Current traffic in Altmore


There are no current incidents in this location.

Roadworks

ROAD WORKSLocation : westbound between junctions J8 (High Wycombe) and J10 (Reading) .

Lane Closures : The hard shoulder is closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 17:00 on 26 Apr 2018.

1.54 miles from Altmore.

ROAD WORKSLocation : westbound exit slip at junction J6 (Slough) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 Apr 2018 to 06:00 on 27 Apr 2018.

Lanes Closed : There will be one of two lanes closed.

7.15 miles from Altmore.

ROAD WORKSLocation : eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 01:38 on 26 Apr 2018 to 06:00 on 3 May 2018.

9.38 miles from Altmore.

ROAD WORKSLocation : southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .

Lane Closures : The hard shoulder is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 16:30 on 30 Apr 2018.

7.68 miles from Altmore.

ROAD WORKSLocation : northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .

Lane Closures : The hard shoulder is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 16:30 on 30 Apr 2018.

8.61 miles from Altmore.

ROAD WORKSLocation : southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 26 Apr 2018 to 07:00 on 27 Apr 2018.

Lanes Closed : There will be two of three lanes closed.

7.62 miles from Altmore.

ROAD WORKSLocation : southbound at junction J4 (High Wycombe) .

Lane Closures : Lane two will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 26 Apr 2018 to 07:00 on 27 Apr 2018.

Lanes Closed : There will be one of two lanes closed.

7.62 miles from Altmore.

ROAD WORKSLocation : southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 26 Apr 2018 to 07:00 on 27 Apr 2018.

Lanes Closed : There will be two of three lanes closed.

7.66 miles from Altmore.


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location : westbound between junctions J8 (High Wycombe) and J10 (Reading) .

Lane Closures : The hard shoulder is closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 17:00 on 26 April 2018.

1.54 miles from Altmore.

51.49--0.75

Location : westbound exit slip at junction J6 (Slough) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 April 2018 to 06:00 on 27 April 2018.

Lanes Closed : There will be one of two lanes closed.

7.15 miles from Altmore.

51.5--0.61

Location : eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 01:38 on 26 April 2018 to 06:00 on 3 May 2018.

9.38 miles from Altmore.

51.42--0.94

Location : southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .

Lane Closures : The hard shoulder is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 16:30 on 30 April 2018.

7.68 miles from Altmore.

51.61--0.76

Location : northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .

Lane Closures : The hard shoulder is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 16:30 on 30 April 2018.

8.61 miles from Altmore.

51.62--0.83

Location : southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 26 April 2018 to 07:00 on 27 April 2018.

Lanes Closed : There will be two of three lanes closed.

7.62 miles from Altmore.

51.61--0.76

Location : southbound at junction J4 (High Wycombe) .

Lane Closures : Lane two will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 26 April 2018 to 07:00 on 27 April 2018.

Lanes Closed : There will be one of two lanes closed.

7.62 miles from Altmore.

51.61--0.76

Location : southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 26 April 2018 to 07:00 on 27 April 2018.

Lanes Closed : There will be two of three lanes closed.

7.66 miles from Altmore.

51.61--0.8

Location : southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 26 April 2018 to 07:00 on 27 April 2018.

Lanes Closed : All lanes will be closed.

7.78 miles from Altmore.

51.62--0.8

Location : northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .

Lane Closures : The hard shoulder is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 16:00 on 30 April 2018.

7.82 miles from Altmore.

51.6--0.69

Location : northbound between junctions J2 (Beaconsfield) and J4 (High Wycombe) .

Lane Closures : The hard shoulder is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 16:00 on 30 April 2018.

7.82 miles from Altmore.

51.6--0.68

Location : southbound between junctions J4 (High Wycombe) and J2 (Beaconsfield) .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 16:00 on 30 April 2018.

Lanes Closed : There is one of four lanes closed.

7.81 miles from Altmore.

51.6--0.69

Location : southbound between junctions J4 (High Wycombe) and J3 (Loudwater) .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 16:00 on 30 April 2018.

