Route Planner to Avoid Traffic
START
FINISH

Traffic Ab Lench

SLIGHT
SEVERE
FULL SCREENUPDATED: 22:43
×
×

Current traffic in Ab Lench

ROAD WORKSLocation : The M5 southbound exit slip at junction J1 (West Bromwich) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

24.64 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

24.88 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

24.8 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J9 (Wednesbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Oct 2017 to 06:00 on 30 Oct 2017.
Lanes Closed : All lanes will be closed.

28.33 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J7 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Oct 2017 to 06:00 on 30 Oct 2017.
Lanes Closed : All lanes will be closed.

27.4 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J7 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Oct 2017 to 06:00 on 30 Oct 2017.
Lanes Closed : All lanes will be closed.

27.4 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound exit slip at junction J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Lanes Closed : All lanes will be closed.

20.36 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J7 (Birmingham) .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Oct 2017 to 06:00 on 30 Oct 2017.
Lanes Closed : There will be one of two lanes closed.

27.4 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Lane Closures : The hard shoulder is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 30 Aug 2017.

21.78 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound exit slip at junction J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

20.09 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J6 (Birmingham) .
Lane Closures : Lane one is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 20:00 on 10 Jul 2018.
Lanes Closed : There is one of two lanes closed.

24.8 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 Oct 2017 to 10 Jul 2018.
Lanes Closed : All lanes will be closed.

24.88 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 Oct 2017 to 10 Jul 2018.
Lanes Closed : All lanes will be closed.

24.8 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J6 (Birmingham) .
Reason : Roadworks.
Status : Currently Active.
Period : from 20:03 on 11 May 2017 to 20:00 on 10 Jul 2018.

24.95 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J6 (Birmingham) .
Reason : Roadworks.
Status : Currently Active.
Period : from 20:03 on 11 May 2017 to 20:00 on 10 Jul 2018.

24.99 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 May 2018 to 06:00 on 30 May 2018.
Lanes Closed : All lanes will be closed.

25.14 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J2 (Dudley) and J4 (Bromsgrove) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Lanes Closed : All lanes will be closed.

22.98 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J3 (Kidderminster) and J4 (Bromsgrove) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Lanes Closed : All lanes will be closed.

18.99 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J3 (Coventry) and J2 (Coventry) .
Lane Closures : Lanes 1 and 2 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of three lanes closed.

29.95 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J10 (Walsall) .
Lane Closures : Lane two is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of two lanes closed.

29.78 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J10 (Walsall) .
Lane Closures : Lane two will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Sep 2017 to 06:00 on 30 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

29.76 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J9 (Lichfield) and J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 Sep 2017 to 16 Sep 2017.
Lanes Closed : All lanes will be closed.

28.95 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound entry slip at junction J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

20.36 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J4 (Bromsgrove) and J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

15.53 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J4A (Birmingham) and J3 (Kidderminster) .
Lane Closures : Lane three will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be one of three lanes closed.

14.77 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J3 (Kidderminster) and J4A (Birmingham) .
Lane Closures : Lane three will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Lanes Closed : There will be one of three lanes closed.

18.68 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J2 (Dudley) and J4 (Bromsgrove) .
Lane Closures : Lane three will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Lanes Closed : There will be one of three lanes closed.

22.98 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J7A (M1/M6) and J6 (Birmingham E) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 Sep 2017 to 8 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 Sep 2017 to 15 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 18 Sep 2017 to 22 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 25 Sep 2017 to 29 Sep 2017.
Lanes Closed : There will be one of three lanes closed.

24.01 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound entry slip at junction J7 (M6N) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 Sep 2017 to 8 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 Sep 2017 to 15 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 18 Sep 2017 to 22 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 25 Sep 2017 to 29 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

24.97 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J4 (Lichfield) and J3A (Tamworth) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 Aug 2017 to 1 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 Sep 2017 to 8 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 Sep 2017 to 15 Sep 2017.

25.01 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound at junction J4 (Lichfield) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 Aug 2017 to 1 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 Sep 2017 to 8 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 Sep 2017 to 15 Sep 2017.

25.06 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J4 (Lichfield) and J3 (Coventry) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 Aug 2017 to 1 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 Sep 2017 to 8 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 Sep 2017 to 15 Sep 2017.

25.98 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound exit slip at junction J9 (Lichfield) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 Sep 2017 to 9 Sep 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 Sep 2017 to 16 Sep 2017.
Lanes Closed : All lanes will be closed.

28.79 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound exit slip at junction J9 (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 Sep 2017 to 9 Sep 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 Sep 2017 to 16 Sep 2017.
Lanes Closed : All lanes will be closed.

28.34 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound entry slip at junction J9 (Lichfield) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 Sep 2017 to 9 Sep 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 Sep 2017 to 16 Sep 2017.
Lanes Closed : All lanes will be closed.

28.8 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound entry slip at junction J9 (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 Sep 2017 to 9 Sep 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 Sep 2017 to 16 Sep 2017.
Lanes Closed : All lanes will be closed.

28.24 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J6 (Birmingham) .
Lane Closures : Lane one is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 4 Sep 2017.
Lanes Closed : There is one of two lanes closed.

24.88 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J6 (Birmingham) .
Lane Closures : Lane one is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 4 Sep 2017.
Lanes Closed : There is one of two lanes closed.

24.8 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J6 (Birmingham) .
Lane Closures : Lane two is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 08:00 on 6 Sep 2017.
Lanes Closed : There is one of two lanes closed.

25.14 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

25.14 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound exit slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

24.89 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound exit slip at junction J6 (Birmingham) .
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 08:00 on 6 Sep 2017.
Lanes Closed : All lanes are closed.

24.89 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J5 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : There will be two of three lanes closed.

25.7 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J5 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lanes 1 and 2 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 08:00 on 6 Sep 2017.
Lanes Closed : There are two of three lanes closed.

25.04 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between the M6 and junction J1 (West Bromwich) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

25.57 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J9 (Wednesbury) and J8 (Birmingham) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

28.02 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J8 (Birmingham) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : from 06:22 on 12 Jul 2017 to 06:00 on 31 Aug 2018.
Lanes Closed : There is one of two lanes closed.

27.09 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 06:00 on 25 Aug 2017 to 06:00 on 28 Aug 2017.
Schedule : From 20:00 on 1 Sep 2017 to 06:00 on 4 Sep 2017.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

24.88 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 06:00 on 25 Aug 2017 to 06:00 on 28 Aug 2017.
Schedule : From 20:00 on 1 Sep 2017 to 06:00 on 4 Sep 2017.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

24.8 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J9 (Wednesbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

28.25 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J1 (West Bromwich) and J2 (Dudley) .
Reason : Roadworks.
Status : Currently Active.
Period : from 06:00 on 24 Jul 2017 to 06:00 on 31 Aug 2018.

24.3 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J2 (Dudley) and J1 (West Bromwich) .
Reason : Roadworks.
Status : Currently Active.
Period : from 06:00 on 24 Jul 2017 to 06:00 on 31 Aug 2018.

23.41 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J3 (Kidderminster) and J2 (Dudley) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 05:58 on 31 Dec 2017.
Lanes Closed : There is one of three lanes closed.

20.01 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Lane Closures : The hard shoulder and lane 4 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 05:58 on 31 Dec 2017.
Lanes Closed : There is one of four lanes closed.

12.09 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .
Lane Closures : The hard shoulder is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 05:58 on 31 Dec 2017.

13.67 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J9 (Lichfield) and J8 (Birmingham E) .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 Sep 2017 to 16 Sep 2017.
Lanes Closed : There will be one of four lanes closed.

27.62 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J10 (Walsall) .
Lane Closures : Lane two will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:30 on 29 Sep 2017 to 06:00 on 30 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

29.39 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J3 (Coventry) and J2 (Coventry) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 Aug 2017 to 1 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 Sep 2017 to 8 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 Sep 2017 to 15 Sep 2017.

29.56 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J9 (Wednesbury) and J10 (Walsall) .
Lane Closures : Lane two is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

28.79 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound exit slip at junction J10 (Walsall) .
Lane Closures : Lane two is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of two lanes closed.

29.4 miles from Ab Lench.

ROAD WORKSLocation : The M42 slip road to the M5 northbound .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Emergency road marking works are planned.
Status : Pending.
Schedule : From 22:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

14.08 miles from Ab Lench.

ROAD WORKSLocation : The A40 westbound between the junctions with the A417 north of Gloucester and the A38 .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 12:30 on 22 Aug 2017 to 16:00 on 22 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 23 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 Aug 2017 to 1 Sep 2017.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 Sep 2017 to 8 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

21.25 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J1 (West Bromwich) and J4 (Bromsgrove) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Lanes Closed : All lanes will be closed.

24.3 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J2 (Dudley) and J1 (West Bromwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be two of three lanes closed.

22.98 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J1 (West Bromwich) and J2 (Dudley) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be two of three lanes closed.

24.78 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J2 (Dudley) and J1 (West Bromwich) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be three of four lanes closed.

22.98 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J1 (West Bromwich) and J2 (Dudley) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

24.78 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J4A (Birmingham) and J3 (Kidderminster) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

14.77 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J3 (Coventry) and J4A .
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 Aug 2017 to 1 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 Sep 2017 to 8 Sep 2017.
Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 Sep 2017 to 15 Sep 2017.

29.72 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J1 (West Bromwich) and J2 (Dudley) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 Aug 2017 to 06:00 on 23 Aug 2017.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

24.78 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J1 (West Bromwich) and J4 (Bromsgrove) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be two of three lanes closed.

24.3 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J3 (Coventry) and J2 (Coventry) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of three lanes closed.

29.56 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J10 (Walsall) and J9 (Wednesbury) .
Lane Closures : The hard shoulder and lane 2 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

28.8 miles from Ab Lench.

ROAD WORKSLocation : The M5 slip road to the M6 southbound .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

26.93 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J8 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be three of four lanes closed.

27.31 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junction J2 (Dudley) and the M6 .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

23.4 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound entry slip at junction J1 (West Bromwich) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 Aug 2017 to 06:00 on 23 Aug 2017.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

24.38 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound at junction J9 (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 Sep 2017 to 16 Sep 2017.
Lanes Closed : All lanes will be closed.

28.58 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J8 (Birmingham E) and J7 (M6N) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 Sep 2017 to 16 Sep 2017.
Lanes Closed : All lanes will be closed.

26.56 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound at junction J9 (Lichfield) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 Sep 2017 to 16 Sep 2017.
Lanes Closed : There will be three of four lanes closed.

28.02 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J5 (Birmingham) and J7 (Birmingham) .
Lane Closures : The hard shoulder, lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 Aug 2017 to 06:00 on 28 Aug 2017.
Schedule : From 20:00 on 1 Sep 2017 to 06:00 on 4 Sep 2017.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : There will be three of four lanes closed.

25.7 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 Aug 2017 to 06:00 on 28 Aug 2017.
Schedule : From 20:00 on 1 Sep 2017 to 06:00 on 4 Sep 2017.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : There will be one of three lanes closed.

26.18 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound at junction J6 (Birmingham) .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 Aug 2017 to 06:00 on 28 Aug 2017.
Schedule : From 20:00 on 1 Sep 2017 to 06:00 on 4 Sep 2017.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : There will be one of two lanes closed.

