Route Planner to Avoid Traffic
START
FINISH

Traffic Devon

SLIGHT
SEVERE
FULL SCREENUPDATED: 03:26
×
×

Current traffic in Devon

ROAD WORKSLocation : The M5 northbound entry slip at junction J23 (Highbridge) .
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.

2.74m from Bridgewater.

ROAD WORKSLocation : The M5 southbound entry slip at junction J23 (Highbridge) .
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.

2.71m from Bridgewater.

ROAD WORKSLocation : The A30 eastbound between the A39 and the junction with the A395 Bodmin North.
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 19:00 on 8 Jan 2018 to 06:00 on 17 Feb 2018.

3.8m from Bodmin.

ROAD WORKSLocation : The A30 eastbound between the A386 and the junction with the A382 .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 Jan 2018 to 06:00 on 24 Jan 2018.
Lanes Closed : All lanes will be closed.

2.44m from Okehampton.

ROAD WORKSLocation : The A30 eastbound between the A386 and the junction with the A382 .
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 06:04 on 10 Jan 2018 to 06:00 on 24 Jan 2018.

2.82m from Okehampton.

ROAD WORKSLocation : The A30 eastbound between the A386 and the junction with the A382 .
Lane Closures : Lane one is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 20:00 on 23 Jan 2018.
Lanes Closed : There is one of two lanes closed.

1.57m from Okehampton.

ROAD WORKSLocation : The A30 eastbound between the junctions with the A386 and the A382 .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 23 Jan 2018 to 06:00 on 24 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

2.82m from Okehampton.

ROAD WORKSLocation : The A38 eastbound between the A386 and the junction with the A374 Plymouth.
Lane Closures : Lane two is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : There is one of two lanes closed.

0.34m from Plymouth.

ROAD WORKSLocation : The A30 eastbound between the A391 and the junction with the A395 Bodmin North.
Lane Closures : Lane one is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 20:00 on 16 Feb 2018.
Lanes Closed : There is one of two lanes closed.

1.63m from Bodmin.

ROAD WORKSLocation : The A30 eastbound entry slip from the A391 .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 Feb 2018 to 06:00 on 17 Feb 2018.
Lanes Closed : All lanes will be closed.

3.08m from Bodmin.

ROAD WORKSLocation : The A30 eastbound between the junctions with the A39 and the A391 .
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 16 Feb 2018 to 06:00 on 17 Feb 2018.
Lanes Closed : There will be one of two lanes closed.

3.8m from Bodmin.

ROAD WORKSLocation : The A38 westbound between the A3121 and the junction with the A374 Plymouth.
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 17 Jan 2018 to 06:00 on 18 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

0.7m from Ivybridge.

ROAD WORKSLocation : The A38 westbound between the junctions with the A3064 and the A388 .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 17 Jan 2018 to 21 Jan 2018.
Schedule : From 19:00 on 30 Aug 2018 to 00:00 on 30 Aug 2018.
Lanes Closed : There will be one of two lanes closed.

2.34m from Plymouth.

ROAD WORKSLocation : The A38 westbound.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 Jan 2018 to 06:00 on 19 Jan 2018.
Lanes Closed : All lanes will be closed.

2.14m from Brixton.

ROAD WORKSLocation : The A38 eastbound exit slip to the A374 Plymouth.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 18 Jan 2018 to 06:00 on 19 Jan 2018.
Lanes Closed : All lanes will be closed.

2.01m from Plymouth.

ROAD WORKSLocation : The A38 eastbound between the A386 and the junction with the A374 Plymouth.
Lane Closures : Lane two will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 18 Jan 2018 to 06:00 on 19 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

0.34m from Plymouth.

ROAD WORKSLocation : The A38 westbound between the junctions with the A3121 and the A374 Plymouth.
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 18 Jan 2018 to 06:00 on 19 Jan 2018.
Lanes Closed : There will be one of three lanes closed.

2.28m from Brixton.

ROAD WORKSLocation : The A38 westbound.
Reason : Roadworks scheme is planned.
Status : Pending.
Schedule : From 19:00 on 18 Jan 2018 to 06:00 on 19 Jan 2018.

2.28m from Brixton.

ROAD WORKSLocation : The A30 eastbound between the A39 and the junction with the A391 .
Lane Closures : Lane one is closed.
Reason : Emergency Roadside Drains works.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : There is one of two lanes closed.

6.45m from Bodmin.

ROAD WORKSLocation : The A38 eastbound between the junctions with the A374 Plymouth and the A3121 .
Lane Closures : Lanes 2 and 3 will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 19 Jan 2018 to 06:00 on 20 Jan 2018.
Lanes Closed : There will be two of three lanes closed.

1.95m from Brixton.

ROAD WORKSLocation : The A38 eastbound between the A374 Plymouth and the junction with the A3121 .
Reason : Roadworks scheme is planned.
Status : Pending.
Schedule : From 19:00 on 19 Jan 2018 to 06:00 on 20 Jan 2018.