Lanes Closed : There is one of three lanes closed.

7.8 miles from Altmore.

51.6--0.69

Location : westbound between junctions J7 (Slough) and J8 (High Wycombe) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 24 November 2018.

2.52 miles from Altmore.

51.5--0.72

Location : eastbound exit slip at junction J10 (Reading) .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 20:56 on 16 April 2018 to 06:00 on 5 May 2018.

6.45 miles from Altmore.

51.43--0.86

Location : eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 2 May 2018 to 06:00 on 3 May 2018.

Lanes Closed : There will be two of three lanes closed.

9.38 miles from Altmore.

51.42--0.94

Location : The A404M southbound entry slip at junction J9B .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 06:00 on 2 May 2018 to 06:00 on 27 June 2018.

Lanes Closed : There will be one of two lanes closed.

1.19 miles from Altmore.

51.52--0.76

Location : westbound between junctions J8 (High Wycombe) and J12 (Reading) .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 21:00 on 2 May 2018 to 06:00 on 11 May 2018.

5.47 miles from Altmore.

51.44--0.84

Location : southbound exit slip to the A4 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 09:30 on 1 May 2018 to 16:00 on 1 May 2018.

Lanes Closed : There will be one of two lanes closed.

1.3 miles from Altmore.

51.52--0.77

Location : westbound entry slip at junction J10 (Reading) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 2 May 2018 to 06:00 on 3 May 2018.

Schedule : From 21:00 on 4 May 2018 to 06:00 on 5 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 May 2018 to 11 May 2018.

Lanes Closed : All lanes will be closed.

6.02 miles from Altmore.

51.43--0.85

Location : westbound entry slip at junction J10 (Reading) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 2 May 2018 to 06:00 on 3 May 2018.

Schedule : From 21:00 on 4 May 2018 to 06:00 on 5 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 May 2018 to 11 May 2018.

Lanes Closed : All lanes will be closed.

6 miles from Altmore.

51.43--0.85

Location : westbound between junctions J8 (High Wycombe) and J12 (Reading) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 2 May 2018 to 06:00 on 3 May 2018.

Schedule : From 21:00 on 4 May 2018 to 06:00 on 5 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 8 May 2018 to 11 May 2018.

Lanes Closed : All lanes will be closed.

5.47 miles from Altmore.

51.44--0.84

Location : The A329M westbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 1 May 2018 to 06:00 on 2 May 2018.

Schedule : From 21:00 on 11 May 2018 to 06:00 on 12 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 May 2018 to 16 May 2018.

Lanes Closed : All lanes will be closed.

6.21 miles from Altmore.

51.43--0.86

Location : The A329M eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 1 May 2018 to 06:00 on 2 May 2018.

Schedule : From 21:00 on 11 May 2018 to 06:00 on 12 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 May 2018 to 16 May 2018.

Lanes Closed : All lanes will be closed.

6.21 miles from Altmore.

51.43--0.86

Location : eastbound exit slip at junction J10 (Reading) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 1 May 2018 to 06:00 on 2 May 2018.

Schedule : From 21:00 on 11 May 2018 to 06:00 on 12 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 14 May 2018 to 16 May 2018.

Lanes Closed : All lanes will be closed.

6.45 miles from Altmore.

51.43--0.86

Location : northbound between junctions J2 (Beaconsfield) and J4 (High Wycombe) .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 16:00 on 26 April 2018.

Lanes Closed : There is one of four lanes closed.

7.83 miles from Altmore.

51.6--0.68

Location : northbound exit slip at junction J3 (Loudwater) .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 16:00 on 26 April 2018.

Lanes Closed : There is one of two lanes closed.

7.82 miles from Altmore.

51.6--0.69

Location : southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 30 April 2018 to 04:00 on 1 May 2018.

Lanes Closed : There will be two of three lanes closed.

9.46 miles from Altmore.