25.03 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound exit slip at junction J6 (Birmingham) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 25 Aug 2017 to 06:00 on 28 Aug 2017.
Schedule : From 20:00 on 1 Sep 2017 to 06:00 on 4 Sep 2017.
Schedule : From 20:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

24.89 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between the M6 northbound and junction J1 (West Bromwich) .
Lane Closures : Lane two will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be one of two lanes closed.

26.99 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J7 (Birmingham) and J8 (Birmingham) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be two of four lanes closed.

27.3 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between the M6 and junction J1 (West Bromwich) .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : There will be one of three lanes closed.

25.57 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J3A (M40) and J3 (Birmingham S) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 Aug 2017 to 25 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

14.91 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound exit slip at junction J5 (Droitwich) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 Sep 2017 to 05:00 on 7 Sep 2017.
Lanes Closed : All lanes will be closed.

10.51 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound exit slip at junction J6 (Worcester) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 7 Sep 2017 to 05:00 on 8 Sep 2017.
Lanes Closed : All lanes will be closed.

8.18 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound exit slip at junction J5 (Droitwich) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 Sep 2017 to 05:00 on 7 Sep 2017.
Lanes Closed : All lanes will be closed.

10.75 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound entry slip at junction J5 (Droitwich) .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 6 Sep 2017 to 05:00 on 7 Sep 2017.
Lanes Closed : All lanes will be closed.

10.52 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound between junctions J9 (Lichfield) and J10 (Tamworth) .
Lane Closures : Lane two will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 Aug 2017 to 25 Aug 2017.
Lanes Closed : There will be one of two lanes closed.

28.2 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound entry slip at junction J4A from M5 North.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 09:30 on 22 Aug 2017 to 18:00 on 22 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 Aug 2017 to 27 Aug 2017.

13.93 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound between junctions J2 (Birmingham S) and J3 (Birmingham S) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 09:30 on 22 Aug 2017 to 18:00 on 22 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 Aug 2017 to 27 Aug 2017.

13.94 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound between the M5 and junction J1 (Bromsgrove) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 09:30 on 22 Aug 2017 to 18:00 on 22 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 Aug 2017 to 27 Aug 2017.

14.01 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between the M42 and junction J15 (Warwick) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

15.25 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between the M42 and junction J15 (Warwick) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

15.26 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound entry slip at junction J5 (Droitwich) .
Lane Closures : Lane one will be closed.
Reason : Emergency road marking works are planned.
Status : Pending.
Schedule : From 21:00 on 24 Aug 2017 to 06:00 on 25 Aug 2017.
Schedule : From 21:00 on 31 Aug 2017 to 06:00 on 1 Sep 2017.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

10.74 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Lane Closures : Lanes 1, 2, 3 and 4 will be closed.
Reason : Emergency road marking works are planned.
Status : Pending.
Schedule : From 21:00 on 31 Aug 2017 to 06:00 on 1 Sep 2017.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

10.41 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J2 (Dudley) and J1 (West Bromwich) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 Aug 2017 to 06:00 on 25 Aug 2017.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

22.98 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound between junctions J4 (Shirley) and J5 (Solihull) .
Reason : Roadworks.
Status : Currently Active.
Period : from 00:00 on 20 Aug 2017 to 23:59 on 23 Aug 2017.

18.71 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J2 (Birmingham S) and J1 (Bromsgrove) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 09:30 on 22 Aug 2017 to 18:00 on 22 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 Aug 2017 to 27 Aug 2017.

14.23 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junction J1 (Bromsgrove) and the M5 .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 09:30 on 22 Aug 2017 to 18:00 on 22 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 Aug 2017 to 27 Aug 2017.

13.99 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound entry slip at junction J9 (Tewkesbury) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 Aug 2017 to 31 Aug 2017.

12.4 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 Aug 2017 to 31 Aug 2017.

9.53 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J6 (Worcester) and J5 (Droitwich) .
Lane Closures : The hard shoulder, lanes 1, 2 and 3 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 05:00 on 22 Aug 2017.
Lanes Closed : There are three of four lanes closed.

8.23 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J9 (Tewkesbury) and J8 (Ross on Wye) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 Aug 2017 to 31 Aug 2017.

12.28 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 Aug 2017 to 31 Aug 2017.

12.09 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 Aug 2017 to 31 Aug 2017.

12.09 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J6 (Worcester) .
Lane Closures : Lanes 2, 3 and 4 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 05:00 on 22 Aug 2017.
Lanes Closed : There are three of four lanes closed.

11.65 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between junctions J14 (Leamington) and J13 (Leamington) .
Lane Closures : The hard shoulder is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 23:59 on 21 Aug 2017.

18.77 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J4 (Lichfield) and J3A (Tamworth) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Horticultural works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

25.01 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J4 (Lichfield) and J3 (Coventry) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 04:00 on 22 Aug 2017.
Lanes Closed : There are two of three lanes closed.

29.14 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J4 (Lichfield) .
Reason : Horticultural works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : All lanes are closed.

25.11 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J3 (Coventry) .
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 04:00 on 22 Aug 2017.
Lanes Closed : All lanes are closed.

29.62 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J4 (Lichfield) .
Lane Closures : Lanes 1 and 2 are closed.
Reason : Horticultural works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : All lanes are closed.

25.15 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J6 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of three lanes closed.

25.16 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound at junction J8 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of three lanes closed.

27.25 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J7 (Birmingham) and J8 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of four lanes closed.

27.3 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound at junction J8 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of three lanes closed.

27.26 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of three lanes closed.

27.42 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 Aug 2017 to 31 Aug 2017.

13.67 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 Aug 2017 to 31 Aug 2017.

9.55 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 Aug 2017 to 31 Aug 2017.

9.55 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J8 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of four lanes closed.

27.31 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J4A and J4 (Lichfield) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Horticultural works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

25.69 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound at junction J4 (Lichfield) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Horticultural works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of two lanes closed.

25.06 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound between junctions J4 (Shirley) and J5 (Solihull) .
Lane Closures : The hard shoulder and lane 2 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

18.71 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound between junctions J2 (Birmingham S) and J3 (Birmingham S) .
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 03:00 on 22 Aug 2017.
Lanes Closed : All lanes are closed.

14.17 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J6 (Birmingham E) and J5 (Solihull) .
Lane Closures : The hard shoulder is closed.
Reason : Planned Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.

21.39 miles from Ab Lench.

ROAD WORKSLocation : The A45 eastbound between the A445 and the junction with the M45 .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 Aug 2017 to 25 Aug 2017.
Lanes Closed : All lanes will be closed.

28.68 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J7 (Worcester) and J6 (Worcester) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

8.05 miles from Ab Lench.

ROAD WORKSLocation : The A40 westbound between the junctions with the M5 and the A417 north of Gloucester.
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 12:30 on 22 Aug 2017 to 16:00 on 22 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 23 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 Aug 2017 to 1 Sep 2017.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 Sep 2017 to 8 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

20.6 miles from Ab Lench.

ROAD WORKSLocation : The M50 eastbound between junctions J3 (Newent) and J2 (Hereford) .
Lane Closures : Lane one will be closed.
Reason : Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 22 Aug 2017 to 06:00 on 23 Aug 2017.
Lanes Closed : There will be one of two lanes closed.

22.79 miles from Ab Lench.

ROAD WORKSLocation : The A40 eastbound between the junctions with the A38 and the A417 north of Gloucester.
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 12:30 on 22 Aug 2017 to 16:00 on 22 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 23 Aug 2017 to 24 Aug 2017.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 Aug 2017 to 1 Sep 2017.
Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 Sep 2017 to 8 Sep 2017.
Lanes Closed : There will be one of two lanes closed.

21.24 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 22 Aug 2017 to 07:00 on 23 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

22.6 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J3 (Coventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Aug 2017 to 04:00 on 23 Aug 2017.
Lanes Closed : All lanes will be closed.

29.62 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J3A (Tamworth) and J4A .
Lane Closures : Lane one will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 22 Aug 2017 to 06:00 on 23 Aug 2017.
Lanes Closed : There will be one of three lanes closed.

25.6 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J4 (Lichfield) and J3 (Coventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Aug 2017 to 04:00 on 23 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

29.14 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound at junction J8 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of three lanes closed.

27.25 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J6 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of three lanes closed.

25.16 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound at junction J8 (Birmingham) .
Lane Closures : Lane three is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

27.26 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J7 (Birmingham) and J8 (Birmingham) .
Lane Closures : Lanes 2 and 3 are closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of four lanes closed.

27.3 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Lane Closures : Lane three is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

27.42 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J8 (Birmingham) and J7 (Birmingham) .
Lane Closures : Lane three is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of four lanes closed.

27.31 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J4 (Lichfield) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 22 Aug 2017 to 06:00 on 23 Aug 2017.
Lanes Closed : All lanes will be closed.

24.99 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J5 (Solihull) and J4 (Shirley) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 00:00 on 22 Aug 2017 to 23:59 on 25 Aug 2017.

18.72 miles from Ab Lench.

ROAD WORKSLocation : The A45 westbound entry slip from the A423 .
Reason : Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 Aug 2017 to 25 Aug 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 Aug 2017 to 31 Aug 2017.
Lanes Closed : All lanes will be closed.

26.94 miles from Ab Lench.

ROAD WORKSLocation : The A45 westbound exit slip to the A423 .
Reason : Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 Aug 2017 to 25 Aug 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 Aug 2017 to 31 Aug 2017.
Lanes Closed : All lanes will be closed.

27.01 miles from Ab Lench.

ROAD WORKSLocation : The A45 eastbound exit slip to the A423 .
Reason : Road marking works are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 Aug 2017 to 25 Aug 2017.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 Aug 2017 to 31 Aug 2017.
Lanes Closed : All lanes will be closed.

26.95 miles from Ab Lench.

ROAD WORKSLocation : The M40 northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 23 Aug 2017 to 06:00 on 24 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

25.22 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 23 Aug 2017 to 06:00 on 24 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

25.24 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J3 (Coventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 23 Aug 2017 to 06:00 on 24 Aug 2017.
Lanes Closed : All lanes will be closed.

29.62 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound exit slip at junction J3 (Coventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 Aug 2017 to 04:00 on 24 Aug 2017.
Lanes Closed : All lanes will be closed.

29.62 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound entry slip at junction J3 (Coventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 23 Aug 2017 to 06:00 on 24 Aug 2017.
Lanes Closed : All lanes will be closed.

29.73 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J4 (Lichfield) and J3 (Coventry) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 Aug 2017 to 04:00 on 24 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

29.14 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J4 (Lichfield) and J2 (Coventry) .
Lane Closures : Lane one will be closed.
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 21:00 on 23 Aug 2017 to 06:00 on 24 Aug 2017.
Lanes Closed : There will be one of three lanes closed.

28.72 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound at junction J9 (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 Aug 2017 to 05:00 on 24 Aug 2017.
Lanes Closed : All lanes will be closed.

28.58 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound between junctions J4 (Lichfield) and J4A .
Lane Closures : Lane one will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 23 Aug 2017 to 05:30 on 24 Aug 2017.
Lanes Closed : There will be one of three lanes closed.

