Current traffic in Abridge

ROAD WORKSLocation : The A12 northbound between the junctions with the M25 and the A1023 .
Lane Closures : Lane one is closed.
Reason : Horticultural works.
Status : Currently Active.
Period : expect disruption until 06:00 on 24 Feb 2018.
Lanes Closed : There is one of two lanes closed.

7.71 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 Feb 2018 to 2 Mar 2018.
Schedule : From 23:00 on 2 Mar 2018 to 06:00 on 3 Mar 2018.
Lanes Closed : There will be three of four lanes closed.

5.03 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise entry slip at junction J26 (Waltham Abbey) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 Feb 2018 to 05:30 on 23 Feb 2018.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 Feb 2018 to 2 Mar 2018.
Schedule : From 23:00 on 2 Mar 2018 to 06:00 on 3 Mar 2018.
Lanes Closed : All lanes will be closed.

4 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise exit slip at junction J26 (Waltham Abbey) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 05:30 on 24 Feb 2018.
Lanes Closed : All lanes will be closed.

4.24 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise entry slip at junction J25 (Enfield) .
Lane Closures : Lane one will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Schedule : From 22:00 on 24 Feb 2018 to 06:00 on 25 Feb 2018.
Lanes Closed : All lanes will be closed.

7.27 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise at junction J25 (Enfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 05:00 on 24 Feb 2018.
Schedule : From 22:00 on 24 Feb 2018 to 05:00 on 25 Feb 2018.
Lanes Closed : All lanes will be closed.

7.61 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J26 (Waltham Abbey) and J25 (Enfield) .
Lane Closures : Lanes 2, 3 and 4 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Schedule : From 22:00 on 24 Feb 2018 to 06:00 on 25 Feb 2018.
Lanes Closed : There will be three of four lanes closed.

5.6 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise between junctions J24 (Potters Bar) and J25 (Enfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 05:00 on 24 Feb 2018.
Schedule : From 22:00 on 24 Feb 2018 to 05:00 on 25 Feb 2018.
Lanes Closed : There will be three of four lanes closed.

8.95 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 05:00 on 24 Feb 2018.
Schedule : From 22:00 on 24 Feb 2018 to 05:00 on 25 Feb 2018.
Lanes Closed : There will be three of four lanes closed.

6.99 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise between junctions J25 (Enfield) and J27 (Stansted) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 Feb 2018 to 2 Mar 2018.
Schedule : From 23:00 on 2 Mar 2018 to 06:00 on 3 Mar 2018.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 5 Mar 2018 to 9 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

5.13 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .
Lane Closures : Lane one will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 26 Feb 2018 to 05:00 on 27 Feb 2018.
Lanes Closed : There will be one of four lanes closed.

9.6 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 26 Feb 2018 to 05:00 on 27 Feb 2018.
Lanes Closed : There will be two of four lanes closed.

3.98 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise at junction J29 (Romford) .
Lane Closures : Lane one will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 26 Feb 2018 to 05:00 on 27 Feb 2018.
Lanes Closed : There will be one of three lanes closed.

9.26 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise exit slip at junction J29 (Romford) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 22:00 on 26 Feb 2018 to 05:00 on 27 Feb 2018.
Lanes Closed : All lanes will be closed.

9.18 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 26 Feb 2018 to 05:00 on 27 Feb 2018.
Lanes Closed : There will be two of four lanes closed.

6.08 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J27 (Stansted) and J25 (Enfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 Feb 2018 to 28 Feb 2018.
Lanes Closed : There will be two of four lanes closed.

3.73 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise exit slip at junction J25 (Enfield) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 Feb 2018 to 2 Mar 2018.
Schedule : From 23:00 on 2 Mar 2018 to 05:00 on 3 Mar 2018.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 5 Mar 2018 to 9 Mar 2018.
Schedule : From 23:00 on 9 Mar 2018 to 05:00 on 10 Mar 2018.
Lanes Closed : There will be one of two lanes closed.

7.61 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J25 (Enfield) and J24 (Potters Bar) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 Feb 2018 to 3 Mar 2018.
Lanes Closed : There will be three of four lanes closed.