51.63--0.87

Location : southbound between junctions J2 (Beaconsfield) and J1A (Watford) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 18:00 and 06:00 from 30 April 2018 to 4 May 2018.

Lanes Closed : There will be one of four lanes closed.

9.12 miles from Altmore.

51.59--0.62

Location : southbound between junctions J5 (High Wycombe) and J4 (High Wycombe) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 27 April 2018 to 04:00 on 28 April 2018.

Lanes Closed : There will be two of three lanes closed.

8.26 miles from Altmore.

51.62--0.82

Location : northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 27 April 2018 to 04:00 on 28 April 2018.

Lanes Closed : There will be two of three lanes closed.

7.73 miles from Altmore.

51.61--0.8

Location : northbound between junctions J4 (High Wycombe) and J5 (High Wycombe) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 27 April 2018 to 04:00 on 28 April 2018.

Lanes Closed : There will be two of three lanes closed.

7.42 miles from Altmore.

51.61--0.78

Location : northbound at junction J4 (High Wycombe) .

Lane Closures : Lane two will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 27 April 2018 to 04:00 on 28 April 2018.

Lanes Closed : There will be one of two lanes closed.

7.43 miles from Altmore.

51.61--0.78

Location : northbound between junctions J3 (Loudwater) and J4 (High Wycombe) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 27 April 2018 to 07:00 on 28 April 2018.

Lanes Closed : There will be two of three lanes closed.

7.62 miles from Altmore.

51.61--0.74

Location : eastbound between junctions J8 (High Wycombe) and J7 (Slough) .

Lane Closures : The hard shoulder is closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 17:00 on 26 April 2018.

4.38 miles from Altmore.

51.51--0.68

Location : westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : The hard shoulder is closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 17:00 on 26 April 2018.

6.12 miles from Altmore.

51.43--0.86

Location : southbound between junctions J4 (High Wycombe) and J2 (Beaconsfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 April 2018 to 28 April 2018.

Lanes Closed : There will be two of four lanes closed.

7.83 miles from Altmore.

51.6--0.68

Location : eastbound exit slip at junction J8 (High Wycombe) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 30 April 2018 to 2 May 2018.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 21 June 2018 to 23 June 2018.

Lanes Closed : There will be one of two lanes closed.

2.09 miles from Altmore.

51.5--0.73

Location : The A404M southbound entry slip at junction J9B .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2018 to 2 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 June 2018 to 23 June 2018.

Lanes Closed : All lanes will be closed.

1.19 miles from Altmore.

51.52--0.76

Location : The A404M southbound between junctions J9B and J9 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2018 to 2 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 June 2018 to 23 June 2018.

Lanes Closed : All lanes will be closed.

1.3 miles from Altmore.

51.52--0.77

Location : The A404M southbound exit slip at junction J9A .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2018 to 2 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 June 2018 to 23 June 2018.

Lanes Closed : All lanes will be closed.

1.83 miles from Altmore.

51.51--0.73

Location : The A404M northbound exit slip at junction J9B .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2018 to 2 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 June 2018 to 23 June 2018.

Lanes Closed : All lanes will be closed.

1.09 miles from Altmore.

51.52--0.76

Location : The A404M northbound between junctions J9A and J9B .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2018 to 2 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 June 2018 to 23 June 2018.

Lanes Closed : All lanes will be closed.

1.69 miles from Altmore.

51.51--0.74

Location : The A404M northbound between junctions J9 and J9A .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2018 to 2 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 June 2018 to 23 June 2018.

Lanes Closed : All lanes will be closed.

2.23 miles from Altmore.

51.5--0.73

Location : The A404M northbound exit slip at junction J9A .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2018 to 2 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 June 2018 to 23 June 2018.

Lanes Closed : All lanes will be closed.

1.72 miles from Altmore.

51.51--0.74

Location : The A329M westbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 2 May 2018 to 06:00 on 3 May 2018.

Schedule : From 21:00 on 4 May 2018 to 06:00 on 5 May 2018.