25.23 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound entry slip at junction J4 (Lichfield) .
Lane Closures : Lane one will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 23 Aug 2017 to 05:30 on 24 Aug 2017.
Lanes Closed : There will be one of two lanes closed.

24.99 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between junctions J14 (Leamington) and J12 (Gaydon) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 00:01 on 22 Aug 2017 to 23:59 on 23 Aug 2017.

20 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J9 (Lichfield) and J8 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 Aug 2017 to 05:00 on 24 Aug 2017.
Lanes Closed : There will be two of four lanes closed.

27.62 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J5 (Solihull) and J4 (Shirley) .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 Aug 2017 to 25 Aug 2017.
Lanes Closed : There will be one of three lanes closed.

18.72 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound at junction J9 (Lichfield) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 23 Aug 2017 to 05:00 on 24 Aug 2017.
Lanes Closed : There will be two of four lanes closed.

28.02 miles from Ab Lench.

ROAD WORKSLocation : The A40 eastbound between the junctions with the A38 and the A417 north of Gloucester.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 05:30 on 22 Aug 2017.
Lanes Closed : All lanes are closed.

21.24 miles from Ab Lench.

ROAD WORKSLocation : The M50 westbound between junctions J2 (Hereford) and J3 (Newent) .
Lane Closures : Lane one will be closed.
Reason : Barrier repairs are planned.
Status : Pending.
Schedule : From 21:30 on 24 Aug 2017 to 06:00 on 25 Aug 2017.
Lanes Closed : There will be one of two lanes closed.

22.73 miles from Ab Lench.

ROAD WORKSLocation : The M50 westbound between junctions J2 (Hereford) and J3 (Newent) .
Lane Closures : Lane two will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 Aug 2017 to 05:00 on 25 Aug 2017.
Lanes Closed : There will be one of two lanes closed.

22.73 miles from Ab Lench.

ROAD WORKSLocation : The M50 eastbound between junctions J3 (Newent) and J2 (Hereford) .
Lane Closures : Lane two will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 Aug 2017 to 05:00 on 25 Aug 2017.
Lanes Closed : There will be one of two lanes closed.

22.79 miles from Ab Lench.

ROAD WORKSLocation : The M40 northbound between junctions J11 (Banbury) and J12 (Gaydon) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 Aug 2017 to 06:00 on 25 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

25.22 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 24 Aug 2017 to 06:00 on 25 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

25.24 miles from Ab Lench.

ROAD WORKSLocation : The M40 northbound between junctions J13 (Leamington) and J15 (Warwick) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 24 Aug 2017 to 07:00 on 25 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

19.37 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between junctions J15 (Warwick) and J13 (Leamington) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadside drains works are planned.
Status : Pending.
Schedule : From 20:00 on 24 Aug 2017 to 07:00 on 25 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

17.2 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between junctions J14 (Leamington) and J12 (Gaydon) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 00:01 on 23 Aug 2017 to 23:59 on 24 Aug 2017.

20 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound exit slip at junction J3 (Birmingham S) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 Aug 2017 to 25 Aug 2017.
Lanes Closed : All lanes will be closed.

14.33 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J7A (M1/M6) and J6 (Birmingham E) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 21:00 on 24 Aug 2017 to 05:00 on 25 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

24.01 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound entry slip at junction J9 (Tewkesbury) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Roadside Drains Works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of two lanes closed.

12.4 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Roadside Drains Works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

9.53 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J9 (Tewkesbury) and J8 (Ross on Wye) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Roadside Drains Works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

10.91 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J7 (Worcester) and J6 (Worcester) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Roadside Drains Works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

8.38 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Roadside Drains Works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

9.38 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J9 (Tewkesbury) and J8 (Ross on Wye) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Roadside Drains Works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

12.28 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Roadside Drains Works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

9.55 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Roadside Drains Works.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of four lanes closed.

9.55 miles from Ab Lench.

ROAD WORKSLocation : The A417 southbound between the junctions with the A436 and the A429 .
Lane Closures : Lane one is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 05:00 on 22 Aug 2017.
Lanes Closed : There is one of two lanes closed.

28.65 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between junctions J14 (Leamington) and J12 (Gaydon) .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 00:01 on 24 Aug 2017 to 23:59 on 25 Aug 2017.

21.81 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound entry slip at Warwick Services.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 00:01 on 24 Aug 2017 to 23:59 on 25 Aug 2017.

21.03 miles from Ab Lench.

ROAD WORKSLocation : The A38M northbound.
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 4 Sep 2017.
Lanes Closed : There is one of two lanes closed.

24.93 miles from Ab Lench.

ROAD WORKSLocation : The A38M northbound.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 5 Sep 2017.
Lanes Closed : All lanes are closed.

24.93 miles from Ab Lench.

ROAD WORKSFrom Location : The A38M northbound.
To Location : The A5127 northbound.
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 Oct 2017 to 10 Jul 2018.
Lanes Closed : All lanes will be closed.

24.46 miles from Ab Lench.

ROAD WORKSLocation : The A38M northbound.
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 Oct 2017 to 10 Jul 2018.
Lanes Closed : All lanes will be closed.

24.93 miles from Ab Lench.

ROAD WORKSLocation : The A38M northbound.
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 4 Sep 2017.
Lanes Closed : There is one of two lanes closed.

24.46 miles from Ab Lench.

ROAD WORKSLocation : The A38M northbound.
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

24.93 miles from Ab Lench.

ROAD WORKSLocation : The A38M southbound.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 5 Sep 2017.
Lanes Closed : All lanes are closed.

24.85 miles from Ab Lench.

ROAD WORKSLocation : The A38M southbound.
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:30 on 22 Dec 2017 to 06:00 on 23 Dec 2017.
Lanes Closed : All lanes will be closed.

24.85 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound entry slip at junction J2 (Dudley) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

23.08 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junction J1 (West Bromwich) and the M6 .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

24.56 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound entry slip at junction J8 (Birmingham E) .
Lane Closures : Lane two will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 Aug 2017 to 06:00 on 25 Aug 2017.
Lanes Closed : There will be one of two lanes closed.

26.36 miles from Ab Lench.

ROAD WORKSLocation : The M42 southbound between junctions J7A (M1/M6) and J7 (M6N) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 Aug 2017 to 06:00 on 25 Aug 2017.
Lanes Closed : There will be two of four lanes closed.

25.36 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J13 (Stroud) and J12 (Gloucester) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 12:30 on 22 Aug 2017 to 16:30 on 22 Aug 2017.

29.42 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J10 (Cheltenham) and J11 (Cheltenham) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 12:30 on 22 Aug 2017 to 16:30 on 22 Aug 2017.

18.24 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J11A (Gloucester) and J12 (Gloucester) .
Reason : Horticultural works are planned.
Status : Pending.
Schedule : From 12:30 on 22 Aug 2017 to 16:30 on 22 Aug 2017.

22.12 miles from Ab Lench.

ROAD WORKSLocation : The M40 southbound between junctions J12 (Gaydon) and J11 (Banbury) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 22:00 on 22 Aug 2017 to 07:00 on 23 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

25.24 miles from Ab Lench.

ROAD WORKSLocation : The A40 eastbound between the A38 and the junction with the M5 .
Reason : Roadworks.
Status : Currently Active.
Period : from 02:26 on 7 Apr 2017 to 23:59 on 19 Feb 2018.

21.77 miles from Ab Lench.

ROAD WORKSLocation : The A40 westbound between the M5 and the junction with the A38 .
Reason : Roadworks.
Status : Currently Active.
Period : from 02:24 on 7 Apr 2017 to 23:59 on 19 Feb 2018.

20 miles from Ab Lench.

ROAD WORKSLocation : The M6 northbound at junction J10 (Walsall) .
Lane Closures : The hard shoulder, lanes 2 and 4 are closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There are two of four lanes closed.

29.58 miles from Ab Lench.

ROAD WORKSLocation : The M42 northbound between junctions J1 (Bromsgrove) and J2 (Birmingham S) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Emergency barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 28 Oct 2017.
Lanes Closed : There is one of three lanes closed.

13.8 miles from Ab Lench.

ROAD WORKSLocation : The M50 westbound between junctions J2 (Hereford) and J4 (S.
Wales) .
Lane Closures : The hard shoulder is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 18:00 on 2 Aug 2018.

19.41 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junction J3 (Kidderminster) and the M6 .
Lane Closures : The hard shoulder is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 30 Aug 2017.

20.5 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J1 (West Bromwich) and J2 (Dudley) .
Lane Closures : The hard shoulder is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 30 Aug 2017.

24.78 miles from Ab Lench.

ROAD WORKSLocation : The M42 slip road to the M5 northbound .
Lane Closures : Lane two is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 31 Dec 2017.
Lanes Closed : There is one of two lanes closed.

14.08 miles from Ab Lench.

ROAD WORKSLocation : The M40 northbound between junctions J12 (Gaydon) and J13 (Leamington) .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 23:00 on 21 Aug 2017 to 07:00 on 22 Aug 2017.
Lanes Closed : There will be two of three lanes closed.

21.83 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J7 (Worcester) and J6 (Worcester) .
Lane Closures : Lane two is closed.
Reason : Barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

8.13 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J5 (Droitwich) and J6 (Worcester) .
Lane Closures : Lane two is closed.
Reason : Barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of four lanes closed.

8.99 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J6 (Worcester) and J7 (Worcester) .
Lane Closures : Lane two is closed.
Reason : Barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of three lanes closed.

8.22 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J5 (Droitwich) and J6 (Worcester) .
Lane Closures : Lane two is closed.
Reason : Barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of four lanes closed.

8.99 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound at junction J4A (Birmingham) .
Lane Closures : Lane two is closed.
Reason : Barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of two lanes closed.

14.06 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J6 (Worcester) and J5 (Droitwich) .
Lane Closures : Lane two is closed.
Reason : Barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of four lanes closed.

8.96 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound between junctions J6 (Worcester) and J5 (Droitwich) .
Lane Closures : Lane two is closed.
Reason : Barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of four lanes closed.

8.96 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J4A (Birmingham) and J5 (Droitwich) .
Lane Closures : Lane two is closed.
Reason : Barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 22 Aug 2017.
Lanes Closed : There is one of four lanes closed.

13.83 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound between junctions J3 (Kidderminster) and J4A (Birmingham) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Lanes Closed : All lanes will be closed.

18.68 miles from Ab Lench.

ROAD WORKSLocation : The M5 southbound entry slip at junction J3 (Kidderminster) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Aug 2017 to 06:00 on 30 Aug 2017.
Lanes Closed : All lanes will be closed.

20.08 miles from Ab Lench.

ROAD WORKSLocation : The M5 northbound entry slip at junction J2 (Dudley) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 24 Aug 2017 to 06:00 on 25 Aug 2017.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

23.32 miles from Ab Lench.

ROAD WORKSLocation : The M6 southbound between junctions J10 (Walsall) and J9 (Wednesbury) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 21:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

29.51 miles from Ab Lench.

ROAD WORKSFrom Location : The M6 southbound exit slip at junction J8 (Birmingham) .
To Location : The M5 southbound between the M6 and junction J1 (Rugby) .
Lane Closures : Lanes 1 and 2 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : From 20:00 on 29 Nov 2017 to 06:00 on 30 Nov 2017.
Lanes Closed : All lanes will be closed.