1.95m from Brixton.

ROAD WORKSLocation : The A38 eastbound between the A374 Plymouth and the junction with the A3121 .
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 Jan 2018 to 06:00 on 20 Jan 2018.
Lanes Closed : All lanes will be closed.

1.96m from Brixton.

ROAD WORKSLocation : The A38 eastbound.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 19 Jan 2018 to 06:00 on 20 Jan 2018.
Lanes Closed : All lanes will be closed.

2.15m from Brixton.

ROAD WORKSLocation : The M5 southbound between junctions J28 (Cullompton) and J29 (Honiton) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 Jan 2018 to 19 Jan 2018.

9.62m from Honiton.

ROAD WORKSLocation : The M5 southbound between junctions J27 (Barnstaple) and J28 (Cullompton) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 Jan 2018 to 19 Jan 2018.

10.29m from Honiton.

ROAD WORKSLocation : The M5 southbound entry slip at junction J28 (Cullompton) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 Jan 2018 to 19 Jan 2018.

9.68m from Honiton.

ROAD WORKSLocation : The M5 northbound entry slip at junction J28 (Cullompton) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 Jan 2018 to 19 Jan 2018.

9.74m from Honiton.

ROAD WORKSLocation : The M5 northbound between junctions J29 (Honiton) and J27 (Barnstaple) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 Jan 2018 to 19 Jan 2018.

3.7m from Exminster.

ROAD WORKSLocation : The M5 northbound exit slip at junction J28 (Cullompton) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 Jan 2018 to 19 Jan 2018.

9.63m from Honiton.

ROAD WORKSLocation : The M5 southbound exit slip at junction J28 (Cullompton) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 09:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 Jan 2018 to 19 Jan 2018.

9.79m from Honiton.

ROAD WORKSLocation : The M5 southbound exit slip at junction J23 (Highbridge) .
Lane Closures : Lane one is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : There is one of two lanes closed.

2.95m from Bridgewater.

ROAD WORKSLocation : The M5 southbound entry slip at junction J23 (Highbridge) .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 17 Jan 2018 to 20 Jan 2018.
Schedule : From 09:30 on 22 Jan 2018 to 15:30 on 22 Jan 2018.
Schedule : From 19:00 on 22 Jan 2018 to 06:00 on 23 Jan 2018.
Schedule : From 09:30 on 23 Jan 2018 to 15:30 on 23 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

2.71m from Bridgewater.

ROAD WORKSLocation : The M5 northbound entry slip at junction J23 (Highbridge) .
Lane Closures : Lane one will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 19:00 and 06:00 from 17 Jan 2018 to 20 Jan 2018.
Schedule : From 09:30 on 22 Jan 2018 to 15:30 on 22 Jan 2018.
Schedule : From 19:00 on 22 Jan 2018 to 06:00 on 23 Jan 2018.
Schedule : From 09:30 on 23 Jan 2018 to 15:30 on 23 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

2.74m from Bridgewater.

ROAD WORKSLocation : The M5 northbound exit slip at junction J23 (Highbridge) .
Lane Closures : Lane one is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : There is one of two lanes closed.

2.52m from Bridgewater.

ROAD WORKSLocation : The A30 eastbound between the junctions with the A38 and the A395 .
Lane Closures : Lane two will be closed.
Reason : Emergency barrier repairs are planned.
Status : Pending.
Schedule : From 09:00 on 17 Jan 2018 to 15:30 on 17 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

8.96m from Liskeard.

ROAD WORKSLocation : The A38 eastbound between the A386 and the junction with the A3121 .
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : All lanes are closed.

2.34m from Plymouth.

ROAD WORKSLocation : The A38 eastbound.
Reason : Roadworks scheme is planned.
Status : Pending.
Schedule : From 19:00 on 22 Jan 2018 to 06:00 on 23 Jan 2018.

2.05m from Buckfastleigh.

ROAD WORKSLocation : The A38 eastbound.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 22 Jan 2018 to 06:00 on 23 Jan 2018.
Lanes Closed : All lanes will be closed.

1.15m from Buckfastleigh.

ROAD WORKSLocation : The A38 eastbound between the junctions with the A385 and the A384 .
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 19:00 on 22 Jan 2018 to 06:00 on 23 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

2.05m from Buckfastleigh.

ROAD WORKSLocation : The M5 southbound entry slip at junction J30 (Exeter) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 Jan 2018 to 27 Jan 2018.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 Jan 2018 to 2 Feb 2018.
Lanes Closed : All lanes will be closed.

2.16m from Exminster.

ROAD WORKSLocation : The M5 northbound entry slip at junction J30 (Exeter) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 Jan 2018 to 27 Jan 2018.
Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 Jan 2018 to 2 Feb 2018.
Lanes Closed : All lanes will be closed.