Lanes Closed : All lanes will be closed.

6.21 miles from Altmore.

51.43--0.86

Location : The A329M eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 2 May 2018 to 06:00 on 3 May 2018.

Schedule : From 21:00 on 4 May 2018 to 06:00 on 5 May 2018.

Lanes Closed : All lanes will be closed.

6.21 miles from Altmore.

51.43--0.86

Location : The A329M westbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 3 May 2018 to 06:00 on 4 May 2018.

Schedule : From 21:00 on 5 May 2018 to 06:00 on 6 May 2018.

Lanes Closed : All lanes will be closed.

5.74 miles from Altmore.

51.43--0.85

Location : The A329M eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 3 May 2018 to 06:00 on 4 May 2018.

Schedule : From 21:00 on 5 May 2018 to 06:00 on 6 May 2018.

Lanes Closed : All lanes will be closed.

5.74 miles from Altmore.

51.43--0.85

Location : westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : The hard shoulder, lanes 1 and 2 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 27 April 2018.

Lanes Closed : There are two of three lanes closed.

7.22 miles from Altmore.

51.42--0.89

Location : westbound exit slip at junction J6 (Slough) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 30 April 2018 to 06:00 on 1 May 2018.

Lanes Closed : All lanes will be closed.

7.15 miles from Altmore.

51.5--0.61

Location : The A404M northbound exit slip at junction J9B .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 11 April 2018 to 06:00 on 12 April 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 21 June 2018 to 23 June 2018.

Lanes Closed : All lanes will be closed.

1.09 miles from Altmore.

51.52--0.76

Location : eastbound between junctions J11 (Basingstoke) and J10 (Reading) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 May 2018 to 12 May 2018.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 14 May 2018 to 19 May 2018.

Lanes Closed : There will be two of three lanes closed.

9.96 miles from Altmore.

51.41--0.96

Location : westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 8 May 2018 to 12 May 2018.

Schedule : Expect disruption everyday between 22:00 and 06:00 from 14 May 2018 to 19 May 2018.

Lanes Closed : There will be two of three lanes closed.

9.23 miles from Altmore.

51.42--0.94

Location : westbound between junctions J5 (Colnbrook) and J6 (Slough) .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 30 April 2018 to 06:00 on 1 May 2018.

Lanes Closed : There will be one of three lanes closed.

7.82 miles from Altmore.

51.5--0.59

Location : westbound entry slip at junction J10 (Reading) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 May 2018 to 13 May 2018.

Lanes Closed : All lanes will be closed.

6.02 miles from Altmore.

51.43--0.85

Location : westbound entry slip at junction J10 (Reading) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 May 2018 to 13 May 2018.

Lanes Closed : All lanes will be closed.

6 miles from Altmore.

51.43--0.85

Location : westbound between junctions J10 (Reading) and J11 (Basingstoke) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 11 May 2018 to 13 May 2018.

Lanes Closed : All lanes will be closed.

5.56 miles from Altmore.

51.44--0.85

Location : eastbound entry slip at junction J10 (Reading) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 26 April 2018 to 28 April 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 30 April 2018 to 5 May 2018.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 7 May 2018 to 10 May 2018.

Lanes Closed : All lanes will be closed.

6.03 miles from Altmore.

51.43--0.86

Location : eastbound exit slip at junction J10 (Reading) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 2 May 2018 to 06:00 on 3 May 2018.

Schedule : From 21:00 on 4 May 2018 to 06:00 on 5 May 2018.

Lanes Closed : All lanes will be closed.

6.45 miles from Altmore.

51.43--0.86

Location : westbound exit slip at junction J10 (Reading) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 20 April 2018 to 06:00 on 21 April 2018.

Schedule : From 21:00 on 3 May 2018 to 06:00 on 4 May 2018.

Schedule : From 21:00 on 5 May 2018 to 06:00 on 6 May 2018.

Lanes Closed : All lanes will be closed.

5.55 miles from Altmore.

51.44--0.85