27.7 miles from Ab Lench.

ROAD WORKSLocation : The A40 westbound between the junctions with the M5 and the A417 north of Gloucester.
Reason : Roadworks.
Status : Currently Active.
Period : from 22:06 on 21 Aug 2017 to 05:00 on 22 Aug 2017.
Lanes Closed : All lanes are closed.

20 miles from Ab Lench.

CONGESTIONCLEARED @ 22:03Location : The M6 northbound between junctions J7 (Birmingham) and J8 (Birmingham) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 22:00 and 22:15 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

27.44 miles from Ab Lench. CLEARED @ 22:03

ACCIDENTCLEARED @ 21:52Location : The M6 northbound between junctions J7 (Birmingham) and J8 (Birmingham) .
Reason : Road traffic collision.
Status : Currently Active.
Time To Clear : The event is expected to clear between 23:15 and 23:30 on 21 Aug 2017.
Return To Normal : Normal traffic conditions are expected between 23:15 and 23:30 on 21 Aug 2017.
Lanes Closed : There are lane closures.

27.39 miles from Ab Lench. CLEARED @ 21:52

BROKEN DOWN VEHICLECLEARED @ 20:42Location : The M5 northbound between junctions J5 (Droitwich) and J4A (Birmingham) .
Lane Closures : Lane one is closed.
Reason : Broken down vehicle.
Status : Currently Active.
Time To Clear : The event is expected to clear between 21:15 and 21:30 on 21 Aug 2017.
Return To Normal : Normal traffic conditions are expected between 21:15 and 21:30 on 21 Aug 2017.
Lanes Closed : There is one of four lanes closed.

11.53 miles from Ab Lench. CLEARED @ 20:42

CONGESTIONCLEARED @ 17:53Location : The M5 southbound between the M6 and junction J1 (West Bromwich) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:45 and 18:00 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

25.57 miles from Ab Lench. CLEARED @ 17:53

BROKEN DOWN VEHICLECLEARED @ 17:33Location : The M42 southbound exit slip at junction J6 (Birmingham E) .
Lane Closures : Lane one is closed.
Reason : Broken down vehicle.
Status : Currently Active.
Time To Clear : The event is expected to clear between 17:45 and 18:00 on 21 Aug 2017.
Return To Normal : Normal traffic conditions are expected between 17:45 and 18:00 on 21 Aug 2017.
Lanes Closed : There is one of two lanes closed.

23.24 miles from Ab Lench. CLEARED @ 17:33

CONGESTIONCLEARED @ 17:03Location : The M6 northbound at junction J8 (Birmingham) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

27.25 miles from Ab Lench. CLEARED @ 17:03

CONGESTIONCLEARED @ 18:22Location : The M6 southbound exit slip at junction J8 (Birmingham) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 18:15 and 18:30 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

27.09 miles from Ab Lench. CLEARED @ 18:22

CONGESTIONCLEARED @ 17:13Location : The M42 northbound at junction J3 (Birmingham S) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

14.65 miles from Ab Lench. CLEARED @ 17:13

CONGESTIONCLEARED @ 17:03Location : The M42 northbound exit slip at junction J7 (M6N) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

24.94 miles from Ab Lench. CLEARED @ 17:03

CONGESTIONCLEARED @ 17:23Location : The M6 northbound at junction J4 (Lichfield) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:15 and 17:30 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

25.64 miles from Ab Lench. CLEARED @ 17:23

CONGESTIONCLEARED @ 17:03Location : The M5 southbound between the M6 and junction J1 (West Bromwich) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

25.57 miles from Ab Lench. CLEARED @ 17:03

CONGESTIONCLEARED @ 16:43Location : The M42 northbound between junctions J3A (M40) and J4 (Shirley) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:30 and 16:45 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

16.34 miles from Ab Lench. CLEARED @ 16:43

CONGESTIONCLEARED @ 16:53Location : The M6 southbound exit slip at junction J10 (Walsall) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 16:45 and 17:00 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.

29.78 miles from Ab Lench. CLEARED @ 16:53

BROKEN DOWN VEHICLECLEARED @ 16:53Location : The M6 northbound between junctions J9 (Wednesbury) and J10 (Walsall) .
Lane Closures : The hard shoulder and lane 1 are closed.
Reason : Broken down vehicle.
Status : Currently Active.
Time To Clear : The event is expected to clear between 17:15 and 17:30 on 21 Aug 2017.
Return To Normal : Normal traffic conditions are expected between 17:15 and 17:30 on 21 Aug 2017.
Lanes Closed : There are two of four lanes closed.

28.71 miles from Ab Lench. CLEARED @ 16:53

CONGESTIONCLEARED @ 17:13Location : The M6 southbound between junctions J7 (Birmingham) and J6 (Birmingham) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 17:30 and 17:45 on 21 Aug 2017.
Cause : Road traffic collision.
Delay : There are currently delays of 10 minutes against expected traffic.

25.07 miles from Ab Lench. CLEARED @ 17:13

ACCIDENTCLEARED @ 17:13Location : The M6 southbound between junctions J6 (Birmingham) and J5 (Birmingham) .
Lane Closures : The hard shoulder is closed.
Reason : Road traffic collision.
Status : Currently Active.
Time To Clear : The event is expected to clear between 19:45 and 20:00 on 21 Aug 2017.
Return To Normal : Normal traffic conditions are expected between 19:45 and 20:00 on 21 Aug 2017.
Delay : There are currently delays of 10 minutes against expected traffic.
Lanes Closed : There is one of four lanes closed.

24.87 miles from Ab Lench. CLEARED @ 17:13

Roadworks

Your Traffic Comments


Traffic in Nearby Villages

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways Agency

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location : westbound between the junctions with the M5 and the A417 north of Gloucester.

Reason : Roadworks.

Status : Currently Active.

Period : from 22:06 on 21 August 2017 to 05:00 on 22 August 2017.

Lanes Closed : All lanes are closed.

20 miles from Ab Lench.

51.89--2.16

From Location : southbound exit slip at junction J8 (Birmingham) .

To Location : The M5 southbound between the M6 and junction J1 (Rugby) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

27.7 miles from Ab Lench.

52.56--1.98

Location : southbound between junctions J10 (Walsall) and J9 (Wednesbury) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

29.51 miles from Ab Lench.

52.58--2.01

Location : northbound entry slip at junction J2 (Dudley) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 24 August 2017 to 06:00 on 25 August 2017.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

23.32 miles from Ab Lench.

52.49--2.02

Location : southbound entry slip at junction J3 (Kidderminster) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Lanes Closed : All lanes will be closed.

20.08 miles from Ab Lench.

52.45--2.02

Location : southbound between junctions J3 (Kidderminster) and J4A (Birmingham) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Lanes Closed : All lanes will be closed.

18.68 miles from Ab Lench.

52.43--2.02

CLEARED @ 22:03Location : northbound between junctions J7 (Birmingham) and J8 (Birmingham) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 22:00 and 22:15 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

27.44 miles from Ab Lench.

52.55--1.93

CLEARED @ 21:52Location : northbound between junctions J7 (Birmingham) and J8 (Birmingham) .

Reason : Road traffic collision.

Status : Currently Active.

Time To Clear : The event is expected to clear between 23:15 and 23:30 on 21 August 2017.

Return To Normal : Normal traffic conditions are expected between 23:15 and 23:30 on 21 August 2017.

Lanes Closed : There are lane closures.

27.39 miles from Ab Lench.

52.55--1.94

Location : southbound between junctions J4A (Birmingham) and J5 (Droitwich) .

Lane Closures : Lane two is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of four lanes closed.

13.83 miles from Ab Lench.

52.35--2.07

Location : northbound between junctions J6 (Worcester) and J5 (Droitwich) .

Lane Closures : Lane two is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of four lanes closed.

8.96 miles from Ab Lench.

52.25--2.13

Location : northbound between junctions J6 (Worcester) and J5 (Droitwich) .

Lane Closures : Lane two is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of four lanes closed.

8.96 miles from Ab Lench.

52.25--2.13

Location : southbound at junction J4A (Birmingham) .

Lane Closures : Lane two is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of two lanes closed.

14.06 miles from Ab Lench.

52.35--2.07

Location : southbound between junctions J5 (Droitwich) and J6 (Worcester) .

Lane Closures : Lane two is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of four lanes closed.

8.99 miles from Ab Lench.

52.25--2.13

Location : southbound between junctions J6 (Worcester) and J7 (Worcester) .

Lane Closures : Lane two is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

8.22 miles from Ab Lench.

52.22--2.16

Location : southbound between junctions J5 (Droitwich) and J6 (Worcester) .

Lane Closures : Lane two is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of four lanes closed.

8.99 miles from Ab Lench.

52.25--2.13

Location : northbound between junctions J7 (Worcester) and J6 (Worcester) .

Lane Closures : Lane two is closed.

Reason : Barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

8.13 miles from Ab Lench.

52.17--2.18

CLEARED @ 20:42Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Lane Closures : Lane one is closed.

Reason : Broken down vehicle.

Status : Currently Active.

Time To Clear : The event is expected to clear between 21:15 and 21:30 on 21 August 2017.

Return To Normal : Normal traffic conditions are expected between 21:15 and 21:30 on 21 August 2017.

Lanes Closed : There is one of four lanes closed.

11.53 miles from Ab Lench.

52.31--2.11

CLEARED @ 17:53Location : southbound between the M6 and junction J1 (West Bromwich) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:45 and 18:00 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

25.57 miles from Ab Lench.

52.53--1.97

CLEARED @ 17:33Location : southbound exit slip at junction J6 (Birmingham E) .

Lane Closures : Lane one is closed.

Reason : Broken down vehicle.

Status : Currently Active.

Time To Clear : The event is expected to clear between 17:45 and 18:00 on 21 August 2017.

Return To Normal : Normal traffic conditions are expected between 17:45 and 18:00 on 21 August 2017.

Lanes Closed : There is one of two lanes closed.

23.24 miles from Ab Lench.

52.45--1.71

CLEARED @ 17:03Location : northbound at junction J8 (Birmingham) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

27.25 miles from Ab Lench.

52.55--1.96

CLEARED @ 18:22Location : southbound exit slip at junction J8 (Birmingham) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 18:15 and 18:30 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

27.09 miles from Ab Lench.

52.55--1.97

CLEARED @ 17:13Location : northbound at junction J3 (Birmingham S) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

14.65 miles from Ab Lench.

52.35--1.85

CLEARED @ 17:03Location : northbound exit slip at junction J7 (M6N) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

24.94 miles from Ab Lench.

52.48--1.71

CLEARED @ 17:23Location : northbound at junction J4 (Lichfield) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:15 and 17:30 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

25.64 miles from Ab Lench.

52.5--1.74

CLEARED @ 17:03Location : southbound between the M6 and junction J1 (West Bromwich) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:00 and 17:15 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

25.57 miles from Ab Lench.

52.53--1.97

CLEARED @ 16:43Location : northbound between junctions J3A (M40) and J4 (Shirley) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:30 and 16:45 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

16.34 miles from Ab Lench.

52.36--1.8

CLEARED @ 16:53Location : southbound exit slip at junction J10 (Walsall) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 16:45 and 17:00 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

29.78 miles from Ab Lench.