2.24m from Exminster.

ROAD WORKSLocation : The A30 westbound entry slip from the A375 .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 08:00 and 16:30 from 23 Jan 2018 to 26 Jan 2018.
Schedule : Expect disruption everyday between 08:00 and 16:30 from 29 Jan 2018 to 2 Feb 2018.
Schedule : From 08:00 on 5 Feb 2018 to 16:30 on 5 Feb 2018.
Lanes Closed : All lanes will be closed.

1.07m from Honiton.

ROAD WORKSLocation : The A30 westbound between the junctions with the A377 and the A382 .
Lane Closures : Lane two will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:30 on 17 Jan 2018 to 15:00 on 17 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

5.25m from Crediton.

ROAD WORKSLocation : The A30 eastbound between the junctions with the A382 and the A377 .
Lane Closures : Lane two will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:30 on 17 Jan 2018 to 15:00 on 17 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

6.21m from Crediton.

ROAD WORKSLocation : The M5 northbound between junctions J27 (Barnstaple) and J26 (Wellington) .
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.

8.67m from Bradford.

ROAD WORKSLocation : The A303 eastbound at the junction with the A356 .
Reason : Emergency roadside drains works are planned.
Status : Pending.
Schedule : From 08:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.
Lanes Closed : All lanes will be closed.

5.74m from Ilchester.

ROAD WORKSLocation : The M5 northbound exit slip at junction J28 (Cullompton) .
Lane Closures : Lane one will be closed.
Reason : Emergency roadworks are planned.
Status : Pending.
Schedule : From 08:01 on 17 Jan 2018 to 16:00 on 17 Jan 2018.
Lanes Closed : All lanes will be closed.

9.63m from Honiton.

ROAD WORKSLocation : The M5 southbound entry slip at junction J23 (Highbridge) .
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : All lanes are closed.

2.71m from Bridgewater.

ROAD WORKSLocation : The M5 southbound between junctions J22 (Burnham on Sea) and J23 (Highbridge) .
Lane Closures : Lanes 1, 2 and 3 will be closed.
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 Jan 2018 to 27 Jan 2018.
Lanes Closed : All lanes will be closed.

3.08m from Bridgewater.

ROAD WORKSLocation : The M5 northbound entry slip at junction J23 (Highbridge) .
Reason : Road repairs are planned.
Status : Pending.
Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 Jan 2018 to 27 Jan 2018.
Lanes Closed : All lanes will be closed.

2.74m from Bridgewater.

ROAD WORKSLocation : The A30 westbound between the junctions with the A395 and the A389 Bodmin North.
Lane Closures : Lane one will be closed.
Reason : Roadworks are planned.
Status : Pending.
Schedule : Expect disruption everyday between 09:00 and 16:00 from 17 Jan 2018 to 18 Jan 2018.
Lanes Closed : There will be one of two lanes closed.

7.93m from Bodmin.

ROAD WORKSLocation : The A38 eastbound between the A386 and the junction with the A374 Plymouth.
Reason : Roadworks scheme is planned.
Status : Pending.
Schedule : From 19:00 on 18 Jan 2018 to 06:00 on 19 Jan 2018.

0.34m from Plymouth.

ROAD WORKSLocation : The A38 eastbound.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 Jan 2018 to 06:00 on 24 Jan 2018.
Lanes Closed : All lanes will be closed.

0.69m from Ashburton.

ROAD WORKSLocation : The A38 eastbound.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 Jan 2018 to 06:00 on 24 Jan 2018.
Lanes Closed : All lanes will be closed.

0.39m from Ashburton.

ROAD WORKSLocation : The A38 eastbound.
Reason : Roadworks scheme is planned.
Status : Pending.
Schedule : From 20:00 on 23 Jan 2018 to 06:00 on 24 Jan 2018.

0.39m from Ashburton.

ROAD WORKSLocation : The A38 eastbound.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 23 Jan 2018 to 06:00 on 24 Jan 2018.
Lanes Closed : All lanes will be closed.

0.74m from Ashburton.

ROAD WORKSLocation : The M5 southbound between junctions J24 (Bridgwater) and J25 (Taunton) .
Lane Closures : The hard shoulder is closed.
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 12:30 on 31 Jan 2018.

3.04m from Taunton.

ROAD WORKSLocation : The M5 southbound between junctions J30 (Exeter) and J31 (Bodmin) .
Lane Closures : The hard shoulder is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 12:00 on 29 Jun 2018.

0.26m from Exminster.

ROAD WORKSLocation : The M5 northbound between junctions J31 (Bodmin) and J30 (Exeter) .
Lane Closures : The hard shoulder is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 12:00 on 29 Jun 2018.

0.46m from Exminster.

ROAD WORKSLocation : The A38 eastbound between the A386 and the junction with the A374 Plymouth.
Reason : Roadworks scheme.
Status : Currently Active.
Period : from 19:10 on 15 Jan 2018 to 06:00 on 17 Jan 2018.