8.3 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

9.8 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Feb 2018 to 05:00 on 28 Feb 2018.
Lanes Closed : There will be two of four lanes closed.

5.32 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

7.43 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise between junctions J28 (Chelmsford) and J29 (Romford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Feb 2018 to 05:00 on 28 Feb 2018.
Lanes Closed : There will be two of four lanes closed.

7.22 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise at junction J29 (Romford) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be one of three lanes closed.

9.26 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise at junction J29 (Romford) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be one of three lanes closed.

8.74 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise exit slip at junction J28 (Chelmsford) southbound.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Lanes Closed : All lanes will be closed.

6.97 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise exit slip at junction J28 (Chelmsford) .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Lanes Closed : There will be one of two lanes closed.

6.78 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise between junctions J29 (Romford) and J30 (Dagenham) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

9.28 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise at junction J28 (Chelmsford) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 27 Feb 2018 to 05:00 on 28 Feb 2018.
Lanes Closed : There will be one of three lanes closed.

6.78 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 28 Feb 2018 to 05:00 on 1 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

8.73 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise entry slip at junction J27 (Stansted) From M11 South.
Lane Closures : Lane one will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Lanes Closed : There will be one of two lanes closed.

2.64 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 16:00 from 1 Mar 2018 to 2 Mar 2018.

4.68 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise at junction J29 (Romford) .
Lane Closures : Lane three will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 Mar 2018 to 05:00 on 2 Mar 2018.
Lanes Closed : There will be one of three lanes closed.

9.06 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise between junctions J29 (Romford) and J30 (Dagenham) .
Lane Closures : Lanes 3 and 4 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 1 Mar 2018 to 05:00 on 2 Mar 2018.
Lanes Closed : There will be two of four lanes closed.

9.28 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise exit slip at junction J26 (Waltham Abbey) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 Feb 2018 to 2 Mar 2018.
Schedule : From 23:00 on 2 Mar 2018 to 05:30 on 3 Mar 2018.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 5 Mar 2018 to 9 Mar 2018.
Lanes Closed : All lanes will be closed.

3.92 miles from Abridge.

ROAD WORKSLocation : The M25 clockwise entry slip at junction J26 (Waltham Abbey) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 Feb 2018 to 2 Mar 2018.
Schedule : From 23:00 on 2 Mar 2018 to 05:30 on 3 Mar 2018.
Schedule : Expect disruption everyday between 22:00 and 05:30 from 5 Mar 2018 to 9 Mar 2018.
Schedule : From 23:00 on 9 Mar 2018 to 05:30 on 10 Mar 2018.
Lanes Closed : All lanes will be closed.

4.17 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise exit slip at junction J25 (Enfield) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 Feb 2018 to 2 Mar 2018.
Schedule : From 23:00 on 2 Mar 2018 to 05:00 on 3 Mar 2018.
Schedule : Expect disruption everyday between 22:00 and 05:00 from 5 Mar 2018 to 9 Mar 2018.
Schedule : From 23:00 on 9 Mar 2018 to 05:00 on 10 Mar 2018.
Lanes Closed : There will be one of two lanes closed.

7.1 miles from Abridge.

MAJOR EVENTAdvance warning: The Are you interested in filmmaking and ideas? is taking place at World write Centre and may have an impact on the traffic in London between 7:30pm - 8:00pm.

8.73 miles from Abridge.

ROAD WORKSLocation : The M25 anticlockwise between junctions J27 (Stansted) and J25 (Enfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 23 Feb 2018 to 06:00 on 24 Feb 2018.
Lanes Closed : There will be two of four lanes closed.

3.72 miles from Abridge.