52.59--2.01

CLEARED @ 16:53Location : northbound between junctions J9 (Wednesbury) and J10 (Walsall) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Broken down vehicle.

Status : Currently Active.

Time To Clear : The event is expected to clear between 17:15 and 17:30 on 21 August 2017.

Return To Normal : Normal traffic conditions are expected between 17:15 and 17:30 on 21 August 2017.

Lanes Closed : There are two of four lanes closed.

28.71 miles from Ab Lench.

52.57--2.01

CLEARED @ 17:13Location : southbound between junctions J7 (Birmingham) and J6 (Birmingham) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 17:30 and 17:45 on 21 August 2017.

Cause : Road traffic collision.

Delay : There are currently delays of 10 minutes against expected traffic.

25.07 miles from Ab Lench.

52.51--1.83

CLEARED @ 17:13Location : southbound between junctions J6 (Birmingham) and J5 (Birmingham) .

Lane Closures : The hard shoulder is closed.

Reason : Road traffic collision.

Status : Currently Active.

Time To Clear : The event is expected to clear between 19:45 and 20:00 on 21 August 2017.

Return To Normal : Normal traffic conditions are expected between 19:45 and 20:00 on 21 August 2017.

Delay : There are currently delays of 10 minutes against expected traffic.

Lanes Closed : There is one of four lanes closed.

24.87 miles from Ab Lench.

52.51--1.83

Location : northbound between junctions J12 (Gaydon) and J13 (Leamington) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 23:00 on 21 August 2017 to 07:00 on 22 August 2017.

Lanes Closed : There will be two of three lanes closed.

21.83 miles from Ab Lench.

52.2--1.48

Location : slip road to the M5 northbound .

Lane Closures : Lane two is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 31 December 2017.

Lanes Closed : There is one of two lanes closed.

14.08 miles from Ab Lench.

52.35--2.07

Location : southbound between junctions J1 (West Bromwich) and J2 (Dudley) .

Lane Closures : The hard shoulder is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 30 August 2017.

24.78 miles from Ab Lench.

52.52--1.97

Location : northbound between junction J3 (Kidderminster) and the M6 .

Lane Closures : The hard shoulder is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 30 August 2017.

20.5 miles from Ab Lench.

52.45--2.01

Location : westbound between junctions J2 (Hereford) and J4 (S.

Wales) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 18:00 on 2 August 2018.

19.41 miles from Ab Lench.

52--2.36

Location : northbound between junctions J1 (Bromsgrove) and J2 (Birmingham S) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Emergency barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 28 October 2017.

Lanes Closed : There is one of three lanes closed.

13.8 miles from Ab Lench.

52.36--1.97

Location : northbound at junction J10 (Walsall) .

Lane Closures : The hard shoulder, lanes 2 and 4 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of four lanes closed.

29.58 miles from Ab Lench.

52.59--2.01

Location : westbound between the M5 and the junction with the A38 .

Reason : Roadworks.

Status : Currently Active.

Period : from 02:24 on 7 April 2017 to 23:59 on 19 February 2018.

20 miles from Ab Lench.

51.89--2.16

Location : eastbound between the A38 and the junction with the M5 .

Reason : Roadworks.

Status : Currently Active.

Period : from 02:26 on 7 April 2017 to 23:59 on 19 February 2018.

21.77 miles from Ab Lench.

51.88--2.24

Location : southbound between junctions J12 (Gaydon) and J11 (Banbury) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 22 August 2017 to 07:00 on 23 August 2017.

Lanes Closed : There will be two of three lanes closed.

25.24 miles from Ab Lench.

52.13--1.39

Location : southbound between junctions J11A (Gloucester) and J12 (Gloucester) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 12:30 on 22 August 2017 to 16:30 on 22 August 2017.

22.12 miles from Ab Lench.

51.86--2.17

Location : southbound between junctions J10 (Cheltenham) and J11 (Cheltenham) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 12:30 on 22 August 2017 to 16:30 on 22 August 2017.

18.24 miles from Ab Lench.

51.91--2.15

Location : northbound between junctions J13 (Stroud) and J12 (Gloucester) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 12:30 on 22 August 2017 to 16:30 on 22 August 2017.

29.42 miles from Ab Lench.

51.78--2.31

Location : southbound between junctions J7A (M1/M6) and J7 (M6N) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 24 August 2017 to 06:00 on 25 August 2017.

Lanes Closed : There will be two of four lanes closed.

25.36 miles from Ab Lench.

52.48--1.71

Location : southbound entry slip at junction J8 (Birmingham E) .

Lane Closures : Lane two will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 21:00 on 24 August 2017 to 06:00 on 25 August 2017.

Lanes Closed : There will be one of two lanes closed.

26.36 miles from Ab Lench.

52.5--1.72

Location : northbound between junction J1 (West Bromwich) and the M6 .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

24.56 miles from Ab Lench.

52.51--1.98

Location : southbound entry slip at junction J2 (Dudley) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

23.08 miles from Ab Lench.

52.49--2.02

Location : The A38M southbound.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:30 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

24.85 miles from Ab Lench.

52.51--1.86

Location : The A38M southbound.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 5 September 2017.

Lanes Closed : All lanes are closed.

24.85 miles from Ab Lench.

52.51--1.86

Location : The A38M northbound.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

24.93 miles from Ab Lench.

52.51--1.86

Location : The A38M northbound.

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 4 September 2017.

Lanes Closed : There is one of two lanes closed.

24.46 miles from Ab Lench.

52.51--1.88

Location : The A38M northbound.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 October 2017 to 10 July 2018.

Lanes Closed : All lanes will be closed.

24.93 miles from Ab Lench.

52.51--1.86

From Location : The A38M northbound.

To Location : The A5127 northbound.

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 October 2017 to 10 July 2018.

Lanes Closed : All lanes will be closed.

24.46 miles from Ab Lench.

52.51--1.88

Location : The A38M northbound.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 5 September 2017.

Lanes Closed : All lanes are closed.

24.93 miles from Ab Lench.

52.51--1.86

Location : The A38M northbound.

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 4 September 2017.

Lanes Closed : There is one of two lanes closed.

24.93 miles from Ab Lench.

52.51--1.86

Location : southbound entry slip at Warwick Services.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 00:01 on 24 August 2017 to 23:59 on 25 August 2017.

21.03 miles from Ab Lench.

52.22--1.5

Location : southbound between junctions J14 (Leamington) and J12 (Gaydon) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 00:01 on 24 August 2017 to 23:59 on 25 August 2017.

21.81 miles from Ab Lench.

52.21--1.48

Location : southbound between the junctions with the A436 and the A429 .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 05:00 on 22 August 2017.

Lanes Closed : There is one of two lanes closed.

28.65 miles from Ab Lench.

51.74--1.96

Location : northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Roadside Drains Works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of four lanes closed.

9.55 miles from Ab Lench.

52.06--2.15

Location : northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Roadside Drains Works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

9.55 miles from Ab Lench.

52.06--2.15

Location : northbound between junctions J9 (Tewkesbury) and J8 (Ross on Wye) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Roadside Drains Works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

12.28 miles from Ab Lench.

52--2.12

Location : northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Roadside Drains Works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

9.38 miles from Ab Lench.

52.11--2.2

Location : northbound between junctions J7 (Worcester) and J6 (Worcester) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Roadside Drains Works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

8.38 miles from Ab Lench.

52.16--2.18

Location : northbound between junctions J9 (Tewkesbury) and J8 (Ross on Wye) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Roadside Drains Works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

10.91 miles from Ab Lench.

52.02--2.12

Location : northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Roadside Drains Works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

9.53 miles from Ab Lench.

52.07--2.16

Location : northbound entry slip at junction J9 (Tewkesbury) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Roadside Drains Works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of two lanes closed.

12.4 miles from Ab Lench.

52--2.12

Location : southbound between junctions J7A (M1/M6) and J6 (Birmingham E) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 24 August 2017 to 05:00 on 25 August 2017.

Lanes Closed : There will be two of three lanes closed.

24.01 miles from Ab Lench.

52.46--1.71

Location : southbound exit slip at junction J3 (Birmingham S) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2017 to 25 August 2017.

Lanes Closed : All lanes will be closed.

14.33 miles from Ab Lench.

52.35--1.88

Location : southbound between junctions J14 (Leamington) and J12 (Gaydon) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 00:01 on 23 August 2017 to 23:59 on 24 August 2017.

20 miles from Ab Lench.

52.23--1.53

Location : southbound between junctions J15 (Warwick) and J13 (Leamington) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 24 August 2017 to 07:00 on 25 August 2017.

Lanes Closed : There will be two of three lanes closed.

17.2 miles from Ab Lench.

52.26--1.62

Location : northbound between junctions J13 (Leamington) and J15 (Warwick) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 24 August 2017 to 07:00 on 25 August 2017.

Lanes Closed : There will be two of three lanes closed.

19.37 miles from Ab Lench.

52.24--1.55

Location : southbound between junctions J12 (Gaydon) and J11 (Banbury) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 24 August 2017 to 06:00 on 25 August 2017.

Lanes Closed : There will be two of three lanes closed.

25.24 miles from Ab Lench.

52.13--1.39

Location : northbound between junctions J11 (Banbury) and J12 (Gaydon) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 24 August 2017 to 06:00 on 25 August 2017.

Lanes Closed : There will be two of three lanes closed.

25.22 miles from Ab Lench.

52.13--1.39

Location : eastbound between junctions J3 (Newent) and J2 (Hereford) .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 24 August 2017 to 05:00 on 25 August 2017.

Lanes Closed : There will be one of two lanes closed.

22.79 miles from Ab Lench.

51.97--2.43

Location : westbound between junctions J2 (Hereford) and J3 (Newent) .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 24 August 2017 to 05:00 on 25 August 2017.

Lanes Closed : There will be one of two lanes closed.

22.73 miles from Ab Lench.

51.97--2.42

Location : westbound between junctions J2 (Hereford) and J3 (Newent) .

Lane Closures : Lane one will be closed.

Reason : Barrier repairs are planned.

Status : Pending.

Schedule : From 21:30 on 24 August 2017 to 06:00 on 25 August 2017.

Lanes Closed : There will be one of two lanes closed.

22.73 miles from Ab Lench.

51.97--2.42

Location : eastbound between the junctions with the A38 and the A417 north of Gloucester.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 05:30 on 22 August 2017.

Lanes Closed : All lanes are closed.

21.24 miles from Ab Lench.

51.88--2.22

Location : northbound at junction J9 (Lichfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 23 August 2017 to 05:00 on 24 August 2017.

Lanes Closed : There will be two of four lanes closed.

28.02 miles from Ab Lench.

52.53--1.73

Location : southbound between junctions J5 (Solihull) and J4 (Shirley) .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 23 August 2017 to 25 August 2017.

Lanes Closed : There will be one of three lanes closed.

18.72 miles from Ab Lench.

52.39--1.77

Location : southbound between junctions J9 (Lichfield) and J8 (Birmingham E) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 23 August 2017 to 05:00 on 24 August 2017.

Lanes Closed : There will be two of four lanes closed.

27.62 miles from Ab Lench.

52.52--1.73

Location : southbound between junctions J14 (Leamington) and J12 (Gaydon) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 00:01 on 22 August 2017 to 23:59 on 23 August 2017.