0.34m from Plymouth.

ROAD WORKSLocation : The M5 southbound between junctions J24 (Bridgwater) and J25 (Taunton) .
Lane Closures : Lane three is closed.
Reason : Emergency barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : There is one of three lanes closed.

2.25m from Taunton.

ROAD WORKSLocation : The M5 northbound between junctions J25 (Taunton) and J24 (Bridgwater) .
Lane Closures : Lane three is closed.
Reason : Emergency barrier repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : There is one of three lanes closed.

1.78m from Taunton.

ROAD WORKSLocation : The A30 eastbound between the A38 and the junction with the A395 .
Lane Closures : Lane one is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 19:00 on 16 Mar 2018.
Lanes Closed : There is one of two lanes closed.

4.63m from Bodmin.

CONGESTIONLocation : The A30 westbound between the junctions with the A395 and the A389 Bodmin North.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 03:15 and 03:30 on 17 Jan 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

5.35m from Bodmin.

ROAD WORKSLocation : The A30 eastbound between the A39 and the junction with the A395 Bodmin North.
Reason : Roadworks are planned.
Status : Pending.
Schedule : From 20:00 on 16 Feb 2018 to 06:00 on 17 Feb 2018.
Lanes Closed : All lanes will be closed.

3.35m from Bodmin.

ROAD WORKSLocation : The A38 eastbound between the A386 and the junction with the A374 Plymouth.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : All lanes are closed.

1.53m from Plymouth.

ROAD WORKSLocation : The M5 northbound exit slip at junction J23 (Highbridge) .
Reason : Road repairs.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : All lanes are closed.

2.56m from Bridgewater.

ROAD WORKSLocation : The A38 eastbound between the junctions with the A388 and the A3064 .
Reason : Roadworks.
Status : Currently Active.
Period : from 20:14 on 16 Jan 2018 to 06:00 on 17 Jan 2018.
Lanes Closed : All lanes are closed.

2.08m from Plymouth.

ROAD WORKSLocation : The M5 northbound exit slip at junction J23 (Highbridge) .
Reason : Roadworks.
Status : Currently Active.
Period : from 20:36 on 16 Jan 2018 to 06:00 on 17 Jan 2018.
Lanes Closed : All lanes are closed.

2.65m from Bridgewater.

ROAD WORKSLocation : The M5 southbound entry slip at junction J23 (Highbridge) .
Reason : Roadworks.
Status : Currently Active.
Period : from 20:56 on 16 Jan 2018 to 06:00 on 17 Jan 2018.
Lanes Closed : All lanes are closed.

2.66m from Bridgewater.

CONGESTIONCLEARED @ 23:38Location : The M5 northbound exit slip at junction J26 (Wellington) .
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 23:30 and 23:45 on 16 Jan 2018.

1.96m from Bradford. CLEARED @ 23:38

CONGESTIONCLEARED @ 21:27Location : The A30 westbound between the junctions with the A395 and the A389 Bodmin North.
Reason : Congestion.
Status : Currently Active.
Return To Normal : Normal traffic conditions are expected between 21:15 and 21:30 on 16 Jan 2018.
Delay : There are currently delays of 10 minutes against expected traffic.

5.35m from Bodmin. CLEARED @ 21:27

ACCIDENTCLEARED @ 22:48Location : The M5 northbound between junctions J29 (Honiton) and J28 (Cullompton) .
Lane Closures : The hard shoulder, lanes 1 and 2 are closed.
Reason : Road traffic collision.
Status : Currently Active.
Time To Clear : The event is expected to clear between 00:15 and 00:30 on 17 Jan 2018.
Return To Normal : Normal traffic conditions are expected between 00:15 and 00:30 on 17 Jan 2018.
Lanes Closed : There are two of three lanes closed.

9.65m from Honiton. CLEARED @ 22:48

ROAD WORKSCLEARED @ 00:56Location : The A30 westbound exit slip to the A377 .
Lane Closures : Lane two is closed.
Reason : Roadworks.
Status : Currently Active.
Period : expect disruption until 06:00 on 17 Jan 2018.
Lanes Closed : There is one of two lanes closed.

0.42m from Exeter. CLEARED @ 00:56

Devon Roadworks

Your Traffic Comments

Let's Get Social

Get in touch with us or stay up to date with our latest news and updates.

Follow us on Facebook See Traffic Update on Twitter See our Pinterest Images View our Blog

Live Email Traffic Alerts

Get live email alerts whenever there is a traffic incident or roadworks on the roads you travel that may cause congestion or jams.

Sign up for free alerts

LEGAL NOTICE

Please remember that it is against the law to use your mobile phone without a hands-free kit whilst driving. If you're caught by the police driving whilst using a hand-held phone you'll get an automatic fixed penalty notice, 6 points on your licence and a fine of £200. A court could also disqualify you from driving.