CONGESTIONCLEARED @ 19:56Location : The M25 anticlockwise at junction J27 (Stansted) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 19:45 and 20:00 on 23 Feb 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

2.54 miles from Abridge. CLEARED @ 19:56

CONGESTIONCLEARED @ 19:46Location : The M25 anticlockwise entry slip at junction J27 (Stansted) From M11 North.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 19:45 and 20:00 on 23 Feb 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

2.53 miles from Abridge. CLEARED @ 19:46

CONGESTIONCLEARED @ 17:46Location : The M25 clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:45 and 18:00 on 23 Feb 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

5.65 miles from Abridge. CLEARED @ 17:46

ACCIDENTCLEARED @ 17:46Location : The M25 clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .
Lane Closures : Lane four is closed.
Reason : Road traffic collision.
Status : Currently Active.
Time To Clear : The event is expected to clear between 18:45 and 19:00 on 23 Feb 2018.
Return To Normal : Normal traffic conditions are expected between 19:15 and 19:30 on 23 Feb 2018.
Lanes Closed : There is one of four lanes closed.

6.39 miles from Abridge. CLEARED @ 17:46

ACCIDENTCLEARED @ 18:56Location : The M25 clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .
Lane Closures : Lane one is closed.
Reason : Road traffic collision.
Status : Currently Active.
Time To Clear : The event is expected to clear between 20:00 and 20:15 on 23 Feb 2018.
Return To Normal : Normal traffic conditions are expected between 19:45 and 20:00 on 23 Feb 2018.
Lanes Closed : There is one of four lanes closed.

5.19 miles from Abridge. CLEARED @ 18:56

Roadworks


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

CLEARED @ 19:56Location : anticlockwise at junction J27 (Stansted) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 19:45 and 20:00 on 23 February 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

2.54 miles from Abridge.

51.68-0.13

CLEARED @ 19:46Location : anticlockwise entry slip at junction J27 (Stansted) From M11 North.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 19:45 and 20:00 on 23 February 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

2.53 miles from Abridge.

51.68-0.12

CLEARED @ 17:46Location : clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:45 and 18:00 on 23 February 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

5.65 miles from Abridge.

51.68--0.01

CLEARED @ 17:46Location : clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .

Lane Closures : Lane four is closed.

Reason : Road traffic collision.

Status : Currently Active.

Time To Clear : The event is expected to clear between 18:45 and 19:00 on 23 February 2018.

Return To Normal : Normal traffic conditions are expected between 19:15 and 19:30 on 23 February 2018.

Lanes Closed : There is one of four lanes closed.

6.39 miles from Abridge.

51.68--0.03

CLEARED @ 18:56Location : clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .

Lane Closures : Lane one is closed.

Reason : Road traffic collision.

Status : Currently Active.

Time To Clear : The event is expected to clear between 20:00 and 20:15 on 23 February 2018.

Return To Normal : Normal traffic conditions are expected between 19:45 and 20:00 on 23 February 2018.

Lanes Closed : There is one of four lanes closed.

5.19 miles from Abridge.

51.68-0

Location : anticlockwise between junctions J27 (Stansted) and J25 (Enfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Lanes Closed : There will be two of four lanes closed.

3.72 miles from Abridge.

51.69-0.05

Crooked Billet Underpass (Westbound) - Lane closure overnight to facilitate works The restrictions have been removed.

6.13 miles from Abridge.

51.6--0.02

Aldermans Hill at the junction with Green Lanes - There will be temporary signals in operation due to a crane in the area.

No restrictions in place.

9.52 miles from Abridge.

51.62--0.11

Walthamstow Avenue (North Circular Road) (Eastbound) On approach to the Crooked Billet Roundabout.

Partial restriction of the off slip towards the roundabout due to an accident.

The collision has been cleared.

All lanes are open.

6.34 miles from Abridge.

51.61--0.03

Bowes Road (North Circular Road) (All Directions) - The traffic signals are not operating under central computer control at this junction.

Traffic signals at this location are now on and working.

9.61 miles from Abridge.

51.61--0.11

Lordship Lane (All Directions) at the junction of Bruce Grove - Temporary traffic lights in place due to water works Traffic is flowing well in the area.

8.48 miles from Abridge.

51.6--0.08

Lordship Lane (All Directions) at the junction of The Roundway - Collision - Lordship Lane is blocked eastbound -Slow moving traffic on approach All roads have reopened.

Traffic is flowing well.

9.17 miles from Abridge.