20 miles from Ab Lench.

52.23--1.53

Location : northbound entry slip at junction J4 (Lichfield) .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 23 August 2017 to 05:30 on 24 August 2017.

Lanes Closed : There will be one of two lanes closed.

24.99 miles from Ab Lench.

52.48--1.71

Location : northbound between junctions J4 (Lichfield) and J4A .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 23 August 2017 to 05:30 on 24 August 2017.

Lanes Closed : There will be one of three lanes closed.

25.23 miles from Ab Lench.

52.48--1.7

Location : northbound at junction J9 (Lichfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 23 August 2017 to 05:00 on 24 August 2017.

Lanes Closed : All lanes will be closed.

28.58 miles from Ab Lench.

52.54--1.73

Location : southbound between junctions J4 (Lichfield) and J2 (Coventry) .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 23 August 2017 to 06:00 on 24 August 2017.

Lanes Closed : There will be one of three lanes closed.

28.72 miles from Ab Lench.

52.47--1.54

Location : southbound between junctions J4 (Lichfield) and J3 (Coventry) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 August 2017 to 04:00 on 24 August 2017.

Lanes Closed : There will be two of three lanes closed.

29.14 miles from Ab Lench.

52.47--1.52

Location : southbound entry slip at junction J3 (Coventry) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 23 August 2017 to 06:00 on 24 August 2017.

Lanes Closed : All lanes will be closed.

29.73 miles from Ab Lench.

52.46--1.49

Location : southbound exit slip at junction J3 (Coventry) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 August 2017 to 04:00 on 24 August 2017.

Lanes Closed : All lanes will be closed.

29.62 miles from Ab Lench.

52.46--1.5

Location : southbound exit slip at junction J3 (Coventry) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 23 August 2017 to 06:00 on 24 August 2017.

Lanes Closed : All lanes will be closed.

29.62 miles from Ab Lench.

52.46--1.5

Location : southbound between junctions J12 (Gaydon) and J11 (Banbury) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 23 August 2017 to 06:00 on 24 August 2017.

Lanes Closed : There will be two of three lanes closed.

25.24 miles from Ab Lench.

52.13--1.39

Location : northbound between junctions J11 (Banbury) and J12 (Gaydon) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 22:00 on 23 August 2017 to 06:00 on 24 August 2017.

Lanes Closed : There will be two of three lanes closed.

25.22 miles from Ab Lench.

52.13--1.39

Location : eastbound exit slip to the A423 .

Reason : Road marking works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2017 to 25 August 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 August 2017 to 31 August 2017.

Lanes Closed : All lanes will be closed.

26.95 miles from Ab Lench.

52.37--1.46

Location : westbound exit slip to the A423 .

Reason : Road marking works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2017 to 25 August 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 August 2017 to 31 August 2017.

Lanes Closed : All lanes will be closed.

27.01 miles from Ab Lench.

52.37--1.45

Location : westbound entry slip from the A423 .

Reason : Road marking works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2017 to 25 August 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 29 August 2017 to 31 August 2017.

Lanes Closed : All lanes will be closed.

26.94 miles from Ab Lench.

52.37--1.46

Location : southbound between junctions J5 (Solihull) and J4 (Shirley) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 00:00 on 22 August 2017 to 23:59 on 25 August 2017.

18.72 miles from Ab Lench.

52.39--1.77

Location : northbound entry slip at junction J4 (Lichfield) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2017 to 06:00 on 23 August 2017.

Lanes Closed : All lanes will be closed.

24.99 miles from Ab Lench.

52.48--1.71

Location : southbound between junctions J8 (Birmingham) and J7 (Birmingham) .

Lane Closures : Lane three is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of four lanes closed.

27.31 miles from Ab Lench.

52.55--1.94

Location : southbound between junctions J7 (Birmingham) and J6 (Birmingham) .

Lane Closures : Lane three is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

27.42 miles from Ab Lench.

52.55--1.94

Location : northbound between junctions J7 (Birmingham) and J8 (Birmingham) .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of four lanes closed.

27.3 miles from Ab Lench.

52.55--1.94

Location : southbound at junction J8 (Birmingham) .

Lane Closures : Lane three is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

27.26 miles from Ab Lench.

52.55--1.96

Location : northbound between junctions J6 (Birmingham) and J7 (Birmingham) .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of three lanes closed.

25.16 miles from Ab Lench.

52.51--1.87

Location : northbound at junction J8 (Birmingham) .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of three lanes closed.

27.25 miles from Ab Lench.

52.55--1.96

Location : southbound between junctions J4 (Lichfield) and J3 (Coventry) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 August 2017 to 04:00 on 23 August 2017.

Lanes Closed : There will be two of three lanes closed.

29.14 miles from Ab Lench.

52.47--1.52

Location : northbound between junctions J3A (Tamworth) and J4A .

Lane Closures : Lane one will be closed.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2017 to 06:00 on 23 August 2017.

Lanes Closed : There will be one of three lanes closed.

25.6 miles from Ab Lench.

52.48--1.68

Location : southbound exit slip at junction J3 (Coventry) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 August 2017 to 04:00 on 23 August 2017.

Lanes Closed : All lanes will be closed.

29.62 miles from Ab Lench.

52.46--1.5

Location : southbound between junctions J12 (Gaydon) and J11 (Banbury) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadside drains works are planned.

Status : Pending.

Schedule : From 20:00 on 22 August 2017 to 07:00 on 23 August 2017.

Lanes Closed : There will be two of three lanes closed.

22.6 miles from Ab Lench.

52.19--1.46

Location : eastbound between the junctions with the A38 and the A417 north of Gloucester.

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 12:30 on 22 August 2017 to 16:00 on 22 August 2017.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 23 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 August 2017 to 1 September 2017.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 September 2017 to 8 September 2017.

Lanes Closed : There will be one of two lanes closed.

21.24 miles from Ab Lench.

51.88--2.22

Location : eastbound between junctions J3 (Newent) and J2 (Hereford) .

Lane Closures : Lane one will be closed.

Reason : Barrier repairs are planned.

Status : Pending.

Schedule : From 21:30 on 22 August 2017 to 06:00 on 23 August 2017.

Lanes Closed : There will be one of two lanes closed.

22.79 miles from Ab Lench.

51.97--2.43

Location : westbound between the junctions with the M5 and the A417 north of Gloucester.

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 12:30 on 22 August 2017 to 16:00 on 22 August 2017.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 23 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 August 2017 to 1 September 2017.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 September 2017 to 8 September 2017.

Lanes Closed : There will be one of two lanes closed.

20.6 miles from Ab Lench.

51.88--2.18

Location : northbound between junctions J7 (Worcester) and J6 (Worcester) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

8.05 miles from Ab Lench.

52.19--2.17

Location : eastbound between the A445 and the junction with the M45 .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2017 to 25 August 2017.

Lanes Closed : All lanes will be closed.

28.68 miles from Ab Lench.

52.36--1.39

Location : southbound between junctions J6 (Birmingham E) and J5 (Solihull) .

Lane Closures : The hard shoulder is closed.

Reason : Planned Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

21.39 miles from Ab Lench.

52.42--1.72

Location : northbound between junctions J2 (Birmingham S) and J3 (Birmingham S) .

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 03:00 on 22 August 2017.

Lanes Closed : All lanes are closed.

14.17 miles from Ab Lench.

52.36--1.95

Location : northbound between junctions J4 (Shirley) and J5 (Solihull) .

Lane Closures : The hard shoulder and lane 2 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

18.71 miles from Ab Lench.

52.39--1.77

Location : southbound at junction J4 (Lichfield) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of two lanes closed.

25.06 miles from Ab Lench.

52.48--1.72

Location : southbound between junctions J4A and J4 (Lichfield) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

25.69 miles from Ab Lench.

52.5--1.74

Location : southbound between junctions J8 (Birmingham) and J7 (Birmingham) .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of four lanes closed.

27.31 miles from Ab Lench.

52.55--1.94

Location : northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 August 2017 to 31 August 2017.

9.55 miles from Ab Lench.

52.06--2.15

Location : northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 August 2017 to 31 August 2017.

9.55 miles from Ab Lench.

52.06--2.15

Location : northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 August 2017 to 31 August 2017.

13.67 miles from Ab Lench.

52.35--2.08

Location : southbound between junctions J7 (Birmingham) and J6 (Birmingham) .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of three lanes closed.

27.42 miles from Ab Lench.

52.55--1.94

Location : southbound at junction J8 (Birmingham) .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of three lanes closed.

27.26 miles from Ab Lench.

52.55--1.96

Location : northbound between junctions J7 (Birmingham) and J8 (Birmingham) .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of four lanes closed.

27.3 miles from Ab Lench.

52.55--1.94

Location : northbound at junction J8 (Birmingham) .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of three lanes closed.

27.25 miles from Ab Lench.

52.55--1.96

Location : northbound between junctions J6 (Birmingham) and J7 (Birmingham) .

Lane Closures : Lanes 2 and 3 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of three lanes closed.

25.16 miles from Ab Lench.

52.51--1.87

Location : southbound exit slip at junction J4 (Lichfield) .

Lane Closures : Lanes 1 and 2 are closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : All lanes are closed.

25.15 miles from Ab Lench.

52.48--1.72

Location : southbound exit slip at junction J3 (Coventry) .

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 04:00 on 22 August 2017.

Lanes Closed : All lanes are closed.

29.62 miles from Ab Lench.

52.46--1.5

Location : southbound entry slip at junction J4 (Lichfield) .

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : All lanes are closed.

25.11 miles from Ab Lench.

52.48--1.7

Location : southbound between junctions J4 (Lichfield) and J3 (Coventry) .

Lane Closures : The hard shoulder, lanes 1 and 2 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 04:00 on 22 August 2017.

Lanes Closed : There are two of three lanes closed.

29.14 miles from Ab Lench.

52.47--1.52

Location : southbound between junctions J4 (Lichfield) and J3A (Tamworth) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Horticultural works.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

25.01 miles from Ab Lench.

52.48--1.72

Location : southbound between junctions J14 (Leamington) and J13 (Leamington) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 23:59 on 21 August 2017.

18.77 miles from Ab Lench.

52.25--1.57

Location : southbound between junctions J4A (Birmingham) and J6 (Worcester) .

Lane Closures : Lanes 2, 3 and 4 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 05:00 on 22 August 2017.

Lanes Closed : There are three of four lanes closed.

11.65 miles from Ab Lench.

52.31--2.1

Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 August 2017 to 31 August 2017.

12.09 miles from Ab Lench.

52.32--2.1

Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 August 2017 to 31 August 2017.

12.09 miles from Ab Lench.

52.32--2.1

Location : northbound between junctions J9 (Tewkesbury) and J8 (Ross on Wye) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 August 2017 to 31 August 2017.

12.28 miles from Ab Lench.

52--2.12

Location : northbound between junctions J6 (Worcester) and J5 (Droitwich) .

Lane Closures : The hard shoulder, lanes 1, 2 and 3 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 05:00 on 22 August 2017.

Lanes Closed : There are three of four lanes closed.

8.23 miles from Ab Lench.

52.22--2.16

Location : northbound between junctions J8 (Ross on Wye) and J7 (Worcester) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 August 2017 to 31 August 2017.