Elsewhere on the web

Highways Agency TrafficHighways England

Official source of traffic updates.

The AA Route PlannerThe AA

AA road and motorway traffic news and route planner.

Traffic CymruTraffic Cymru

The Welsh government's traffic information service for Wales.

Traffic ScotlandTraffic Scotland

Live traffic conditions and news for Scotland's road network.

Advertise on Traffic UpdateYOUR AD HERE

Advertise to millions of motorists, holidaymakers and commuters.

Location : southbound entry slip at junction J23 (Highbridge) .

Reason : Roadworks.

Status : Currently Active.

Period : from 20:56 on 16 January 2018 to 06:00 on 17 January 2018.

Lanes Closed : All lanes are closed.

2.66m from Bridgewater.

51.17--2.98

Location : northbound exit slip at junction J23 (Highbridge) .

Reason : Roadworks.

Status : Currently Active.

Period : from 20:36 on 16 January 2018 to 06:00 on 17 January 2018.

Lanes Closed : All lanes are closed.

2.65m from Bridgewater.

51.17--2.98

Location : eastbound between the junctions with the A388 and the A3064 .

Reason : Roadworks.

Status : Currently Active.

Period : from 20:14 on 16 January 2018 to 06:00 on 17 January 2018.

Lanes Closed : All lanes are closed.

2.08m from Plymouth.

50.41--4.18

Location : northbound exit slip at junction J23 (Highbridge) .

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : All lanes are closed.

2.56m from Bridgewater.

51.16--2.98

Location : eastbound between the A386 and the junction with the A374 Plymouth.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : All lanes are closed.

1.53m from Plymouth.

50.4--4.1

Location : eastbound between the A39 and the junction with the A395 Bodmin North.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 16 February 2018 to 06:00 on 17 February 2018.

Lanes Closed : All lanes will be closed.

3.35m from Bodmin.

50.43--4.78

Location : westbound between the junctions with the A395 and the A389 Bodmin North.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 03:15 and 03:30 on 17 January 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

5.35m from Bodmin.

50.52--4.64

CLEARED @ 23:38Location : northbound exit slip at junction J26 (Wellington) .

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 23:30 and 23:45 on 16 January 2018.

1.96m from Bradford.

50.97--3.2

CLEARED @ 21:27Location : westbound between the junctions with the A395 and the A389 Bodmin North.

Reason : Congestion.

Status : Currently Active.

Return To Normal : Normal traffic conditions are expected between 21:15 and 21:30 on 16 January 2018.

Delay : There are currently delays of 10 minutes against expected traffic.

5.35m from Bodmin.

50.52--4.64

CLEARED @ 22:48Location : northbound between junctions J29 (Honiton) and J28 (Cullompton) .

Lane Closures : The hard shoulder, lanes 1 and 2 are closed.

Reason : Road traffic collision.

Status : Currently Active.

Time To Clear : The event is expected to clear between 00:15 and 00:30 on 17 January 2018.

Return To Normal : Normal traffic conditions are expected between 00:15 and 00:30 on 17 January 2018.

Lanes Closed : There are two of three lanes closed.

9.65m from Honiton.

50.83--3.4

Location : eastbound between the A38 and the junction with the A395 .

Lane Closures : Lane one is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 19:00 on 16 March 2018.

Lanes Closed : There is one of two lanes closed.

4.63m from Bodmin.

50.51--4.65

Location : northbound between junctions J25 (Taunton) and J24 (Bridgwater) .

Lane Closures : Lane three is closed.

Reason : Emergency barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : There is one of three lanes closed.

1.78m from Taunton.

51.02--3.06

Location : southbound between junctions J24 (Bridgwater) and J25 (Taunton) .

Lane Closures : Lane three is closed.

Reason : Emergency barrier repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : There is one of three lanes closed.

2.25m from Taunton.

51.03--3.05

Location : eastbound between the A386 and the junction with the A374 Plymouth.

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 19:10 on 15 January 2018 to 06:00 on 17 January 2018.

0.34m from Plymouth.

50.4--4.13

Location : northbound between junctions J31 (Bodmin) and J30 (Exeter) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 12:00 on 29 June 2018.

0.46m from Exminster.

50.69--3.49

Location : southbound between junctions J30 (Exeter) and J31 (Bodmin) .

Lane Closures : The hard shoulder is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 12:00 on 29 June 2018.

0.26m from Exminster.

50.69--3.49

Location : southbound between junctions J24 (Bridgwater) and J25 (Taunton) .

Lane Closures : The hard shoulder is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 12:30 on 31 January 2018.

3.04m from Taunton.

51.04--3.04

Strong winds are forecast to continue today and into Wednesday affecting north and west facing coasts.

The wind will strengthen Wednesday evening with gusts potentially reaching 70 mph by around 21:00.

These strong winds will continue through the night until easing slightly around 06:00 on Thursday morning.