51.6--0.09

Broad Lane (Northbound) there will be no right turn into High Road due to works in the area.

8.78 miles from Abridge.

51.58--0.07

Southend Road (North Circular Road) at the junction of Wadham Road - All lanes are now open.

All lanes are now open.

Traffic is flowing well.

5.64 miles from Abridge.

51.6-0

Newham Way (Eastbound) at the junction of Noel Road - All lanes now open.

All lanes now open.

8.97 miles from Abridge.

51.52-0.05

Rainham Road North junction with Oxlow Lane (All Directions): The traffic lights are not working at this location.

The signals have now been repaired.

6.78 miles from Abridge.

51.55-0.16

Romford Road (Both Directions) between Upton Lane and Green Street - Romford Road has reopened in both directions Romford Road has reopened in both directions, and vehicles that remain parked at the scene are not causing an obstruction.

Traffic is flowing normally.

7.52 miles from Abridge.

51.55-0.03

Green Street (All Directions) at the junction of Jute Lane - The level crossing barriers are now working.

Fault now repaired.

6.2 miles from Abridge.

51.66--0.03

Crownfield Road (All Directions) at the junction of A112 Leyton High Road - Temporary signals in operation due to bus shelter upgrade works.

(Sundays Only)

7.89 miles from Abridge.

51.55-0

A13 Ripple Road (Eastbound) just after the entry slip from Lodge Avenue - All lanes reopened following a collision.

Traffic flows are normal for the time of day.

7.67 miles from Abridge.

51.53-0.11

Ripple Road (Eastbound) - Lane three (of three) blocked due to a broken down vehicle.

The accident has been cleared and lane three has been reopened to traffic.

Traffic flows are returning to normal for the time of day.

7.78 miles from Abridge.

51.53-0.12

Angel Road (North Circular Road) (All Directions) at the junction of the Cooks Ferry Flyover - The A406 has been fully reopened eastbound with one lane reopened in the westbound carriageway.

All lanes open with traffic flowing well.

6.59 miles from Abridge.

51.61--0.04

Stoke Newington High Street (Both Directions) at the junction of Stoke Newington Church Street.

Traffic lights are working.

Traffic signals are on and working.

Traffic is moving well.

9.7 miles from Abridge.

51.56--0.08

Stamford Hill (All Directions) at the junction of Clapton Common - The traffic signals at this junction are out of order.

Trafic is back to normal

9.17 miles from Abridge.

51.57--0.07

Seven Sisters Road (Both Directions) at the junction of A10 Tottenham High Road- The road will be closed overnight to facilitate works.

8.85 miles from Abridge.

51.58--0.07

Station Road (All Directions) between Valence Avenue and Broomfield Road - Temporary traffic signals in operation to facilitate resurfacing works.

5.45 miles from Abridge.

51.57-0.13

Advance warning: The Are you interested in filmmaking and ideas? is taking place at World write Centre and may have an impact on the traffic in London between 7:30pm - 8:00pm.

8.73 miles from Abridge.

51.56--0.04

Location : anticlockwise exit slip at junction J25 (Enfield) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 February 2018 to 2 March 2018.

Schedule : From 23:00 on 2 March 2018 to 05:00 on 3 March 2018.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 5 March 2018 to 9 March 2018.

Schedule : From 23:00 on 9 March 2018 to 05:00 on 10 March 2018.

Lanes Closed : There will be one of two lanes closed.

7.1 miles from Abridge.

51.68--0.04

Location : clockwise entry slip at junction J26 (Waltham Abbey) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 February 2018 to 2 March 2018.

Schedule : From 23:00 on 2 March 2018 to 05:30 on 3 March 2018.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 5 March 2018 to 9 March 2018.

Schedule : From 23:00 on 9 March 2018 to 05:30 on 10 March 2018.

Lanes Closed : All lanes will be closed.

4.17 miles from Abridge.

51.68-0.03

Location : anticlockwise exit slip at junction J26 (Waltham Abbey) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 February 2018 to 2 March 2018.

Schedule : From 23:00 on 2 March 2018 to 05:30 on 3 March 2018.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 5 March 2018 to 9 March 2018.