9.53 miles from Ab Lench.

52.07--2.16

Location : northbound entry slip at junction J9 (Tewkesbury) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 29 August 2017 to 31 August 2017.

12.4 miles from Ab Lench.

52--2.12

Location : southbound between junction J1 (Bromsgrove) and the M5 .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 09:30 on 22 August 2017 to 18:00 on 22 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 August 2017 to 27 August 2017.

13.99 miles from Ab Lench.

52.36--2.05

Location : southbound between junctions J2 (Birmingham S) and J1 (Bromsgrove) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 09:30 on 22 August 2017 to 18:00 on 22 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 August 2017 to 27 August 2017.

14.23 miles from Ab Lench.

52.36--1.94

Location : northbound between junctions J4 (Shirley) and J5 (Solihull) .

Reason : Roadworks.

Status : Currently Active.

Period : from 00:00 on 20 August 2017 to 23:59 on 23 August 2017.

18.71 miles from Ab Lench.

52.39--1.77

Location : northbound between junctions J2 (Dudley) and J1 (West Bromwich) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 24 August 2017 to 06:00 on 25 August 2017.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

22.98 miles from Ab Lench.

52.49--2.02

Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Lane Closures : Lanes 1, 2, 3 and 4 will be closed.

Reason : Emergency road marking works are planned.

Status : Pending.

Schedule : From 21:00 on 31 August 2017 to 06:00 on 1 September 2017.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

10.41 miles from Ab Lench.

52.28--2.12

Location : northbound entry slip at junction J5 (Droitwich) .

Lane Closures : Lane one will be closed.

Reason : Emergency road marking works are planned.

Status : Pending.

Schedule : From 21:00 on 24 August 2017 to 06:00 on 25 August 2017.

Schedule : From 21:00 on 31 August 2017 to 06:00 on 1 September 2017.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

10.74 miles from Ab Lench.

52.29--2.12

Location : southbound between the M42 and junction J15 (Warwick) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

15.26 miles from Ab Lench.

52.34--1.79

Location : southbound between the M42 and junction J15 (Warwick) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

15.25 miles from Ab Lench.

52.35--1.8

Location : northbound between the M5 and junction J1 (Bromsgrove) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 09:30 on 22 August 2017 to 18:00 on 22 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 August 2017 to 27 August 2017.

14.01 miles from Ab Lench.

52.36--2.05

Location : northbound between junctions J2 (Birmingham S) and J3 (Birmingham S) .

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 09:30 on 22 August 2017 to 18:00 on 22 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 August 2017 to 27 August 2017.

13.94 miles from Ab Lench.

52.35--1.92

Location : northbound entry slip at junction J4A from M5 North.

Reason : Horticultural works are planned.

Status : Pending.

Schedule : From 09:30 on 22 August 2017 to 18:00 on 22 August 2017.

Schedule : Expect disruption everyday between 09:30 and 18:00 from 25 August 2017 to 27 August 2017.

13.93 miles from Ab Lench.

52.35--2.07

Location : northbound between junctions J9 (Lichfield) and J10 (Tamworth) .

Lane Closures : Lane two will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 22 August 2017 to 25 August 2017.

Lanes Closed : There will be one of two lanes closed.

28.2 miles from Ab Lench.

52.53--1.73

Location : southbound entry slip at junction J5 (Droitwich) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 6 September 2017 to 05:00 on 7 September 2017.

Lanes Closed : All lanes will be closed.

10.52 miles from Ab Lench.

52.29--2.12

Location : southbound exit slip at junction J5 (Droitwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 6 September 2017 to 05:00 on 7 September 2017.

Lanes Closed : All lanes will be closed.

10.75 miles from Ab Lench.

52.29--2.12

Location : northbound exit slip at junction J6 (Worcester) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 7 September 2017 to 05:00 on 8 September 2017.

Lanes Closed : All lanes will be closed.

8.18 miles from Ab Lench.

52.21--2.16

Location : northbound exit slip at junction J5 (Droitwich) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 21:00 on 6 September 2017 to 05:00 on 7 September 2017.

Lanes Closed : All lanes will be closed.

10.51 miles from Ab Lench.

52.29--2.12

Location : southbound between junctions J3A (M40) and J3 (Birmingham S) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 22 August 2017 to 25 August 2017.

Lanes Closed : There will be two of three lanes closed.

14.91 miles from Ab Lench.

52.35--1.82

Location : southbound between the M6 and junction J1 (West Bromwich) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be one of three lanes closed.

25.57 miles from Ab Lench.

52.53--1.97

Location : northbound between junctions J7 (Birmingham) and J8 (Birmingham) .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be two of four lanes closed.

27.3 miles from Ab Lench.

52.55--1.94

Location : southbound between the M6 northbound and junction J1 (West Bromwich) .

Lane Closures : Lane two will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be one of two lanes closed.

26.99 miles from Ab Lench.

52.55--1.96

Location : northbound exit slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 25 August 2017 to 06:00 on 28 August 2017.

Schedule : From 20:00 on 1 September 2017 to 06:00 on 4 September 2017.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

24.89 miles from Ab Lench.

52.51--1.86

Location : southbound at junction J6 (Birmingham) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 25 August 2017 to 06:00 on 28 August 2017.

Schedule : From 20:00 on 1 September 2017 to 06:00 on 4 September 2017.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : There will be one of two lanes closed.

25.03 miles from Ab Lench.

52.51--1.87

Location : southbound between junctions J7 (Birmingham) and J6 (Birmingham) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 25 August 2017 to 06:00 on 28 August 2017.

Schedule : From 20:00 on 1 September 2017 to 06:00 on 4 September 2017.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : There will be one of three lanes closed.

26.18 miles from Ab Lench.

52.53--1.9

Location : northbound between junctions J5 (Birmingham) and J7 (Birmingham) .

Lane Closures : The hard shoulder, lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 25 August 2017 to 06:00 on 28 August 2017.

Schedule : From 20:00 on 1 September 2017 to 06:00 on 4 September 2017.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : There will be three of four lanes closed.

25.7 miles from Ab Lench.

52.51--1.79

Location : northbound at junction J9 (Lichfield) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 September 2017 to 16 September 2017.

Lanes Closed : There will be three of four lanes closed.

28.02 miles from Ab Lench.

52.53--1.73

Location : southbound between junctions J8 (Birmingham E) and J7 (M6N) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 September 2017 to 16 September 2017.

Lanes Closed : All lanes will be closed.

26.56 miles from Ab Lench.

52.51--1.73

Location : northbound at junction J9 (Lichfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 September 2017 to 16 September 2017.

Lanes Closed : All lanes will be closed.

28.58 miles from Ab Lench.

52.54--1.73

Location : southbound entry slip at junction J1 (West Bromwich) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2017 to 06:00 on 23 August 2017.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

24.38 miles from Ab Lench.

52.51--1.98

Location : northbound between junction J2 (Dudley) and the M6 .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

23.4 miles from Ab Lench.

52.5--2.02

Location : southbound between junctions J8 (Birmingham) and J7 (Birmingham) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be three of four lanes closed.

27.31 miles from Ab Lench.

52.55--1.94

Location : slip road to the M6 southbound .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

26.93 miles from Ab Lench.

52.55--1.96

Location : southbound between junctions J10 (Walsall) and J9 (Wednesbury) .

Lane Closures : The hard shoulder and lane 2 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

28.8 miles from Ab Lench.

52.57--2.01

Location : southbound between junctions J3 (Coventry) and J2 (Coventry) .

Lane Closures : The hard shoulder, lanes 1 and 2 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of three lanes closed.

29.56 miles from Ab Lench.

52.47--1.5

Location : southbound between junctions J1 (West Bromwich) and J4 (Bromsgrove) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be two of three lanes closed.

24.3 miles from Ab Lench.

52.51--1.98

Location : southbound between junctions J1 (West Bromwich) and J2 (Dudley) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 22 August 2017 to 06:00 on 23 August 2017.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

24.78 miles from Ab Lench.

52.52--1.97

Location : northbound between junctions J3 (Coventry) and J4A .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 August 2017 to 1 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 September 2017 to 8 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 September 2017 to 15 September 2017.

29.72 miles from Ab Lench.

52.46--1.49

Location : northbound between junctions J4A (Birmingham) and J3 (Kidderminster) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

14.77 miles from Ab Lench.

52.37--2.07

Location : southbound between junctions J1 (West Bromwich) and J2 (Dudley) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

24.78 miles from Ab Lench.

52.52--1.97

Location : northbound between junctions J2 (Dudley) and J1 (West Bromwich) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be three of four lanes closed.

22.98 miles from Ab Lench.

52.49--2.02

Location : southbound between junctions J1 (West Bromwich) and J2 (Dudley) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be two of three lanes closed.

24.78 miles from Ab Lench.

52.52--1.97

Location : northbound between junctions J2 (Dudley) and J1 (West Bromwich) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be two of three lanes closed.

22.98 miles from Ab Lench.

52.49--2.02

Location : southbound between junctions J1 (West Bromwich) and J4 (Bromsgrove) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Lanes Closed : All lanes will be closed.

24.3 miles from Ab Lench.

52.51--1.98

Location : westbound between the junctions with the A417 north of Gloucester and the A38 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 12:30 on 22 August 2017 to 16:00 on 22 August 2017.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 23 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 29 August 2017 to 1 September 2017.

Schedule : Expect disruption everyday between 09:30 and 15:30 from 4 September 2017 to 8 September 2017.

Lanes Closed : There will be one of two lanes closed.

21.25 miles from Ab Lench.

51.88--2.22

Location : slip road to the M5 northbound .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Emergency road marking works are planned.

Status : Pending.

Schedule : From 22:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

14.08 miles from Ab Lench.

52.35--2.07

Location : northbound exit slip at junction J10 (Walsall) .

Lane Closures : Lane two is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of two lanes closed.

29.4 miles from Ab Lench.

52.58--2.01

Location : northbound between junctions J9 (Wednesbury) and J10 (Walsall) .

Lane Closures : Lane two is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

28.79 miles from Ab Lench.

52.57--2.01

Location : southbound between junctions J3 (Coventry) and J2 (Coventry) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 August 2017 to 1 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 September 2017 to 8 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 September 2017 to 15 September 2017.

29.56 miles from Ab Lench.

52.47--1.5

Location : southbound entry slip at junction J10 (Walsall) .

Lane Closures : Lane two will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:30 on 29 September 2017 to 06:00 on 30 September 2017.

Lanes Closed : There will be one of two lanes closed.

29.39 miles from Ab Lench.

52.58--2.01

Location : southbound between junctions J9 (Lichfield) and J8 (Birmingham E) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 September 2017 to 16 September 2017.

Lanes Closed : There will be one of four lanes closed.

27.62 miles from Ab Lench.

52.52--1.73

Location : northbound between junctions J4A (Birmingham) and J4 (Bromsgrove) .

Lane Closures : The hard shoulder is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 05:58 on 31 December 2017.

13.67 miles from Ab Lench.

52.35--2.08

Location : northbound between junctions J5 (Droitwich) and J4A (Birmingham) .

Lane Closures : The hard shoulder and lane 4 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 05:58 on 31 December 2017.

Lanes Closed : There is one of four lanes closed.