There is a risk of large waves and sea spray overtopping seawalls at high tide.

The risk is likely to remain during Thursday and possible into Friday 19 January.The time and date of the first forecast high water is 18:30 tonight, 16/01/2018.

The forecast tide level is 5.17 m AOD.

The forecast wind strength and direction is Force 7 West North West.

The time and date of the second forecast high water is 07:00 on 17/01/2018.

The forecast tide level is 5.04 m AOD.

The forecast wind strength and direction is Force 7 West North West.

Please note all tide times are in local time and are using the 24 hour clock and refer to the high water time at Hinkley Point.

5.71m from Minehead.

51.22--3.61

Location : eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 January 2018 to 06:00 on 24 January 2018.

Lanes Closed : All lanes will be closed.

0.74m from Ashburton.

50.51--3.76

Location : eastbound.

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 20:00 on 23 January 2018 to 06:00 on 24 January 2018.

0.39m from Ashburton.

50.52--3.74

Location : eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 January 2018 to 06:00 on 24 January 2018.

Lanes Closed : All lanes will be closed.

0.39m from Ashburton.

50.52--3.74

Location : eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 January 2018 to 06:00 on 24 January 2018.

Lanes Closed : All lanes will be closed.

0.69m from Ashburton.

50.51--3.76

Location : eastbound between the A386 and the junction with the A374 Plymouth.

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 19:00 on 18 January 2018 to 06:00 on 19 January 2018.

0.34m from Plymouth.

50.4--4.13

Location : westbound between the junctions with the A395 and the A389 Bodmin North.

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 17 January 2018 to 18 January 2018.

Lanes Closed : There will be one of two lanes closed.

7.93m from Bodmin.

50.54--4.59

Location : northbound entry slip at junction J23 (Highbridge) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 January 2018 to 27 January 2018.

Lanes Closed : All lanes will be closed.

2.74m from Bridgewater.

51.17--2.98

Location : southbound between junctions J22 (Burnham on Sea) and J23 (Highbridge) .

Lane Closures : Lanes 1, 2 and 3 will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 06:00 from 24 January 2018 to 27 January 2018.

Lanes Closed : All lanes will be closed.

3.08m from Bridgewater.

51.17--2.98

Location : southbound entry slip at junction J23 (Highbridge) .

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : All lanes are closed.

2.71m from Bridgewater.

51.17--2.98

Location : northbound exit slip at junction J28 (Cullompton) .

Lane Closures : Lane one will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 08:01 on 17 January 2018 to 16:00 on 17 January 2018.

Lanes Closed : All lanes will be closed.

9.63m from Honiton.

50.86--3.38

Location : eastbound at the junction with the A356 .

Reason : Emergency roadside drains works are planned.

Status : Pending.

Schedule : From 08:01 on 17 January 2018 to 16:00 on 17 January 2018.

Lanes Closed : All lanes will be closed.

5.74m from Ilchester.

50.95--2.77

Location : northbound between junctions J27 (Barnstaple) and J26 (Wellington) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 08:01 on 17 January 2018 to 16:00 on 17 January 2018.

8.67m from Bradford.

50.93--3.34

Location : eastbound between the junctions with the A382 and the A377 .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 08:30 on 17 January 2018 to 15:00 on 17 January 2018.

Lanes Closed : There will be one of two lanes closed.

6.21m from Crediton.

50.73--3.76

Location : westbound between the junctions with the A377 and the A382 .

Lane Closures : Lane two will be closed.

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 08:30 on 17 January 2018 to 15:00 on 17 January 2018.

Lanes Closed : There will be one of two lanes closed.

5.25m from Crediton.

50.73--3.74

Location : westbound entry slip from the A375 .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 08:00 and 16:30 from 23 January 2018 to 26 January 2018.

Schedule : Expect disruption everyday between 08:00 and 16:30 from 29 January 2018 to 2 February 2018.

Schedule : From 08:00 on 5 February 2018 to 16:30 on 5 February 2018.

Lanes Closed : All lanes will be closed.

1.07m from Honiton.

50.79--3.21

Location : northbound entry slip at junction J30 (Exeter) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 January 2018 to 27 January 2018.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 January 2018 to 2 February 2018.

Lanes Closed : All lanes will be closed.

2.24m from Exminster.

50.71--3.46

Location : southbound entry slip at junction J30 (Exeter) .

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 22 January 2018 to 27 January 2018.

Schedule : Expect disruption everyday between 20:00 and 05:00 from 29 January 2018 to 2 February 2018.

Lanes Closed : All lanes will be closed.

2.16m from Exminster.

50.71--3.46

Location : eastbound between the junctions with the A385 and the A384 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 19:00 on 22 January 2018 to 06:00 on 23 January 2018.

Lanes Closed : There will be one of two lanes closed.

2.05m from Buckfastleigh.