Lanes Closed : All lanes will be closed.

3.92 miles from Abridge.

51.68-0.04

Location : clockwise between junctions J29 (Romford) and J30 (Dagenham) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 1 March 2018 to 05:00 on 2 March 2018.

Lanes Closed : There will be two of four lanes closed.

9.28 miles from Abridge.

51.57-0.29

Location : clockwise at junction J29 (Romford) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 1 March 2018 to 05:00 on 2 March 2018.

Lanes Closed : There will be one of three lanes closed.

9.06 miles from Abridge.

51.57-0.29

Location : anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 16:00 from 1 March 2018 to 2 March 2018.

4.68 miles from Abridge.

51.64-0.22

Location : anticlockwise entry slip at junction J27 (Stansted) From M11 South.

Lane Closures : Lane one will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Lanes Closed : There will be one of two lanes closed.

2.64 miles from Abridge.

51.68-0.13

Location : anticlockwise between junctions J29 (Romford) and J28 (Chelmsford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be two of four lanes closed.

8.73 miles from Abridge.

51.58-0.28

Location : clockwise at junction J28 (Chelmsford) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 February 2018 to 05:00 on 28 February 2018.

Lanes Closed : There will be one of three lanes closed.

6.78 miles from Abridge.

51.61-0.26

Location : clockwise between junctions J29 (Romford) and J30 (Dagenham) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be two of four lanes closed.

9.28 miles from Abridge.

51.57-0.29

Location : clockwise exit slip at junction J28 (Chelmsford) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Lanes Closed : There will be one of two lanes closed.

6.78 miles from Abridge.

51.61-0.26

Location : clockwise exit slip at junction J28 (Chelmsford) southbound.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Lanes Closed : All lanes will be closed.

6.97 miles from Abridge.

51.61-0.26

Location : clockwise at junction J29 (Romford) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be one of three lanes closed.

8.74 miles from Abridge.

51.58-0.28

Location : anticlockwise at junction J29 (Romford) .

Lane Closures : Lane three will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be one of three lanes closed.

9.26 miles from Abridge.

51.57-0.29

Location : clockwise between junctions J28 (Chelmsford) and J29 (Romford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 February 2018 to 05:00 on 28 February 2018.

Lanes Closed : There will be two of four lanes closed.

7.22 miles from Abridge.

51.61-0.27

Location : clockwise between junctions J28 (Chelmsford) and J29 (Romford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be two of four lanes closed.

7.43 miles from Abridge.

51.6-0.27

Location : clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 27 February 2018 to 05:00 on 28 February 2018.

Lanes Closed : There will be two of four lanes closed.

5.32 miles from Abridge.

51.63-0.23

Location : anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 28 February 2018 to 05:00 on 1 March 2018.

Lanes Closed : There will be two of four lanes closed.

9.8 miles from Abridge.

51.56-0.29

Location : anticlockwise between junctions J25 (Enfield) and J24 (Potters Bar) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 February 2018 to 3 March 2018.

Lanes Closed : There will be three of four lanes closed.

8.3 miles from Abridge.

51.69--0.07

Location : clockwise exit slip at junction J25 (Enfield) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 February 2018 to 2 March 2018.

Schedule : From 23:00 on 2 March 2018 to 05:00 on 3 March 2018.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 5 March 2018 to 9 March 2018.

Schedule : From 23:00 on 9 March 2018 to 05:00 on 10 March 2018.

Lanes Closed : There will be one of two lanes closed.

7.61 miles from Abridge.

51.68--0.06

Location : anticlockwise between junctions J27 (Stansted) and J25 (Enfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 February 2018 to 28 February 2018.

Lanes Closed : There will be two of four lanes closed.

3.73 miles from Abridge.

51.68-0.05

Location : anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 February 2018 to 05:00 on 27 February 2018.

Lanes Closed : There will be two of four lanes closed.

6.08 miles from Abridge.

51.62-0.25

Location : anticlockwise exit slip at junction J29 (Romford) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 26 February 2018 to 05:00 on 27 February 2018.