12.09 miles from Ab Lench.

52.32--2.1

Location : northbound between junctions J3 (Kidderminster) and J2 (Dudley) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 05:58 on 31 December 2017.

Lanes Closed : There is one of three lanes closed.

20.01 miles from Ab Lench.

52.45--2.02

Location : northbound between junctions J2 (Dudley) and J1 (West Bromwich) .

Reason : Roadworks.

Status : Currently Active.

Period : from 06:00 on 24 July 2017 to 06:00 on 31 August 2018.

23.41 miles from Ab Lench.

52.5--2.02

Location : southbound between junctions J1 (West Bromwich) and J2 (Dudley) .

Reason : Roadworks.

Status : Currently Active.

Period : from 06:00 on 24 July 2017 to 06:00 on 31 August 2018.

24.3 miles from Ab Lench.

52.51--1.98

Location : southbound entry slip at junction J9 (Wednesbury) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

28.25 miles from Ab Lench.

52.57--2

Location : northbound entry slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 06:00 on 25 August 2017 to 06:00 on 28 August 2017.

Schedule : From 20:00 on 1 September 2017 to 06:00 on 4 September 2017.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

24.8 miles from Ab Lench.

52.51--1.87

Location : southbound entry slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 06:00 on 25 August 2017 to 06:00 on 28 August 2017.

Schedule : From 20:00 on 1 September 2017 to 06:00 on 4 September 2017.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

24.88 miles from Ab Lench.

52.51--1.87

Location : southbound exit slip at junction J8 (Birmingham) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : from 06:22 on 12 July 2017 to 06:00 on 31 August 2018.

Lanes Closed : There is one of two lanes closed.

27.09 miles from Ab Lench.

52.55--1.97

Location : southbound between junctions J9 (Wednesbury) and J8 (Birmingham) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

28.02 miles from Ab Lench.

52.56--1.99

Location : southbound between the M6 and junction J1 (West Bromwich) .

Lane Closures : The hard shoulder and lane 1 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of three lanes closed.

25.57 miles from Ab Lench.

52.53--1.97

Location : northbound between junctions J5 (Birmingham) and J6 (Birmingham) .

Lane Closures : Lanes 1 and 2 are closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 08:00 on 6 September 2017.

Lanes Closed : There are two of three lanes closed.

25.04 miles from Ab Lench.

52.51--1.83

Location : northbound between junctions J5 (Birmingham) and J6 (Birmingham) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : There will be two of three lanes closed.

25.7 miles from Ab Lench.

52.51--1.79

Location : northbound exit slip at junction J6 (Birmingham) .

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 08:00 on 6 September 2017.

Lanes Closed : All lanes are closed.

24.89 miles from Ab Lench.

52.51--1.86

Location : northbound exit slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

24.89 miles from Ab Lench.

52.51--1.86

Location : southbound exit slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

25.14 miles from Ab Lench.

52.51--1.87

Location : southbound exit slip at junction J6 (Birmingham) .

Lane Closures : Lane two is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 08:00 on 6 September 2017.

Lanes Closed : There is one of two lanes closed.

25.14 miles from Ab Lench.

52.51--1.87

Location : northbound entry slip at junction J6 (Birmingham) .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 4 September 2017.

Lanes Closed : There is one of two lanes closed.

24.8 miles from Ab Lench.

52.51--1.87

Location : southbound entry slip at junction J6 (Birmingham) .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 4 September 2017.

Lanes Closed : There is one of two lanes closed.

24.88 miles from Ab Lench.

52.51--1.87

Location : southbound entry slip at junction J9 (Lichfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 September 2017 to 9 September 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 September 2017 to 16 September 2017.

Lanes Closed : All lanes will be closed.

28.24 miles from Ab Lench.

52.53--1.73

Location : northbound entry slip at junction J9 (Lichfield) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 September 2017 to 9 September 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 September 2017 to 16 September 2017.

Lanes Closed : All lanes will be closed.

28.8 miles from Ab Lench.

52.54--1.72

Location : northbound exit slip at junction J9 (Lichfield) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 September 2017 to 9 September 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 September 2017 to 16 September 2017.

Lanes Closed : All lanes will be closed.

28.34 miles from Ab Lench.

52.54--1.73

Location : southbound exit slip at junction J9 (Lichfield) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 4 September 2017 to 9 September 2017.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 11 September 2017 to 16 September 2017.

Lanes Closed : All lanes will be closed.

28.79 miles from Ab Lench.

52.54--1.72

Location : southbound between junctions J4 (Lichfield) and J3 (Coventry) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 August 2017 to 1 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 September 2017 to 8 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 September 2017 to 15 September 2017.

25.98 miles from Ab Lench.

52.47--1.64

Location : southbound at junction J4 (Lichfield) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 August 2017 to 1 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 September 2017 to 8 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 September 2017 to 15 September 2017.

25.06 miles from Ab Lench.

52.48--1.72

Location : southbound between junctions J4 (Lichfield) and J3A (Tamworth) .

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 22 August 2017 to 24 August 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 29 August 2017 to 1 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 September 2017 to 8 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 September 2017 to 15 September 2017.

25.01 miles from Ab Lench.

52.48--1.72

Location : southbound entry slip at junction J7 (M6N) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 September 2017 to 8 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 September 2017 to 15 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 18 September 2017 to 22 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 25 September 2017 to 29 September 2017.

Lanes Closed : There will be one of two lanes closed.

24.97 miles from Ab Lench.

52.48--1.71

Location : southbound between junctions J7A (M1/M6) and J6 (Birmingham E) .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 4 September 2017 to 8 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 11 September 2017 to 15 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 18 September 2017 to 22 September 2017.

Schedule : Expect disruption everyday between 08:00 and 18:00 from 25 September 2017 to 29 September 2017.

Lanes Closed : There will be one of three lanes closed.

24.01 miles from Ab Lench.

52.46--1.71

Location : southbound between junctions J2 (Dudley) and J4 (Bromsgrove) .

Lane Closures : Lane three will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Lanes Closed : There will be one of three lanes closed.

22.98 miles from Ab Lench.

52.49--2.02

Location : southbound between junctions J3 (Kidderminster) and J4A (Birmingham) .

Lane Closures : Lane three will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Lanes Closed : There will be one of three lanes closed.

18.68 miles from Ab Lench.

52.43--2.02

Location : northbound between junctions J4A (Birmingham) and J3 (Kidderminster) .

Lane Closures : Lane three will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : There will be one of three lanes closed.

14.77 miles from Ab Lench.

52.37--2.07

Location : northbound between junctions J4 (Bromsgrove) and J3 (Kidderminster) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

15.53 miles from Ab Lench.

52.38--2.05

Location : northbound entry slip at junction J3 (Kidderminster) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

20.36 miles from Ab Lench.

52.45--2.01

Location : southbound between junctions J9 (Lichfield) and J8 (Birmingham E) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 21:00 and 06:00 from 13 September 2017 to 16 September 2017.

Lanes Closed : All lanes will be closed.

28.95 miles from Ab Lench.

52.54--1.72

Location : northbound entry slip at junction J10 (Walsall) .

Lane Closures : Lane two will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 September 2017 to 06:00 on 30 September 2017.

Lanes Closed : There will be one of two lanes closed.

29.76 miles from Ab Lench.

52.59--2.01

Location : southbound exit slip at junction J10 (Walsall) .

Lane Closures : Lane two is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There is one of two lanes closed.

29.78 miles from Ab Lench.

52.59--2.01

Location : southbound between junctions J3 (Coventry) and J2 (Coventry) .

Lane Closures : Lanes 1 and 2 are closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 22 August 2017.

Lanes Closed : There are two of three lanes closed.

29.95 miles from Ab Lench.

52.45--1.46

Location : southbound between junctions J3 (Kidderminster) and J4 (Bromsgrove) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Lanes Closed : All lanes will be closed.

18.99 miles from Ab Lench.

52.43--2.02

Location : southbound between junctions J2 (Dudley) and J4 (Bromsgrove) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Lanes Closed : All lanes will be closed.

22.98 miles from Ab Lench.

52.49--2.02

Location : southbound exit slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 May 2018 to 06:00 on 30 May 2018.

Lanes Closed : All lanes will be closed.

25.14 miles from Ab Lench.

52.51--1.87

Location : southbound entry slip at junction J6 (Birmingham) .

Reason : Roadworks.

Status : Currently Active.

Period : from 20:03 on 11 May 2017 to 20:00 on 10 July 2018.

24.99 miles from Ab Lench.

52.51--1.87

Location : northbound entry slip at junction J6 (Birmingham) .

Reason : Roadworks.

Status : Currently Active.

Period : from 20:03 on 11 May 2017 to 20:00 on 10 July 2018.

24.95 miles from Ab Lench.

52.51--1.87

Location : northbound entry slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 October 2017 to 10 July 2018.

Lanes Closed : All lanes will be closed.

24.8 miles from Ab Lench.

52.51--1.87

Location : southbound entry slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 2 October 2017 to 10 July 2018.

Lanes Closed : All lanes will be closed.

24.88 miles from Ab Lench.

52.51--1.87

Location : southbound entry slip at junction J6 (Birmingham) .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 20:00 on 10 July 2018.

Lanes Closed : There is one of two lanes closed.

24.8 miles from Ab Lench.

52.51--1.87

Location : northbound exit slip at junction J3 (Kidderminster) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

20.09 miles from Ab Lench.

52.45--2.02

Location : northbound between junctions J3 (Kidderminster) and J2 (Dudley) .

Lane Closures : The hard shoulder is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 30 August 2017.

21.78 miles from Ab Lench.

52.47--2.02

Location : northbound entry slip at junction J7 (Birmingham) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 October 2017 to 06:00 on 30 October 2017.

Lanes Closed : There will be one of two lanes closed.

27.4 miles from Ab Lench.

52.55--1.93

Location : southbound exit slip at junction J3 (Kidderminster) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 20:00 on 29 August 2017 to 06:00 on 30 August 2017.

Lanes Closed : All lanes will be closed.

20.36 miles from Ab Lench.

52.45--2.01

Location : northbound entry slip at junction J7 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 October 2017 to 06:00 on 30 October 2017.

Lanes Closed : All lanes will be closed.

27.4 miles from Ab Lench.

52.55--1.93

Location : northbound entry slip at junction J7 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 October 2017 to 06:00 on 30 October 2017.

Lanes Closed : All lanes will be closed.

27.4 miles from Ab Lench.

52.55--1.93

Location : northbound entry slip at junction J9 (Wednesbury) .

Lane Closures : Lanes 1 and 2 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 October 2017 to 06:00 on 30 October 2017.

Lanes Closed : All lanes will be closed.

28.33 miles from Ab Lench.

52.57--2.01

Location : northbound entry slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

24.8 miles from Ab Lench.

52.51--1.87

Location : southbound entry slip at junction J6 (Birmingham) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 22 December 2017 to 06:00 on 23 December 2017.

Lanes Closed : All lanes will be closed.

24.88 miles from Ab Lench.

52.51--1.87

Location : southbound exit slip at junction J1 (West Bromwich) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : From 21:00 on 29 November 2017 to 06:00 on 30 November 2017.

Lanes Closed : All lanes will be closed.

24.64 miles from Ab Lench.

52.51--1.97