50.45--3.79

Location : eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 22 January 2018 to 06:00 on 23 January 2018.

Lanes Closed : All lanes will be closed.

1.15m from Buckfastleigh.

50.47--3.79

Location : eastbound.

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 19:00 on 22 January 2018 to 06:00 on 23 January 2018.

2.05m from Buckfastleigh.

50.45--3.79

Location : eastbound between the A386 and the junction with the A3121 .

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : All lanes are closed.

2.34m from Plymouth.

50.39--4.09

Location : eastbound between the junctions with the A38 and the A395 .

Lane Closures : Lane two will be closed.

Reason : Emergency barrier repairs are planned.

Status : Pending.

Schedule : From 09:00 on 17 January 2018 to 15:30 on 17 January 2018.

Lanes Closed : There will be one of two lanes closed.

8.96m from Liskeard.

50.57--4.56

Location : northbound exit slip at junction J23 (Highbridge) .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : There is one of two lanes closed.

2.52m from Bridgewater.

51.16--2.98

Location : northbound entry slip at junction J23 (Highbridge) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 19:00 and 06:00 from 17 January 2018 to 20 January 2018.

Schedule : From 09:30 on 22 January 2018 to 15:30 on 22 January 2018.

Schedule : From 19:00 on 22 January 2018 to 06:00 on 23 January 2018.

Schedule : From 09:30 on 23 January 2018 to 15:30 on 23 January 2018.

Lanes Closed : There will be one of two lanes closed.

2.74m from Bridgewater.

51.17--2.98

Location : southbound entry slip at junction J23 (Highbridge) .

Lane Closures : Lane one will be closed.

Reason : Road repairs are planned.

Status : Pending.

Schedule : Expect disruption everyday between 19:00 and 06:00 from 17 January 2018 to 20 January 2018.

Schedule : From 09:30 on 22 January 2018 to 15:30 on 22 January 2018.

Schedule : From 19:00 on 22 January 2018 to 06:00 on 23 January 2018.

Schedule : From 09:30 on 23 January 2018 to 15:30 on 23 January 2018.

Lanes Closed : There will be one of two lanes closed.

2.71m from Bridgewater.

51.17--2.98

Location : southbound exit slip at junction J23 (Highbridge) .

Lane Closures : Lane one is closed.

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : There is one of two lanes closed.

2.95m from Bridgewater.

51.17--2.98

Location : southbound exit slip at junction J28 (Cullompton) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 09:01 on 17 January 2018 to 16:00 on 17 January 2018.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 January 2018 to 19 January 2018.

9.79m from Honiton.

50.86--3.38

Location : northbound exit slip at junction J28 (Cullompton) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 09:01 on 17 January 2018 to 16:00 on 17 January 2018.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 January 2018 to 19 January 2018.

9.63m from Honiton.

50.86--3.38

Location : northbound between junctions J29 (Honiton) and J27 (Barnstaple) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 09:01 on 17 January 2018 to 16:00 on 17 January 2018.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 January 2018 to 19 January 2018.

3.7m from Exminster.

50.74--3.46

Location : northbound entry slip at junction J28 (Cullompton) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 09:01 on 17 January 2018 to 16:00 on 17 January 2018.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 January 2018 to 19 January 2018.

9.74m from Honiton.

50.86--3.38

Location : southbound entry slip at junction J28 (Cullompton) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 09:01 on 17 January 2018 to 16:00 on 17 January 2018.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 January 2018 to 19 January 2018.

9.68m from Honiton.

50.86--3.38

Location : southbound between junctions J27 (Barnstaple) and J28 (Cullompton) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 09:01 on 17 January 2018 to 16:00 on 17 January 2018.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 January 2018 to 19 January 2018.

10.29m from Honiton.

50.88--3.38

Location : southbound between junctions J28 (Cullompton) and J29 (Honiton) .

Reason : Emergency roadworks are planned.

Status : Pending.

Schedule : From 09:01 on 17 January 2018 to 16:00 on 17 January 2018.

Schedule : Expect disruption everyday between 09:00 and 16:00 from 18 January 2018 to 19 January 2018.

9.62m from Honiton.

50.86--3.38

Location : eastbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 19 January 2018 to 06:00 on 20 January 2018.

Lanes Closed : All lanes will be closed.

2.15m from Brixton.

50.38--4.02

Location : eastbound between the A374 Plymouth and the junction with the A3121 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 19 January 2018 to 06:00 on 20 January 2018.

Lanes Closed : All lanes will be closed.

1.96m from Brixton.

50.38--4.03

Location : eastbound between the A374 Plymouth and the junction with the A3121 .

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 19:00 on 19 January 2018 to 06:00 on 20 January 2018.

1.95m from Brixton.

50.38--4.05

Location : eastbound between the junctions with the A374 Plymouth and the A3121 .

Lane Closures : Lanes 2 and 3 will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 19:00 on 19 January 2018 to 06:00 on 20 January 2018.

