEARED @ 15:47

CONGESTIONCLEARED @ 15:36Location : The A55 westbound between the junctions with the A51 and the A483 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:30 and 15:45 on 18 Dec 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

26.19 miles from Baschurch. CLEARED @ 15:36

CONGESTIONCLEARED @ 15:06Location : The A55 eastbound exit slip to the A483 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:00 and 15:15 on 18 Dec 2017.

25.86 miles from Baschurch. CLEARED @ 15:06

CONGESTIONCLEARED @ 15:26Location : The A55 westbound exit slip to the A483 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:15 and 15:30 on 18 Dec 2017.

25.85 miles from Baschurch. CLEARED @ 15:26

CONGESTIONCLEARED @ 15:46Location : The A483 southbound between the junctions with the A55 and the A5156 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 18 Dec 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

25.65 miles from Baschurch. CLEARED @ 15:46

CONGESTIONCLEARED @ 14:37Location : The A5 northbound at the junction with the A49 South of Shrewsbury.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 14:30 and 14:45 on 18 Dec 2017.

8.22 miles from Baschurch. CLEARED @ 14:37

CONGESTIONCLEARED @ 13:47Location : The A49 northbound between the junctions with the A4113 and the A489 .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 18 Dec 2017.

23.77 miles from Baschurch. CLEARED @ 13:47

CONGESTIONCLEARED @ 10:47Location : The A5 northbound at the junction with the A49 South of Shrewsbury.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 10:45 and 11:00 on 18 Dec 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

8.22 miles from Baschurch. CLEARED @ 10:47

THE A483 NORTHBOUND BETWEEN THE A5156 AND THE JUNCTION WITH THE A55CLEARED @ 15:18The A483 northbound between the A5156 and the junction with the A55

22.72 miles from Baschurch. CLEARED @ 15:18

ROAD WORKSCLEARED @ 11:27Location : The M6 northbound between junctions J16 (Stoke on Trent) and J19 (Northwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 06:00 from 18 Dec 2017 to 31 Mar 2018.
Lanes Closed : There will be two of three lanes closed.

29.72 miles from Baschurch. CLEARED @ 11:27

Roadworks

Your Traffic Comments


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location : northbound between the A489 and the junction with the A5 south of Shrewsbury.

Reason : Lighting repairs are planned.

Status : Pending.

Schedule : From 20:00 on 15 December 2017 to 06:00 on 16 December 2017.

Schedule : From 20:00 on 18 December 2017 to 06:00 on 23 December 2017.

Schedule : From 20:00 on 25 December 2017 to 06:00 on 30 December 2017.

Schedule : From 20:00 on 1 January 2018 to 06:00 on 6 January 2018.

Lanes Closed : All lanes will be closed.

8.64 miles from Baschurch.

52.67--2.76

Location : westbound exit slip to the A483 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:30 and 16:45 on 18 December 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

26.19 miles from Baschurch.

53.16--2.88

CLEARED @ 16:16Location : southbound between the junctions with the A55 and the A5156 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:15 and 16:30 on 18 December 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

25.65 miles from Baschurch.

53.15--2.91

CLEARED @ 15:47Location : southbound between the A489 and the junction with the A4113 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 18 December 2017.

23.61 miles from Baschurch.

52.44--2.84

CLEARED @ 15:36Location : westbound between the junctions with the A51 and the A483 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:30 and 15:45 on 18 December 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

26.19 miles from Baschurch.

53.16--2.88

Location : northbound between the A5156 and the junction with the A55 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 18 December 2017.

Delay : There are currently delays of 15 minutes against expected traffic.

25.66 miles from Baschurch.

53.15--2.92

CLEARED @ 15:06Location : eastbound exit slip to the A483 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:00 and 15:15 on 18 December 2017.

25.86 miles from Baschurch.

53.16--2.92

CLEARED @ 15:26Location : westbound exit slip to the A483 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:15 and 15:30 on 18 December 2017.

25.85 miles from Baschurch.

53.16--2.91

CLEARED @ 15:46Location : southbound between the junctions with the A55 and the A5156 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 15:45 and 16:00 on 18 December 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

25.65 miles from Baschurch.

53.15--2.91

CLEARED @ 14:37Location : northbound at the junction with the A49 South of Shrewsbury.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 14:30 and 14:45 on 18 December 2017.

8.22 miles from Baschurch.

52.68--2.76

CLEARED @ 13:47Location : northbound between the junctions with the A4113 and the A489 .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 13:45 and 14:00 on 18 December 2017.

23.77 miles from Baschurch.

52.44--2.84

CLEARED @ 10:47Location : northbound at the junction with the A49 South of Shrewsbury.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 10:45 and 11:00 on 18 December 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

8.22 miles from Baschurch.

52.68--2.76

This message contains gauge information for Llanymynech, Maesbrook and Cae Howel.This message will be updated by 10 am on Tuesday 19th of December or if the situation changes.At 3 pm today;The level at the Llanymynech Gauge was 2.22 metres and falling slowly.

A peak level of 3.98 metres occurred early on Thursday morning.The level at the Maesbrook Gauge was 0.40 metres and steady.The level at the Cae Howel Gauge was 3.88 metres and steady.

6.7 miles from Baschurch.

52.81--3.02

This message contains gauge information for Rodington and Walcot.This message will be updated by 10 am on Tuesday the 19th of December or if the situation changes.At 3 pm today;the level at the Rodington Gauge 0.70 metres and falling slowly.

A peak level of 1.25 metres occurred on Friday 15th December.the level at the Walcot Gauge was 1.64 metres and falling slowly.

A peak level of 2.09 metres occurred on Friday 15th December.

8.4 miles from Baschurch.