Lanes Closed : All lanes will be closed.

9.18 miles from Abridge.

51.57-0.29

Location : anticlockwise at junction J29 (Romford) .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 26 February 2018 to 05:00 on 27 February 2018.

Lanes Closed : There will be one of three lanes closed.

9.26 miles from Abridge.

51.57-0.29

Location : clockwise between junctions J27 (Stansted) and J28 (Chelmsford) .

Lane Closures : Lanes 3 and 4 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 26 February 2018 to 05:00 on 27 February 2018.

Lanes Closed : There will be two of four lanes closed.

3.98 miles from Abridge.

51.65-0.2

Location : anticlockwise between junctions J30 (Dagenham) and J29 (Romford) .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 22:00 on 26 February 2018 to 05:00 on 27 February 2018.

Lanes Closed : There will be one of four lanes closed.

9.6 miles from Abridge.

51.56-0.29

Location : clockwise between junctions J25 (Enfield) and J27 (Stansted) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 26 February 2018 to 2 March 2018.

Schedule : From 23:00 on 2 March 2018 to 06:00 on 3 March 2018.

Schedule : Expect disruption everyday between 22:00 and 05:00 from 5 March 2018 to 9 March 2018.

Lanes Closed : There will be two of four lanes closed.

5.13 miles from Abridge.

51.68-0.01

Location : clockwise between junctions J25 (Enfield) and J26 (Waltham Abbey) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 05:00 on 24 February 2018.

Schedule : From 22:00 on 24 February 2018 to 05:00 on 25 February 2018.

Lanes Closed : There will be three of four lanes closed.

6.99 miles from Abridge.

51.68--0.04

Location : clockwise between junctions J24 (Potters Bar) and J25 (Enfield) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 05:00 on 24 February 2018.

Schedule : From 22:00 on 24 February 2018 to 05:00 on 25 February 2018.

Lanes Closed : There will be three of four lanes closed.

8.95 miles from Abridge.

51.69--0.09

Location : anticlockwise between junctions J26 (Waltham Abbey) and J25 (Enfield) .

Lane Closures : Lanes 2, 3 and 4 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Schedule : From 22:00 on 24 February 2018 to 06:00 on 25 February 2018.

Lanes Closed : There will be three of four lanes closed.

5.6 miles from Abridge.

51.68--0.01

Location : clockwise at junction J25 (Enfield) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 05:00 on 24 February 2018.

Schedule : From 22:00 on 24 February 2018 to 05:00 on 25 February 2018.

Lanes Closed : All lanes will be closed.

7.61 miles from Abridge.

51.68--0.06

Location : clockwise entry slip at junction J25 (Enfield) .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Schedule : From 22:00 on 24 February 2018 to 06:00 on 25 February 2018.

Lanes Closed : All lanes will be closed.

7.27 miles from Abridge.

51.68--0.05

Location : clockwise exit slip at junction J26 (Waltham Abbey) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 05:30 on 24 February 2018.

Lanes Closed : All lanes will be closed.

4.24 miles from Abridge.

51.68-0.03

Location : anticlockwise entry slip at junction J26 (Waltham Abbey) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 22 February 2018 to 05:30 on 23 February 2018.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 February 2018 to 2 March 2018.

Schedule : From 23:00 on 2 March 2018 to 06:00 on 3 March 2018.

Lanes Closed : All lanes will be closed.

4 miles from Abridge.

51.68-0.03

Location : anticlockwise between junctions J28 (Chelmsford) and J27 (Stansted) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 23:00 on 23 February 2018 to 06:00 on 24 February 2018.

Schedule : Expect disruption everyday between 22:00 and 05:30 from 26 February 2018 to 2 March 2018.

Schedule : From 23:00 on 2 March 2018 to 06:00 on 3 March 2018.

Lanes Closed : There will be three of four lanes closed.

5.03 miles from Abridge.

51.63-0.22

Location : northbound between the junctions with the M25 and the A1023 .

Lane Closures : Lane one is closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 06:00 on 24 February 2018.

Lanes Closed : There is one of two lanes closed.

7.71 miles from Abridge.

51.62-0.29