Lanes Closed : There will be two of three lanes closed.

1.95m from Brixton.

50.38--4.05

Location : eastbound between the A39 and the junction with the A391 .

Lane Closures : Lane one is closed.

Reason : Emergency Roadside Drains works.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : There is one of two lanes closed.

6.45m from Bodmin.

50.42--4.85

Location : westbound.

Reason : Roadworks scheme is planned.

Status : Pending.

Schedule : From 19:00 on 18 January 2018 to 06:00 on 19 January 2018.

2.28m from Brixton.

50.38--4.01

Location : westbound between the junctions with the A3121 and the A374 Plymouth.

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 19:00 on 18 January 2018 to 06:00 on 19 January 2018.

Lanes Closed : There will be one of three lanes closed.

2.28m from Brixton.

50.38--4.01

Location : eastbound between the A386 and the junction with the A374 Plymouth.

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 19:00 on 18 January 2018 to 06:00 on 19 January 2018.

Lanes Closed : There will be one of two lanes closed.

0.34m from Plymouth.

50.4--4.13

Location : eastbound exit slip to the A374 Plymouth.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 January 2018 to 06:00 on 19 January 2018.

Lanes Closed : All lanes will be closed.

2.01m from Plymouth.

50.39--4.09

Location : westbound.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 18 January 2018 to 06:00 on 19 January 2018.

Lanes Closed : All lanes will be closed.

2.14m from Brixton.

50.38--4.02

Location : westbound between the junctions with the A3064 and the A388 .

Lane Closures : Lane one will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : Expect disruption everyday between 19:00 and 06:00 from 17 January 2018 to 21 January 2018.

Schedule : From 19:00 on 30 August 2018 to 00:00 on 30 August 2018.

Lanes Closed : There will be one of two lanes closed.

2.34m from Plymouth.

50.41--4.19

Location : westbound between the A3121 and the junction with the A374 Plymouth.

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 19:00 on 17 January 2018 to 06:00 on 18 January 2018.

Lanes Closed : There will be one of two lanes closed.

0.7m from Ivybridge.

50.39--3.93

CLEARED @ 00:56Location : westbound exit slip to the A377 .

Lane Closures : Lane two is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : There is one of two lanes closed.

0.42m from Exeter.

50.7--3.54

Location : eastbound between the junctions with the A39 and the A391 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 19:00 on 16 February 2018 to 06:00 on 17 February 2018.

Lanes Closed : There will be one of two lanes closed.

3.8m from Bodmin.

50.43--4.79

Location : eastbound entry slip from the A391 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 16 February 2018 to 06:00 on 17 February 2018.

Lanes Closed : All lanes will be closed.

3.08m from Bodmin.

50.43--4.77

Location : eastbound between the A391 and the junction with the A395 Bodmin North.

Lane Closures : Lane one is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 20:00 on 16 February 2018.

Lanes Closed : There is one of two lanes closed.

1.63m from Bodmin.

50.45--4.7

Location : eastbound between the A386 and the junction with the A374 Plymouth.

Lane Closures : Lane two is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

Lanes Closed : There is one of two lanes closed.

0.34m from Plymouth.

50.4--4.13

Location : eastbound between the junctions with the A386 and the A382 .

Lane Closures : Lane two will be closed.

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 19:00 on 23 January 2018 to 06:00 on 24 January 2018.

Lanes Closed : There will be one of two lanes closed.

2.82m from Okehampton.

50.71--4.05

Location : eastbound between the A386 and the junction with the A382 .

Lane Closures : Lane one is closed.

Reason : Roadworks.

Status : Currently Active.

Period : expect disruption until 20:00 on 23 January 2018.

Lanes Closed : There is one of two lanes closed.

1.57m from Okehampton.

50.74--3.97

Location : eastbound between the A386 and the junction with the A382 .

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 06:04 on 10 January 2018 to 06:00 on 24 January 2018.

2.82m from Okehampton.

50.71--4.05

Location : eastbound between the A386 and the junction with the A382 .

Reason : Roadworks are planned.

Status : Pending.

Schedule : From 20:00 on 23 January 2018 to 06:00 on 24 January 2018.

Lanes Closed : All lanes will be closed.

2.44m from Okehampton.

50.72--4.05

Location : eastbound between the A39 and the junction with the A395 Bodmin North.

Reason : Roadworks scheme.

Status : Currently Active.

Period : from 19:00 on 8 January 2018 to 06:00 on 17 February 2018.

3.8m from Bodmin.

50.43--4.79

Location : southbound entry slip at junction J23 (Highbridge) .

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

2.71m from Bridgewater.

51.17--2.98

Location : northbound entry slip at junction J23 (Highbridge) .

Reason : Road repairs.

Status : Currently Active.

Period : expect disruption until 06:00 on 17 January 2018.

2.74m from Bridgewater.

51.17--2.98