52.82--2.67

CLEARED @ 15:18The A483 northbound between the A5156 and the junction with the A55

22.72 miles from Baschurch.

53.11--2.95

15.61 miles from Baschurch.

52.61--2.62

28.93 miles from Baschurch.

52.79--2.17

Location : northbound between junctions J16 (Stoke on Trent) and J19 (Northwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 18 December 2017 to 1 February 2018.

Lanes Closed : There will be two of three lanes closed.

29.72 miles from Baschurch.

53.08--2.34

Location : northbound between junctions J14 (Stafford) and J15 (Stoke on Trent) .

Lane Closures : Lane three will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 21 December 2017 to 06:00 on 22 December 2017.

Lanes Closed : There will be one of three lanes closed.

29.63 miles from Baschurch.

52.86--2.16

Location : southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .

Lane Closures : Lane three will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 21 December 2017 to 06:00 on 22 December 2017.

Lanes Closed : There will be one of three lanes closed.

29.33 miles from Baschurch.

52.96--2.22

Location : northbound between junctions J15 (Stoke on Trent) and J16 (Stoke on Trent) .

Lane Closures : The hard shoulder is closed.

Reason : Emergency barrier repairs.

Status : Currently Active.

Period : expect disruption until 16:30 on 18 December 2017.

28.5 miles from Baschurch.

52.99--2.27

Location : southbound between junctions J16 (Stoke on Trent) and J15 (Stoke on Trent) .

Lane Closures : The hard shoulder is closed.

Reason : Emergency barrier repairs.

Status : Currently Active.

Period : expect disruption until 16:30 on 18 December 2017.

28.08 miles from Baschurch.

52.99--2.28

Location : eastbound between the junctions with the A41 and the A51 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 20 December 2017 to 05:00 on 21 December 2017.

Lanes Closed : All lanes will be closed.

26.88 miles from Baschurch.

53.17--2.86

Location : southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 21 December 2017 to 06:00 on 22 December 2017.

Lanes Closed : There will be two of three lanes closed.

29.45 miles from Baschurch.

52.96--2.22

Location : eastbound exit slip at junction J5 (Telford) .

Lane Closures : Lane one will be closed.

Reason : Bridge repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 December 2017 to 22 December 2017.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 January 2018 to 11 December 2018.

Lanes Closed : There will be one of two lanes closed.

18.66 miles from Baschurch.

52.68--2.45

Location : westbound exit slip at junction J5 (Telford) .

Lane Closures : Lane one will be closed.

Reason : Bridge repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 18 December 2017 to 22 December 2017.

Schedule : Expect disruption everyday between 21:00 and 05:00 from 2 January 2018 to 11 December 2018.

Lanes Closed : There will be one of two lanes closed.

18.53 miles from Baschurch.

52.68--2.45

Location : southbound between junctions J15 (Stoke on Trent) and J14 (Stafford) .

Lane Closures : The hard shoulder is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 19:00 on 18 December 2017.

29.62 miles from Baschurch.

52.98--2.23

Location : southbound between junctions J16 (Stoke on Trent) and J15 (Stoke on Trent) .

Lane Closures : The hard shoulder is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 19:00 on 18 December 2017.

29.53 miles from Baschurch.

53.07--2.33

Location : northbound between junctions J15 (Stoke on Trent) and J16 (Stoke on Trent) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 19:00 on 18 December 2017.

29.6 miles from Baschurch.

52.98--2.23

Location : northbound between junctions J13 (Stafford) and J14 (Stafford) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 19:00 on 18 December 2017.

29.56 miles from Baschurch.

52.81--2.16

Location : westbound between junctions J6 (Telford W) and J7 (Wellington) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 December 2017 to 06:00 on 19 December 2017.

Lanes Closed : There will be one of two lanes closed.

17.18 miles from Baschurch.

52.69--2.48

Location : eastbound between junctions J7 (Wellington) and J6 (Telford W) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 December 2017 to 06:00 on 19 December 2017.

Lanes Closed : There will be one of two lanes closed.

14.65 miles from Baschurch.

52.69--2.55

Location : westbound between junctions J4 (Telford E) and J5 (Telford) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 December 2017 to 06:00 on 19 December 2017.

Lanes Closed : There will be one of two lanes closed.

20.44 miles from Baschurch.

52.68--2.4

Location : eastbound between junctions J5 (Telford) and J4 (Telford E) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 December 2017 to 06:00 on 19 December 2017.

Lanes Closed : There will be one of two lanes closed.

18.43 miles from Baschurch.

52.68--2.45

Location : westbound between junctions J5 (Telford) and J6 (Telford W) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 December 2017 to 06:00 on 19 December 2017.

Lanes Closed : There will be two of three lanes closed.

18.36 miles from Baschurch.

52.68--2.45

Location : eastbound between junctions J6 (Telford W) and J5 (Telford) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 December 2017 to 06:00 on 19 December 2017.

Lanes Closed : There will be two of three lanes closed.

17.18 miles from Baschurch.

52.69--2.48

Location : southbound between the A5 south of Shrewsbury and the junction with the A489 .

Reason : Lighting repairs are planned.

Status : Pending.

Schedule : From 20:00 on 15 December 2017 to 06:00 on 16 December 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 18 December 2017 to 23 December 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 25 December 2017 to 31 December 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 1 January 2018 to 6 January 2018.

Lanes Closed : All lanes will be closed.

8.29 miles from Baschurch.

52.68--2.76

CLEARED @ 11:27Location : northbound between junctions J16 (Stoke on Trent) and J19 (Northwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 18 December 2017 to 31 March 2018.

Lanes Closed : There will be two of three lanes closed.

29.72 miles from Baschurch.

53.08--2.34